Reso 2047N
OF THE FLWNNZ,4!�TG CO-'*�tISSION OF CITY OF WFERTINO
APPROVAL OF MODIFICATION TO
NUMBER 184C,
a r i.'
APPLICANT: Lam
bert, ert, Newman, o glas, w.fo Ri'i and H. Childress
SUBMITTED: February 25, 1980
LOCATION: Lindy Canyon at westerly _erminus .of Lindy Lance
Approval in recommended subject to :"s;e findings 35 set forth on Page 1 and
sub nonclusi ns as set forth in the minutes of the Planniag Commission
meeting can March 10, 1980.
i- 14. Standard Conditions to the extent that zhev do not conflict it'd the
C a f: n' Qertinc
MENT
L CITY 57ANDARD DEVELOPZONDITISN'
Streer widening, improvements, ana dedications shall ne
in accordance with City standards and specifications and
as required by the City Engineer.
Curbs, gutters, sidewalks and structures Shal'.
installed to grades and to be constructed in accordance
with standards specified by the City Engineer.
3, Street lighting shall be installed and shall je as
approved by the City Engineer. On -site lighting shall
be as required by the Architectural and Site Approval
Committee and ordinances and regulations of the City.
All on and off site lighting shall be designed to in
no Way interfere with adjacent areas and shall be no
higher than the maximum height permitted by the zoiie
in which the property is Iccated.
A. Fire hydrants shall be lovated as Tes: uired by the Cityt
3, Traflic control signs will be placed at locations to be
specified by the City.
o. Street trees will be planted in the public right-of-way
and shall be of a type approved by the City in accordance
With Ordinance :No. 125.
Grading shall be as approved and required by the 0t%-
Engineer in accordance with Ordinance No. 214(a).
3. Drainage shall be to the satisfaction of the
Engineer.
Surface flow across public sidewalks may be allowed in
Rl, R2 and R3 zoning unless storm drain facilitie4 are
deemed necessary by the City Engineer.
All developments other than Rl, RZ and R3 zoning shall
be served by on -site storm drainage facilities connected
to the City storm drainage system. If City storm drains
are not available, drainage facilities shall be installed
to the satisfaction of the City Engineer.
9. The applicant shall be responsible for complying with 2he
requirements of the Underground Utility Ordinance No. 331
and other related ordinances and regulations of the Wzy
of Cupertino, and shall make the necessary arrangements
with the utility companies involved for the installaticr,
of said facilities. The applicant shall submit a detailec-
plan showing utility undergrounding provisions. t'T%is
plan must have prior approval of the utiliy companies;
and the City Engineer).
.r ri Y v G .Y ob.T F314 id
r p "i 4 ui�� iC+�z "'r
` i 1 Lr .i. ....n J ii;a }. pi a x!
$ =`* C% v*
Ln 3TP F l ndsIc"api, and omen i s R I
shall be as shown on the seta
-' title t+ ii:i.bit ` _-Xcep�- or u .iess "siiE"s�i.3�'� �
here in .
ParIcing must meet the requirements set f0 i th
Cupertino City Ordinance No. 00,'(Iq- and must oe
accordance with the approved plot plan
117. A masonry wall will be built by any commercial developer
to separate such commercial area from any resident;al
area. such wall shall be six feet high above the highest
adjoiniag finisaed grade.
13 Landscaping areas shall be maintained at w s n can s i te
plan. Detailedlandscaping plans, related to arra.r_ge-
went, selection f plant materials and sizesrkall
be
approved by the Architectural and Site Approval Com-
m ttee and City Council prior, to issuancello
permit'.
The ,^.. piicant, sha11 be respons ib Y e s or cone
site as :sown on approved plot plan and shall be r e q iii r e a
to enter irto a development a,�een_�e.a with the C� .fir c� ,p n
ciud
Cupert2n{? ^roe a diZg for pa;�ment of necessary , feps . ';; ¢
iag but not limited to, checking and inspection =es, t
I storms drain fee, and L2i1eT�TQUI3d tt l tY fee. , Said �rw'
„ , e issuance
02-
of � �tl� i 1ing
'
went shall. be executed pricer h
hermit
a-"y ,`t z+ x' .: y S,y'' ✓' a4 dt
r r a cox' ar -
Vi
2` J