Loading...
B-2018-0048 - COFO Certificate of Occupancy This Certificate is issued pursuant to the requirements of Section 111.2 of the 2016 California Building Code certifying that at the time of issuance, the portion of this structure described below has been inspected for compliance with the requirements of this code and with the various ordinances of the City regulating building construction for the occupancy and division of occupancy and the use for which the proposed occupancy is classified. Building Permit Number(s): B-2018-0048 Application Date(s): 01-08-2018 Issuance Date(s): 01/10/2020 Address of Building: 21020 Homestead Rd. Scope of Work: (N) BANK BUILDING (4,172 S.F.) Use: Bank Occupancy Classification: B Occ Load: 232 occ Total Floor Area: 4,172 sq.ft. Type of Construction: V-B Fire Sprinklers System: Yes Current Property Owner: Hedong LLC Current Owner Address: 300 Santana Row 5th Floor, San Jose, CA 95128 Final Inspection By: Bob Sabich, Building Inspector Final Inspection Date: 06-03-2020 *SPECIAL STIPULATIONS OR CONDITIONS: None ____________________________________ 07/21/2020 Albert Salvador, P.E., C.B.O., Building Official Date Issued NOTICE/POSTING: No changes shall be made in the character of occupancy. This certificate shall be posted in a conspicuous place on the premises, and shall not be removed except by the auth ority of the Building Official. CofO Application.doc revised 08/08/18 COMPLETE A SEPARATE APPLICATION FOR EACH BUILDING: PROJECT ADDRESS CUPERTINO, CA APN # DATE OWNER NAME PHONE E-MAIL STREET ADDRESS CITY, STATE, ZIP CONTRACTOR NAME PHONE E-MAIL STREET ADDRESS CITY, STATE, ZIP MAIL CERTIFICATE TO: (Please allow up to 10 business days for delivery): CONTACT NAME PHONE E-MAIL STREET ADDRESS CITY, STATE, ZIP LIST ALL BUILDING PERMITS ISSUED FOR PROJECT: PERMIT NUMBER DATE FINALED INSPECTOR SCOPE 1 2 3 4 NOTE: Please attach a copy of BOTH SIDES of the signed inspection job card to this application. -OFFICE USE ONLY - SPECIAL STIPULATIONS OR CONDITIONS: CHECKLIST: Copy of Job Card Attached (both sides)? ________ Permit signed off in system? ________ No other permits open or expired in system? ________ Verification of payment for certification? ________ APPLICATION FOR CERTIFICATE OF OCCUPANCY COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • building@cupertino.org B-2018-0048 06.30.2020 Bob Sabich FINAL BUILDING 21020 Homestead Rd 07/06/2020 egabb@menemshasolutions.com Bank of America 21020 Homestead Rd Cupertino , CA 95014 Tracy.Gessner@am.jll.comTracy Gessner 602-478-9820 602-478-9820 20521 Earl Street Torrance CA 90503 Tracy.Gessner@am.jll.com Ron Caropino 310-560-8634 20521 Earl Street Torrance CA 90503 INSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 21020 HOMESTEAD RD CUPERTINO, CA 95014-0240 CUPERTINO APN: 326 07 020 PERMIT NO: B-2018-0048 OWNER'S NAME: OWNER INFO MISSING FROM RECORD OWNER'S PHONE: 408-252-4451 CONTRACTOR: MENEMSHA DEVELOPMENT GROUP INC, 20521 EARL ST TORRANCE CONTRACTOR PHONE: 310-738-8086 DATE ISSUED 7/2/2020 8:11:33 AM ISSUED BY:VALUATION: $0 JOB DESCRIPTION BANK OF AMERICA - (N) BANK BUILDING (4172 SF) REV #1 - ADD A "WELLNESS ROOM"; ADD EXTERIOR DOOR TO ELECTRICAL ROOM; DETAILS OF THE BANDIT BARRIER" AT THE TELLER LINES-ISSUED 1-10-2020 INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2019-06-13 Failed   FOUNDATION 2019-06-14 Partial   FOUNDATION 2019-06-26 Passed   REINFORCEMENT 2019-06-28 Partial   UNDERFLOOR PLUMBING 2019-06-28 Cancelled   UNDERGROUND ELECTRICAL 2019-05-31 Passed   UNDERGROUND ELECTRICAL 2019-06-21 Partial   UNDERGROUND ELECTRICAL 2019-06-26 Passed   UNDERGROUND SEWER 2019-05-31 Passed   REINFORCEMENT 2019-08-06 Partial Antonio Torrez EXTERIOR SHEAR 2019-08-06 Partial Antonio Torrez ROUGH ELECTRICAL 2019-08-20 Passed Bob Sabich ROUGH FRAME 2019-08-20 Passed Bob Sabich ROUGH PLUMBING 2019-08-20 Partial Bob Sabich DUCT WRAP - 1ST LAYER 2019-08-27 Cancelled Antonio Torrez INSULATION 2019-08-27 Passed Antonio Torrez ROUGH MECHANICAL 2019-08-27 Passed Antonio Torrez SHEETROCK 2019-08-30 CONDITIONAL Paul O'Sullivan SHEETROCK 2019-09-05 CONDITIONAL Antonio Torrez MASONRY/STEEL 2019-09-05 Passed Antonio Torrez EXTERIOR LATH 2019-09-12 Passed Bob Sabich SCRATCH COAT 2019-09-16 Passed Bob Sabich ROUGH ELECTRICAL 2019-10-07 Conditional Bob Sabich FIRE DEPT - SPRINKLERS - ROUGH 2019-10-04 Conditional Santa Clara County Fire FIRE DEPT - SPRINKLERS - ROUGH 2019-10-04 Cancelled Santa Clara County Fire ELECTRIC METER RELEASE 2019-10-11 Passed Paul O'Sullivan SHEETROCK 2019-10-10 Passed Bob Sabich T-BAR 2019-10-24 Conditional Antonio Torrez ROUGH ELECTRICAL 2019-10-24 Passed Antonio Torrez ROUGH MECHANICAL 2019-10-24 Passed Antonio Torrez UNDERGROUND ELECTRICAL 2019-11-08 Conditional Paul O'Sullivan FINAL ELECTRICAL 2019-11-25 Passed Bob Sabich FINAL MECHANICAL 2019-11-25 Passed Bob Sabich FINAL PLUMBING 2019-11-25 Passed Bob Sabich TEMPORARY OCCUPANCY 2019-11-25 Conditional Bob Sabich ROUGH PLUMBING 2019-11-25 Passed Bob Sabich FIRE DEPT - ALARM FINAL 2019-11-27 Conditional Santa Clara County Fire FIRE DEPT - TCO 2019-11-27 Conditional Santa Clara County Fire FIRE DEPT - SPRINKLERS - FINAL 2019-11-27 Conditional Santa Clara County Fire TEMPORARY OCCUPANCY 2019-11-27 Conditional Bob Sabich GAS METER RELEASE 2019-12-17 Passed Bob Sabich GAS TEST 2019-12-17 Passed Bob Sabich GAS TEST 2019-12-17 Passed Bob Sabich PW - DEPARTMENT FINAL 2020-01-29 Passed Kevin Rieden SANITARY - FINAL 2020-01-22 Passed cupsanitary FIRE DEPT - FINAL 2020-01-30 Cancelled Santa Clara County Fire TEMPORARY OCCUPANCY 2020-02-12 Failed Bob Sabich TEMPORARY OCCUPANCY 2020-02-13 Conditional Bob Sabich FIRE DEPT - TCO 2020-02-12 Failed Santa Clara County Fire FIRE DEPT - FINAL 2020-06-22 Passed Santa Clara County Fire FINAL BUILDING 2020-06-30 Passed Bob Sabich EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.