Reso 40545—l-88
CITY OF CUPERTINO
10300 TORN AVENUE
CUPERMO, CALIFOR41A 95014
RESOLUTION NO. 4054
OF THE PLANNING MMSSION OF T E CITY OF CUPERTINO
APPROVING A TENTATIVE PARCEL, 'PAP CONSOLIDATING 14 PARCELS
I1V'M ONE PARCEL
i
SECTION I. FINDINGS
WHEREAS, the Plying Commission of the City of Gino received an
application for a Tentative Parcel map, as described on Page 2 of this
Resolution; and
WHE7-AS, the necessary public notices have been given as recTilred by the
subdivision and Procedural ordinances of, the City of Camino, and the
Planning Commission has held at least one Public Hearing in regard to the
application; and
WHEREM,7 the Planning Commission fire that the application meets the
following regAr meets a
a) That the Proposed pare map is consistent with the City of
AML Cupertino General Plan and any applicable Specific plan.
b)That the designimprovement
or �p of the proposed parcel map is
consistent with the General plan and any applicable Specific plan.
c), That the site is physically suitable for the type and intensity of
development contemplated under the approved consolidation.
d) That the design of the parcel map or the prcposed inprorements are
not likely to cause substantial envirormental doge nor
substantially and avoidably injure fish and wildlife or their
habitat.
•
e) That the design of the parcel map or the type of improvements
associated therewith are not detrimental to the health, safety,
peace, gals and geraral welfare of persons residing or working in
the vicinity of the consolidation.
f) That the design of the parcel map and its associated improvements
will not conflict with easements aaNired by the public at large for
access through or use of property within the Proposed consolidation.
NOW, TBEREFOIRE,, B IT RESOLVED:
That upon careful consideration of maps, exhibits, fads, testimony and
other evidence submitted in this matter, the application for 'Tentative
Parcel Map is hereby recommended for approval, suhjeat to the conditions
enumerated in this Resolution beginning on Page 2 thereof , an
a RESOLUTION NO. 4054 (5�'N 88) 5/9/88
PAGE o 2
That the subconclusions upon which the findings and conditions specified
in this Resolution are based are contained in the Public Hearing Record
concerning Application 5-M-88, as set forth in the Minutes of the
Planning C=issiOn meeting of May 9, 1988, and are incorporated by
reference as though fully set forth herein.
SECTION I2 o PROJECT DATA
Application-No(s)
Applicant:
Prosy Owner:
Location:
1. STREET WIDENMG
5: 88
Street widening, Inprovewnts and dedications shall be provided in
accordance with City Standards and'specifications and as required by
the Clay Engineer.
2. CURB AND GUTTER
Curbs and gutters,, sidewalks and related stzucttires shall be installed
in accordance grades and standards as specified e _ _.
_�f-�e' -_- - -
3. STREET LIGHTING INS'T A T MON
Street lighting shall be installed and shall be as approved -by the
City Engineer. Lighti.ng fixtures,shall be positions so as to
preclude glare and other forte of visual interference to adjoining
properties-, and shall be no higher than the maximm height permit
by the zone in which the site is locatedo
Fire hydrants shall be located as required by the City.
5. TRAFFIC SIGNS
Traffic control signs shall be placed at locations specific by the
City.
•
RESOLUTION NO. 4054 (5=M4- 88) 5/9/88
PAGE 3 a
6. STREET' TREES
Street trees shall be planted within the Public Right of Way and shall
be of a type approved by the city in accordance with Ordinance 125
7. GRAD NG
Grading shall be as approved and required by the City Engineer in
accordance with Ordinance 125.
Drainage shall be provide to the satisfaction of the City Engineer.
Surface flow across public sidewalks may be allowed in the R 1, R 2
and R 3 zones unless storm drain facilities are deemed necessary by
the City Engineer. Development in all other zoning districts shall be
serve by on site storm drayage facilities connected to the City
storm drainagesystem. If City storm drains are not available,
drainage facilities shall be installed to the satisfaction of the City
inner.
9. UMERMOUND =T TTIP
ANIL The developer shall comply with the requirements of the Underground
Utilities Ordinance NO. 331 and other related Ordinances and
regulations of the City of Cupertino, and shall coordinate with
affectted, utility providers for installation of underground utility
devices. The developer shall submit detailed plans showing utility
underground provisions. Said plans shall be subject to prior `approval
of the affected Utility provider and the City Engineer.
10. DEVELOFFEW ArRrFKnTT
The project develcper shall enter into a development agreement with
the City of Cupertino providing for payment of fees, including but not
11mited to cheddng and inspection fees g storm drain fees, park
dedication fees and fees for and ding Of utilities. Said
agreement shall be executed prior to issuance Of construction permits.
11. TRANSFOIqJERS
Electrical transformers, telephone vaults and similar above ground
equipment enclosures shall be screened with fencing and landscaping
or located underground such that said equipment is not visible from
public street areas.
12. SIGNAL MODIFICATION
The signal at Bubb and McClellan Tads shall be modified as determined
necessary by the Public Works to