Loading...
Reso 6891 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6891 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING ADOPTION OF A MITIGATED NEGATIVE DECLARATION, MITIGATION MEASURES, AND A MITIGATION MONITORING AND REPORTING PROGRAM FOR THE DEVELOPMENT OF A NEW SEVEN (7) STORY, 155 ROOM HOTEL WITH ASSOCIATED IMPROVEMENTS LOCATED AT 10931 NORTH DE ANZA BLVD. (APN: 326-10-061) The Planning Commission recommends that the City Council adopt the Mitigated Negative Declaration, mitigation measures, and Mitigation Monitoring and Reporting Program, in substantially similar form to the Draft Resolution attached hereto as Exhibit EA. PASSED AND ADOPTED at a Regular Meeting of the Planning Commission of the City of Cupertino the 10th day of December 2019, by the following roll call vote: AYES: COMMISSIONERS: Chair Wang, Moore, Fung, Takahashi g g NOES: COMMISSIONERS: none ABSTAIN: COMMISSIONERS: none ABSENT: COMMISSIONERS: Vice Chair Saxena ATTEST: APPROVED. Age Benjamin Fu R " ay" Dir. of Community Development Chair, Planning Commission 1 EXHIBIT EA RESOLUTION NO. A RESOLUTION OF THE CUPERTIsNO GITY COUNCIL ADOPTING A MITIGATED NEGATIVE DE(i ARATIOI\L,.MITIGATION MEASURES, AND A MITIGATION MONITORING AND REPORTING PROGRAM FOR THE DEVELOPMENT OF A NEW SEVEN (7) STORY, 155 ROOM HOTEL WITH ASSOCIATED IMPROVEMENTS LOCATED AT 10931 NORTH DE ANZA BLVD. (APN: 326-10-061) SECTION I: PROJECT DESCRIPTION Application No.: EA-2018-03 Applicant: De Anza Properties (Sherly Kwok) Property Owner: Northwest Properties, LP Location: 10931 N De Anza Blvd. (APN #326-10-061) SECTION II: ENVIRONMENTAL REVIEW PROCESS WHEREAS, the City of Cupertino received an application on March 20,2018 for a General Plan Amendment,Development Permit,Development Agreement,Architectural and Site Approval Permit, and Use Permit, to allow the development of a new 7-story, 155 room hotel with associated site and landscaping improvements, and associated environmental review ("Project"); and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code Section 21000 et seq.) ("CEQA") and the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) ("CEQA Guidelines"), the City prepared an Initial Study and proposed Mitigated Negative Declaration (State Clearinghouse No. 2019079010) ("IS/MND") for the De Anza Hotel Project ("Project"); and WHEREAS, the Project is described in the July 2, 2019 "Public Draft Initial Study for The De Anza Hotel Project ("Draft IS/MND"); and WHEREAS, on June 28, 2019 the City issued a Notice of Intent to Adopt a Mitigated Negative Declaration; and WHEREAS, on June 28, 2019 the IS/MND for the project was distributed to responsible agencies and the public for review and comment for a 30-day period that ended July 29, 2019; and WHEREAS, the IS/MND concluded that significant environmental effects on Air Quality, Biological Resources, Cultural Resources, Geology and Soils, Greenhouse Gas Emissions, 2 Noise, Tribal Cultural Resources, and Utilities and Service Systems would be avoided or reduced to less-than-significant levels by mitigation measures ("MM") identified in the IS/MND; and WHEREAS, on August 1, 2019, the City of Cupertino's Environmental Review Committee held a duly noticed public hearing to receive public testimony and reviewed and considered the information contained in the Draft IS/MND, and voted 5-0-0 to recommend that the City Council adopt the Draft IS/MND (EA-2018-03) and mitigation measures; and WHEREAS, the Planning Commission independently reviewed and considered the IS/MND together with the comments and the responses to those comments prior to taking action on the Project; and WHEREAS, the comments received by the Planning Commission do not require major revisions to the IS/MND due to new or substantially more severe significant effects on the environment; and WHEREAS, text revisions made after publication of the Draft IS/MND, which are found in the December [#], 2019 [Final — INSERT CORRECT TITLE] IS/MND, merely clarify, amplify or make insignificant modifications to the IS/MND, and recirculation of the IS/MND is not required. WHEREAS, on December 10, 2019, the Planning Commission held a duly noticed public hearing to receive staff's presentation and public testimony, and to consider the information contained in the IS/MND along with all staff reports, other pertinent documents, and all written and oral statements received prior to and at the public hearing, and recommended on a xx-xx vote, based on substantial evidence in the record, that the City Council adopt the MND, adopt and incorporate into the Project and implement as conditions of approval all of the mitigation measures for the project that are identified in the IS/MND, and adopt the Mitigation Monitoring and Reporting Program for the Project; and WHEREAS, the City Council has independently reviewed and considered the IS/MND together with the comments and the responses to those comments prior to taking action on the Project; and WHEREAS, the comments received by the City Council do not require major revisions to the IS/MND due to new or substantially more severe significant effects on the environment; and WHEREAS, on January 21, 2020 prior to taking action on the Project, the City Council held a duly noticed public hearing to receive staff's presentation and public testimony, 3 and to further consider the information contained in the IS/MND, along with all staff reports, other pertinent documents, and all written and oral statements received prior to and at the public hearing. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the IS/MND, comments on the IS/MND, maps, facts, exhibits, testimony, staff reports, public comments, and other evidence submitted in this matter, the City Council: 1. Finds that the IS/MND for the Project has been completed in compliance with CEQA and reflects the independent judgment and analysis of the City. 2. Finds that, on the basis of the whole record before it, there is no substantial evidence that the Project as proposed and mitigated will have a significant effect on the environment. 3. Finds that the text revisions to the IS/MND merely clarify, amplify or make insignificant modifications to the IS/MND; therefore, recirculation of the IS/MND is not required. 4. Adopts the Mitigated Negative Declaration for the Project. 5. Adopts and incorporates into the Project all of the mitigation measures identified in the IS/MND. The City Council further makes the mitigation measures, which are listed below, required conditions of approval of the Project to the extent they are within the responsibility and jurisdiction of the City: a. AIR QUALITY Mitigation Measure AQ-1: The project's construction contractor shall comply with the following Bay Area Air Quality Management District best management practices for reducing construction emissions of fugitive dust (PMio and PM2.5): • Water all active construction areas at least twice daily, or as often as needed to control dust emissions. Watering should be sufficient to prevent airborne dust from leaving the site. Increased watering frequency may be necessary whenever wind speeds exceed 15 miles per hour. Reclaimed water should be used whenever possible. • Pave, apply water twice daily or as often as necessary to control dust, or apply (non-toxic) soil stabilizers on all unpaved access roads, parking areas, and staging areas at construction sites. • Cover all trucks hauling soil, sand, and other loose materials or require all trucks to maintain at least 2 feet of freeboard (i.e., the minimum required space between the top of the load and the top of the trailer). 4 • Sweep daily(with water sweepers using reclaimed water if possible)or as often as needed all paved access roads, parking areas and staging areas at the construction site to control dust. • Sweep public streets daily (with water sweepers using reclaimed water if possible) in the vicinity of the project site, or as often as needed, to keep streets free of visible soil material. • Hydroseed or apply non-toxic soil stabilizers to inactive construction areas. • Enclose, cover, water twice daily, or apply non-toxic soil binders to exposed stockpiles (dirt/sand). • Limit vehicle traffic speeds on unpaved roads to 15 miles per hour. • Replant vegetation in disturbed areas as quickly as possible. • Install sandbags or other erosion control measures to prevent silt runoff from public roadways. Mitigation Measure AQ-2: Prior to issuance of any grading, demolition and/or building permits, the construction contractor(s) shall demonstrate the following, during construction, on all plans: • The use of construction equipment fitted with Level 3 Diesel Particulate Filters for all equipment of 50 horsepower or more. • Maintain a list of all operating equipment in use on the project site for verification by the City of Cupertino Building Division official or his/her designee. The construction equipment list shall state the makes, models, and number of construction equipment on-site. • Ensure that all equipment shall be properly serviced and maintained in accordance with manufacturer recommendations. • Ensure that all construction plans submitted to the City of Cupertino Planning Department and/or Building Division clearly show the requirement for Level 3 Diesel Particulate Filters emissions standards for construction equipment over 50 horsepower. • Communicate with all sub-contractors in contracts and construction documents that all nonessential idling of construction equipment is restricted to 5 minutes or less in compliance with California Air Resources Board Rule 2449 and is responsible for ensuring that this requirement is met. b. BIOLOGICAL RESOURCES Mitigation Measure BIO-1: Nests of raptors and other birds shall be protected when in active use, as required by the federal Migratory Bird Treaty Act and the California of Fish and Game Code. The construction contractor shall indicate the following on all construction plans, if construction activities and any required tree 5 removal occur during the breeding season (February 1 and August 31). Preconstruction surveys shall: • Be conducted by a qualified biologist prior to tree removal or grading, demolition, or construction activities. Note that preconstruction surveys are not required for tree removal or construction, grading, or demolition activities outside the nesting period. • Be conducted no more than 14 days prior to the start of tree removal or construction. • Be repeated at 14-day intervals until construction has been initiated in the area after which surveys can be stopped. • Document locations of active nests containing viable eggs or young birds. Protective measures for active nests containing viable eggs or young birds shall be implemented under the direction of the qualified biologist until the nests no longer contain eggs or young birds. Protective measures shall include: • Establishment of clearly delineated exclusion zones (i.e., demarcated by identifiable fencing, such as orange construction fencing or equivalent) around each nest location as determined by the qualified biologist, taking into account the species of birds nesting, their tolerance for disturbance and proximity to existing development. In general, exclusion zones shall be a minimum of 300 feet for raptors and 75 feet for passerines and other birds. • Monitoring active nests within an exclusion zone on a weekly basis throughout the nesting season to identify signs of disturbance and confirm nesting status. • An increase in the radius of an exclusion zone by the qualified biologist if project activities are determined to be adversely affecting the nesting birds. Exclusion zones may be reduced by the qualified biologist only in consultation with California Department of Fish and Wildlife. • The protection measures shall remain in effect until the young have left the nest and are foraging independently or the nest is no longer active. c. CULTURAL RESOURCES Mitigation Measure CULT-1: If any prehistoric or historic subsurface cultural resources are discovered during ground-disturbing (including grading, demolition and/or construction) activities: • All work within 50 feet of the resources shall be halted, the City shall be notified and a qualified archaeologist shall be consulted. The contractor shall cooperate in the recovery of the materials.Work may proceed on other parts of the project site while mitigation for tribal cultural resources,historical resources or unique archaeological resources is being carried out. 6 • The qualified archaeologist shall prepare a report for the evaluation of the resource to the California Register of Historical Places and the City Building Department. The report shall also include appropriate recommendations regarding the significance of the find and appropriate mitigations as follows: o If the resource is a non-tribal resource, the archaeologist shall assess the significance of the find according to CEQA Guidelines Section 15064.5. o If the resource is a tribal resource — whether historic or prehistoric — the consulting archaeologist shall consult with the appropriate tribe(s) to evaluate the significance of the resource and to recommend appropriate and feasible avoidance, testing, preservation or mitigation measures, in light of factors such as the significance of the find, proposed project design, costs, and other considerations.If avoidance is infeasible, other appropriate measures (e.g., data recovery) may be implemented. • All significant non-tribal cultural materials recovered shall be, as necessary, and at the discretion of the consulting archaeologist, subject to scientific analysis, professional museum curation, and documentation according to current professional standards. d. TRIBAL CULTURAL RESOURCES Mitigation Measure TCR-1: Implement Mitigation Measure CULT-1. e. GEOLOGY AND SOILS Mitigation Measure GEO-1: The construction contractor shall incorporate the following in all grading, demolition, and construction plans: • In the event that fossils or fossil-bearing deposits are discovered during grading, demolition, or building, excavations within 50 feet of the find shall be temporarily halted or diverted. • The contractor shall notify the City of Cupertino Building Department and a City-approved qualified paleontologist to examine the discovery. • The paleontologist shall document the discovery as needed,in accordance with Society of Vertebrate Paleontology standards (Society of Vertebrate Paleontology 1995), evaluate the potential resource, and assess the significance of the finding under the criteria set forth in CEQA Guidelines Section 15064.5. • The paleontologist shall notify the appropriate agencies to determine procedures that would be followed before construction is allowed to resume at the location of the find. • If the project applicant determines that avoidance is not feasible, the paleontologist shall prepare an excavation plan for mitigating the effect of the project based on the qualities that make the resource important.The excavation 7 plan shall be submitted to the City for review and approval prior to implementation. f. GREENHOUSE GAS EMISSIONS Mitigation Measure GHG-1: The project applicant shall offset a minimum of 173 metric tons metric tons of carbon dioxide-equivalent(MTCO2e) emissions per year for a period of 30 years (5,190 MTCO2e) through the purchase of voluntary carbon offsets (i.e., not compliance offsets) from the California Air Resources Board (CARB) approved Offset Project Registries (i.e., Climate Action Reserve, Verra, American Carbon Registry) or forecasted mitigation units (FMUs) (GHG Mitigation Credits) from the Climate Action Reserve's Climate Forward program. The voluntary carbon offsets or FMUs must be real, additional, permanent, confirmable, and enforceable. The order of preference for purchase of voluntary carbon offsets or FMUs shall be as follows: 1) within the City; 2) within the San Francisco Bay Area Air Basin; 3) within the State of California; then 4) elsewhere in the United States. Evidence of payments, and funding of an escrow-type account or endowment fund shall be submitted to the City by the project applicant. Prior to issuance of the certificate of occupancy, the project applicant shall submit to the City of Cupertino Building Division official or his/her designee, the necessary documentation to verify the agreement to purchase the necessary voluntary carbon offsets or FMUs to offset project emissions to below 1,100 MTCO2e per year. g. NOISE Mitigation Measure NOISE-1: The following shall be incorporated in all demolition, grading, and construction plans, as required by the CMC, Construction activities shall take place only during daytime hours of 7:00 a.m. and 8:00 p.m. on weekdays, and 9:00 a.m. to 6:00 p.m. on weekends. In addition, the construction crew shall adhere to the following best management practices shall be observed: • At least 90 days prior to the start of construction activities, all offsite businesses and residents within 300 feet of the project site will be notified of the planned construction activities. The notification will include a brief description of the project, the activities that would occur, the hours when construction would occur, and the construction period's overall duration. The notification should include the telephone numbers of the City's and contractor's authorized representatives that are assigned to respond in the event of a noise or vibration complaint. • The project applicant and contractors shall prepare and submit a Construction Noise Control Plan to the City's Building Department and Code Enforcement 8 for review and approval prior to issuance of any grading, demolition, and/or building permits. The Construction Noise Plan shall demonstrate compliance with the 80 dBA limit in the CMC. The details of the Construction Noise Control Plan, including those details listed herein, shall be included as part of the permit application drawing set and as part of the construction drawing set, shall be implemented by the on-site Construction Manager, and shall include, but not be limited to, the following available controls to comply with the 80 dBA performance standard: o At least 10 days prior to the start of construction activities, a sign will be posted at the entrance(s) to the job site, clearly visible to the public, which includes permitted construction days and hours, as well as the telephone numbers of the City's and contractor's authorized representatives that are assigned to respond in the event of a noise or vibration complaint. If the authorized contractor's representative receives a complaint, he/she will investigate, take appropriate corrective action, and report the action to the City. o During the entire active construction period, equipment and trucks used for project construction will utilize the best available noise control techniques (e.g., improved mufflers, equipment re-design, use of intake silencers, ducts, engine enclosures, and acoustically attenuating shields or shrouds), wherever feasible. o Include noise control requirements for equipment and tools, including concrete saws, to the maximum extent feasible. Such requirements could include, but are not limited to, erecting temporary plywood noise barriers between areas where concrete saws will be used and nearby sensitive receptors; performing work in a manner that minimizes noise; and undertaking the noisiest activities during times of least disturbance to nearby sensitive receptors. o During the entire active construction period, stationary noise sources will be located as far from sensitive receptors as possible, and they will be muffled and enclosed within temporary sheds, or insulation barriers or other measures will be incorporated to the extent feasible. o During the entire active construction period, noisy operations will be conducted simultaneously to the degree feasible in order to reduce the time periods of these operations. o Select haul routes that avoid the greatest amount of sensitive use areas and submit to the City of Cupertino Public Works Department for approval prior to the start of the construction phase. o Signs will be posted at the job site entrance(s), within the on-site construction zones, and along queueing lanes (if any) to reinforce the 9 prohibition of unnecessary engine idling. All other equipment will be turned off if not in use for more than 5 minutes. o During the entire active construction period and to the extent feasible, the use of noise producing signals, including horns, whistles, alarms, and bells will be for safety warning purposes only. The construction manager will use smart back-up alarms,which automatically adjust the alarm level based on the background noise level, or switch off back-up alarms and replace with human spotters in compliance with all safety requirements and laws. Mitigation Measure NOISE-2: Mechanical equipment shall be selected and designed to reduce impacts on surrounding uses to meet the Cupertino Municipal Code noise limits of 60 dBA and 50 dBA at residential uses during daytime and nighttime, respectively, and 65 dBA and 55 dBA at non-residential sensitive uses (i.e., the Cupertino Hotel) during daytime and nighttime, respectively.A qualified acoustical consultant shall be retained to review mechanical noise as these systems are selected to determine specific noise reduction measures necessary to reduce noise to comply with the City's noise level requirements. Mechanical equipment shall be selected and designed to reduce impacts on surrounding uses to meet the City's noise level requirements. Noise reduction measures could include, but are not limited to: • Selection of equipment that emits low noise levels; • Installation of noise dampening techniques, such as enclosures and parapet walls, to block the line-of-sight between the noise source and the nearest receptors; • Locating equipment in less noise-sensitive areas, where feasible. h. UTILITIES AND SERVICES MITIGATION MEASURE Mitigation Measure UTIL-1: No building permits shall be issued by the City for the proposed De Anza Hotel Project that would result in exceeding the permitted peak wet weather flow capacity of 13.8 mgd through the Santa Clara sanitary sewer system. The project applicant may demonstrate, to the satisfaction of the City of Cupertino and Cupertino Sanitary District (CSD), that the proposed hotel would not exceed the peak wet weather flow capacity of the Santa Clara sanitary sewer system by implementing one or more of the following methods: 1. Reduce inflow and infiltration in the CSD system to reduce peak wet weather flows; or 2. Increase on-site water reuse, such as increased grey water use, or reduce water consumption of the fixtures used within the proposed project, or other 10 methods that are measurable and reduce sewer generation rates to acceptable levels, to the satisfaction of the CSD. 3. The proposed project's estimated wastewater generation shall be calculated using the generation rates used by the San Jose-Santa Clara Water Pollution Control Plant Specific Use Code & Sewer Coefficient table in the May 2007, City of Santa Clara Sanitary Sewer Capacity Assessment, unless alternative (i.e., lower) generation rates achieved by the proposed project are substantiated by the project applicant based on evidence to the satisfaction of the CSD. 5. Adopts the Mitigation Monitoring and Reporting Program for the Project, as amended, attached hereto as Exhibit EA-1, and incorporated herein by reference, which incorporates all the mitigation measures identified in the Final IS/MND. PASSED AND ADOPTED this 21st day of January 2020, at a Regular Meeting of the City Council of the City of Cupertino, State of California, by the following roll call vote: AYES: NOES: ABSENT: ABSTAIN: SIGNED: Steven Scharf, Mayor Date City of Cupertino ATTEST: Date Grace Schmidt, City Clerk 11 Exhibit EA-1 Mitigation Monitoring and Reporting Program De Anza Hotel 10931 North De Anza Blvd., APN: 326-10-061 January 2020 Mitigation Measure Timeframe and Method of Compliance Oversight of Responsibility for Implementation Implementation Mitigation Measure AQ-1:The project's construction contractor shall During the construction Improvements City of Cupertino comply with the following Bay Area Air Quality Management District best and post-construction related to these Public Works and management practices for reducing construction emissions of fugitive dust phases, the project measures shall Building Departments (PM10 and PM2.5): proponent shall be be printed on • Water all active construction areas at least twice daily,or as often as responsible for all construction needed to control dust emissions.Watering should be sufficient to implementing these documents, prevent airborne dust from leaving the site.Increased watering measures,including contracts,and frequency may be necessary whenever wind speeds exceed 15 miles improvements. project plans per hour.Reclaimed water should be used whenever possible. and shall be reviewed by • Pave, apply water twice daily or as often as necessary to control the Director of dust,or apply(non-toxic)soil stabilizers on all unpaved access Community roads,parking areas, and staging areas at construction sites. Development and the • Cover all trucks hauling soil,sand,and other loose materials or Director of Public Work require all trucks to maintain at least 2 feet of freeboard(i.e.,the prior to the issuance of minimum required space between the top of the load and the top of grading and/or building the trailer). permits. • Sweep daily(with water sweepers using reclaimed water if possible) or as often as needed all paved access roads,parking areas and staging areas at the construction site to control dust. • Sweep public streets daily(with water sweepers using reclaimed water if possible)in the vicinity of the project site, or as often as needed,to keep streets free of visible soil material. • Hydroseed or apply non-toxic soil stabilizers to inactive construction areas. • Enclose, cover,water twice daily,or apply non-toxic soil binders to exposed stockpiles(dirt/sand). • Limit vehicle traffic speeds on unpaved roads to 15 miles per hour. • Replant vegetation in disturbed areas as quickly as possible. • Install sandbags or other erosion control measures to prevent silt runoff from public roadways. 2 Mitigation Measure Timeframe and Method of Compliance Oversight of Responsibility for Implementation Implementation Mitigation Measure AQ-2:Prior to issuance of any grading, demolition Project proponent to ensure Provide documentation City of Cupertino and/or building permits, the construction contractor(s)shall demonstrate inclusion of these demonstrating Public Works, the following, during construction,on all plans: requirements in all compliance (i.e. Planning, and • The use of construction equipment fitted with Level 3 Diesel contracts and permit specifications of vehicles Building Departments Particulate Filters for all equipment of 50 horsepower or more. documents.Prior to the and equipment) and on • Maintain a list of all operating equipment in use on the project site issuance of any the construction for verification by the City of Cupertino Building Division official or construction permit. drawings clearly show his/her designee.The construction equipment list shall state the the requirement for makes, models,and number of construction equipment on-site. Level 3 Diesel • Ensure that all equipment shall be properly serviced and maintained Particulate Filters in accordance with manufacturer recommendations. emissions standards for • Ensure that all construction plans submitted to the City of Cupertino construction equipment Planning Department and/or Building Division clearly show the over 50 horsepower. requirement for Level 3 Diesel Particulate Filters emissions standards for construction equipment over 50 horsepower. • Communicate with all sub-contractors in contracts and construction documents that all nonessential idling of construction equipment is restricted to 5 minutes or less in compliance with California Air Resources Board Rule 2449 and is responsible for ensuring that this requirement is met. Mitigation Measure BIO-1: Nests of raptors and other birds shall be Project proponent to add If grading and/or tree Community protected when in active use, as required by the federal Migratory Bird this to all construction removal begins during Development Treaty Act and the California of Fish and Game Code.The construction plans and contracts to the stated dates in the Department contractor shall indicate the following on all construction plans,if ensure biologist conducts mitigation measure,A construction activities and any required tree removal occur during the pre-construction surveys as final report of nesting breeding season(February 1 and August 31).Preconstruction surveys required. birds,including any shall: protection measures, • Be conducted by a qualified biologist prior to tree removal or shallbe submitted tothe grading,demolition,or construction activities. Note that Director of Community preconstruction surveys are not required for tree removal or Development prior to the start of demolition. 3 Mitigation Measure Timeframe and Method of Compliance Oversight of Responsibility for Implementation Implementation construction, grading, or demolition activities outside the nesting period. • Be conducted no more than 14 days prior to the start of tree removal or construction. • Be repeated at 14-day intervals until construction has been initiated in the area after which surveys can be stopped. • Document locations of active nests containing viable eggs or young birds. Protective measures for active nests containing viable eggs or young birds shall be implemented under the direction of the qualified biologist until the nests no longer contain eggs or young birds.Protective measures shall include: • Establishment of clearly delineated exclusion zones (i.e., demarcated by identifiable fencing,such as orange construction fencing or equivalent) around each nest location as determined by the qualified biologist, taking into account the species of birds nesting, their tolerance for disturbance and proximity to existing development.In general,exclusion zones shall be a minimum of 300 feet for raptors and 75 feet for passerines and other birds. • Monitoring active nests within an exclusion zone on a weekly basis throughout the nesting season to identify signs of disturbance and confirm nesting status. • An increase in the radius of an exclusion zone by the qualified biologist if project activities are determined to be adversely affecting the nesting birds.Exclusion zones may be reduced by the qualified biologist only in consultation with California Department of Fish and Wildlife. • The protection measures shall remain in effect until the young have left the nest and are foraging independently or the nest is no longer active. 4 Mitigation Measure Timeframe and Method of Compliance Oversight of Responsibility for Implementation Implementation Mitigation Measure CULT-1:If any prehistoric or historic subsurface During site excavation,the All Community cultural resources are discovered during ground-disturbing(including project proponent shall be archaeologicalmonitorin Development Public grading, demolition and/or construction) activities: responsible for g andreporting Works&Building • All work within 50 feet of the resources shall be halted, the City shall implementation measures shallbe Department be notified,and a qualified archaeologist shall be consulted.The ofArchaeological included inall contractor shall cooperate in the recovery of the materials.Work monitoring.Monitoring construction documents, may proceed on other parts of the project site while mitigation for shall be conducted during and construction tribal cultural resources,historical resources or unique earthmoving activities by a management plans, archaeological resources is being carried out. qualified archaeologist. contracts,andproject • The qualified archaeologist shall prepare a report for the evaluation During construction, the plans and shall be of the resource to the California Register of Historical Places and the project proponent and reviewed by the City Building Department.The report shall also include appropriate contractor shall CommunityDevelopmen recommendations regarding the significance of the find and beresponsible for t Department appropriate mitigations as follows: notification of • If the resource is a non-tribal resource, the archaeologist shall assess anydiscoveries. the significance of the find according to CEQA Guidelines Section 15064.5. • If the resource is a tribal resource—whether historic or prehistoric— the consulting archaeologist shall consult with the appropriate tribe(s)to evaluate the significance of the resource and to recommend appropriate and feasible avoidance, testing, preservation or mitigation measures,in light of factors such as the significance of the find,proposed project design, costs,and other considerations.If avoidance is infeasible,other appropriate measures (e.g., data recovery)may be implemented. • All significant non-tribal cultural materials recovered shall be,as necessary, and at the discretion of the consulting archaeologist, subject to scientific analysis,professional museum curation,and documentation according to current professional standards. Mitigation Measure TCR-1:Implement Mitigation Measure CULT-1. During site excavation,the All Director of project proponent shall be archaeologicalmonitorin CommunityDevelopm 5 Mitigation Measure Timeframe and Method of Compliance Oversight of Responsibility for Implementation Implementation responsible for g andreporting ent,Public Works& implementation of measures shallbe Building Department Archaeological monitoring. printed onall Monitoring shall be construction documents, conducted during contracts, andproject earthmoving activities by a plans and shall be qualified archaeologist. reviewed by the Director During construction,the ofCommunityDevelopm project proponent and ent contractor shall be responsible for notification of any discoveries. Mitigation Measure GEO-1:The construction contractor shall incorporate At the construction phase, All attenuation City of Cupertino the following in all grading, demolition,and construction plans: the project proponent and measures shall be Public Works& • In the event that fossils or fossil-bearing deposits are discovered contractor shall be printed on construction Building Department during grading, demolition, or building, excavations within 50 feet responsible for completing documents,contracts, of the find shall be temporarily halted or diverted. all improvements. construction • The contractor shall notify the City of Cupertino Building management plan, and Department and a City-approved qualified paleontologist to project plans and examine the discovery. reviewed by the Director • The paleontologist shall document the discovery as needed,in of Public Works prior to accordance with Society of Vertebrate Paleontology standards issuance of grading (Society of Vertebrate Paleontology 1995), evaluate the potential and/or building permits. resource, and assess the significance of the finding under the criteria set forth in CEQA Guidelines Section 15064.5. • The paleontologist shall notify the appropriate agencies to determine procedures that would be followed before construction is allowed to resume at the location of the find. • If the project applicant determines that avoidance is not feasible,the paleontologist shall prepare an excavation plan for mitigating the effect of the project based on the qualities that make the resource 6 Mitigation Measure Timeframe and Method of Compliance Oversight of Responsibility for Implementation Implementation important.The excavation plan shall be submitted to the City for review and approval prior to implementation. Mitigation Measure GHG-1:The project applicant shall offset a minimum Project proponent is Provide to City Staff City of Cupertino of 173 metric tons metric tons of carbon dioxide-equivalent(MTCO2e) responsible during proof of purchase of said Planning and Building emissions per year for a period of 30 years (5,190 MTCO2e)through the construction of the project offsets. Department purchase of voluntary carbon offsets(i.e.,not compliance offsets) from the to purchase the voluntary California Air Resources Board(CARB)approved Offset Project Registries carbon offsets. (i.e.,Climate Action Reserve,Verra,American Carbon Registry)or forecasted mitigation units(FMUs) (GHG Mitigation Credits) from the Climate Action Reserve's Climate Forward program.The voluntary carbon offsets or FMUs must be real,additional,permanent,confirmable, and enforceable.The order of preference for purchase of voluntary carbon offsets or FMUs shall be as follows: 1)within the City;2)within the San Francisco Bay Area Air Basin;3)within the State of California;then 4) elsewhere in the United States.Evidence of payments,and funding of an escrow-type account or endowment fund shall be submitted to the City by the project applicant.Prior to issuance of the certificate of occupancy, the project applicant shall submit to the City of Cupertino Building Division official or his/her designee,the necessary documentation to verify the agreement to purchase the necessary voluntary carbon offsets or FMUs to offset project emissions to below 1,100 MTCO2e per year. Mitigation Measure NOISE-1: The following shall be incorporated in all At the constructionphase, All attenuation City of Cupertino demolition,grading,and construction plans.Construction activities shall the projectproponent measures shallbe Public Works,and take place in compliance with CMC Chapter 10.48.In addition,the andcontractor shall printed on Planning and Building construction crew shall adhere to the following best management practices beresponsible constructiondocuments, Department shall be observed: forcompleting contracts,construction • At least 90 days prior to the start of construction activities,all offsite allimprovements. management plan, businesses and residents within 300 feet of the project site will be andproject plans and notified of the planned construction activities.The notification will reviewed by the Director include a brief description of the project,the activities that would of PublicWorks prior occur,the hours when construction would occur,and the 7 Mitigation Measure Timeframe and Method of Compliance Oversight of Responsibility for Implementation Implementation construction period's overall duration.The notification should toissuance of grading include the telephone numbers of the City's and contractor's and/or building permits. authorized representatives that are assigned to respond in the event of a noise or vibration complaint. • The project applicant and contractors will prepare a Construction Noise Control Plan prior to issuance of any grading, demolition, and/or building permits.The details of the Construction Noise Control Plan, including those details listed herein,will be included as part of the permit application drawing set and as part of the construction drawing set. • At least 10 days prior to the start of construction activities,a sign will be posted at the entrance(s)to the job site, clearly visible to the public,which includes permitted construction days and hours,as well as the telephone numbers of the City's and contractor's authorized representatives that are assigned to respond in the event of a noise or vibration complaint.If the authorized contractor's representative receives a complaint,he/she will investigate, take appropriate corrective action,and report the action to the City. • During the entire active construction period,equipment and trucks used for project construction will utilize the best available noise control techniques(e.g.,improved mufflers,equipment re-design, use of intake silencers, ducts, engine enclosures,and acoustically attenuating shields or shrouds),wherever feasible. • Include noise control requirements for equipment and tools, including concrete saws, to the maximum extent feasible.Such requirements could include,but are not limited to,erecting temporary plywood noise barriers between areas where concrete saws will be used and nearby sensitive receptors;performing work in a manner that minimizes noise;and undertaking the noisiest activities during times of least disturbance to nearby sensitive receptors. 8 Mitigation Measure Timeframe and Method of Compliance Oversight of Responsibility for Implementation Implementation • During the entire active construction period,stationary noise sources will be located as far from sensitive receptors as possible, and they will be muffled and enclosed within temporary sheds, or insulation barriers or other measures will be incorporated to the extent feasible. • During the entire active construction period,noisy operations will be conducted simultaneously to the degree feasible in order to reduce the time periods of these operations. • Select haul routes that avoid the greatest amount of sensitive use areas and submit to the City of Cupertino Public Works Department for approval prior to the start of the construction phase. • Signs will be posted at the job site entrance(s),within the on-site construction zones, and along queueing lanes(if any)to reinforce the prohibition of unnecessary engine idling.All other equipment will be turned off if not in use for more than 5 minutes. • During the entire active construction period and to the extent feasible,the use of noise producing signals,including horns, whistles, alarms,and bells will be for safety warning purposes only. The construction manager will use smart back-up alarms,which automatically adjust the alarm level based on the background noise level,or switch off back-up alarms and replace with human spotters in compliance with all safety requirements and laws. Mitigation Measure NOISE-2:Mechanical equipment shall be selected At the construction phase, At the construction At the construction and designed to reduce impacts on surrounding uses to meet the the project proponent and phase, the project phase,the project Cupertino Municipal Code noise limits of 60 dBA and 50 dBA at contractor shall be proponent and proponent and residential uses during daytime and nighttime,respectively,and 65 dBA responsible for completing contractor shall be contractor shall be and 55 dBA at non-residential sensitive uses(i.e.,the Cupertino Hotel) all improvements. responsible for responsible for during daytime and nighttime,respectively.A qualified acoustical completing all completing all consultant shall be retained to review mechanical noise as these systems improvements. improvements. are selected to determine specific noise reduction measures necessary to reduce noise to comply with the City's noise level requirements. 9 Mitigation Measure Timeframe and Method of Compliance Oversight of Responsibility for Implementation Implementation Mechanical equipment shall be selected and designed to reduce impacts on surrounding uses to meet the City's noise level requirements.Noise reduction measures could include,but are not limited to: • Selection of equipment that emits low noise levels; • Installation of noise dampening techniques,such as enclosures and parapet walls, to block the line-of-sight between the noise source and the nearest receptors; • Locating equipment in less noise-sensitive areas,where feasible. Mitigation Measure UTIL-1:No building permits shall be issued by the Prior to the issuance of any Demonstrate that the Department of Public City for the proposed De Anza Hotel Project that would result in construction permit. proposed hotel would Works and Cupertino exceeding the permitted peak wet weather flow capacity of 13.8 mgd not exceed the peak Sanitary District through the Santa Clara sanitary sewer system.The project applicant may weather flow capacity of demonstrate,to the satisfaction of the City of Cupertino and Cupertino the Santa Clara sanitary Sanitary District(CSD),that the proposed hotel would not exceed the peak sewer. wet weather flow capacity of the Santa Clara sanitary sewer system by implementing one or more of the following methods: 1. Reduce inflow and infiltration in the CSD system to reduce peak wet weather flows;or 2. Increase on-site water reuse,such as increased grey water use,or reduce water consumption of the fixtures used within the proposed project,or other methods that are measurable and reduce sewer generation rates to acceptable levels,to the satisfaction of the CSD. The proposed project's estimated wastewater generation shall be calculated using the generation rates used by the San Jose-Santa Clara Water Pollution Control Plant Specific Use Code&Sewer Coefficient table in the May 2007,City of Santa Clara Sanitary Sewer Capacity Assessment, unless alternative(i.e.,lower) generation rates achieved by the proposed project are substantiated by the project applicant based on evidence to the satisfaction of the CSD. 1188857.2 10