PC Packet 02-13-2018CITY OF CUPERTINO
AGENDA
PLANNING COMMISSION
6:45 PM
10350 Torre Avenue, Council Chamber
Tuesday, February 13, 2018
PLEDGE OF ALLEGIANCE
ROLL CALL
CEREMONIAL MATTERS AND PRESENTATIONS
1.Subject: Elect a Chair, Vice Chair and Committee representatives
Recommended Action: Recommend and elect a Planning Commission Chair,
Planning Commission Vice Chair, make a recommendation to the City Council for a
representative to the Environmental Review Committee, keep or select new
representatives to the Housing Commission and Economic Development Committee
Staff Report
1 - Committee Appointments
2 - 2018 meeting calendar
APPROVAL OF MINUTES
2.Subject: Draft Minutes of January 23, 2018
Recommended Action: approve the Draft Minutes of January 23, 2018
Draft Minutes of January 23, 2018
POSTPONEMENTS
ORAL COMMUNICATIONS
This portion of the meeting is reserved for persons wishing to address the Commission
on any matter not on the agenda. Speakers are limited to three (3) minutes. In most
cases, State law will prohibit the Commission from making any decisions with respect
to a matter not on the agenda.
WRITTEN COMMUNICATIONS
CONSENT CALENDAR
Page 1
February 13, 2018Planning Commission AGENDA
Unless there are separate discussions and/or actions requested by council, staff or a
member of the public, it is requested that items under the Consent Calendar be acted
on simultaneously.
PUBLIC HEARINGS
OLD BUSINESS
NEW BUSINESS
3.Subject: Planning Commission Work Program 2018
Recommended Action: discuss Work Program for 2018
Staff Report
1 - 2017-2018 City Work Program
STAFF AND COMMISSION REPORTS
ADJOURNMENT
Page 2
February 13, 2018Planning Commission AGENDA
If you challenge the action of the Planning Commission in court, you may be limited to
raising only those issues you or someone else raised at the public hearing described in
this agenda, or in written correspondence delivered to the City of Cupertino at, or prior
to, the public hearing. In the event an action taken by the planning Commission is
deemed objectionable, the matter may be officially appealed to the City Council in
writing within fourteen (14) days of the date of the Commission’s decision. Said appeal
is filed with the City Clerk (Ordinance 632).
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning
to attend the next Planning Commission meeting who is visually or hearing impaired
or has any disability that needs special assistance should call the City Clerk's Office at
408-777-3223, 48 hours in advance of the meeting to arrange for assistance. Upon
request, in advance, by a person with a disability, Planning Commission meeting
agendas and writings distributed for the meeting that are public records will be made
available in the appropriate alternative format. Also upon request, in advance, an
assistive listening device can be made available for use during the meeting.
Any writings or documents provided to a majority of the Planning Commission after
publication of the packet will be made available for public inspection in the
Community Development Department located at City Hall, 10300 Torre Avenue,
during normal business hours and in Planning packet archives linked from the
agenda/minutes page on the Cupertino web site.
IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal
Code 2.08.100 written communications sent to the Cupertino City Council,
Commissioners or City staff concerning a matter on the agenda are included as
supplemental material to the agendized item. These written communications are
accessible to the public through the City’s website and kept in packet archives. You are
hereby admonished not to include any personal or private information in written
communications to the City that you do not wish to make public; doing so shall
constitute a waiver of any privacy rights you may have on the information provided to
the City.
Members of the public are entitled to address the Planning Commission concerning
any item that is described in the notice or agenda for this meeting, before or during
consideration of that item. If you wish to address the Planning Commission on any
issue that is on this agenda, please complete a speaker request card located in front of
the Commission, and deliver it to the City Staff prior to discussion of the item. When
you are called, proceed to the podium and the Chair will recognize you. If you wish to
Page 3
February 13, 2018Planning Commission AGENDA
address the Planning Commission on any other item not on the agenda, you may do so
by during the public comment portion of the meeting following the same procedure
described above. Please limit your comments to three (3) minutes or less. Please note
that Planning Commission policy is to allow an applicant and groups to speak for 10
minutes and individuals to speak for 3 minutes.
For questions on any items in the agenda, or for documents related to any of the items
on the agenda, contact the Planning Department at (408) 777 3308 or
planning@cupertino.org.
Page 4
PLANNING COMMISSION STAFF REPORT
Agenda Date:February 13, 2018
SUBJECT
Appointment of a Chair, Vice Chair and Committee representatives
RECOMMENDATION
Elect a Chair and Vice Chair
Recommend an Environmental Review Committee (ERC) representative
Appoint a Housing Commission representative
Appoint a Design Review Committee (DRC) member and an alternate
Appoint an Economic Development Committee representative
Discuss the Hearing Schedule for 2018
BACKGROUND
Terms
The terms of office of the Chair, Vice Chair and Design Review Committee members are
for one year and end in January of each year.
Environmental Review Committee
Typically, the City Council reviews the staff members of ERC annually. Historically,
the Planning Commission recommends its Chair to serve on the Environmental Review
Committee. The Planning Commission’s recommended ERC member will be reviewed
and formally appointed by the City Council.
Housing Commission
The Planning Commission sends a representative to the Housing Commission to
provide better communication between the Commissions. The Planning Commissioner
is not a voting member and there is no term of office. New appointments occur from
time-to-time; the same representative may be re-appointed or a new representative may
be selected. Usually the selection is determined by the level of interest of a particular
Planning Commissioner.
COMMUNITY DEVELOPMENT DEPARTMENT
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3308 • FAX (408) 777-3333
Design Review Committee
The Municipal Code provides that the Vice Chair of the Planning Commission is the
Chair of the Design Review Committee, so only one member and an alternate need to
be appointed.
Economic Development Committee
Each year, the Planning Commission sends a representative to the Economic
Development Committee to help enhance awareness and communication with the
business community. The Economic Development Committee is an ad hoc committee.
There are no term limits, the same representative may be re-appointed or a new
representative may be selected.
DISCUSSION
Chair and Vice Chair: The selection of the Chair typically is the Vice Chair, who was
Geoff Paulsen (appointed in January 2015, first term ends 2019). The selection of the
new Vice Chair typically is based on seniority and rotation. The following
Commissioners are listed below based on seniority and rotation:
1. Don Sun – re-appointed January 2015 (second term ends 2019)
2. Geoff Paulsen –appointed January 2015 (first term ends 2019)
3. Alan Takahashi – re-appointed in January 2017 (second term ends 2021)
4. David Fung – appointed January 2017 (first term ends January 2021)
5. Jerry Liu – appointed January 2017 (first term ends January 2021)
Prepared by: Beth Ebben, Administrative Assistant
Approved by: Benjamin Fu, Assistant Director of Community Development
Attachments:
1 - Planning Commission Committee Appointees
2 - Tentative 2018 Planning Commission Hearing Calendar
G:\Planning\PDREPORT\MISCELL\2015-2017\pc appointments 2-13-18.rtf
PLANNING COMMISSION COMMITTEE APPOINTEES updated 2/13/18
Planning Commission Meeting / 2nd & 4th Tuesday, 6:45 p.m.
- Chair
– Vice Chair
- Commissioner
- Commissioner
- Commissioner
Design Review Committee / 1st & 3rd Thursday, 5:00 p.m., Conference Room C
- Chair (the Vice Chair always serves as the Chair for this Committee)
- Commissioner
- alternate
Economic Development Committee/ Quarterly, 2nd Wednesday, 10:00a.m., Conference
Room A (2-14-18, 5-09-18, 8-08-18 and 11-14-18)
– representative
– alternate
(City Council representatives: Scharf, Vaidhyanathan)
Environmental Review Committee / 1st & 3rd Thursday, 9:30 a.m., Conference Room C
– representative (the Chair is always recommended for appointment to this Committee by the
Council)
– alternate
(City Council representatives: Paul, Scharf (alternate))
Housing Commission Meeting / 2nd Thursday, 9:00 a.m., Conference Room C
– representative
- alternate
Mayor’s Monthly Meeting/ 1st Wednesday, 5:30pm, Conference Room A
cancelled…January 3rd
…February 7th
…March 7th
…April 4th
…May 2nd
…June 6th
…July 4th
…August 1st
…September 5th
…October 3rd
…November 7th
… December 5th
◄
Dece
mber January 2018 Febru
ary ►
Su
n Mon Tue Wed Thu Fri Sat
1
HOLIDAY
2
HOLIDAY
3
Mayor’s Monthly Meeting
4
ERC meeting
DRC meeting
5 6
7 8 9
PC meeting
10 11
AH meeting
HC meeting
12 13
14 15
HOLIDAY
16
CC meeting
17 18
ERC meeting
DRC meeting
19 20
21 22
FAC meeting
23
PC meeting
24 25
AH meeting
26 27
28 29 30 31
◄
Janua
ry February 2018 Marc
h ►
Sun Mon Tue Wed Thu Fri Sat
1
ERC meeting
DRC meeting
2 3
4 5 6
CC meeting
7
Mayor’s Monthly Meeting
8
AH meeting
HC meeting
9 10
11 12 13
PC meeting
14
Econ Dev meeting
15
ERC meeting
DRC meeting
16 17
18 19
HOLIDAY
20
CC meeting
21 22
AH meeting
23 24
25 26 27
PC meeting
28
◄
Febru
ary March 2018 Apri
l ►
Sun Mon Tue Wed Thu Fri
Sa
t
1
ERC meeting
DRC meeting
2 3
4 5 6
CC meeting
7
Mayor’s Monthly Meeting
8
AH meeting
HC meeting
9 10
11 12 13
PC meeting
14
Pre-Hearing meeting
15
ERC meeting
DRC meeting
16 17
18 19 20
CC meeting
21 22
AH meeting
23 24
25 26
FAC meeting
27
PC meeting
28 29 30 31
◄
March April 2018 Ma
y ►
Sun Mon Tue Wed Thu Fri
Sa
t
1 2 3
CC meeting
4
Mayor’s Monthly Meeting
5
ERC meeting
DRC meeting
6 7
8 9 10
PC meeting
11 12
AH meeting
HC meeting
13 14
15 16 17
CC meeting
18 19
ERC meeting
DRC meeting
20 21
22 23 24
PC meeting
25 26
AH meeting
27 28
29 30
◄April May 2018 June
►
Sun Mon Tue Wed Thu Fri Sat
1
CC meeting
2
Mayor’s Monthly Meeting
3
ERC meeting
DRC meeting
4 5
6 7 8
PC meeting
9
Econ Dev meeting
10
AH meeting
HC meeting
11 12
13 14 15
CC meeting
16 17
ERC meeting
DRC meeting
18 19
20 21 22
PC meeting
23 24
AH meeting
25 26
27 28
HOLIDAY
29
Sp FAC meeting
30 31
◄May June 2018 July
►
Sun Mon Tue Wed Thu Fri Sat
1 2
3 4 5
CC meeting
6
Mayor’s Monthly Meeting
7
ERC meeting
DRC meeting
8 9
10 11 12
PC meeting
13 14
AH meeting
HC meeting
15 16
17 18 19
CC meeting
20 21
ERC meeting
DRC meeting
22 23
24 25 26
PC meeting
27 28
AH meeting
29 30
◄June July 2018 Augu
st ►
Sun Mon Tue Wed Thu Fri Sat
1 2 3
CC meeting
4
Mayor’s Monthly Meeting
HOLIDAY
5
ERC meeting
DRC meeting
6 7
8 9 10
PC meeting
11 12
AH meeting
HC meeting
13 14
15 16 17
CC meeting
18 19
ERC meeting
DRC meeting
20 21
22 23
FAC meeting
24
PC meeting
25 26
AH meeting
27 28
29 30 31
◄July August 2018
Sept
emb
er ►
Sun Mon Tue Wed Thu Fri Sat
1
Mayor’s Monthly Meeting
2
ERC meeting
DRC meeting
3 4
5 6 7
CC meeting
8
Econ Dev meeting
9
AH meeting
HC meeting
10 11
12 13 14
PC meeting
15 16
ERC meeting
DRC meeting
17 18
19 20 21
CC meeting
22 23
AH meeting
24 25
26 27 28
PC meeting
29 30 31
◄
August September 2018
Oct
obe
r ►
Sun Mon Tue Wed Thu Fri
Sa
t
1
2 3
HOLIDAY
4
CC meeting
5
Mayor’s Monthly Meeting
6
ERC meeting
DRC meeting
7 8
9 10 11
PC meeting
12 13
AH meeting
HC meeting
14 15
16 17 18
CC meeting
19 20
ERC meeting
DRC meeting
21 22
23 24
FAC meeting
25
PC meeting
26 27
AH meeting
28 29
30
◄
Septem
ber October 2018
Nove
mber
►
Sun Mon Tue Wed Thu Fri Sat
1 2
CC meeting
3
Mayor’s Monthly Meeting
4
ERC meeting
DRC meeting
5 6
7 8 9
PC meeting
10 11
AH meeting
HC meeting
12 13
14 15 16
CC meeting
17 18
ERC meeting
DRC meeting
19 20
21 22 23
PC meeting
24 25
AH meeting
26 27
28 29 30 31
◄
October November 2018
Dece
mber
►
Sun Mon Tue Wed Thu Fri Sat
1
ERC meeting
DRC meeting
2 3
4 5 6
CC meeting
7
Mayor’s Monthly Meeting
8
AH meeting
HC meeting
9 10
11 12
HOLIDAY
13
PC meeting
14
Econ Dev meeting
15
ERC meeting
DRC meeting
16 17
18 19 20
CC meeting
21
Sp AH meeting
22
HOLIDAY
23
HOLIDAY
24
25 26
FAC meeting
27
PC meeting
28 29 30
◄
Novemb
er December 2018
Janu
ary
►
Sun Mon Tue Wed Thu Fri Sat
1
2 3 4
CC meeting
5
Mayor’s Monthly Meeting
6
ERC meeting
DRC meeting
7 8
9 10 11
PC meeting
12 13
AH meeting
HC meeting
14 15
16 17 18
CC meeting
19 20
ERC meeting
DRC meeting
21 22
23 24
HOLIDAY
25
HOLIDAY
26
CITY HALL CLOSED
27
AH meeting
CITY HALL CLOSED
28
CITY HALL CLOSED
29
30 31
HOLIDAY
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, CA 95014
CITY OF CUPERTINO
PLANNING COMMISSION MEETING
DRAFT MINUTES, January 23, 2018
PLEDGE OF ALLEGIANCE
At 6:45 p.m Chairperson Sun called to order the regular Planning Commission meeting
in the Cupertino Community Hall Council Chambers, 10350 Torre Avenue, Cupertino,
CA. and led the Pledge of Allegiance.
ROLL CALL
Present: Chairperson Don Sun, Vice Chairperson Geoff Paulsen and Commissioner
David Fung. Absent: Commissioners Alan Takahashi, and Jerry Liu
APPROVAL OF MINUTES
1.Subject:Draft Minutes of September 12, 2017.
Recommended Action: Approve the Draft Minutes of September 12, 2017
2.Subject:Draft Minutes of September 26, 2017.
Recommended Action: Approve the Draft Minutes of September 26, 2017
3.Subject:Draft Minutes of November 14, 2017.
Recommended Action: Approve the Draft Minutes of November 14, 2017
Moved by Paulsen and seconded by Fung. The motion carried 3-0-2 (Liu and
Takahashi absent)
POSTPONEMENTS/REMOVAL FROM CALENDAR: None
ORAL COMMUNICATIONS: None
WRITTEN COMMUNICATIONS:
statements were received regarding Item #4
CONSENT CALENDAR: None
PUBLIC HEARINGS:
4.Subject: Consider an appeal of the Director’s decision to approve a Two-Story Permit
to allow the construction of a new 2,400 square foot two-story, single family residence
and a Minor Residential Permit to allow for the construction of a new rear and side-facing
second story balcony. Application No(s): R-2017-27, RM-2017-28; Applicant(s): Frank Ho
(Sun/Hou residence); Appellant(s): Joseph Chou and Jeff and Christine Ronne; Location:
18850 Barnhart Avenue APN# 375-33-015
Recommended Action:That the Planning Commission adopt the draft resolutions to
deny the appeal and uphold the Community Development Director’s decision to approve
a Two-Story Permit (R-2017-27 and a Minor Residential Permit (RM-2017-28) for the
project.
Assistant Planner Erika Poveda reviewed the Staff Report
The Applicant(s) and the Appellant(s) addressed to and answered questions from the
Commissioners
Chair Sun opened the public comment period and the following individual(s) spoke:
Jennifer Griffin
Chair Sun closed the public comment period
Moved by Com. Paulsen, second by Com. Fung, and carried 3-0-2 (Takahashi and Liu
absent) to deny the appeal and uphold the decision of the Director of Community
Development to approve Application No(s). R-2017-27 and RM-2017-28 per the Draft
Resolution(s).
OLD BUSINESS: None
NEW BUSINESS: None
REPORT OF THE DIRECTOR OF COMMUNITY DEVELOPMENT: None
REPORT OF THE PLANNING COMMISSION:
Commissioner Paulsen reported on the topics discussed in the Mayor’s Monthly Meeting
with Commissioners.
ADJOURNMENT:
The meeting was adjourned at 7:40pm to the next Planning Commission meeting on
February 13, 2018 at 6:45 p.m.
Respectfully Submitted:
______/s/Beth Ebben_______________
Beth Ebben, Administrative Assistant
PLANNING COMMISSION STAFF REPORT
Agenda Item No. Agenda Date:February 13, 2018
APPLICATION
Planning Commission work program for FY2018-19
RECOMMENDATION
Review and recommend that the City Council adopt the Planning Commission FY2018-
19 work program.
BACKGROUND
The Planning Commission may consider adopting a draft work program each year,
which is forwarded to the City Council for consideration. The proposed work program
is primarily based on the City Council’s adopted goals for 2017-2018 (Attachment 1).
Other projects may consist of potential private developments that may be seeking to
undergo the development review process.
DISCUSSION
The projects that are anticipated for the Planning Department in Fiscal Year 2018/2019
include the projects listed below. The list also includes items discussed for the current
fiscal year. There may be additional items based on Council feedback.
1. On-line Permitting System.
Enable applicants and members of the public access status of plan/development
review through new online permitting system. The new system allows increased
transparency and efficiency through heightened public access and improves
accountability and overall customer experience. The internal module had been
implemented for Planning, Building, Public Works and Business License functions.
The transition is anticipated to begin in the spring 2018 and continue into the
summer of 2018.
2. Outreach.
OFFICE OF COMMUNITY DEVELOPMENT
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org
FY 2018-19 Planning Commission Work Program February 13, 2018
Page 2
a. Collaboration with other departments to increase community outreach through
new technologies. Build youth engagement by connecting with youth groups
such as Teen Commission, De Anza College, and High Schools. Ongoing efforts
in collaboration with various Departments and agencies including the schools
depending on the project.
b. Monthly presentation at Creekside Farmers Market to encourage public
interaction with Community Development Department services and ongoing
projects.
c. Expand outreach to the business community to surface and address business
needs through available and future City services. Ongoing efforts with the
Economic Development Manager to engage the retail and business community.
d. Improve outreach and information sharing with internal staff and the public to
create greater connectivity with our business base. Ongoing efforts with the
Economic Development Manager to provide easier and effective outreach, such
as utilizing newsletters and publications.
3. Front Counter.
Further improvements to public access to planning and project update information
and promote existing tools. On-going efforts to continue to explore outreach tools,
website improvements, and increase e-subscriptions.
4. Public Document E-Library.
The creation of a digital on-line library of current and historical Planning, Building
and Public Works documents. On-going process until all documents are digitized.
5. Implement “Paperless” Permit Application System.
Please see Item 1.
6. Apple Campus 2.
While the Visitor Center opened in November 2017, phased occupancy for the main
building continues. Ancillary buildings expected to be completed by the end of 2018.
7. Main Street.
The Hotel, Park and Loft apartments are under construction. All other components
have been completed. The hotel has been completed with the conference and
restaurant portions to be finalized in spring 2018. The Lofts apartment project is
expected to be completed by spring of 2018.
8. Charities Housing.
The development of an 18-unit low income senior housing project was approved in
2017 with building permits to be submitted and reviewed by the end of 2018.
9. Cupertino Village Hotel.
The construction of a new 165-room hotel that requires general plan amendments
was authorized by the City Council to submit formal applications for general plan
amendments in August 2018.
10. Hotel on Goodyear Tire site.
FY 2018-19 Planning Commission Work Program February 13, 2018
Page 3
The construction of a new 156-room, five-story hotel, with conference space and
restaurant at the Good Year Tire site requiring general plan amendments was
authorized by the City Council to submit formal applications for general plan
amendments in August 2018.
11. The Forum.
The construction of 25 new independent living villas and associated building
addition. Draft EIR was circulated to the public in December 2017 with public
hearings anticipated in 2018.
12. Vallco Shopping District Specific Plan.
The development of the Specific Plan with outreach anticipated to conclude by fall
of 2018.
Other Projects
Any additional comments or projects suggested by the Planning Commission will be
reported to the City Council for consideration based on Council priority and the
availability of staff time. While not all projects in the Work Program may be commenced
in FY 2018-19, projects may be rolled over to the Work Program for FY2019-20 based on
availability of staff time and resources.
1. Heart of the City Specific Plan.
The Commission requested to (a) Amend the street tree list to allow alternative trees
of a larger canopy and defer the tree type to the city arborist (Public Works), and (b)
Clarify the minimum street side setback requirements.
2. The Parking Ordinance.
The Commission requested exploring the inclusion of parking incentives when
projects provide electric vehicles, charging stations, and alternative transportation
methods.
3. Teacher Housing Project.
The Commission recommended to set a goal of 100 senior or "teacher" housing units
per year for five years and/or provide incentive and priority for Cupertino residents.
4. Review Parking Requirements.
Evaluation and revision of current ordinance including conformance with State-
required reduced parking requirements related to affordable housing and projects in
Priority Development and transit areas. This item will be reviewed along with any
future update of the parking ordinance.
5. Eliminate the restriction on outdoor seating for restaurants. Currently, the ordinance
allows only 20% of a restaurant’s seating to be outdoors. This item will be reviewed
in conjunction with any future update to the General Commercial (CG) ordinance.
FY 2018-19 Planning Commission Work Program February 13, 2018
Page 4
Items that have been reviewed, completed or conducted on an ongoing basis include
the following:
6. The Commission requested a review of parking performance for projects that have
received parking variances or exceptions. Evaluations of sites in Cupertino are
conducted routinely for projects that require parking studies. This provides the City with
valuable data on how sites that were approved previously are performing.
7. Evaluate existing and proposed residential projects and impacts to schools.Staff
would like to note that this is already being conducted for residential projects and that the
analysis includes existing enrollments.
8. Evaluate the appropriateness of a Cupertino Transit Program to provide free shuttle
service.Council has already added this item as part of the community amenity list when
reviewing General Plan amendment authorizations.
9. Modify the R-1 Ordinance to address scale of projects and privacy protection
measures. The Council amended the R-1 ordinance in 2011 to relax design standards and to
allow larger homes to be constructed without design review. There are existing privacy
protection measures such as trees, opaque windows and higher window sills.
10. Any future outreach efforts to consider providing a list of various city commissions
and boards.A complete list of City commissions is provided on the City’s website. Staff
would additionally like to note that Commissions are subject to Brown Act requirements.
Prepared by: Benjamin Fu, Assistant Director of Community Development
Approved by: Aarti Shrivastava, Assistant City Manager/Director of Community
Development
Attachments:
Attachment 1 – City Council Work Program FY 2017-2018
G:\Planning\BFu\PC items\Work Program\FY 2018-2019 Planning Commission Work Program.doc
Administration
Project Title Project Objective Progress to Date Next Steps Current Status Completion Date Staff Lead
Minimum Wage Collaborate with neighboring cities to
implement a local minimum wage of $15
by 2019
Ordinance was adopted by Council on
October 4th. Staff sent out letters and
postcards to all business license holders
to notify them of the new requirement. A
contract was negotiated with San Jose's
Office of Equality Assurance for
enforcement services. Staff also worked
with Economic development to notify
residents of potential price increases due
to the new requirement and encourage
them to support local businesses.
In September, staff will make a
determination and certify to the City
Council that employment and sales tax
revenues are healthy enough to proceed
with the scheduled increases.
Completed January 2017 Jaqui Guzman
Payday Lending Prevent the proliferation of predatory
lending businesses in Cupertino
Ordinance adopted by Council December
6, 2016
Completed December 2016 Jaqui Guzman
Revamp
Cupertino
Scene
Modernize the Cupertino Scene to
increase readership and community
engagement
The February Cupertino Scene has a
completely new look with a larger page
size, brighter colors, more graphics, and
thoughtful articles.
Completed February 2017 Brian Babcock
Tools for
Community
Engagement
Explore uses for Peak Democracy as a
tool for community engagement
Funding is proposed in FY 17-18 The City will reactivate the licensing
agreement with Peak Democracy in FY
17-18 Project Approved
Brian Babcock
Teen Incubator
Project
Explore a partnership with FUSD to
establish a teen tech incubator program.
This will be an ongoing annual program.
New Project Design program in partnership with FUSD
and community/industry volunteers
In Progress December 2017 David Brandt &
Jeff Milkes
Alternative Fuel
Siting Plan
Develop a citywide alternative fuel
(including charging stations) siting plan.
Siting plans will identify appropriate
locations for Level 1 (slow charge), Level
2 (fast charge) and Level 3 and DC (rapid
charge) stations in the community (CAP
Measure C-T-7 and M-F-1).
The City's Sustainability Division
partnered with Santa Clara County to
apply for a Strategic Growth Council,
Sustainable Communities Planning Grant
to complete this work at no cost to the
City. The County was awarded the
contract to move forward and a work plan
is being developed to advance this effort
in all partner jurisdictions.
This fully-funded project will result in the
development of an alternative fuel siting
plan for the City (electric vehicle charging
stations and hydrogen fueling stations to
be considered), along with fleet and
personal vehicle policy and incentive
proposals to be advanced at the regional
scale.
In Progress June 2018 Misty Mersich
Anti-Hate
Resolution
To make a statement that Cupertino is an
inclusive city that celebrates diversity,
respects human rights, and rejects all
forms of hate and discrimination against
protected groups
Researched the different approaches
cities are taking to
Work with Cities Association on a regional
approach
In Progress May 2017 Katy Nomura &
Jaqui Guzman
Biennial
Community
Survey
To gather data from residents regarding
City services
Contracted with Godbe research, worked
with departments to develop
questionnaire, and gathered resident
contact information
The draft questionnaire was shared with
Council on March 9th. We have
scheduled the survey for the end of March
with results expected in early May.
In Progress May 2017 Jaqui Guzman
& Katy Nomura
CCE Launch and participate in a regional
Community Choice Energy Program (CAP
Measure C-E-7).
Staff was instrumental in launching Silicon
Valley Clean Energy Authority JPA in
March 2016. Cupertino was the first City
to join the JPA. To date, 10 cities and the
County have joined. SVCE has hired a
CEO and 5 staff, and will launch electricity
service for customers starting in April
2017.
Staff will continue to outreach to the
Cupertino community, to make sure they
are aware of SVCE starting service in
April 2017, and will continue outreach
through the launch period which ends July
2017.
In Progress July 2017 Misty Mersich
Administration
Project Title Project Objective Progress to Date Next Steps Current Status Completion Date Staff Lead
Climate Action
Plan
Implement the City’s Climate Action Plan
(CAP).
Staff has developed annual metrics for the
Sustainability Commission and City
Council. Public and private projects have
a CAP component.
Complete GHG Inventory Update. CAP
Implementation will follow the timeline and
framework provided in Appendix C of the
document.
In Progress 2020 Misty Mersich &
Gilee Corral
Communication
Assessment
Implement recommendations of the
Communications Assessment.
Priorities have been identified and initial
recommendations have been
implemented, including creation of a
citywide Communication Working Group.
Created a central inventory of all
communications platforms and channels
and trained key staff.
Staff will be developing City branding
standards, including a style guide for
internal and external communications.
In Progress December 2017 Brian Babcock
Cupertino
Green Team
Reinvigorate staff on workplace
environmental actions and related CAP
measures through employee centered
sustainability campaigns related to zero
waste events, reducing energy use,
greening transportation and employee
commute.
Increase information on sustainability
activities and utilize internal online
intranet to disseminate information to staff
on commuter benefits, bike fleet, electric
pool vehicles, environmental purchasing
policy, bike lockers, and other
sustainability related programs for city
staff. ( CAP Measure M-VF-1 & 3)
Revisit green team initiative and additional
forums/tools to rally staff support and
engagement to elevate behavior change
focused action across the agency.
In Progress Ongoing Misty Mersich
Energy & Water
Efficiency
Redesign GreenBiz and residential
energy efficiency and water conservation
programs to reflect current industry best
practices (i.e. behavior change,
sustainability and resilience activities) and
achieve CAP objectives (CAP Measure C-
E-1, 2, 3).
The City is working to evaluate its current
residential energy efficiency and water
conservation programs and will develop a
proposal that will remodel these services
to take advantage of current rebates and
financing options, regional partnerships,
and new hardware and software
applications. GreenBiz is also undergoing
redesign through in-house staff to make
sure the program continues to serve the
community and help reduce energy and
water usage.
Work to identify behavior change
motivations for Cupertino residents to
encourage home energy and water
retrofits using Community Based Social
Marketing techniques. Once possible
behaviors are identified,staff will work to
re-define current programs. Continue to
expand the number of businesses
certified in the GreenBiz program,
targeting new business tenants, and local
community daycares and pre-schools.
In Progress January 2018 Misty Mersich
Lawrence-Mitty Acquire a parcel at Lawrence Expy and
Mitty Ave to allow for the expansion of the
City's trail network and development of a
new park and trail expansion
Staff has reached a tentative agreement
with SJWC to purchase the Lawrence-
Doyle property. On April 1, 2017, the City
will host an Open House at the Lawrence-
Mitty site to allow residents to view the
site and gather initial feedback.
Staff is negotiating with the County on
environmental mitigations needed to
make the Lawrence-Mitty property
suitable for recreational public use.
In Progress TBD Jaqui Guzman
Social Media
Presence
Enhance Community Engagement
through social media tools.
Through the use of differing social
platforms, the City is not only able to
disseminate information more effectively,
but also respond to customer inquiries at
a more rapid pace. This space is
continuing to expand through the use of
paid advertising to broaden our reach to
not only members within the community,
but outside as well.
In order to further our success we are
continuing to enhance interdepartmental
coordination and participation. We will
also increase the use of social analytics to
improve communications practices.
In Progress Ongoing Colleen Letire
Administration
Project Title Project Objective Progress to Date Next Steps Current Status Completion Date Staff Lead
Utility
Management
Software
Grow CAP-related data gathering and
analysis by fully developing the
utility consumption and cost accounting
program (CAP Measure M-F-3).
Staff benchmarked energy across
municipal facilities and parks using EPA’s
Energy Star Portfolio Manager (as
required by AB1103) and separately
constructing an Access Database of all
energy and water utility accounts.
In June 2016, the City contracted with
Lucid Design Group to provide their utility
management software called Building,
a SaaS platform that automates utility
data entry, offers analysis tools, and
produces dashboards.
Working with Lucid to implement the
software, fully equipped with all available
historical data (up to 10 years in some
cases). The software should eliminate the
hand entry of bills by Accounts Payable
as well as by Sustainability Division staff,
allow easy access to data, and provide
informative dashboards. This will allow the
City to improve tracking of municipal
energy and water data by developing an
system to track consumption data by site
(CAP Measure M-F-3).
In Progress December 2017 Katy Nomura
Legislative
Agenda
Develop a Legislative Agenda with the
Legislative Action Committee for the
upcoming CA legislative session to allow
for nimble response to advocacy requests
Staff has gathered examples of legislative
agenda's from other cities and is tracking
current bills that Council has taken a
position on
Draft a proposed legislative agenda for
review by Legislative Action Committee
Scheduled April 2017 Jaqui Guzman
Gun Safety Implement a gun safety ordinance in
Cupertino to reduce gun-related injuries
and crimes. Encourage residents to
participate in gun safety courses.
Staff presented a proposed Gun Safety
Ordinance to the Public Safety
Commission in January and February.
The Public Safety Commission took no
action on the proposed ordinance.
Council directed staff to draft an
ordinance to require enhanced safe gun
storage requirements for retail gun
vendors. Staff will draft language and take
it to the Public Safety Commission for
comment.
In Progress July 2017 Jaqui Guzman
Information Services
Project Title Project Objective Progress to Date Next Steps Current Status Completion Date Staff Lead
GIS Strategic
Plan
Develop 5 year GIS strategic Plan Complete Completed 2016 Teri Gerhardt
VDI
Implementation
Implement Virtual Desktop or Virtual
Private Network software. (VDI)
Project rescoped to provide
telecommuting and remote access to
City's network.
Completed October 2016 Mariyah
Serratos
3D Modeling Improve City Planning, architecture, and
design by virtual 3D visualization
Aerial mapping and LiDAR data acquired.
Currently working with ESRI on 3D
visualization
Implement solution for Planning Division -
March 2017
In Progress March 2017 Teri Gerhardt
City Channel
Upgrade
Technology refresh for City Channel
Control Room
Installation phase complete - currently
documenting, programming, and fine
tuning system
Final pre-rollout stage In Progress March 2017 Peter
Coglianese
CityWorks
Expansion
Expanding Cupertino’s GIS-centric asset
management system to include the Parks
Grounds Division and Traffic Signals
group.
We have completed the asset inventories
for Grounds, including all park and
irrigation features. We have completed
the asset inventories for Traffic Signals,
Configured Cityworks for Traffic Signal
Workflows, and trained the users in the
field.
Currently configuring Cityworks for
Grounds Division workflows. When that is
completed we will train the staff on how to
use the software to manage their assets
in the field and in the office.
In Progress April 2017 Teri Gerhardt
Community Hall
AV Upgrade
Technology refresh for Community Hall
control room, Council dias and podium
Most equipment procured, dais complete Working on audiovisual equipment,
podium, and control system installation.
In Progress July 2017 Peter
Coglianese
Data
Transparency
Enhance Data Transparency to staff and
public
Procured Building Eye application that
allows City Permit data to be visualized by
a simple interactive map.
Implement Building Eye by June 2017 In Progress June 2017 Teri Gerhardt
Enhance
Cybersecurity
Strengthen security for the City's
computer data, networks, and compute
devices
1) Replaced email security product 2)
procured endpoint security product 3)
Negotiating with vendor on remote
security incident event management
(SIEM) capabilities.
1) Implement endpoint security product
April 2017 2) Implement SIEM April 2017
In Progress April 2017 Mariyah
Serratos
Enhanced Cell
Coverage
Develop a strategy for improving cell
phone coverage (with PW).
1) Verizon Tower has been installed -
power still outstanding. 2) TIC
Commission reviewed RootMetric's
solution for a Cell Coverage/Capacity
Study.
1) Power applied to Verizon Tower 2)
Discussion with ATT on colocating on
Verizon tower 3) TIC Commission review
at least one more solution for cell
coverage/capacity study
In Progress July 2017 Bill Mitchell
Fiber Network
Expansion
Extend fiber to the Service Center.The Service Center is one of the last
remaining city facilities not interconnected
by fiber optics.
IS is working with PW staff on
design/implementation
In Progress June 2018 John
Raaymakers
Fuel
Management
System
Fuel Management System (FMS)
procurement, implementation and data
migration
System procured, implemented and data
migrated. Currently fixing minor issues
Final pre-rollout stage In Progress March 2017 Nidhi Mathur
GIS
Enhancement
Enhance GIS data resources and
information access for employees and
community.
Replaced MapGuide (internal City-wide
mapping application) and public Property
Information application with an updated
Property Information App and Magnet.
Splitting the new Property Information
application to offer more to internal users
over what is currently available to both the
public and staff. We will be including
Public Works projects and Planning
projects as well as some additional
property info fields.
In Progress April 2017 Teri Gerhardt
Information Services
Project Title Project Objective Progress to Date Next Steps Current Status Completion Date Staff Lead
Land
Management
System
Implement "paperless" permit application
land management system (LMS).
Paperless permit process for land
management implemented in January
2016. Current LMS (Magnet) determined
not be be best fit to fill existing and future
needs for system updates. Currently
reviewing two other LMS solutions.
Implementation of updated LMS system
expected to be completed in FY2017-18
In Progress June 2018 Bill Mitchell
Laserfiche Rio Provide trusted document repository with
workflow and forms capability
1) IS partnered with City Clerk to develop
requirements, review options and procure
solution
Continue work with City Clerk to
implement Rio product by July 2017
In Progress July 2017 Nidhi Mathur
Local Area
Network
Upgrade
Upgrade existing network architecture
with advanced solution.
Performed network discovery and
currently reviewing vendor solutions
Procure in FY2016-17 - Complete
implementation in FY2017-18
In Progress 2018 Mariyah
Serratos
Network
Upgrade
Technology refresh for network server
and storage area network
Procured Simplivity hyper converged
solution.
Installation by May 2017 In Progress May 2017 Mariyah
Serratos
PerfectMind Replace disparate recreation applications
with one solution which provides
enhanced functions
1) Contract signed 2) product being
implemented
Continue working with Recreation staff on
implementation by December 2017.
In Progress December 2017 Nidhi Mathur
Radio Cupertino
Upgrade
Upgrade the Emergency Alert Radio
Station with updated
hardware/software/backup power
Installed new hardware and battery
system.
Currently working on software
configuration.
In Progress March 2017 Peter
Coglianese
Strategic Plan Implement a new Technology Plan.1) A FY2016-17 tactical work plan has
been developed and being implemented
2) Currently working with consultant on 3
year strategic plan
1) Continue progress on tactical plan 2)
Consultant interview staff, Council and
TIC Commission on desired strategic IT
initiatives
In Progress July 2017 Bill Mitchell
WAN Upgrade Review existing telecom circuits and
modify as necessary
Defined preferred design and soliciting
bids from vendors to enhance service yet
at a reduced price
Implement new design by July 2017 In Progress July 2017 Mariyah
Serratos
Website
Redesign
Redesign of www.cupertino.org Brand new external website with the
updated backend content management
system currently used by 40 active
content editors
Continue content addition to CMS.
Complete by June 2017
In Progress June 2017 Nidhi Mathur
Planning and Community Development
Project Title Project Objective Progress to Date Next Steps Current Status Completion Date Staff Lead
"Start a
Business"
Pamphlet
Provide a “How to Start a Business in
Cupertino” pamphlet in multiple
languages.
“How to Start a Business in Cupertino”
pamphlet is available on Economic
Development website. Updated with
information about minimum wage
ordinance, new business license rates,
recycling and composting info (collaborate
with Environmental Services)
Continue to update annually Completed 2016 Angela Tsui
Beekeeping
Code Update
Update the Municipal Code to allow urban
beekeeping.
In March 2016 Council directed staff to
review and propose amendments to the
existing regulations. First reading on the
revised ordinance conducted Nov. 15th
and second reading conducted Dec. 6th,
2016.
Completed December 2016 Ellen Yau
BMR Housing
Admin Manual
Update BMR Housing Administrative
Manual.
Housing Commission updated BMR
Housing Administrative Manual in
September 2016.
Completed September 2016 Kerri Heusler
Economic
Development
Plan
Worked with consultants to finalize and
present to City Council an Economic
Development Strategic Plan (EDSP) for
Cupertino.
The EDSP was completed and adopted
by Council in October 2016.
Completed October 2016 Angela Tsui
Shop Local
Campaign
Launch a “Shop Local” campaign.Promoted local businesses through “Eats
95014” dining guide app and ”Cupertino-
At-A-Glance” website. “Shop Cupertino”
message is printed on City’s reusable
bags and ordinance signage. Drafted a
comprehensive campaign as part of the
Economic Development Strategic Plan.
Continue annually Completed 2015 Angela Tsui
EDSP
Implementation
Consider policies and related Code and
Specific Plan amendments to implement
policies in the Economic Development
Strategic Plan.
EDSP adopted by City Council in late
2016. Identified several policies for
forward-looking economic development
including:1. Consider allowing
incubator/co-working uses to replace retail
on sites that have underperforming retail
and meet specific criteria. 2. Consider
creating office allocation in the General
Plan specifically for mid-to-small size
companies. 3. Identify and develop
regulations for an Innovation/Arts district
in the City. 4. Create a policy to allow
mobile uses (including food trucks) in the
City. This could include identifying areas
where such uses could be allowed.
Develop work program and budget
Project Approved
2018 Angela Tsui
Heart of the City
Plan
Amend the Heart of the City Specific Plan
to amend the street tree list to allow
alternative trees of a larger canopy and
defer the tree type to the city arborist
(Public Works)
Recommended by Planning Commission
in March 2016.
To be reviewed with future update of
Heart of the City Specific Plan.
Project Approved
TBD TBD
Parking
Incentive
Explore parking incentives for projects
providing more than the required electric
vehicle parking, charging stations and
alternative transportation methods.
Recommended by Planning Commission
in March 2016.
To be reviewed along with any future
update of the parking ordinance.
Project Approved
TBD TBD
Planning and Community Development
Project Title Project Objective Progress to Date Next Steps Current Status Completion Date Staff Lead
Penalties for
violation of
Conditions of
Approval
Consider increasing maximum penalty of
$100K for violations of conditions of
approval.
Requested by Councilmember.Issue will be reviewed with related
municipal code updates.
Project Approved
TBD TBD
Public Art in
Developments
Review and consider amending the
$100,000 maximum for Public Art in
Developments.
In 2016 the FAC requested that this
project be added to the upcoming work
program.
Project will be initiated in Summer 2017
Project Approved
TBD Catarina Kidd
Restaurant
outdoor seating
Update the General Commercial (CG)
Ordinance to remove restriction and/or
streamline process for allowing outdoor
seating that exceeds 20% of indoor
seating.
Recommended by Planning Commission
in March 2016.
To be reviewed in conjunction with any
future update to the General Commercial
(CG) ordinance.
Project Approved
TBD TBD
Teacher
Housing
Evaluate a “Teacher Housing” project in
partnership with a non‐profit developer try
to identify and develop surplus school
property as a teacher housing project.
In March 2016, the Planning Commission
recommended adding a goal of providing
100 senior or "teacher" housing units per
year for the next five years and/or provide
incentive and priority for Cupertino
residents. The priority system was
implemented as part of the BMR
Administrative Manual update in
September 2016.
Project will be initiated in Fall 2017
Project Approved
TBD Kerri Heusler
Apple Campus
2
Apple Campus 2 Development Project.The Main building, parking structure,
Theater and Fitness Center under
construction. Architectural and Site
Approval for remaining buildings in Phase
1 - outdoor dining stations, reception
buildings, maintenance buildings etc.
approved spring/summer 2016. Phase 2
construction underway for one office
building, two R&D buildings and a
secondary parking structure. Street
Improvements at ramps at Wolfe and I-
280 and Lawrence and I-280 are due to
be completed by spring 2017.
Occupancy for main building will begin in
April and phased to end of 2017. Phase 2
and ancillary building expected to be
completed by 2018.
Project Approved
2018 Albert
Salvador/Piu
Ghosh
Economic
Development
Website
Streamline city web content for new
businesses. Develop an integrated
approach for outreach and marketing to
brokers, business owners, and others as
a center for innovation and the heart of
Silicon Valley.
Valuable content and links on existing
site.
Will continue to assess the needs of
businesses and add helpful resources.
Work with the City's Public
Affairs/Communications team to redesign
the Economic Development webpages
within the Citywide website enhancement.
In Progress 2018 Angela Tsui
General Plan
Authorization
Implement General Plan Authorization
Process
One GPA Authorization request
(Scandinavian Design) received in the
second cycle of FY2016-17 is being heard
by the Council on March 7, 2017.
Process General Plan Authorization
applications as received.
In Progress Ongoing Piu Ghosh
Hamptons Hamptons Apartments Development
Project. 942 units. (Housing Element site)
Approved in June 2016 with a
Development Agreement (15 year term).
Applicant has delayed project by 18
months.
In Progress TBD Catarina Kidd
Main Street Main Street Development Project (130Ksf
retail, 260Ksf office, 180 room hotel, 120
apartments + public park)
Hotel, Park and Loft apartments under
construction. All other components
complete.
Hotel and apartment project are expected
to be completed by end of 2017.
In Progress December 2017 Gian Martire
Planning and Community Development
Project Title Project Objective Progress to Date Next Steps Current Status Completion Date Staff Lead
Marina Plaza Marina Plaza Mixed Use Development
Project (188 units, 23Ksf retail, 122 room
hotel). (Housing Element site)
Project approved in September 2016 with
a Development Agreement (5 years).
Applicant is delaying project to 2nd
quarter of 2018.
In Progress 2020 Erick Serrano
Non-Medical
Marijuana
Establish regulations regarding non-
medical marijuana use, distribution,
delivery, cultivation and commercial
activities.
Urgency Ordinance adopted November
2016 to maintain local control of non-
medical marijuana regulation to the extent
possible.
On hold pending preparation of a regional
model ordinance and State licensing
processes. The City has until Fall 2017 to
either adopt a new ordinance or renew the
Urgency ordinance for another 10 months.
In Progress March 2018 Piu Ghosh
Public
Document E-
Library
Create a digital on-line library of current
and historical Planning, Building and
Public Works documents.
Document digitization ongoing. 39%
increase in online documents YTD over
FY2016-17. Public Works has a 41%
increase in online documents YTD over
FY2016-17.
Continue process until all documents are
digitized
In Progress 2019 Ari Lattanzi
Single Story
Overlay
Develop regulations to allow the
establishment of single story overlay
zones in R1 zoning districts.
Council directed staff to initiate the project
in June 2016. Outreach meeting
conducted. Draft regulations currently in
development.
Review with Planning Commission
anticipated in March 2017. Review and
adoption by City Council anticipated in
April 2017.
In Progress May 2016 Erick Serrano
Small Business
Dev. Center
Explore the viability of establishing a small
business development center within the
City of Cupertino.
This is an action item in the EDSP as a
resource to retain and grow small and
midsize businesses.
Continue to explore opportunities.In Progress TBD Angela Tsui
Conceptual
Plans
Convert Conceptual Plans to digital format
(North De Anza and South De Anza).
Project delayed due to staffing need.Project will be initiated in FY2017-18.On Hold Piu Ghosh
Heart of the City
Plan
Amend the Heart of the City Specific Plan
for clarifications to the minimum street
side setback requirements.
Project on hold.On Hold Erick Serrano
Vallco Vallco Development Project and Vallco
Shopping District Specific Plan. (Housing
Element site)
In December 2014, Council authorized the
preparation of a Specific Plan for the
Vallco Shopping District. Applicant
submitted an application in September
2015. Two initiatives related to the site
(Measures C&D) failed in November
2016. Since this is a Housing Element
site, a Specific Plan required to be
approved by May 2018 per Housing
Element law.
Bring a proposal for Council consideration
on a community-centered process on a
plan for Vallco.
On Hold TBD Aarti
Shrivastava
Recreation and Community Services
Project Title Project Objective Progress to Date Next Steps Current Status Completion Date Staff Lead
Community
Swimming Pool
Study
Determine community support for a year-
around aquatics facility
Incorporate into the Parks & Recreation
System Master Plan
Project Approved
2018/2019 Gail Seeds and
Jeff Milkes
Accreditation of
the RCS Dept
National accreditation by the Commission
for Accreditation of Park and Recreation
Agencies to assure policy makers,
staff, Cupertino community members and
taxpayers that the parks and recreation
agency has been independently evaluated
against established benchmarks as
delivering a high level of quality of service.
In process of researching and scheduling
staff to begin work.
Application process is followed by a self
evaluation of the department relative to
151 national standards for accreditation. A
task force of front line employees,
supervisors and managers will convene in
the Spring of 2017.
Project Approved
TBD Jeff Milkes
Event/Festival
Coordination
Improve coordination of events/festivals to
ensure success.
Developed and piloting new Special Event
application for 2017 events (Jan 2017).
Prepared a more comprehensive City
events calendar (Feb 2017).
Benchmarked special event fees (Feb
2017).
Develop and issue Exclusive Use Permits
for events (Mar-Nov 2017). Calculate
event/festival costs and recommend fee
waivers for Council consideration with
annual budget (May 2017). Recommend
special event fees for Council
consideration (May 2017). Develop policy
and City code revisions for Council
consideration (Dec 2017). Project Approved
December 2017 Mariah Dabel
Lawrence-Mitty
Park
Plan and Design Lawrence-Mitty property
for park use, subject to City acquisition
Pending City acquisition. Site reviews are
being conducted for Parks & Recreation
Commissioners.
1. Hold open house opportunity for
residents to visit site. 2. Annex property
into City 3. Establish community design
goals process. 4. Select design
consultant. 5. Develop plans.
In Progress TBD Gail Seeds and
Jeff Milkes
Citywide Park
Master Plan
Create a 20+ year community-driven
vision plan to best meet current and future
parks, open space & recreation needs,
through establishing goals & priorities and
building upon, enhancing or expanding
infrastructure & programs.
Council authorized consultant contract
Jan. 2017. Program schedule developed
February 2017.
Evaluate existing park and recreation
system, evaluate community input,
develop vision & goals, identify
prioritization criteria. Community outreach
will explore best use of existing & future
park spaces to identify needs for different
events, activities, cricket pitch, etc.
In Progress Fall 2018 Gail Seeds
Creek Corridor
Master Plan
Develop a master plan for lands along
Stevens Creek from Stevens Creek Blvd.
to McClellan Road (includes Stockmeir
Ranch, BBF Golf Course, BBF Park and
picnic-swim areas, McClellan Ranch
Preserve, McClellan Ranch West)
Community Outreach complete. 3
concepts were presented to the P&R
Commission & City Council. A preferred
concept was presented to P&R
Commission in March 2016 & to City
Council April 2016.
Coordinate next steps with progress on
the Citywide Parks, Open Space &
Recreation Master Plan to allow choices
for Stevens Creek Corridor to be
coordinated with city wide needs and
goals.
In Progress TBD Gail Seeds
Restore
Stocklmeir
Ranch
Continue to restore the Stocklmeir Ranch Parks and Recreation Commission
reviewed on 2/2/17 to consider
renovations to the Stocklmeir house by
the Rotary Club, with the intent of building
utilized for non-profit meeting space.
Agreement has been drafted by City
Attorney's Office. Awaiting Council
direction to proceed with Rotary or pursue
other options.
In Progress TBD Jeff Milkes
Replace
Recreation
Software
Investigate and replace the recreation
registration software with a cloud‐based
software version to be accessed at any
City facility.
The PerfectMind Contract was executed
on 2/1/16. Efficiency audit and Discovery
completed 6/2016. Initial system
configuration and data entry completed in
10/2016.
Finalize data entry, configuration (April
2017). Training and user acceptance
testing (May-Sept 2017). Data migration
(August-Sept 2017). Go Live (October
2017).
In Progress November 2017 Mariah Dabel
Recreation and Community Services
Project Title Project Objective Progress to Date Next Steps Current Status Completion Date Staff Lead
Community
Outreach
Develop a master plan for lands along
Stevens Creek from Stevens Creek Blvd.
to McClellan Road (includes Stocklmeir
Ranch, BBF Golf Course, BBF Park and
picnic-swim areas, McClellan Ranch
Preserve, McClellan Ranch West)
Over 6,000 residents use NextDoor and
Neighborhood Watch Coordinator
provides regular updates via NextDoor
and Yahoo eCAP group. Block Leaders
were tapped to provide feedback for the
Recreation Master Plan as well as the
Parklet pilot program. The department
hired social media expert in limited-term
two-year position.
City staff are identifying a method for City
communication/announcements to and
among Block Leaders. Staff investigating
permanent social media/marketing
specialist.
In Progress December 2018 Mariah Dabel
Partnerships Explore potential of partnerships with the
Library, YMCA, Rotary and other groups
to enhance/expand programs.
Initial outreach meetings started in
2/15. Library Staff and City Staff met
several times in 2016 to discuss
facility usage guidelines for Community
Hall as well as program partnership
opportunities. Recreation & Library are
partnering on bring library programs to
Memorial Park in summer 2017 with four
children's performers at the Amphitheatre.
Staff are meeting regularly with the
Library and YMCA. Staff will coordinate
with other entities to expand programs
and reduce redundancies through
partnerships. Staff will create draft policy
for Parks & Recreation Commission and
City Council provide greater support to
nonprofits.
In Progress Ongoing Christine Hanel
Blacksmith
Shop
Prepare for the grand
opening/programming of the Blacksmith
Shop.
Blacksmith Shop waiting for installation of
a forge.
Follow-up project for a working forge in
the Blacksmith shop scheduled in 2017.
In Progress December 2017 Tom Walters
Disaster
Council
Increase participation from other City
departments
Determine Disaster Council direction to
increase functionality.
Once Disaster Council attendance
becomes more robust - new work plan will
be created.
In Progress December 2017 Tom Walters
Disaster
Council
Identify local stakeholders and encourage
them to participate in Disaster Council.
Have been gathering input/feedback Tour the Emergency Operations Center
with members of the disaster council.
In Progress December 2017 Tom Walters
Office of OES Explore options for enhanced Emergency
Services in Cupertino
OES report and workplan created and
delivered to Recreation and Community
Services Director
Determine City's objectives for OES In Progress December 2017 Tom Walters
BBF Splash
Pad
Install a splash pad at Blackberry Farm
pool area. (see also in Public Works tab)
Included in FY2015-16 CIP.On hold pending completion of the
Corridor Master Plan.
On Hold Tom Walters
Administrative Services
Project Title Project Objective Progress to Date Next Steps Current Status Completion Date Staff Lead
Labor
Negotiations
Negotiate long-term contracts that are fair,
financially sustainable and competitive in
the local labor market.
Negotiated 3 year contract with all
bargaining units with a term of 7/1/16‐
6/30/19.
None Completed October 2016 Kristina Alfaro
Employee
Engagement
Measure employee's engagement level
and sustain and or increase that level of
engagement
This is a new project that is anticipated to
be rolled out in early FY2017-18
Conduct baseline survey in July/August of
2017
Project Approved
June 2018 for first
round
Kristina Alfaro
and Karen
Bernard Guerin
HR Portal
Enhancement
Explore and implement the Leave
Request portion of the City's HR Portal
This is a new project that is anticipated to
be rolled out in FY2017-18
HR Staff to receive training and set up the
Leave Request portion of the site
Project Approved
January 2018 Karen Bernard
Guerin and
Thomas Leung
Laserfiche
Integration
As part of a citywide laserfiche
integrations the Human Resources
division will move to electronic employee
files. The Finance Division will move all
financial data documents to laserfiche.
This is a new project that is anticipated to
be rolled out in FY2017-18
Citywide kickoff and development of a
laserfiche committee
Project Approved
January 2018 Lisa Taitano
and Maria
Jimenez
NeoGov Simplify and streamline the City's hiring
process and consolidate job description,
salary and benefit information.
This is a new project that is anticipated to
be rolled out in FY2017-18
Implementation of new software in
May/June 2017
Project Approved
July 2017 Laura
Miyakawa and
Thomas Leung
OpenGov
Budget Builder
OpenGov Budget Builder beta program.
Department directors and staff will submit
proposals and narratives in OpenGov,
manage approvals and comments online,
and create a consolidated view of the
budget.
City used budget builder for the 2016-17
First Quarter and Mid Year Reports and
will use it for the FY2017-18 Proposed
Budget as well.
City is scheduled to meet with Opengov
staff in later March to discuss the software
and collaborate on possible improvement
to the software.
In Progress June 2018 Thomas Leung
OpenGov
Transparency
OpenGov Platform to increase budgetary
transparency and public engagement.
City signed up for additional offerings
including additional reporting capabilities,
data science, Civic Dashboards and
mapping. In addition, in we are in the
process of automating the monthly
uploads.
Automate the posting of financial data
after monthly closes to have close to real
time financial data for continued
transparency and public
engagement. Add additional graphics and
dashboards.
In Progress June 2018 Thomas Leung
Staff Training Allow for a well trained staff in all areas of
Administrative Service including but not
limited to, Human Resources, Finance,
ERP and Budget.
Attended New World Systems (NWS)/
Tyler Technologies trainings on FM and
HR modules, attend online trainings. Sent
Administrative Services, Departmental
and Technical staff to annual Tyler
conference. HR Staff attended annual HR
Conference and Finance and other
administrative services has attended other
GFOA and CSMFO trainings.
Continued staff training and development
through webinars and training through
CalPERS, the Government Finance
Officers Association (GFOA), NWS/Tyler,
and CalPelra that will increase staff
knowledge and skills in order to enhance
customer service for the community.
In Progress Ongoing Kristina Alfaro
and Lisa
Taitano
Public Works
Project Title Project Objective Progress to Date Next Steps Current Status Completion Date Staff Lead
Audit Solid
Waste
Agreement
Conduct audit of solid waste franchise
agreement.
Audit establishing baseline expenses for
2010 and 2014 has been completed.
Completed.Completed September 2016 Roger Lee
Fleet
Management
Policies
Review Fleet Management policies Public Works, Finance and Sustainability
staff coordinate all new fleet purchases.
Update of fleet use and policy
development is an ongoing process.
Evaluate City-wide fleet vehicles that may
be considered for replacement.
Completed May 2016 Chris Mertens
Joint Use
Agreement with
CUSD
Negotiate new Joint Use Agreement with
Cupertino Unified School District for
shared sports fields
Existing agreement sunsets June 2016 Completed June 2016 Roger Lee
Vehicle
Replacement
Program
Update Managed Vehicle Replacement
Program.
Two all-electric and six plug-in hybrid
vehicles were added to the fleet in
FY2015-16. One all electric is utilized as a
City Hall pool vehicle.
Evaluate feasibility to transfer existing
vehicles within the fleet so that purchases,
if needed, are more environmentally
conscience.
Completed July 2016 Chris Mertens
Consider complete lifecycle costs.In Spring 2015, the Library and the
Service Center added two and four
electric vehicle charging stations,
respectively.
By Spring 2015, the Service Center will
have two electric vehicle charging
stations.
Completed July 2016 Chris Mertens
Evaluate vehicle/equipment sharing with
other agencies.
The two year equipment sharing
agreement with the Town of Los Gatos
and City of Campbell were renewed in
FY2015-16.
Similar opportunities may exist with other
West Valley Cities.
Completed July 2016 Chris Mertens
Evaluate alternate fuel vehicle feasibility
for Service Center vehicles (electric,
hybrid, battery systems to eliminate long
term idling) (CAP Measure M-VF-1, 2, 3).
Staff completed an analysis of alternative
fuel vehicles to inform the FY2013-14
Vehicle Replacement Schedule (VRS).
This document contains a tool to enable
similar assessments during each FY VRS.
This alternative fuel vehicle strategy also
guides the City towards additional fleet
best management practices (e.g. fleet
right-sizing, developing vehicle vocational
specifications) that will be advanced as
part of this year’s VRS and updated
environmentally preferable procurement
policy.
Completed July 2016 Chris Mertens
Evaluate feasibility to transfer existing
vehicles within the fleet so that purchases,
if needed, are more environmentally
conscience.
Was feasible with all six purchases of
green vehicles in FY2015-16.
Ongoing Completed July 2016 Chris Mertens
Water System
Audit
Conduct comprehensive audit of City
owned potable water system.
Current lease agreement expires in 2022.Completed February 2017 Roger Lee
Comprehensive
drainage eval
on Regnart
Evaluate the necessary repairs and
upgrades to remediate drainage issues on
Regnart Road
New Project
Project Approved
TBD Chad Mosley
Lease Agmt. for
Library Bldg
Negotiate new lease agreement with
County of Santa Clara for new library
building
Current agreement expires December
2019
Pending commencement of negotiations
in FY2017-18
Project Approved
June 2018 Roger Lee
Public Works
Project Title Project Objective Progress to Date Next Steps Current Status Completion Date Staff Lead
Local Transit Address local transit needs for schools
and seniors
New project FY2017-18 Proposing limited term Transit Planner in
FY2017-18. This position will work with
VTA and local groups on current needs
and issues, including Ride-Sharing
programs, as well as coordinate with other
cities for potential ballot measures. This
position would also work on solutions for
corporate buses.Project Approved
TBD Timm Borden
Municipal Water
System
Ensure lessee (San Jose Water Co.) is
maintaining and operating system to
industry standard.
City directed audit of system was
completed in December 2016.
Staff is meeting with San Jose Water Co.
on a monthly basis to resolve issues and
to establish/implement an asset
management plan. Current lease
agreement expires 2022.Project Approved
Ongoing Roger Lee
Public Bldg
Condition
Assess.
Determine priority assessment of
buildings for future improvements.
New project FY2017-18 Solicit qualifications from prospective
consultants to assess the condition of all
public buildings.Project Approved
TBD Roger Lee
Storm Water
Funding Ballot
Increase funding of storm water pollution
prevention to cost recovery.
None. Increase requires 2/3 majority
vote.
Evaluate Godbe survey findings, learn
from success of Palo Alto and determine
feasibility of proceeding with ballot
initiative.Project Approved
TBD Roger Lee
Wireless Master
Plan
Update the City's Wireless Master Plan Request funding for plan for FY2017-18 Begin work in Winter of 2018
Project Approved
June 2018 Chad Mosley
Civic Center
Improvements
Design and Construct improvements at
the civic center to (1) address building
and operational deficiencies at City Hall,
(2) add parking to the site, and (3) add a
community room at the Library.
Council direction On Hold TBD Katy Jensen
EOC
Alternatives
Develop an alternative for an Emergency
Operations Center at a facility other than
City Hall in conjunction with Service
Center Admin Building Feasibility Study
Identify potential annex to Service Center Staff will present alternative EOC as a
potential CIP for FY2017-18 - see above.
Coordinate meeting and tour of Service
Center facility with Disaster Council
In Progress May 2017 Alex Acenas
Pavement
Management
Implement programs to preserve and
enhance pavement condition throughout
the City.
Approval of recommended funding over
the last several fiscal years has increased
the overall pavement condition index of
the street network to 78 out of a possible
100.
Funding of $6.0M for FY2017-18 will be
requested for (1) the 2017 Phase 3
Asphalt Project to finish Stevens Creek
and De Anza Boulevards. and (2) 2018
Phase 1 Asphalt Project focused on
residential streets. Annual funding of
approx. Ongoing cost of $4M is
anticipated to maintain a pavement
condition of 80 PCI.
In Progress Ongoing Roger Lee
Ped.
Transportation
Plan
Develop strategy to advance sidewalk
improvements and right of way acquisition
ahead of development.
Reimbursement ordinance amended.
Neighborhood meetings expected to
occur 2016.
Completed February 2016 David Stillman
Consider Safe Routes to School and other
funding sources.
Completed May 2016 David Stillman
Complete a Safe Routes to Schools map
noting sidewalk gaps
Alta study is underway.Completed May 2016 David Stillman
Public Works
Project Title Project Objective Progress to Date Next Steps Current Status Completion Date Staff Lead
Ped.
Transportation
Plan
Update Pedestrian Transportation Plan Hired Toole Design Group to complete
plan. Work began in February 2017.
Continue to work on plan. Completion
anticipated in Summer of 2017.
In Progress August 2017 David Stillman
Traffic Impact
Fee Program
The Mobility Element of the General Plan,
Policy M-10.1 and M-10.2 directs staff to
develop and implement a citywide
transportation improvement plan and to
enact a transportation impact fee for new
development.
Funding approved.Consultant work nearly complete, public
works shops held, including meetings with
Chamber of Commerce Legislative Action
Committee. On hold pending better
understanding of Measure B
Transportation Tax rollout and priorities
due to overlap of projects including in
currently proposed Traffic Impact Fee.
Scheduled June 2017 David Stillman
Public Works
Project Title Project Objective Progress to Date Next Steps Current Status Completion Date Staff Lead
CIP Projects Sister City Directional and Mileage Marker
at Civic Center
Project is complete.Completed September 2016 Alex Acenas
Sport Center - East Courts Resurfacing
project
Project is complete.Completed November 2016 Katy Jensen
Foothill/Cupertino Road Storm Drain Negotiations under way.Upon completion of PG&E work,
anticipate construction over summer/fall
2017.
In Progress December 2017 John
Raaymakers
Monta Vista area sidewalk improvement
projects:
1- Pasadena Ave. Public Improvements
2- McClellan Rd. Sidewalk
Improvement-Ph. 2
3- Orange & Byrne Sidewalk
Improvements
Pasadena project is complete.
McClellan project is in design phase and
communication with impacted residents
has begun.
Further discussion with residents and
property owners impacted by McClellan
project. Development of construction
contract documents for McClellan.
In Progress December 2017 John
Raaymakers
Fiber Optic at Service Center: Extend
fiber optic communications to the City
Service Center on Mary Ave.
Project is included in FY2016-17 CIP.
Consultant selection is underway.
Initiate design and develop construction
contract documents for bidding.
Anticipate construction in fall 2017.
In Progress December 2017 John
Raaymakers
McClellan Ranch West-Green Parking Install durable pervious surface -
meadow-esque, for supplemental parking
capacity for staff and park users. Planning
and design began in spring 2016.
Anticipate summer-fall 2017 construction,
upon appropriation of additional funds for
construction.
In Progress December 2017 Alex Acenas
Storm Drain Master Plan Update Survey of existing system and data
collection is complete.
Anticipate start of master plan calculations
in summer 2017 with goal of completion
by end of CY 2017.
In Progress December 2017 Katy Jensen
City Bridge Maintenance Repairs Routine periodic repairs to six
bridges. Partially grant
funded. Agreement with grantor and
selection of consultants is complete.
Preliminary design and environmental
clearance process. Anticipate
construction over spring/summer 2018.
In Progress October 2018 John
Raaymakers
Retaining Wall Repair/Replacements at
Cordova & Regnart Rds.
Background research and
design/engineering work is has started.
Develop construction contract
documents. Anticipate construction
complete prior to start of 2017 rainy
season.
In Progress December 2017 John
Raaymakers
Recreation Facilities Monument Signs Replace failing monument signs at 5
facilities with new signs consistent with
approved signage convention.
Initiate project spring 2017 Scheduled December 2017 Katy Jensen
Storm Drain Improvements-Byrne &
Stevens Creek Blvd.
Scheduled in 5-year CIP Proposed 2018 project Scheduled TBD Katy Jensen
Blackberry Farm-Splash Pad Subject to the outcome of the Stevens
Creek Corridor Master Plan.
Subject to the outcome of the Stevens
Creek Corridor Master Plan.
On Hold