Reso 1893 24-TM-78
•
; RESOLUTION NO. 1893
• OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO
RECOMENDING APPROVAL OF A TENTATIVE MAP TO DIVIDE A
411 30,000 SQ. FT. PARCEL (APPROXIMATELY .7 OF AN ACRE)
INTO TWO PARCELS CONSISTING OF APPROXIMATELY 11,000
SQ FT. AND 19 ,000 SQ. FT. EACH.
APPLICANT: James C. Scott
ADDRESS : 10280 Scenic Boulevard, Cupertino, California 95014
SUBMITTED: September 7, 1978
LOCATION: East side of Scenic Boulevard approximately 200 ft. southerly of the
intersection with Carmen Road.
Approval is recommended subject to the findings as set forth on Page- 1 and
subconclusions as set forth in the minutes of the Planning Commission meeting
of October 9, 1978.
CONDITIONS:
1- 14. Standard Conditions to the extent that they do not conflict with the
special conditions enumerated herein. In the event a conflict does
exist, the special conditions enumerated herein shall apply.
15. That the approval is based upon Exhibit A of Application 24-TM-78 as
may be modified by additional conditions contained herein.
16. If the applicant intends to utilize the existing asphalt pavement for
access to both Parcel A and Parcel B it will be necessary to record a
reciprocal ingress/egress easement.
17. The garage and lanai shall be removed and the abandoned pool filled in or
removed subject to the approval of the Chief Building Inspector prior to
filing of the final map.
• 18. The property line shall be adjusted slightly to ensure that it is located
a minimum of 3 ft. from the westerly most roof overhang or wall of the
guest house on Parcel B. The guest house is considered an accessory structure
and is not permitted any cooking facilities. The guest house structure
shall be inspected and brought up to standards of the uniform building code
prior to any form of occupancy or at the time of application for building
permits for the main structure on Parcel B whichever comes first.
19. The applicant shall provide separate sewer, water and electrical connections
for both parcels and shall remove or fill in any septic systems presently
serving either Parcel A'or Parcel B prior to ' filing of the final parcel map
subject to the approval of the Santa Clara County Health Department. Also,
the final'map shall reflect any easements or sanitary sewer or water lines
to Parcel B.
-2-
R
CITY OF CUPERTINO
411
City Hall, 10300 Torre Avenue
Cupertino, California 95014
Telephone: (408) 2,52-4505
RESOLUTION OF THE .PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING
THE APPROVAL OF A TENTATIVE MAP
WHEREAS, the attached application has been submitted to the City of Cupertino
requesting approval of a tentative map; and
WHEREAS, the Planning Commission has held ' at least one public hearing in
regard to the application; and
WHEREAS, the Planning Commission has duly, considered and heard all evidence
submitted in regard to said application; and
WHEREAS, the necessary public notices have been given as required by the
subdivision and procedural ordinances of the City of Cupertino.
NOW, THEREFORE, BE IT RESOLVED:
1. That the Planning Commission makes the following findings :
a) That the proposed map is consistent with the general and specific
plans.
b) That the design or improvement of the proposed subdivision is
I consistent with the general and specific plans.
c) That the site is physically suitable for the type of development.
d) That the site is physically suitable for the proposed density of
development.
e) That the design of the subdivision or the proposed improvements are
not likely to cause substantial environmental damage or substantially
and avoidably injure fish or wildlife or their habitat.
f) That the design of the subdivision or the type of improvements are
not likely to cause serious public health problems.
g) That the design of the subdivision or the type of improvements will
not conflict with easements, acqui' ed by the public at large, for
access through or use of, property within the proposed subdivision.
110
-1-
24-T'i-78
•
Planning Conmiiss-ion Resolution No. 1893 (continued)
410
20. A soil and foundation investigation should he completed for Parcel B
prior to any additional development . Of primary concern is the
determination of a safe setback distance from the edge of the steep
cliff face located along the eastern edge of the parcel .
PASSED AND ADOPTED this 9th day of October, 1978, at a regular meeting of the
Planning Commission of the City of Cupertino , State of California, by the
following roll call vote:
AYES : Commissioners Adams , Claudy, Gatto, Koenitzer, Chairperson Blaine
NAYS : None
ABSTAIN: None
ABSENT: None
APPROVED:
/s/ Sharon Blaine
Sharon Blaine, Chairperson
Planning Commission
® ATTEST:
•
CtaA.A21.A
Robert Cowan
Assistant Planning Director
•
•
•
—3—