Loading...
Item 4-Handout1 City of Cupertino Building Reach Code Peer City Reach Code Comparisons Type EE ZNE Solar EV Low-Rise Residential High-Rise Residential Nonresidential Mixed-Use Portola Valley CALGreen 2016 EE, EV, Third- Party cert. X X - Require Build It Green point calculation. Projects <3,000 sq ft need 75 points, projects> 3,000 sq ft minimum 75 points with one additional point for each 50 sq ft over 3,000 - Solar ready infrastructure: solar zone should be located on the roof or overhand and have an area no less than 500 sq ft AND projects shall provide a pathway for conduit and plumbing to support the installation of future PV or solar thermal - EV ready infrastructure requirements: (1) service panel provide at least 208/240v, 50 amps grounded AC outlet and dedicated branch circuit, and (2) wiring with capacity to accommodate 100-amp circuit - Comply with mandatory CALGreen measures - EV ready infrastructure requirements: (1) service panel provide 208/240v, 50 amps grounded AC outlet and dedicated branch circuit, and (2) wiring with capacity to accommodate 100-amp circuit 2019 CALGreen Tier 1 EE, EV + green measures X X - 15% better than CALGreen - 15% spaces EV capable - 5% better than CALGreen - Up to 8% spaces EV capable - Nonres: 10% better than CALGreen - Hotel/motel: 5% better than CALGreen - Up to 8% of spaces EV capable - 12% reduction in baseline water use As applicable for each component Palo Alto CALGreen 2016 Solar &/or EE X X - Minimum one or the other: (1) 10% less than standard design with no PV or (2) 20% less than standard design if building includes a PV system - Solar: required for single family - New: CALGreen Tier 2; Alterations: Tier 1 (excluding EE) - Minimum one or the other: (1) 10% less than standard design with no PV or (2) 12% less than standard design if building includes a PV system - New: CALGreen Tier 2; Alterations: Tier 1 (excluding EE) - Minimum one or the other: (1) 10% less than standard design with no PV or (2) equal to standard design with PV system - New: CALGreen Tier 2; Alterations: Tier 1 (excl. EE) - If >$100,000: EPA Portfolio Manager, projects >10,000 sq ft: performance review Sunnyvale CALGreen 2019 + Third Party cert. - CALGreen + GreenPoint Rated & verified with minimum of 90 points - CALGreen + GreenPoint Rated & verified with min. of 90 points - Build It Green certification - ≤ 5,000 sq ft: CALGreen mandatory measures - >5,000 sq ft – 30,000 sq ft: CALGreen + LEED Gold certification - >30,000 sq ft: CALGreen + LEED Gold certification with USGBC Certification and Design Phase credits reviewed by USGBC City of Cupertino Sustainability Commission August 29, 2019 Stringency 2 San Mateo CALGreen 2019 Solar, EE, EV X X - Mixed fuel: 15% better than CALGreen - SFR: 1 kW PV - MFR 3-16 units: 2 kW PV - SFR: EV ready - MFR: 15% spaces EV capable - MFR 17+ units: 3 kW PV - MFR: 15% EV capable - Office use – mixed fuel: 10% better than CALGreen - Buildings < 10,000 sq ft require 3 kW PV - Buildings > 10,000 sq ft require 5 kW PV - Mixed use: provide min size PV for both res and nonres components - 10% EV capable and 5% EVSE installed spaces 2019 CALGreen Tier 2 EE, EV + green measures X X - EDR = 0 and all EE measures - 20% spaces EV capable - 10% better than CALGreen - Up to 10% spaces EV capable - Nonres: 15% better than CALGreen - Hotel/motel: 10% better than CALGreen - Up to 10% spaces EV capable - 20% reduction in baseline water use As applicable for each component Mountain View SVCE model code X X X Silicon Valley Clean Energy CALGreen 2019 Solar, EE, EV X X X - Mixed fuel: 25% better than CALGreen - Electrification readiness - 3 or 5 kW PV - Mixed fuel: 7% better than CALGreen - Electrification readiness - 3 or 5 kW PV - MFR: 100% EV Ready - Office mixed fuel: 14% better than CALGreen & electrification readiness - Retail mixed fuel: 14% better than CALGreen & electrification readiness - 3 or 5 kW PV - Office - 10% spaces EVSE installed, 10% spaces EV Ready, 30% spaces EV Capable - Other Nonres - 6% spaces EVSE, 5% spaces L1 EV Ready San Jose CALGreen 2019 EE, EV X X - Mixed fuel: 25% better than CALGreen - Mixed fuel: 7% better than CALGreen - Solar-ready - 50%* EV Ready or EVSE (25% Level 2, 75% Level 1), remainder EV Capable - Office mixed fuel: 14% better than CALGreen - Retail mixed fuel: 14% better than CALGreen - Solar-ready - 10% spaces EVSE, 40% spaces EV Capable (with reserved capacity) Berkeley All-Electric - Prohibits natural gas infrastructure in new construction - new cooking, water heating, and/or building heating systems cannot use natural gas - Differs from a reach code by leveraging the City’s authority under the California Constitution to prohibit installation of hazardous internal gas piping infrastructure when granting use permits for new buildings Santa Monica CALGreen 2016: Solar, EE & ZNE X X X - Require PV system: 1.5 watts per sq ft - Designed to use 15% less energy than allowed by CALGreen and achieve an EDR of Zero - Require PV system: 2 watts per sq ft - Designed to use 10% less energy than allowed by CALGreen - Renewable energy required to heat pool with requirements (1) surface area of solar collectors equal to or greater than 70% of surface area of pool (2) renewable energy provides 60% of total energy for heating (3) no electrical resistance heaters from non- renewable sources shall be used to heat pool Stringency