Loading...
Reso 401216-04-87 (Rev.) CITY OF CUPERTINO 10430 S. De Anza Boulevard Cupertino, California 95014 RESO=ON NO. 4012 OF THE PLANNING O:IMSSION OF THE CITY OF CUPERTINO APPROVING A TENTATIVE MAP TO SUBDIVIDE ONE LOT INM THREE PARCELS SECTION 1: FINDINGS WHEREAS, the Planning Commission of the City of Cupertino received an application for a Tentative Subdivision Map, as described on Page 2 of this Resolution; and WHEREAS, the necessary public notices have been given as required by the subdivision and Procedural Ordinances of the City of Cupertino, and the Planning Commission has held at least one Public Hearing in regard to the application; and WHEREAS, the Planning Commission finds that the application meets the following requirements: a) That the proposed subdivision map is consistent with the City of Cupertino General Plan and any applicable Specific Plan. b) That the design or inprovement of the proposed subdivision is consistent with the General Plan and any applicable Specific Plan. c) That the site is physically suitable for the type and intensity of development contemplated under the approved subdivision. d) That the design of the subdivision or the proposed improvements are not likely to cause substantial environmental damage nor substantially and avoidably injure fish and wildlife or their habitat. e) That the design of the subdivision or the type of improvements associated therewith are not detrimental to the health, safety, peace, morals and general welfare of persons residing or working in the vicinity of the subdivision. f) That the design of the subdivision and its associated improvements will not conflict with easements acquired by the public at large for access through or use of property within the proposed subdivision. NOW, THEREFORE, BE IT RESOLVED: That upon careful consideration of maps, exhibits, facts, testimony and other evidence submitted in this matter, the application for Tentative Subdivision Map is hereby approved, subject to the conditions enumerated in this Resolution beginning on Page 2 thereof; and RESOLTTTION NO. 4012 (16-1IM-87 Rev.) 11/23/87 PAGE - 2 - BE IT FURTHER, RESOLVED: That the subconclusions upon which the findings and conditions specified in this Resolution are based are contained in the public Hearing Record concerning Application 16-M-87 (Rev), as set forth in the Minutes of the planning Commission Meeting of November 23, 1987, and are incorporated by reference as though fully set forth herein. SECTION II • PROJECT DESCRIPTIODI Application No(s) 16-TM-87 Applicant: warren Whaley Property Owner: Bobbie Roberts Location: West side of Clarkston Avenue, anoroxi ggly 100 feet north of Flintshire Street SECTION III: CONDITIONS AUGNISTERED BY THE PUBLIC WORKS DEPAIrIMFNP Street widening, improvements and dedications shall be provided in accordance with City standards and specifications and as required by the City Engineer. r • �:: s .0 r, IMM�: �u�5:•�l�%3ui�Yi.'1 Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades and standards as specified by the City Engineer. 3. STREET LIGHTING INSTAIIATION Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjoining properties, and shall be no higher than the maximann height permitted by the zone in which the site is located. 4. FIRE FIYT7EtANT Fire hydrants shall be located as required by the City. 5. 'TRAFFIC SIGNS Traffic control signs shall be placed at locations specified by the City. RESOL=ON NO. 4012 (16-d3M-87 Rev.) 11/23/87 PAGE - 3 - 6. STREET TREES Street trees shall be planted within the Public Right of Way and shall be of a type approved by the City in accordance with Ordinance 125. 7. GRADING Grading shall be as approved and required by the City Engineer in accordance with Ordinance 125. 8. DRF Drainage shall be provided to the satisfaction of the City Engineer. Surface flow across public sidewalks may be allowed in the R-1, R-2 and R-3 zones unless storm drain facilities are deemed necessary by the City Engineer. Development in all other zoning districts shall be served by on site storm drainage facilities connected to the City storm drainage system. If City storm drains are not available, drainage facilities shall be installed to the satisfaction of the City Engineer. 9. UNDERGROUND UrILSTIES The developer shall conply with the requirements of the Underground Utilities ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. The developer shall submit detailed plants showing utility underground provisions. Said plants shall be subject to prior approval of the affected utility provider and the City Engineer. 10. DEVELDPIMq-, AGREFNff3dr The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for undexgrounding of utilities. Said agreement shall be executed prior to issuance of construction permits. SECTION IV: C014DIT7ONS ADMINISTERED BY THE PLANNING DEPAR MENr 11. APPROVED E74iIBITS The reocmme-rdation of approval is based on Exhibit A of Application 16-JDf-87 (Rev.), except as may be amended by the Conditions contained in this Resolution. RESOLUMON NO. 4012 (16--IIM1-87 Rev.) 11/23/87 PAGE - 4 - 12. ACCESS/FIRE PROTECPION — LOT 1 The access corridor serving Parcel 1 as shown on Exhibit A shall be recorded as a fire lane easement on the final map and shall meet city standards, including provision of a 32 foot inside radius which will require adjustment of the westerly boundary of Parcel 3, and reduction of lot area for said Parcel 3 by approximately 500 sq. ft. Open parking spaces required by the R1 Ordinance shall not be located in the fire lane. Paving of said corridor shall be limited to the northerly 12 foot width thereof; the remaining 8 foot width shall be left as open soil, or treated with ground cover requiring minimal irrigation, along the entire length of the adjoining property to the south in order to protect the root system of the specimen trees on said adjoining site. The subdivider may retain the option to provide an interior fire sprinkler system within the fixture home to be built on Parcel 1. Should the sprinkler option be chosen, the final map may reflect elimination of the fire lane easement, the aforementioned radius adjustment and fire equipment turnaround area. However, the twelve foot wide paved access corridor shall be configured as described in the per! paragraph. 13. TREE PROTECTION The applicant shall provide a plan for preservation of the 42 inch Redwood on Lot 3. Retention of the 24 inch Deodora Cedar on Lot 2 is optional. Said plan shall include graphic depiction of a protection device to be installed along the dripline perimeter of said tree(s) for the duration of construction activities. The plan shall include a written report from a consulting arborist or landscape architect, approved by the Department of Planning and Development prior to preparation of the report. Said report shall detail measures to be taken to ensure the survival of said specimen(s) during and after construction. J a :• • • �� p; a�17�.J9 All existing structures on the site shall be removed prior to recordation of the final map. The developer shall assume the responsibility to obtain all required demolition permits in accordance with city oniinan^es. Alternatively, the subdivider may post a bond to ensure demolition of existing structures. Under this latter option, the structures shall be removed prior to transfer of interest in any Parcel• RESOLUTION NO. 4012 (16-TM-87 Rev.) 11/23/87 PAGE - 5 - 110 PASSED AND ADOPTED this 23rd day of November, 1987 at a Regular Meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: COMMISSIONERS: Szabo, Claudy, Sorensen, Chr. Mackenzie NOES: COMMISSIONERS: None ABSTAIN: COMMISSIONERS: None ABSENT: COMMISSIONERS: Adams ATTEST: APPROVED: VerL1-4-1,0-WA Robert Cowan Do Mackenzie, airman Director of Planning Cupertino P1 Commission 1) S