Reso 4001APPLICATION 19-9M--87
CITY OF CUPERTINO
10430 S. De Anza Blvd.
Cupertino, California 95014
RESOLUTION NO. 4001
OF THE PLANNING DIRECTOR OF THE CITY OF CUPERTINO
APPROVING A TENTATIVE PARCEL MAP TO CONSOLIDATE
'IWO PARCEIS IMM ONE PARCEL
SECTION I• FINDINGS
WHEREAS, the Planning Director of the City of Cupertino received an
application for a Tentative Parcel Map, as described on Page 2 of this
Resolution; and
WHEREAS, the necessary public notices have been given as required by the
Subdivision and Procedural ordinances of the City of Cupertino, and the
Planning Director has held at least one Public Hearing in regard to the
application; and
WHEREAS, the Planning Director finds that the application meets the
following requirements:
a) That the proposed tentative parcel map is consistent with the City
of Cupertino General Plan and with any applicable Specific Plan.
b) That the design or improvement of the proposed consolidation is
consistent with the General Plan and any applicable Specific Plan.
c) That the site is physically suitable for the type and intensity of
development contemplated under the approved consolidation.
d) That the design of the consolidation or the proposed improvements
are not likely to cause substantial environmental damage nor
substantially and avoidably injure fish or wildlife or their
habitat.
e) That the design of the consolidation or the type of improvements
associated therewith are not detrimental to the health, safety,
peace, morals and general welfare of persons residing or working in
the vicinity of the consolidation.
f) That the design of the consolidation and its associated improvements
will not conflict with ezzements acquired by the public at large for
access through or use of property within the proposed consolidation.
- 1 -
RESOLMON IM. 4001 (19-J1M-87) 10/28/87
Page - 2 -
NOW, THEREFORE, BE IT RESOLVED:
That upon careful consideration of maps, exhibits, facts, testimony and
other evidence submitted in this matter, the application for the Tentative
Parcel Map is hereby approved, subject to the conditions enumerated in
this Resolution beginning on Page 2 thereof; and
BE IT FURTHER RESOLVED:
That the subconclusions upon which the findings and conditions specified
in this resolution are based are contained in the Public Hearing record
concerning Application 19-IM-87, as set forth in the Minutes of the
Planning Director Meeting of October 28, 1987, and are incorporated by
reference as though fully set forth herein.
SECTION II: APPLICATION DESCRIPTION
Application No(s) 19-TM-87
�._ Applicant: Mission Engineers, Inc.
Property Owner: Mariani Group of Companies
Location: Southwest corner of De Anza Boulevard and
Homestead Road
SECTION III: CONDITIONS AEMINISPERED BY THE PUBLIC WORKS DEPARIM NP
1. STREET IMPROVEMENTS & DEDICATION
Street widening, inprovements, and dedications shall be in
accordance with City Standards and specifications and as required by
the City Engineer.
2. CURB. GCT= & SIDEWALK
Curbs, gutters, sidewalks, and structures shall be installed to
grades and to be constructed in accordance with standards specified
by the City Engineer.
3. LIGHTING
Street lighting shall be installed and shall be as approved by the
City Engineer. On -street lighting shall be as required by the
Architectural and Site Approval Committee and ordinances and
regulations of the City. All on and off -site lighting shall
designed to in no way interfere with adjacent areas and shall be no
higher than the maximum height permitted by the zone in which the
property is located.
RESOLUTION NO. 4001 (19-1M-87) 10/28/87
Page-3-
4. FIRE HYDPA M
Fire hydrants shall be located as required by the City.
5. TRAFFIC CONTROL SIGNS
Traffic control signs will be placed at locations to be specified by
the City.
Msng�-aa.
Street trees will be planted in the public right-of-way and shall be
of a type approved by the City in accordance with Ordinance No. 125.
7. GRADING
Grading shall be as approved and required by the City Engineer in
accordance with Ordinance No. 214(a).
Drainage shall be to the satisfaction of the City Engineer.
Surface flow across public sidewalks may be allowed in R1, R2, and
R3 zoning unless storm drain facilities are deemed necessary by the
City Engineer.
All developments other than R1, R2, and R3 zoning shall be served by
on -site storm drainage facilities connected to the City storm
drainage system. If City storm drains are not available, drainage
facilities shall be installed to the satisfaction of the City
Engineer.
9. UNDERGROUND UTILITIES
The applicant shall be responsible for conplying with the
requirements of the Underground Utility Ordinance No. 331 and other
related ordinances and regulations of the City of Cupertino, and
shall make the necessary arrangements with the utility companies
involved for the installation of said facilities. The applicant
shall submit a detailed plan showing utility underground provisions.
(This plan must have prior approval of the utility conpanies and the
City Engineer.)
• • • • is • a• a� is
The project developer shall enter into a development agreement with
the City of Cupertino providing for payment of fees, including but
not limited to checking and inspection fees, storm drain fees, park
dedication fees and fees for undergrounding of utilities. Said
agreement shall be executed prior to issuance of construction
permits.
RESOLUTION NO. 4001 (19-0I-87) 10/28/87
Page - 4 -
11. TRAFFIC SIGNAL RELOCATION
Traffic signals shall be relocated as required by the City.
12. RIGHT TURN LANE
A right turn lane shall be provided on Homestead Road. The
transition to the right turn lane shall be consistent with City
StardarclG. The applicant shall install any off -site improvements
necessary to accxanplish this, including off -site dedications.
13. PEDESTRIAN EASEhMENT
Pedestrian easements over the sidewalk area shall be prepared by the
developer, approved by the City Attorney and recorded against the
subject property prior to issuance of building permits.
SECTION IV: CONDITIONS ADIMUSTERED BY THE PLANNING DEPARTNla1T
14. APPROVED E MBITS
That the approval is based on Exhibit A of Application 19-ZM-87
except as may be amended by additional conditions enumerated herein.
15. LIMITED APPROVAL
This approval is limited to the consolidation of two parcels into
one parcel and is not intended to inply approval of any proposed
structures or site improvements shown on Exhibit A.
16. INGRESS/EGRESS EASEMENTS
The applicant shall record a covenant agreeing to enter into
ingress/egress easements with the adjoining property owner at such
time as the City can require the same of said adjoining owner.
17. DRIVEWAY CONSOLIDATION
The applicant shall record a covenant agreeing to consolidate
driveways with the adjoining property owner at such time as the City
can require the same of said adjoining owner.
APPROVED this 28th day of October, 1987, before the Director of Planning
and Development of the City of Cupertino, State of California.
W'-t- 5 4�Lvcw,
Robert S. Cowan
Director of Planning And Development
RES19TM87(Q1)