Loading...
08080201-SISep 17 2008 11:18HM Hohbach-Lewin/SF 9/17/2048 11:42 FAX 408 771 3333 f 71 tar 4153188522 t' Q 0001/0007 10300 Torre Avenue Cupertino, California 95014 Telephone! (408) 717-3228 FAX- (408) 777-3333 COIL04UN17YDEYELOPAaMI BUILDIW DIVISION BUILDING DEPARTMENT SPEGIAi. INS_ PEMON AND TE MNG AGREEMM Project Name: j&Mft'A �.��.es�+izE T W nand.. Date: -L / Project }des; C>$QSCZO 1 To permit applicants ofprojects requiring Special Xtispection and/or Tcstiug per UBC Secdon 1701: BEFORE A PERMR CAN BE ISSUED: no Owner. General Contractor, Project ArchitectIfEnginoer and Special lnspeetor shall acknowledge the required special inspections, testing and conditions. When determined by the Building Inspection Division, a pre -construction conference with the parties involved will be held to review the special inspection requirements and procedmm . Special inspection and testing.shall meet the minimum requirements of UBC 1701. The following conditions are also applicable: 1. Contractor is responsible for notification to the Special Inspector or Agency regarding individual inspections for times listed on the attached Schedule and noted on the City approved plans. Adequate notice shall be provided so the Special Inspector bas time to become familiar with the project and do a thorough job for all inspections. 2.. Each Special Inspector shall submit his qualifications to the City and is subject to a personal .interview for pre-gnalihcation. Special Inspectors small display anzpproved identification badge when pe6ouning the fuDetion of a special inspector or upon request, and must have a valid ICBO Certification for the. type ofwork being inspected. 3. Duties and Responsibilities of the Special Inspector arc: A- Observe the work for conformance with the CTIY APPROVED (stumped) design drawings and specifications and applicable workmanship provisiions of the UBC. NOTE: Shop drawings may be used Wx as an aid to inspection. B. Bring non-confa nning itcam to tba immediate attention of the contractor and note in daily report (Re£ tic& 4). If any ouch item is not resolved in a timely manner; or is about to be incorporated in the work notify the Building Inspection Division and the Project_ Engineer or Architect immediately by telephone at 408-777 3228, or in persom r- v . OFFICE CQPJ� OCT 0 8 700 p.l Received Time Sep.l1. 2008 12:03PM No-6140 Sep 17 2008 11:18RM Hohbach-Lewin/SF 4153188522 09/17/2008 11.42 FAX 408 777 3333 Z0002/0007 P.2 Special Inspection and Testing Agrc=ent C. Fwnish reports of tests and inspections directly to the Building Iaspe ction Division, Engineer and Architect of record and others as desigoede& These reports are to include the following: • Describe inspections and test made with applicable locations ■ List all non -conforming items ■ Indicate how nan-conforming items were resolved or indicate unresolved items as applicable ■ Itemize changes authorized by Architect, Engineer, and wing Inspection Division, if not included in non-conformance items D. Ins= that an adequate number of pre -qualified special hmpectionpersonnel are on the job, based on the intensity of activities, quality of work peafbruied and the various operations occu1rh1& , , - E. Submit a FINAL LEITER OF COMPLETION to.the Building Inspection Divinon stating tbat, to the best of his knowlWge, all items req=' mg special inspection and testing were acoomplishe d, approved and reported in conformance with the approved design drawings, specifications, approved change order and the applicable workmanship provisions of the UBC. Items not in conformance, unresolved items or any discrepancles in nns melon coverage (i.e. missed inspections, ` periodie inspections performed when "continuous" inspections were required, etc.) shall be specially itcmi,zod in this report- F. FINAL LETTP.R OF COMPLETION shall be signed by the Licensed Registered Engineer of the Special Inspection Agency of record. 4. Each Special Inspector cball complete and sign the SymW hwvgfm Ptocord of each day's inspection and provide a daily handwritten report in a format acceptable to the Building inspection Division (to remain at the job site with the contractor for review by the Building Department's b apoctor). Content of the daily reports shall be per Item 3C above. 5. Work requiring a special inspection, and the performance of a special inspection, shall be monitored by the City's building inspector. City approval is required prior to placement of concrtm General Contractor shall notiffy 40ga777-3228, 24 hyou s in advance for each day special inspections will be conducted. 6. Special inspections are to be pesfonned ona CONTINUOUS BASIS. meaning that. the SPECIAL. 24SPECOTR IS ON SITE IN THE GENERAL AREA AT ALL TI3M OBSERVING THE WORIC REQUIRING SPECIAL INSPECTION. Penodia inspections may be approved by the Building Inspection Division and, if approved. sball be noted on the SPECIAL INSPECTION AND TESTING SCHEDULE. 7. Only the City approved Testing Agency of re cord sball sampleti trm elt and test materials. 8. Only the City -approved Special Inspection Agency of record shall provide special inspectors. Independent inspectors may be prc-approved by the Building Inspection Division per Item 2 above, V3 Revised NI1/04 Received Time Sep. 17, 2008 12:03PM No. 6140 Sep 17 20o8 11:18AM Hohbach-Lewin/SF 09/17/2008 11:42 FAX 408 777 3333 4153188522 p.3 (A0003/0007 10300 Torre Avenge Crpa lino, California 95014 relepbom (408) r"--3228 ,Z U PERT INO Am. (408) 777-3333 COMMUNIIYDBVELOPMBNT/BV DM DIVWON STRUCTURAL TESTS AND INSPECTIONS SCHEDULE Prior to isstw= of a budding permit, the Owner, as the advice of the Architect or Enginem, shall complete, sign and submit this form to the building OfficiaL 'CRA6441 A'ric.t..o -er- RE "ra'os. L. 9 /i C. /c % Project Name Date ' Prof ect Addtess Te on Agency Owner's Name & Title Owner hereby certifies that the Testing/Inspection Agency named above bas been engaged to perform stmctural tests and inspections during constmctioq as cbecked below, io satisfy all applicable portions of the Building Code. Prior to issuance of an occupancy permit, the Inspection Agency shall submit a statement that all items of designated work performed were reported. Any items chec end, but not test or inspected, will be noted and explained. Whcnaver any designated items on this lin am ready for sampling, testing or inspotdioA it shall be the responsibility of to Contractor to give timely notice to the Inspection Agency so that the required suvices may be perfoaned. REneORCING SZ EEX- Tensile & Bond, age set par brat per tans In gmcdoo of Piwernem Iaspocd= of'Veining MASONRY: Pnlimoary Acceptance Tcala (Mammy Liming, Wall Prisms) Sbbacq=w Test (Momr, Greut, Field wall Prism) Inspmdpn of (routing bispoWan of Plac=ew do Groroting ASPRAL17C CONCRETE: Mac Dcsigs Inpe96010 of Batch Pbuit Caae/Tedt Feld inspectim Scift n7ity Tests speeifte Cavity Aspbab Cement Sieve Analysis x pack= stabilomerss value swell STRUCIV1lAI SMEL: Semple 8t Test (llet specific nwmbera below) Shop Idadficat ion dt Welding Inspccdou ShW Ridiogmpby Field Welding Inspection Field Rotting b3spechm Field Ultrasonic Inspection -_ Metal Deck Welding Inspection DMLTLA71NO OONCRVM- Sa=ple & Tat L% t Weian P*W an PAq cue P*w Received Time Sep, 11, 2008 12:03PM No•6140 Sep 17 200e 11:18HM Hohbach-Lewin/SF 09/17/2008 11:42 FA.1 408 777 3333 4153188522 p.4 Q0004/0007 nwtaW Tests nd Inspections Schedule )N SHOTCREi'E GROVI & MORTAR )nr- ShLot Grout Mortar Teats for Desism S 0f Agwegailes lvf ac Desi Testpanel Batch Plaint Ingpection Camant Crab SwnpLe Place '= Tests Cast SpeCiMCUS Pick-up Smples Sbrinkagc Bars Yield Check Air Check Unit wcdgbt ECAST&M TESSIONED OONCREIP- _ RCb&rri g-TCsts _ Iaspocbion of Remfacmg Placement _ Tendon Tesp . _ inspection of Teadoa PbKcn=t Impecdon of t:on=W Plac=cnt _ bup=tion of Concrete Batrhh,g _ Inspwdon of Panel Attad mzmb & I neres _ b*eetion of Panel Insmuaticm _ Coep moo ion Tests _ULTectim Of JNGI CAISSONS. CAPS. TIES: ' _ iaspecdw of Roiafoccing Ph=ncat _ Inspecton of Concrete Phoemeza _ hupectiom of Concrete Batebiag 00 "V 7,7—�e _ Iapootion of Stud Fabrication _ Ingwtkm ofRan.fOrMg & Forms _ Inspection of C Cr to Plaoament _ Inspection of Tisbadw x PROOFING: hupoction of P4cnixiis Density Teat Tlaclmmt Tests Inspect Bat ung FUX MAT'SRiAL: Acaepb ►ee Test: Moistae-Densty Detrinstion Field Density ROOPW(k b>apetion of Placement Sa wle k Tat STRVCCUML WOOD: Inspection of Fabdcaden Iaspecdon of truce Joist Fabrication Sample d: Test Composes Inspection of file Ism Fabacation Shm Diaphragms 212 Revised &11/04 Received Time Sep.11. 2008 12:03PM Nc.6140 S'ep 17 2008 11:18nM Flohbach-Lewin/SF 09/17/2.008 11:43 FAa 408 777 3333 4153188522 p.5 Z 0005/0007 !' Special Inspection and Testing Agreement 9. BEFORE AN OCCUPANCY PERMIT CAN BE ISSUED: The Special Inspector or Agency shall submit a FINAL LETTER OF COMPLETION, per item 3E above, directly to the Building lnspection Division. 10. Copy of SPECIAL INSPECTION AMID TESTING SCHEDULE, SPECIAL INSPECTION AND TESTING AGREEMENT, SPECIAL INSPECTION RECORD, and SPECIAL INSPECTION DAILY REPORT, SHALL BE AT THE JOB SITE- ACICNOWLEDG i a -• owner. General Contractor. Special Inspector or Agency., Project Engin=/Architoct: Building Inspection Division: 3/3 Revised 6/11104 K► r%C-o dl• V�•r O � SEAT Te.s n csfor y Neceived Time: Soo. 17, 2008 1.2:03PM No. 611.0 Sep 17 2009 11:19AM Hohbach-Lewin/SF 09/17/2008 11:43 PAX 408 777 3333 4153188522 p.g 00008/0007 1. 10300 Torre Avg mw Ctg wlinv, CdY n is 95014 Telephhow. (408) 777-3228 FAX (409) 777-3333 COhOdUMTYDEPEWPhiSNTI BUILDING DrMON BUILDING DEPARTMMNT WCX F 8 1 9-P& kit e- NGL oS V Q qt Sin' t" we c L. ProjectAddms Project'%tle owner ofproje requiting Special Inspeetim or to rung per Chapter 17 of the 1999 Cilffbmia Building Code, please mowk dp and return to the City. TORE A PERMIT CAN BE ISSUED: The Owner, or his representative, on the advice of The responsible Project ginew or Architect, Thal] complete, sip and submit the attached ftwm "Structual Tests and Iaspoctiom Schedule" t,o the d1dmg Dcp&Mmw t for review and approval. it owner andhis general contractor, wbere applicable, shall also admowledge.the following conditions applicable to ceW Inspection aad/ar testing. 1. Gantractar is responsible for props notification to the Inspecting or Testing agency for items listed 2. Only the tftg Ubma ry should take samples and hmsport them to &air laboratory. 3. Copies of all laboratory repots and inspections are to be sent .directly to the City by the Testing agmwy, 4. bspectiol agency to submit names and qualification of on -site special ms;wtors to the Building Department far approval- S. The Special Inspector is under the authority and is ttspowible to the Building Official. Allinspection concerns and/or problems encountcrcd are to be brought to his attention immediately. 6. Special inpecon may be required, as a miainsim to provide weekly report to this dap®rtraent of all inspection activity. 7.. It is the respo rwibility of the connactor to review City appcoved plans for additional inspection or testing nequfivw nts that may be noted . S. BEFORE AN OCCUPANCY PERMIT CAN BE ISSUED: The bWecdpa ag®cy shall submit a statemau Chad all itelrla requiring testing and inspection have baser fulfilled and rcportoti Those itenns not vestal and/or inspeciod shall be noted in this statement. 'Copy of statement is to be maintained at the job site for City's Building Inspector's review prior to final inspoetiona. ProjectEagineer or Architect 5ipature Teatiag/Iru i t^,,ontracboe Sure City Plan Cheek Eaginees Signature P~ an PW~ pow Received Time Sep.11, 2006 12:03PM No.6140 S'ep 17 2008 11:18AM Hohbach—Lewin/SF 4153188522 p.7 09/17/2008 11:43 FAX 408 777 3333 a0007/0007 RECOGNIZED SPECIAL INSPECTION & nSM NC AGENCIES E r f e c r i r X 3/ I/ 0 S- 1 2/ 3 0/ 0 S :l1PE TINO ray: RC->� C s� �►-AypMedo�wL UR14 •UMabrt+tcad llsa�y Pabl[aa�ae Tab ody - BawUW C.eeteelmtnt SS87 Swot Boulevard (925) 48+40220 x X 3/31/2009 Caawairaats Pleasaoeon. CA 94566 846A64S _ SIM C"M AsawclIkI6 1871 The Ala noda Saitw 200 (4 M 29&MS x X X X x 3/31/1006 * Sao Jaw. G1. 951 29"114 X3JL Associates 1181 QMTY IAM 03W (92S) 4624NO x x x X x 2/2812906 Ptaaaanwn, CA 94366 925 462-OM C+P� BaptOwariag 74 Slr°ico Coww= (510)668-1815 X X X X X X 11/301r10DS CA 94539 10 49D4&6 CrsNidat°d 7060 Rail Cotter Patim". 03DD (910 4e0"000 X X X X X X 2/1[/2006 ZmAjacarint labs CA•94%&3108 925 4BS.Mlt Cowalrodlwn IKdiaials 2271-11 Pilae Cant (925) 825-wo x X X x ' X X 6/30/1006 TwWaLisve. CA %520-1252 682-7953 cmab°dioa 2142 RhwmDrive. Such E (925) 41MSI X X X X X X 10/3ll1006 T Swrvleea Plwwtaa CA 94M 462-3183 _ Coas6sadab 7wsdn8 di 242 West Lamb Road, Suito F (9N) 576.2271 X X x X X X 1Worm [k Trs , CA 95304 09 339-289S Dyaamic 1300 Space Pak Way (6.50) 9674082 x X X X X X t 01 IMM Consuha°tsLa. Mwuot4* cw'CA 94043 630 967-695S soft Slaw°a 47953 Warm Spr(np Boulevard MO) 353-0320 x x X X X X 121Wr"S Cwaatlbnb Frwmoa CA %539 7400 510 353-0344 BNGEO MI Oi w Cw Ww Rd., Suite 2DO 8-1600 x X X X X X 1201/2006 loco ratd Sao Rasnoo, CA 94583-1545 925 38-7425 Iversy*6 P.adneertme 1760 Induttrial Way. Suite I (707)231-1212 X X X 12130/200S CAmwatomw Nam CA %558 9MIS9.1393 Yattptetlwaa 690 Surwl Street Bldg. i1 (408)us-8460 X X X X X X 3l31l2006 Sao Jobe CA 95126 408 271.0902 fupsatiaa Her 26 Tba 8 obm:=4M (41S) 2433-3263 X X X X x X 02118r200t SeavkM Iau Stm Frmc(st m CA 94105 415 243-3266 its ��°a�°t Co.Yas 865 Cotmtg Lwc, Sk A (70'f) 4474035 X X X X X 17/3012005 CA 956N 70 7-4143 Kki°fddwrlitc 7133 RiA Coda Parkwty, 0100 (9:4) 494-17D0 X X X X X X l/31f2006 P'.camroa CA94S66 4W-2977 lltarbawaclwr 43DPtsatooCan%Suite B (9,M 4S4jjOn X 10131/2006 lac- live more, CA 94551 4544S64 Krssac and 543 Parted Sued (408) 271-2200 X X x X X X 1214317A05 Associates Ina- Sao late. CA 95112 271-2201 Matrri ood. Inc 3102 Industtial BoOeftrd x X X X X X 12r30i100S We" Saa� CA 95691 7S4i701t PDcldasEathwaln8 6743Dublb►Boulawxr* sl3 (92S)829-w90 x x x x x x 12130r1006 CoAndta We Du CA 94S6t 829"5 MgoisMoorw t956WebtterStteel.Stite400 (SIO)633-5640 X X X X X 10/31r2006 OWdand CA 94612 510 633-5646 PSI 365 Victor Surat. Suite C (833) 757-ffi16 X X X x X X 12/JOMM S&UUZICA93907 l 757.6265 M Ebf°aar% Ibc. 150 Nash W1ge UMA SWte M4 (925) 933 4600 X X X X X X 08r3IrAw Walnut Crodk CA 94SW2434 92 932-462S SlpetTesting 3121 Diablo Avenue (510)187-6484 X X X X X x 1l31/2D06 Laboratawies Hn CA 94S45 510 783.4295 Sa ti-Etury P_O. B" 880550, R mws Paint (415) 330.38D0 ampamw Shipyard, 8u11ding 114 (413) 330-MO x x x x x x zalka 06 San Francisco. CA 941813 Tarr°seswslt leK 6640 VIA Del ono, 0110 (400) 3624M x x x x x x 1213N2005 San kok CA 95119 408 3624926 Testing Ugiawars Ine_ 2311 Teaprden Street (510) M3142 X X X X X X 1213fYm Sao Louudto, CA 94577 510 634-3777 T.tgaleetl,,bw.aawti.til� 25rrP"MoSted (SM26F70Z1 x x x x x x lor3t/1Do7 P CA 93721 559)268-7126 APe a mK awe Won ealta+ld sar potedWaal spe iwl >*$C*R a aaa41051utdae eIft_ Aleaer ®r " a95aaw in fw ww 1h a awe iwutbL Bwtld(a[ O�oiak uwy add aed/ar cerwova a[encia Arm Ws Cut know 51�aoaaacs waSom" SaMon Received Time Sep.17. 2008 12:03?M No•6140