Loading...
Reso 258617-U-63 FIESOLUT ION NO. 2506 (Minute Urdrrr-> OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPRUVING A MINOR CHANGE AS PROVIDED E1Y CONDITION 29 OF THE CITY COUNCIL ACTION LETTER DATED 110VEME+ER 1, 1983 0Y MODIFYING A PORTION OF THE DEPRESSED PARKING LOT AS SHOWN ON EXHIBITS H AND I OF USE PERMIT APPLICATION 17-U-83. F 114D I MGS: VVe to the fact that the major portion of the parking lot will remain depressed and that only a small portion adjacent to the building is to be elevated, the Commission finds that the intent of the General Plan Policy statements is being satisfied. PASSED AND ADOPTED this 26th day of November, 1984, at a regular meeting of the Planning Commission of the City of Lup rtino. State of California, by the following roll call vote: AYES: Commissioners Adams, Chairman Claudy NAYS: None ABSTAIN: None ABSENT: None ATTEST: /s/ James H. Sisk ----------------- James H. Sisk Planning Director Mackenzie, Sorensen, Szabo, APPROVED: /s/ John Claudy -------------------------- John Claudy, Chairman Planning Commission Revised August b, 1984 CITY OF CUPERTINO 1_15_Ci_ty_Standard_Dev_elogmant_Conditions 1. Street widening, improvements, and dedications shall be in accordance with City Standards and specifications and as required by the City Engineer. 2. Curbs, gutters, sidewalks and structures shall be installed to grades and to be constructed in accordance with standards specified by the City Engineer. 3. Street lighting shall be installed and shall be as approved by the City Engineer. On -street lighting shall be as required by the Architectural and Site Approval Committee and ordinances and regulations of the City. All on and off -site lighting shall be designed to in no way interfere with adjacent areas and shall be no higher than the maximum height permitted by the zone in which the property is located. 4. Fire hydrants shall be located as required by the City. 5. Traffic control signs will be placed at locations to be specified by the City. b. Street trees will be planted in the public right-of-way and shall be of a type approved by the City in accordance with Ordinance No. 125. 7. Grading shall be as approved and required by the City Engineer in accordance with ā¯‘rdinance No. 214(a). S. Drainage shall be to the satisfaction of the City Engineer. Surface flow across public sidewalks may be allowed in R1, R2, and R3 zoning unless storm drain facilities are deemed necessary by the City Engineer. All developments other than R1, R2, and R3 zoning shall be served by on -site storm drainage facilities connected to the City storm drainage system. If City storm drains are not available, drainage facilities shall be installed to the satisfaction of the City Engineer. 9. The applicant shall be responsible for complying with the requirements of the Underground Utility Ordinance No., 331 and other related ordinances and regulations of the City of Cupertino, and shall make the necessary arrangements with the utility companies involved for the installation of said facilities. The applicant shall submit a detailed plan showing utility underground provisions. (this plan must have prior approval of the utility companies and the City Engineer.) 10. The location of all buildings, fences, roadways, parking areas, landscaping and other facilities or features shall be as shown on the site plan submitted labeled "E::hibit A". except or unless indicated otherwise herein. 1 1-15 Standard Conditions (Continued) 11. Parking must meet the requirements set forth in Cupertino City Ordinance No. 002(q) and must be in accordance with the approved plot plan. 12. A masonry wall will be built by a commercial developer to separate such commercial area from any residential area; such wall shall be six feet high above the highest adjoining finished grade. 13. Landscaping areas shall be maintained as shown on site plan. Detailed landscaping plans, related to arrangement, selection of plant materials and sizes, shall be approved by the Architectural and Site Approval Committee and City Council prior to issuance of a building permit. 14. The applicant shall be responsible for completing the site as shown on approved plot plan and shall be required to enter into a development agreement with the City of Cupertino providing for payment of necessary fees, including but not limited to checking and inspection -fees, storm drain fee, and underground utility fee. Said agreement shall be executed prior to the issuance of a building permit. 15. Electrical -and telephone transformers shall be screened with fencing and landscaping, or undergrounded, such that they are not visible from public street areas.