B-2018-0048 - COFO
Certificate of Occupancy
This Certificate is issued pursuant to the requirements of Section 111.2 of the 2016 California Building Code certifying that
at the time of issuance, the portion of this structure described below has been inspected for compliance with the
requirements of this code and with the various ordinances of the City regulating building construction for the occupancy
and division of occupancy and the use for which the proposed occupancy is classified.
Building Permit Number(s): B-2018-0048 Application Date(s): 01-08-2018 Issuance Date(s): 01/10/2020
Address of Building: 21020 Homestead Rd.
Scope of Work: (N) BANK BUILDING (4,172 S.F.)
Use: Bank Occupancy Classification: B Occ Load: 232 occ
Total Floor Area: 4,172 sq.ft. Type of Construction: V-B Fire Sprinklers System: Yes
Current Property Owner: Hedong LLC
Current Owner Address: 300 Santana Row 5th Floor, San Jose, CA 95128
Final Inspection By: Bob Sabich, Building Inspector
Final Inspection Date: 06-03-2020
*SPECIAL STIPULATIONS OR CONDITIONS: None
____________________________________ 07/21/2020
Albert Salvador, P.E., C.B.O., Building Official Date Issued
NOTICE/POSTING: No changes shall be made in the character of occupancy. This certificate shall be posted in a conspicuous place on
the premises, and shall not be removed except by the auth ority of the Building Official.
CofO Application.doc revised 08/08/18
COMPLETE A SEPARATE APPLICATION FOR EACH BUILDING:
PROJECT ADDRESS CUPERTINO, CA APN # DATE
OWNER NAME PHONE E-MAIL
STREET ADDRESS CITY, STATE, ZIP
CONTRACTOR NAME PHONE E-MAIL
STREET ADDRESS CITY, STATE, ZIP
MAIL CERTIFICATE TO: (Please allow up to 10 business days for delivery):
CONTACT NAME PHONE E-MAIL
STREET ADDRESS CITY, STATE, ZIP
LIST ALL BUILDING PERMITS ISSUED FOR PROJECT:
PERMIT NUMBER DATE FINALED INSPECTOR SCOPE
1
2
3
4
NOTE: Please attach a copy of BOTH SIDES of the signed inspection job card to this application.
-OFFICE USE ONLY -
SPECIAL STIPULATIONS OR CONDITIONS: CHECKLIST:
Copy of Job Card Attached (both sides)? ________
Permit signed off in system? ________
No other permits open or expired in system? ________
Verification of payment for certification? ________
APPLICATION FOR CERTIFICATE OF OCCUPANCY
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3228 • building@cupertino.org
B-2018-0048 06.30.2020 Bob Sabich FINAL BUILDING
21020 Homestead Rd 07/06/2020
egabb@menemshasolutions.com
Bank of America
21020 Homestead Rd Cupertino , CA 95014
Tracy.Gessner@am.jll.comTracy Gessner
602-478-9820
602-478-9820
20521 Earl Street Torrance CA 90503
Tracy.Gessner@am.jll.com
Ron Caropino 310-560-8634
20521 Earl Street Torrance CA 90503
INSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 21020 HOMESTEAD RD CUPERTINO, CA 95014-0240
CUPERTINO APN: 326 07 020 PERMIT NO: B-2018-0048
OWNER'S NAME: OWNER INFO MISSING FROM RECORD OWNER'S PHONE: 408-252-4451
CONTRACTOR: MENEMSHA DEVELOPMENT GROUP INC, 20521 EARL ST TORRANCE CONTRACTOR PHONE: 310-738-8086
DATE ISSUED 7/2/2020 8:11:33 AM ISSUED BY:VALUATION: $0
JOB DESCRIPTION
BANK OF AMERICA - (N) BANK BUILDING (4172 SF) REV #1 - ADD A "WELLNESS ROOM"; ADD EXTERIOR DOOR TO ELECTRICAL ROOM; DETAILS OF THE BANDIT BARRIER" AT THE TELLER
LINES-ISSUED 1-10-2020
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2019-06-13 Failed
FOUNDATION 2019-06-14 Partial
FOUNDATION 2019-06-26 Passed
REINFORCEMENT 2019-06-28 Partial
UNDERFLOOR PLUMBING 2019-06-28 Cancelled
UNDERGROUND ELECTRICAL 2019-05-31 Passed
UNDERGROUND ELECTRICAL 2019-06-21 Partial
UNDERGROUND ELECTRICAL 2019-06-26 Passed
UNDERGROUND SEWER 2019-05-31 Passed
REINFORCEMENT 2019-08-06 Partial Antonio Torrez
EXTERIOR SHEAR 2019-08-06 Partial Antonio Torrez
ROUGH ELECTRICAL 2019-08-20 Passed Bob Sabich
ROUGH FRAME 2019-08-20 Passed Bob Sabich
ROUGH PLUMBING 2019-08-20 Partial Bob Sabich
DUCT WRAP - 1ST LAYER 2019-08-27 Cancelled Antonio Torrez
INSULATION 2019-08-27 Passed Antonio Torrez
ROUGH MECHANICAL 2019-08-27 Passed Antonio Torrez
SHEETROCK 2019-08-30 CONDITIONAL Paul O'Sullivan
SHEETROCK 2019-09-05 CONDITIONAL Antonio Torrez
MASONRY/STEEL 2019-09-05 Passed Antonio Torrez
EXTERIOR LATH 2019-09-12 Passed Bob Sabich
SCRATCH COAT 2019-09-16 Passed Bob Sabich
ROUGH ELECTRICAL 2019-10-07 Conditional Bob Sabich
FIRE DEPT - SPRINKLERS - ROUGH 2019-10-04 Conditional Santa Clara County Fire
FIRE DEPT - SPRINKLERS - ROUGH 2019-10-04 Cancelled Santa Clara County Fire
ELECTRIC METER RELEASE 2019-10-11 Passed Paul O'Sullivan
SHEETROCK 2019-10-10 Passed Bob Sabich
T-BAR 2019-10-24 Conditional Antonio Torrez
ROUGH ELECTRICAL 2019-10-24 Passed Antonio Torrez
ROUGH MECHANICAL 2019-10-24 Passed Antonio Torrez
UNDERGROUND ELECTRICAL 2019-11-08 Conditional Paul O'Sullivan
FINAL ELECTRICAL 2019-11-25 Passed Bob Sabich
FINAL MECHANICAL 2019-11-25 Passed Bob Sabich
FINAL PLUMBING 2019-11-25 Passed Bob Sabich
TEMPORARY OCCUPANCY 2019-11-25 Conditional Bob Sabich
ROUGH PLUMBING 2019-11-25 Passed Bob Sabich
FIRE DEPT - ALARM FINAL 2019-11-27 Conditional Santa Clara County Fire
FIRE DEPT - TCO 2019-11-27 Conditional Santa Clara County Fire
FIRE DEPT - SPRINKLERS - FINAL 2019-11-27 Conditional Santa Clara County Fire
TEMPORARY OCCUPANCY 2019-11-27 Conditional Bob Sabich
GAS METER RELEASE 2019-12-17 Passed Bob Sabich
GAS TEST 2019-12-17 Passed Bob Sabich
GAS TEST 2019-12-17 Passed Bob Sabich
PW - DEPARTMENT FINAL 2020-01-29 Passed Kevin Rieden
SANITARY - FINAL 2020-01-22 Passed cupsanitary
FIRE DEPT - FINAL 2020-01-30 Cancelled Santa Clara County Fire
TEMPORARY OCCUPANCY 2020-02-12 Failed Bob Sabich
TEMPORARY OCCUPANCY 2020-02-13 Conditional Bob Sabich
FIRE DEPT - TCO 2020-02-12 Failed Santa Clara County Fire
FIRE DEPT - FINAL 2020-06-22 Passed Santa Clara County Fire
FINAL BUILDING 2020-06-30 Passed Bob Sabich
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.