14040107 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 10230 LEBANON DR CONTRACTOR:FREEDOM SOLAR INC PERMIT NO: 14040107
OWNER'S NAME: BARTAS JOHN A AND JENNY L 845 S MCGLINCY LN DATE ISSUED:04/16=14
OWNER'S PHONE: 4088570605 CAMPBELL,CA 95008 PHONE NO:(408)613-2300
013- LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL E] COMMERCIAL ❑
INSTALL 19 FLUSH MOUNTED PV PANELS,4.9 KW
License Class aE Lic. II 3! r
ContractorJq, Date:"s
I hereby affirm that I am licensed under the provisions of Chapter 9
(commencing with Section 7000)of Division 3 of the Business&Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
crformance of the work for which this permit is issued. Sq.FI floor Arca: Valuation:520069
have and will maintain Worker's Compensation Insurance,as provided for by
eclian 3700 of[lie Labor Code,for the performance of the work for which this APN Number:34214014.00 Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that rhe above information is PERMIT EXPIRES IF WORK IS NOT STARTED
correct.1 agree to comply with all city and county ordinances and state laws relating WITHIN 180 D +RMIT ISSUANCE OR
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save 180 D OM ALLED INSPECTION.
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the ` f
granting of this pemail. Additionally,the applicant understands and will comp sue Date: v
with all non-point sourc egulations per the Cupertino Municipal Code,Section
9.18.
RE-ROOFS:
Signatu All roofs shall be inspected prior to any roofing material being installed.if a roof is
installed without first obtaining an inspection,I agree to remove all new materials for
inspection.
❑ OWNER-BUILDER DECLARATION
I hereby affirm that I am exempt from the Contractor's License Law for one of Signature of Applicant: Date:
the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044,
Business&Professions Code)
I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE
construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the
California Health&Safety Code,Sections 25505,25533,and 25534. 1 will
I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous
I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous
Compensation,as provided for by Section 3700 ofthe Labor Code,for the air contaminants as defined by the Bay Area Air Quality Managemcnt District I
performance of the work for which this permit is issued. will maintain compliance with the Cupertino 1tmicipal Code,Chapter 9.12 and
I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 25 ,2 33,and 25534.
Section 3700 of the Labor Code,for the performance of the work for which this
permit is issued, Ovvncr or authorized ager Date0=ei!
1 certify that in the performance of the work for which this permit is issued,I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of Caiifomia. If,after making this certificate of exemption,1 CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code,1 must I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be,deemed revoked, work's for which this permit is issued(See.3097,Civ C.)
Lender's Name
APPLICANT CERTIFICATION Lender's Address
I certify that i have read this application and state that the above information is
correct.I agree to comply with all city and eounty ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes.(We)agree to save
indemnify and keep harmless the City of Cupertino against liabilities,judgments, ARCHITECT'S DECLARATION
costs,and expenses which may accrue against said City in consequence of the I understand my plans shall he used as public records.
granting of this permit.Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional
9.18.
Signature Date
ALTERNATIVE ENERGY PERMIT APPLICATION 1 O
COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION
10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 h
�_k A
CUPERTINO (408)777-3228•FAX(408)777-3333 •building(8cuAertino.orq
PROJECTADDRESS APN 4 ^ JD
OWNER NAME HONE E-AAAIL
✓! 1 Cl U b ,
STREET I DRESS L' STAT£,�IP 07 ,�`/ F
23o � ��7Q Cl
4/
CONTACT,Iyy�ME ONE E-MAIL
�'IGr✓1k. Zrp/_k v y -G-7 rr�n� ec SU o✓.tet
STREETADDRESSC6 f nC �v7 C TY,STATE,ZIP C rj O �Ix
❑OWNER ❑ OWNER-BUILDER ❑ OWNERAGENT C+ cONCRACTOR ❑CONTRACTORAGENT ❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER ❑TENANT
CO CTORN ME LICENSE NUMBER LICENSE PE BUS.LIC#
COMPANY NAME E-MA1L AX
/ �o r3RD
STREET_ADDRESSS- OC ,STATE,ZIP UE
ARCHITECT/ENGINEER NAME LICENSE NUMBER BU .LIC JF J
COMPANY NAME E-MAIL FAX
STREET ADDRESS CITY,STATE,Z1P PHONE
USE OF n-glrD or Duplex ❑ Multi-Family PROJECT IN WILDLAND PROJECTIN
STRUCTURE: ❑ Commercial URBAN INTERFACE AREA ❑ Yes tt No D,pODZONE ❑ Yes �KNO
50LAR PANELS 7❑ ELECTRIC VEHICLE CHARGING STATION El SOLAR WATER t1E.ATING El OTHER:
Lu
FOR SOLAR PANELS: NUMBER OF PANELSfUNITS: fJ KILOWATTS: ,/) TOTAL VALUATION::�.,/
f f c) Cb
DESCRIPTION OF WORK
b
RE ED RY:
By my signature below,I certify to each of the fi ll I am the property owner or authorized agent to act on the property owners .
application and the information I have provided I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local
ordinances and stale laws relating to buildin ons tion.=1resentatives ofCapertino to enter the above-id ntitied roperty for inspection purposes.
SignatureofApplieantlAgent: >/ Date:
SUPP ,: ENTA INFO TION REQUIRED OFFICE USE ONLY
w OVER-THE-COUNTER
G
EXPRESS
U
S
❑ STANJJARD
U
❑ LtRGE
0.
❑ MAJOR
PVApp_2012.doc revised 06/20/12
CITY OF CUPERTINO
FEE ESTIMATOR—BUILDING DIVISION
ADDRESS: 10230 lebanon dr DATE: 0411612014 REVIEWED BY: MELISSA
APN: 342 14 014 BP4: Z10�4010:2 1 -VALUATION: 1$20,069
*PERMIT TYPE: Building Permit PLAN CHECK TYPE: Alteration 1 Repair
PRIMARY SFD or Duplex PENTAMATION SOLAR-RE
USE: PERMIT TYPE:
WORK INSTALL 19 FLUSH MOUNTED PV PANELS 4.9 kW
SCOPE
i6lec:h. Plon Check Plumb. Plan Check Flee.Plan Check
Rech, Permil F'ee: Phimb. Permil Fee: Ver.. Permil Fee.
Onc�r Afech.Insp. Other Plumb Insp Usher Elec_Insp.
:flerh hrsp.Fee- Phrnib_lisp, Fee, flee. snip.Fee-
NOTE: This estimate does not include fees due to other Departments(i.e.Planning,Public Worlrs,Fire,Sanitary Sewer Disfrict,School
District,elG . These fees are based on lire prelinthiary information available and are only an estimate. Contact the De t or addn'l info.
FEE ITEMS (Fee Resolalion 11-053 Ef1.' 7/1/13) FEE QTY/FEE MISC ITEMS
Plan Check Fee: $0.00 F 1-7 # Alternative Energy System
Suppl. PC Fee: 0 Reg. 0 OT 0.0 1 hrs $0.00 $229.00 IPHOTOVRES I Photovoltaic System
PME Plan Check: $0.00
Permit Fee: $0.00
Suppl. Insp. Fee:Q Reg. 0 OT o.o hrs $0.00
PME Unit Fee: $0.00
PME Permit Fee: $0.00
Conslrriction Tax:
ildininistrutive Fee: 0
Work Without Permit? 0 Yes (j) No $0.00 0
Advanced Planning Fee: $0.00 Select a Non-Residential
Building or Structure 0
1'i°mc�l 1�oclrirlenlulia,7 Fees: A
Strom Motion Fee: IBSEISMICR $2.01 Select an Administrative Item
Bldg Stds Commission Fee: IBCBSC $1.001 7
SUBTOTALS: $3.01 $229.00 TOTAL FEE: 1 $232.01
71
Revised: 04101/2014
Residential Solar Permit Application
4.9 kW roof mount fixed flush PV system (grid tied, no batteries)
Valuation: $20,069.00
Project Address 10230 Lebanon Drive 14Y10'10107PCu ertino, CA 95014
Assessor's Parcel Number(APN):342-14-014
Owner John and Jenny Bartas (same address as project)
(408) 857-0605
...�a
Plan Preparer Marina Zierk CUPERTINO��,j~�''-�.;.�
R Building Department
and Freedom Solar, Inc.
Solar Company 845 South McGlincy Lane `' APR 9 5 2414
Campbell, CA 95008
(408) 613-2300 REVIEWED FOR CODE COMPLIANCE
Reviewed By. ��14
CSLB 8-940672
Workmans Comp-State Compensation Insurance Fund
Policy#824-0507591-12 thru 12/16/2014
Joe Longwello(408)289-5917
4�
• 19 total solar ACPV panels to be mounted on CreoMount rack system. Racks are to be grounded.
(See attached CreoMount data sheets.)
• All electrical work will be performed by a licensed contractor and in conformance with the 2013
CEC.
t.
1y
,1
,1
f
' d
AC VODU
i
ET-P660260WBAC
ET-P660250WBAC
�— ET-P660250BBAC
ET
_Hjgh Performance
Superior performance under low irradigon condition
Optimized output with module-level MPPT
Up to 25%more energy per site over central
and string inverter-based systems
Smarter I:nstallafion and Monitoring
Flexible design and easy expansion
Up to 50%faster to install
No separate grounding or DC wires
Web-based,real-time monitoring of each module
http.1/etsolar.theenergybridge.com
d,nn uasrcuaannn MD., - f
IIFIiIIISlllllllilll
5,483 �_ 5.6 is.e
Clear ( 17
�•�'� 37- 658 4.IG'•
CustomerService • • Support
Response within 4B hours '
ACPV system design consultants `
For technical support,please contact
Telephone:+1925 460 9898
E-mail:techsupport@etsolar.us
�,yn x�'�' '
ui 1741 ` �A�� .�. PV CYCLENEW E C To:^yards Excelle5r7ce
Vim
o blarxr+
Nominal Power(M 238
Nominal Voltage(V) 2081240(±10%) -—_
Nominal Frequency(Hz) 60(+I%)
Nominal Output Current(A)
@208V 1.14
@240V 0.99
Power Factor X0.99 I
THD IEEE 1547 Compliant
Peak Efficiency 95.7%
Night Power Consumption 150mW(240V)1220mW(208V) I
Operating Temp. Range 40'C-+65'C
DG Electrical Data
Nominal Power Output 250W 260W
Power Tolerance 0-+5W - -
Temp.Coeff, of Pmax -0.44%1C
NOCT 45.3±2C -
� f
• &1.f9
4
Dimensions 1640 x 992 x 57.5 mm
(64.57 x 39.06 x 2.26 inch)
Weight 21.59 kg (47.59 lbs)
-a
AC Connector Square style, double locking m e
Max. Load 5400 Pascals(112 lblft2)
Depending on installation method j
Cooling(Mrcminmrteo Natural convection-No fans
Protection Level NEMA 6
Warranty and Certifications
Warranty(year) 10-year vnrranty on matedai and workmanship;
25-year performance warranty for PV module,
25-year warranty formicroimeder The Ultimate All-in-One '
rSolutJoh
Module Certification UL 1703 ET Solar AC Module Series features an innovative integration of ET
Microinverter Certifications UL 17411 CSA 107.1, Modules and Solarl3ridge Pantheon Il microinverters.ACPV systems with
FCC Part 15 Class B ET AC Modules yield more energy,lower design and instailalion costs
and feature innovative web-based and on-site monitoring of each module.
ACPV Array Desi�n Features
Cempared with tradillonal PV systems,this innovative AC solution from
Max.Current per Branch Circuit 20A ET Solar can produce up to 25%more energy by reducing losses from
Max. Units per 20A Branch 0C wiring,shading and module mismatch.ET AC System also avoids
(1-DPST, 20A Breaker)240VAC 16(Single Phase) high-voltage DC on the roof,which makes installation and maintenance
(3-DPST,20A Breakers)208VAC 14(Per Phase)142(Total) safer and more flexible.The AC connectors are specially designed to
(1-TPST,20A Breaker)208VAC 8(Per Phase)124(Total) prevent thefl.
Communication Power Line Carrier
Monitoring Web-based Module-level Monitoring ET SolarAC Module Series features a 25-yearend-to-end performance
warranty.
Packing MannerOfrhAfAC� DCII
Container 20'GP 40'GP
Pieces per Pallet 22 22 _ —
Pieces per Container 264 616
r
ET SOALR
AC MODULE
QUICK I GUIDE
REVIEW ALL SAFETY INSTRUCTIONS BEFORE YOU BEGIN.
For more detailed information on the installation and use of these products,review the
complete installation manuals.
COMPONENTS OF
ET SOLAR AC MODL LE
The diagram below identifies the various components of a ET solar AC module.
V
t`
® Pantheon(@ II microinverter
Module's junction box
Insulated AC cable,
which contains an equipment grounding conductor (EGC)
0 Mid-cable junction
Q AC cable connector
Ilk
Towards Excellence
PREPARING MODULES
FOR INSTALLATION
r-
s"lalno.
sorra!rro.
k
1. Attach cable clips to the Frame as needed and secure cable in clips.
2. Remove one serial number sticker from the mid-cable junction and place it on the array map.
INSTALLING
MODULES
Additional accessories
0`
recommended for — ---re
installing AC modules:
Transition cable (M.F)
Extenstion cables(M-M,M-F,F-F)
Cable clips
End caps(M,F) r"•a
® L '',
1. Remove the protective cover from the transition cable and attach the cable to the transition box
per NEC and local standards.
2. Plug the first module into the connecting cable.Continue connecting subsequent modules to the
end of the row.
3. use an extension cable to connect rows of modules. use cable management devices,such as
cable clips, to secure extension cable off the roof.
4. On the last module in the string. insert the end cap onto the connecting plug or receptacle.This
cap protects the cabling from dirt and moisture.
\Towards Excellence
INSTALLING
POWER MANAGER
O
Ate.
O
1. Attach the Power Manager's mounting 6. Wire the Power Manager to a dedicated SPST
bracket to the wall. breaker in the same service panel or sub-panel
to which the solar array is wired.
2. Remove access cover and AC terminal
block cover. 7- Remove the Consent to Share label.
3. Hang the power Manager on the B. Plug the Ethernet cable into the Ethernet port.
bracket and secure with screws.
9. Plug the Ethernet cable into the network router.
4. Connect AC wiring to the Power Manager
following all NEC and local standards. 10. Replace the Power Manager access cover and
power on the Power Manager.
5. Reattach the AC lerminal block cover.
\Towards Excellence
COMMISSIONING
THE S TE a'
v POWER.SdOW
69 ccww ,
0..uro'm ReodV4 beaw•r'm Sae Inm Con>nv�r Opo<roe 8e
Guvlw Sadat llmCcr Modu49eda1Numhrx Ueiy SII.Enegr WAw IP Ad&= Gf llew
son+v.vanes
NOdee Fkm LEad�s�E�rer Cuer ui
R4hOdh O'Addn4s demwnENu]aef
RCE A+:'� 1$du4 AG Po.cA G91°ICN Vnuae
Oa+m LlaCAddrcss SolThr Iar
EE
Eff]
Lal Portl sync J EeipsloAluna � ,eppeen miy*hen
�,�meAumme�on n
TMYtlulE
_ _ _. rYU FwgpMCr
Tna llnTS
Before you begin i Eu Aad rI LL•m
commissioning the , UpR�q„
site,Familiarize I Ea
1,yourself w!th It q,
menusFavi?rlaf�lc, = F1,1—Te
?fromit e Painre� � Yod�hSNlel
M'anagcr''� CQ
Aauen 7e
eaemn Mame
CONFIRM INTERNET CONNECTION
POWER OW Following startup,which takes approximately 5 mintues,the Power Manager's LCD
: Commdisplays the home screen.When the Power Manager has an Internet connection,
the right side of the home screen displays "COMM"The current time is acquired
from the Internet.
DISCOVER MODUf ES
To establish communications between the Power Manager and the AC modules.
select OPERATIONS->DISCOVER NEW in the LCD menu,
When NEW reflects the number of installed modules.you can stop the discovery
° ■ phase,waitfor wrap-up and module configuration to complete.
° Depending on the size of the array,discovery can take up to 60 minutes.
RUNINE
00:0Q:00STOP;
° SET TIME ZONE
SLTMMEMO To set the time zone,select OPERATIONS->SET TIME ZONE.Choose your region and
focal time zone.
HONOLULU
HOME SCREEN
.7/37° ` The home screen reports the current power production,the number of modules
COMM that reported/the total number of known modules, and whether an Internet
connection exists.
NNW
"* "ter-•r A k F `t � �-�,
Q
A
Table of Contents
Intruduc4nn;Installer Respmtsibility;Resaurcea ..................................................................._...................Page 1
- w= Compuuwnl List..................................................................._..__„............_............._............_.........--..Page
Tunis Aec;ulrod.............................:........:..::..........:.,..,...........„...............,..................::...:..:............,..........Page 3
.0
• InslaUBtian Step 1:Prepare[Ion On SNef3mund:..................................... .—..........................................Pagv 3
Inelallation Step'-Mount dw L.Nn cl and Bre513 Railv........,-:...:...........................................................-.-- -Pngc4
h:stallation Stup 3:Allow«.ttul hisortlon no it................................_............................................................P;ig.)5
Inslallatimj SSuU a:iNvdula Insciuon.......................................................,..,.........,.............,.......,...,...._..Pafle 8
j •`, . a► _ lnstallatbn Stop S:FnishipgTaucbes...... .........................................._._..._.................._.......................Pagc 7
f ��
Mi,CNllan[:oix:BaceRail Sphca;h1sortionnail6p{ics...................................................... ............... ...PageB
' W
ProductWarranty.....:.........................................................,........................................................................Pagu 9
b•'1�
� ri�� �r ',.J'��Y d•.
1'.�W FS•p t?
Manufacturer of
Sessi®nS®Iaar'� Crete
�6satip iaouvnnc srsrtrs 5es�al�ognr5�ofar 7rr 1�
. 'S `'��.t`aY_-__ " _v `.:;.... 'v ^HA"t^�3
_~ '_--+r 5C .t , }`1F �___-__�.�-�--,1 r -5 -'r --•+r-3y�-_..� 1---.�T r„I .-' a--------.—..��_.-r-._�_i _ ,
�� .. -. . ,` .:,}l.t l'.� W� ?k' � t��� f�;,, ;� Gr 6 ,_h�4� � i��s t .'> -':�. �a ,A vJu—
IntroductionComponent List
CtcoMouni by Session velar is a IidKiUI=and Biro IghIIorward p tdtcd roof rnuuuang zorulim•.for a%vide varilry ul
solar I)hMay Olt air,mods. $uiwrior m9dulo rvI lnhpn is I)row,dcd v+ipwuI tho uvi of damps and the Labot-nianswo
tusks usually,asociatcd sr.th tradaiona'tla;nylrg mzeh:,ds This installstmn manual will pnnuis this irformatiom
nGdilud Sara prore-mion311nsmallation.
I
Installer Responsibility t 4
t
The;ussu.11or is tnit y a=sxensi6te for
•
Camplyllnilwlih rll 3pislie bla local or nalinnal buVing uda%,wh.Lh maeuw,nas'his manual. �`•t'n�iid'"`�`�" •''°' n°''�
•.a'.'.,p o� ..ae:.'wrrr.
wy..w ems• *�'�.+ aby rso..
Brounng lltal CrcoiMcrunt cr.d olhcr pruduou nm oppropriatu far the partrcclnr InalJlaum,and ll-o
installati[m emiror'rn�nu a�:
13
• Ensor ng that all sSnrurural Suppers membr.rs,Inclrr-]iny the roof,its ryhorR,and eanncclions,can su(.dlon
the arrav un der all eecle level loading conditions.
v
•Uswrl only Creol.lount part's and inSlalT:tr Supplied pans,s spe-cih6d by SrsGion Soar(vu hstitutwI er 2 �, •,.�''_ S
parts nray voi.,the werrnnly and invplilrate She 1ruors of c-arlihr}ttion it:all Sc.a'nn Soar puhiiratwnMI.
•Ensuring 1ha1 sa horing dMcea,irtcluding loo%Crt'kvS,ha✓e sdeµunro pullout ntrcngth and%hoar _, .- ,:�� • f "l
cnrncaics as:r5ralled.
•Alainta,ning il,e waterproof inuprity of tho mut,including of appioprinto flashing, 3 .'
•Ensuring Sale Tn5tc9adaa ui all alar-trical nalscL of tl,e PV array
•Ens,rring that Domed and npprep'lsirl dosian parameters aro used In dowrn lning the dasign Iead orlhe
installation.Parr,.ctets such as Snrxr loading,wind<_re=d,i7npostim and tu�ogr,tphic tartars should be -
conflrnocl with the local tw lding official or a licensed profas:l.+nal engivaer. "
r 6.
3.
Resources _
+CrenNIUL11-1 Dcsirin tied Layout ManuoT -r-. •µ 'i
•Crou Mnunl Onnifid ug FJlauual
1.AluTec insertion Bail
•ASCE 7-95 Mlnlmum Design Leads for Buirdings and CrherSwcmreg 2 Splice
AluTee Splice Set _
•Walcls our vnhnc7ra'n'no Serias on vW-o by visiting yrvve.sess.onwlar.corn 3.rLuYee Bctaieirtg Clip Set r
7.
I B.
+Croo7cri Cusiamcr Suapon:tB31 f 439.30D0 d,AluVer SaSe Pail NEE
S.AluVer Splice Set
6.AluVer Connector Sol
7.AuTEI
e,AluToo ec Edge Stop&AluUer End Cap
9,AluTec T-Stop 9• 1G d
7D.Tyco SOLKLAMP-Grounding Lug
ACQ
ffeetion5plar crcoht int L-oll Wamn1•P.0,I 6_1=7 ray:w l•Fads r
t r
,q`:� I L. ��,•- �. � +,�;9 gr�+Ig'. � e' � � �i b 'tF3„ .k t,5�°'m� �? �r'' a�[.kL� 8���r �t�� 6�����% t ��� '>.I I��{�� 41 L �w�v 1,�v �.: ° '�
Tools Required Installation Continued
•Tal:umeasure Stop Z Mount the LrFeet and Base Rails
• Phillips ecrowdriver
CleorRtount i9 GompaUble with alf Sinllrliird reel alt"r.0rnc'nt6.LFea1 dr-3 r;crnllttitedto roof atl9chmLntswith
•
001 an[t 7x1 i"drat ttu herriware supplied from the roof aMldl Fant mantrfattuler.
• MLIFl saw to Cul rail lon3llls
• Jr16"wrench-•t:omhina4ory ap?Ivbux and rocket vvilh extension
• 11B"alhnwranch
Butter,•vlrvden sparor(length=panel hnighl y 37G"l AITea L-Fwt 800.0201001
AlLiVor Connector xt 800.006.015
Installation 11)-13"x 3i4-Hix Bolt,$$
1[1.3,x"x 1116"Washer,SS
Step 1:Preparation On the Ground 11)•SW Nut.SS
Grounding:Gnrnnding is arcompllahed by 1:mnmiming modules and rails to s baro copper wirrr that lfaVUrBes
the array.oncr+modules arc insraNd an the roof.acce."Jo grounding Ioc3Uons for rrudules and framework is
r?atrlcted, plan the 0round wire path and Uruundin0 rlarnp locations endpreasssmhia on the ground before 1.Mount all of the GFrcl to the roof nttnrhnxmis,
bVOInning the installalinn on thn roof.
Lerav®rornaecllon lalsa until:,tee r�
r-
AltiVcr Base Rsdlr
AWTcu Insoalun pail VariksAM modulo 11ilcknrass '
-TYCO Solid YJire GraunUln,I Assembly for t-12 AWG 450.056 Qui
Modulus Varies la:rmanufacturor
Baso Rally Drill;i Till-hulo caniarud on the bottom of tow W"d Rail
5;15°from the rail?n(i h+,rall ono ground chin{)per section of rail. TWA 2.Insert Slot Nut and slido into possiriivn wit11 LFout. '�-•.�.
6 plirrs tlo nut crali{ as n prvvrd rounding cunnzCilons so each j ,.
4 Y R ti I S 3.Insort3l0'x3.1 boll thranphw.lshornndL•Fnot
Seylnent ni rail must Lm individually grcuridid W h its own ground and hint]lighten thio oohs so you can maks final
clarno, 1JT " adJustments.
V
tnsertion RDAs:Dihl a 3118"hole 5,16'from the c0pa(11 the rail.
rnstall enc ground sharp per rail or splLc[d 1'ortian t.1 n)il.
d.With rails In poBuioa.ennum the frarr+mwork is
t:yuare and pmalln].anttthatIII ovndlan0s until
Modures:Insta l one around.lamp par mutlule in the msnufaLlum, reriulreci retnarrks aro,within spct:Jlerf limit5.7hon
approved lncatlan, Mod vn installed 5iilo uy Biala.eo U+ousa { tiNhlon connector hobs itorpt+e iu 20 fulbs.l. "-�'••
the side U.arwlh,brs gCCp51jlble aB you progress.
5.Fu+ally,liyfeten LFrxatnu.urtinlf Dolts t. .,t �;,
Exampic:hlstnding loft to),Ohl.Insrall the gnnlnd tlamp on lL•o "'�,� � rronut.winrers1weiGCahone.
right%ido su oom,Lim mpdule is inm-Led,0111 uunrnd clamp Ig t:nsily ?ary` � i•A•
amnsslole to ca nnecl the Around wire. ''4�Y�
w to
Snsritao$Plur Cm-W—nrlr..mllPA—ml-Paan3 $assionsolop CrmMo llL2WIINrlsm l•F:iq.+d
7.
-
_
,.�„S -4:--s�•-� --qr..>,,v—.i .., �r�-,r-Q+.-'3 -,^n r � -,z:�` _ �^°�.. "7.^. p. --c-'�•�'.._wP.x°e'�".w ,1...,,.�,b, ��...a,�e -nays � Rvs*a yx-T,�=--rvesran•-.�.".a r3q ,
i -'e _ q .a. -.5� .Y°"a -� `,� Z {•a "*.r - a„�nG i .'.ti<• :w a r�:::a. '"^�i-...,�.
y w �+r� _•�'� Y y it`�yy 1 ,�I� F,IQs a .� x.1517 �'"'l���✓, �l "Fri:.. � i U i�p�$ �4 �kr� S'''; �g -�,q+ �.r: sag ��'�'"pa� t "�`� � r ,?r's'' `q.°,:yra
{[p[�''`— o- {�� �,�.�. ,-J;.a'41S 1'•��� Z..1."�."5„q����in°'!,1'9 Ngf.� ��� .dl � e �`s-' ..r�.,r°i. �r.,�.•'��.� �.,.'3-P' f?. .,. .pi 9.G,;,�Y .r,�
Installation Continued Installation Continued
Step 3.Mount the Insertion Rail Step 4.Module Insertion
Tho Intrr*xv,Rail his 7 cGF"r,,rcr 6eplh Llizv tell that hold _ �,� ';a> ;xis Solar ma.fule insl.dation is gairk and aicprle.This iso three step P owss viW1outaPV vsas or rams.
The rnadoie,
r°
a' ,� 1.51,2rling:rant the uppennasT raw,slide Ihn rnatfule
To ensurepmpermodula+stenrion,a!llnserlionFaifsmnst D” t' � -
be frmW1*d with die deep p"Asr Maing downhill, under thr:tap lnsigl inn Rail. _
AluTec Rstainintf Clip Sit eta-005LO S L Lower=Aulr,ant.:the hutYnrn Irim.4ion Rail.
(l)-Rctainifg Clip f
I11-3:'R'x 3$"Hex Bnlr.5S
(1),Slot Hur,S.C.•
AluTec Edea Stop Slat BogRJ5.J10
(1)•EdUe Slop
i7},•11A`><.51$"Shout[�tah!Scr�1t,SS
t.PlarLilia first rail,in Jre imvPat pasition with
the deep packet downhiff and cnnnat>.wilh Rte
Retaining Clip eari31F"x3rR'bolt. Check ilial 3.Slide module rJ.o.vn against the bettorn Insertion Aaif. d
any ovorhangs snatch ilia pion and hand tighten '�e - Modula nnmndon is cuatpletcd without any ciampsl fix:r
the units sa ti otr Cain Mika final a¢juettnrtnis to
enure the inwfliLiA Rai;is ctraiof and square to
Ilii Baso Red, l-11ahO ng Cf9ps can be installed on
niche!5fJ3 of the Ina,trlion Rer;1.
2.Spacin(I is cynical.Urind a hinters as a sparer W
pesilion-and set lhtr ticks TPil tviir holp gugrunfoc
ro�shovntht:certcct.spneing. SaLter,lcngrh-
mocialn 1!eiaht 3rd;Vdrily that ms11 h1S@T6011
Fail its yurrllel,ends ars in rlr•.&,anti the spacing is
maiolaineUthraughoutlhoenliresysl3rn,
Sesa�ohSolar Cre.:.gt.^,+ntir�etatl h��,vrxl•P�aaa Seaiiep$plpr i1�d�wml uTst:,ll r�rrseral•F%agC6
"•�.�.srr-r!•�. ,. -w1y-.^a<r«, ..°` ^Y�.: ,:�. ^'�;a"Ir..?-Y ,. .�.,,...,e-p,+y�•r.�Nn,-a:r: . ....g_:._ �•.�-.�+.c..`e:t-- � ,ve±ar to P+"�1,:+•c-•.-_4r'-� p"r°'"'�;;'"Y" �?T, �..�
E.-.:�.:a�:.�i.s-..awe.L"w�.1�:¢:.Ls�.-=�_aa4:..,, - g,.- u..T„�:.=..:P,:,�,." -t'.,.'e-.�. <h. �„.�taa;.....w.,.�"'_.'i'.�—.,:.:�- tw's'4•.._.•.:�:F_!'.'.'"°�. �P;�-�`k..,i. w'�I �-�- .,•�a„ �.�:..:�"'"�'.��,�:z �.n.:..r.�-.'" s..k�:haL�ra.`A�
s
t_
q
IBM=
Installation Continued Miscellaneous
Step 5: Finish ingTouches Base Rail Splice
SPpcns may be t<mquirn8 when rail lenlylh extends rhl;standard 20 fool rail nr ut urilire r:crap.Splice saren6ih
PiDirts ReqUired..1`6iThis MO, Part Number a+reeds the nil to spliceB can be installed in anV roiition along rho rail.
AluTecTStop 800.006.002
AtuTer Edgo Slop Sot a00.M.010
jtl-EdgoSlop AluVerSplice Sal 800AO1i.01t
ISI-114"x Bid"Sheet hiatal S-,rm SS i11-Alul&,r Splice
(1)-Slut Nut,SS l4)-02x 1"Self Ori:ling Screws
AluVer End Cap 800.006.014
Pluwf 3"spliru limldu one cad of the tall and secure
an both Aidon with 912x 1"9rif-drillinr79cravos. Puce;
1. 11 your Installation includCST—Stops,plate ona at other 2"eo[I inside udloinlr,g mil and cecuro on horn
the uppor edge of nach modulo after it is Insurtr:d. sides with 02 x 1"self-drilling screws,
rA
Insertion Rail Splice
Splieos may t-e r:quirerl whop rel length mcoeds the;tondard 20 too:rad or to utilize scrap.Thn split„is an
2.W%ch one EfIrSo Step at bosh or,dc p4 t ash eYtornalsplice and overlaps tlhu bottom(JINP Inanrlioo Hail so it rennet be Ins ANA directly over the Carr,ria'd,
nsertion Rail.Fa Stan with one 11,�"x 5,8"screw. Splice strmnglh exceed,the tail qc apliccs vin bu installod fn any position in the open span.
AluTeo Splice Sc;t 800.001,012
111•Alp7uc Splices
Id)-LI"n 1!4"Cone Point Sucker Set Screw,SS
Slide the spl'cn ovi=f the hoitorrh of the hisertimi Reil ;
3.Fn if Caps pmviti h a finished ippeariixv to 1ho and center ovor joinl l:otwaen rahle.Leavh a 1?4"gap N
installation.Insert ono at each and of the Baso bltweon rails for expahslon and contrartion,Tlghten 4
RaB(s)acrd Nip into place until flush, one side of splice to 6 WIN and tighten the uther
side to 2 ILghs. .
a V
A A
SossionSvlar CrtoMcmml1 ns%ll hnn,hal•Paoo7 SCasion5olar CronMuum la;tal hlxntiai•Ng0
„_..�.:i�ci�-:,.�+. �k# �. _:':. � ',_.>r rt.3a� �'ox �.� y.�w.`.��_____. �.x h�1.`�.`_��...— - � ,.-- �--•-�-- ,�
f—:' � + ,
CrcoTem 14Year Limited Product Warranty
C.,lenadrrnnlnlnrhF uff,[!I%•>d.i•P,I-PIor p,od-Vt;the+;Imp^'rKhrt.tl•Fr,,d,rq'Ietihl wana,ua r.,
lin w,ut.�el F[,u-hmr f'P,.PJ,xrr refeppl_AL.Q--dJtL rndI tt"Dr Ix+uras l'Pxad Y:
'L.0 LM t:i,r',,I llrChl'-II.—ill hl W Ta r.-n
tferrx+rn iwIl: cd a,0%tr+tsrar u,p re a p•:L.>h et xr I10s r�srs IN Iti,4'a 01c,14 lad I-stJa V Pr-W'l.-tied 0 b!"vas to di
I— arW cc^:';.—Fiero.
Tl:r.1'LmnN ercA rot WJu'w d-�+ •.o<enr L+'J,warty Frgdu[7 that may d'.tlranE•JinrnL FTarnpr,ar:Ie.Lrk.fir-GnIial,
ft—rm 1 and M a,ohlyalan In hlahmer t•+14 ra:�rt to ery Prvd:lCt erhlch IF u.hlcct;o allernlr[n,nmadcelmn.utv[ahr ri:Y.f
It"oh,nhu>r,lVp1yphar+ke:eanl•Jr im Pc'pnrW..or Irr,.t;:lallon 14w Is naTrtlxr W.ne,61ni:1,ampilanu n�nhlhn r,,nm,raclu,rr'+.vrnlr:�l
UHldaF0.
admtng li-%Vmra,l Parap any Pr,duu[1418 La wirer Io Ua drtanr,xr lbnr errsY.q 7+.lar ahetl reFalr cr re rlrs t,r.daf,:�m Prcdue„m
0-14.M.fYrt M:IrMJ OT iaa Sr 3„rrr u+amu'Fp1r dUtl O1 W p M rr,*•'rnI ri•a•I 1•vr[f.Y,rl6aYr,c�:a ahLpx rrpaT�a of e,ry-J„d LY
,fa-^:ala--L,ttrdvtha%'.'— my ill.mm�[.q,rel'a-.++.seL}a,rsrd•-r alo[Ifu,kT-i•FFY••e.ILlsJgrtlo e•,l en,l rJ of Lcaru•:+C.:lasi
I aa.,h w ty srsFsrr w wnr FT du Q ru' —!by rl,fr JVamn[r
Ai+,,,,f.rr~vrary pf,elarad hems twh as S'Y1•+t•d.ISo end Ba[huga may pm„Ha,an[tYn lv�.aasrr+ec of lHr'vavnThwt4a:rxdty ah.+IS ar'y Ea
d,r�rn,•J sa F—f,m pnr[k:+.W srracdy h.rn:Gae:rw,911er orad,in,ar enaiLst sll tn't LYarra v'v hY dromYd la rodudr any.a:alTd.mmf
pf erY k rV
WMra:aL:na;ulrvdm g— Soler P'."Pl,:ripen—ILi ar am Fat,.w=>I rlalm a nd er 010vimal 6v I Jfca such no:1w 1o�f�•rn
ral'q r+ry and addm Fa haml.
O!SCLAI61 zyFY:SaoJ'.NTY
LnCEPr hORT,ItF.^.F'LGOING709Y PANTIES. 4t FiEb-rD=CLAHd.^„AND E:L'LL1015ALL 417 HLRWARIANI LE4 Bc KEL'il
iJn IALF LIED.triCLU31NO,BOT NOT LVAP`COTOc4t AFIDOQ-LL wPLIcDV,.AFRAupF 3o L1 FY.-rwfTA91LnyAND0p Fn'Im's FORA
P.i"_r a1LiA�J:309E.
LIhIIw.I NCILLL-^91LIL
TH E LIAR LWY PF'U31 ION *LAFL IF d-Ny.AND rLVCF1:.^•--R'D SOLE s:1:0`.;USM MPALDY FDR PAW GF$FO9AffY CLAtm OF Aie
VIN L)WHAT--VEP nF 04
FC:LG:..rrPrFIE L EOAL T.iSGFY AH75t'1HETH FR AR MINn VdTORT OR CONTA.[L'T rHALL NOT EP opEA'F.RTNAN
1-14PACrml FIAtCHItSSPR.SIFCIFTHFPROOL,rz,%Ni IIPPEFECTTONWIrWCL)CHr..U•Ihd4Ltaap"c INNOFWf)TSHALL&E3511jN;OLAR
EE LIABL EW FLRCHAM7,FOR Afr?:PECIAL,u1CIDENTAL.OR CONUOIJEynIAL D"lA3 Era OFAhY KIH 3 IFICLUrIT NO-BLrr NOT L4AI TED
TVL CCIATENG4T1011 RH:ABVitSEh'.ENTOA DAtf•ACEB ON 4FLOUNTOFTHE Ld°.-r.CFF-AEG-c6dT OR FFCGPELTIVEFR0AF30R FOR ATT!
OTWAFlL14r0Af%VKA1=EVEP.
Session Solar
60 Old EI PLreblo Road
Scotts Valley, CA 95066
TnfMvtv.sessiansolar.com
Wo r@sessionsolaccoin
Telephone:{831)438-9000
Fax:(831)438-9010
Smssxn E;ara•rs a laed.ng[:i,r+rarrJa disrr'fwfor nrru�r F1•o1u,.�r+tfeic IPL prpderra eon,,•+yr•i n fa pYn1Jd,,!Ls ns YxI r at
r.•.'oefu•,r 1 pron+fefary sa:-r nwvr-rinp eFxJenu eadprovid.x�pr^;1u supaerr ro FnG3L'ar�Fnrvlc.i7.a=CDx 5rraian Se:r
fa e[p;.ircd Sy j'-%r+Jrt F9rr>F.YrY'S[••'ar.!J�r,;.1�.a aF>t+-.rH of enC of rfw fut>e::yrt.:tdtro:aic{FV7 rn_rsdr,rx%D:uLCa in f u:uJx-
,nn Ly{Jr(h;,a+di•dp10DAl p;orrnrrtn nldfa Frvdrmlcn Olf7r.'n TWr�;Ltrr�Hks,f»th lrGtdr;l•en•rt.-Pp in Germ:lly.=Krs.,1n
5rrlar ie dnSrq!a[f fo F7,rruir:d;h:flhc•luvpfJ„ur tx•rfchraJr crx,I plwuuritry,�t+:=r,a;vr5k"rrar bh;usmrrurL,ra c'rnngy wdN rFliwblu,
qurdlly Flodllu!?
r•apnaTlA Facl:•aed�ul IPL
rte rntvn Cv['.Lm.:r:;./rr•:,F n,Ctr�ln;"a,,,tur:-t:il.`T,L•f.�^�.H.:Ja a`,r h4r:'_:1 My-r+uU tf.F_nn'n.1.s1,.LI"+�nh Iu�lA.r�t9.
$esslOrLSo/pr '.I L-f.1viLwlr�•FHMin'[ti•Pa'65°
" _ � �i 'x- - - •:,---may^w�� . 3
y
Page 11 11.0. 12
SUNM46,00Corp.
WARNING NO7[CES: These instructions Zcover
Roof m1. Installer is responsible for use installation of lite EZ Rooi mount
and application of Personal
Safety Equipment Including but product line including the following:
EZ Roof Mount with rTrr foot, not limited to:fall protection,eye EZ Roof mount with"L"foot,
and hand protection,proper use available in silver or black
Standoff and Variants of electrical cords,use of ladders, finish K10058-xxx
and electrical hazard protection.
2. Torque values are called out in
Patent# US 89226488 this Instruction Manual and must
be adhered to. `
3. The use of anti-seize
compound such as Permatex
INSTALLATION INSTRUCTIONS recomizelubri or all
recommended for all threaded
parts. . EZ Roof mount with standoff,
Contents: 2.3-5.7 inch K10064-xxx
Please Read Carefully Before Installing Warning Notices.Installer responsibility 2
Specifications 3
Illustrated Parts lists for al{Variants 3
Tools and Supplies needed for Install 4
Laying out a Roof Mounted PV System 5 - Sri
Locating rafters and verifying centers 5
{rd Instalfing EZ roof mount with`L°toot 6
Installing EZ roof mount with Standoff 7 gunModo"L"foot connection
f Installing EZ roof mount with"C"Bracket 8
10 year Product and Finish Warranty 8 to standard and light rail.
K10066-001 and 002 tall.
" - Specifications:
- The pullout performance of the EZ Roof
Mount is entirely dependent upon the
;- strength and correct mounting of the V
Lag Bolt in the roof joist.The pilot hole
must not be oversized,the wood must IL
be in serviceable condition,and the lag
bolt must have at least 2 Inches of . EZ Roof Mount with"C"
thread in the Joist timber. Bracket.
Products are tested and listed by IAPMO wA+w
To standards EC002-2{)11 and UL-441-96 Rain Test �� � Pullout
(uplift):
specification is:
Pullout(upliR):21fi0 lbs lowest of 3 tests
Document Number 2012-Ki0068a Lateral Deflection:840 lbs,lowest of 3
Support(Dead load);2500 lbs. �
SunModo Corp.,2009.2012 C-All rights Reserved Rain test:UL 441-96,pass
EZ Roof Mount Installation®SunModo 2012 Document 4 2012-K1C068a EZ Roof Mount Installation 0 Sun Modo 2012 Document h 2012-K10068a
eB900Tx-ZTOZ o luawnoo0 ZTOZ opovyuns 0 uogelluoul 1unow loos 23 e8900Tx-ZTOZ U luawroo0 ZTOZ opoyyuns CD uopel}xlsut lunovy;oolt z9
100-500MI IN 7004 7,310 IJ Ed ;110!-pue T00-99001A xxx-4900Ta ANJO04 Z310 Ved
la>IyeiO] 11N lo0j 1 'ul L-S-S-Z-44opue3S
'sdwelo pue pue p!w lol;alloos
(dee deap 911L pue smejos Be!j01;aros t
deep 9116 qp.m 40uaim 19NDoS B1E �� !
xel{pue;loq Bei)•s;a�loos g4lL d
L pue 9116 411m 4ouamn anbjoi
X0n40
IIUp ol;eNaos your 81E lo;jo;depy • i ' ' `�
40,
;noAel o;la4jew sle}oai to Nley3 •
:lnjesn eq ueo;ey;swal!jetpo as 0 g„0„pue opus;g uo;oo}„-1„ lunoyy}lopue3g Do}shed 1u474µ!4
(luelenenba to;ueleas uotpn�lsu0a 'suopdo jay;o pue'y;Bual e�)xe';yBlsy el;xe'�10e1e We s;uelaen xxx-;ey;sloN.
OOZL 30)luelees uoa!l!s pue unB NPED -)nu x9H youl
9 L1L i p}of youalm lueosalo algelsn(py XXX--pue T00-ZSOOZ x 8900TH IDI
2ul4se!i ltl (papnpul ION)Ilea ltl 11004 Z3 41!m papnl0ul
10041 IV
ti
'()uelenenba ao
11008 xeleuued)punodwoo e21es-11utl
'Jolewelp 4ou!ZBlL';loq Bel Jo}3!9 IIUO
3s �-
,510519
TxB-dEDXoHIV 9900Zd gogBel loaaKssalulelsCX9i/S
100-90001:)JayseM
K' PC o!Jlael3 8ulleds 78 590oZV a04s IV
,uogepe;sul j,oal;noAel W einseew edel d�
IV wopulle;sul :T!>j ay;u!papnl0ui lou
goy papeau sa!lcicins pue 510O.L HIEJ IV)100;,.I,,Um XXX-990OLM Pue LOO-890001*1 lunoD!I yooa 73 ao}161-1 Pud
Vl a6ed fI aged
Page IS 1'6y. 16
Installation ofthe EZ Roof Mount Kit
K10068-xxx
1. From the marked location,move 3. Make sure the washer on the
dawn the roof 2.25 inches from threaded shank Is positioned '
the bottom of the shingle,and correctly.Use roofer bar to lift
drill the pilot hole for the lag bolt roof shingle,slide the flashing
with a 7132 drill bit.For maximum under shingle,and insert the -
strength,the hole should not be flashing on threaded shank as
more than 3 inches in depth,end shown,
a drill stop may be used to insure
this. f9F Installation of the EZ Roof Mounting
3. Place AL standoff on shoe
Standoff Kit K10064-xxx threads and tighten by hand,then
1. Mount the AL shoe the same as by wrench. Use 15 lbs-ft.
-
nominal for ue,
shown above.
4. Insert"L"foot to AL shoe an lap
of flashing.Place AL hex cap on ,
shoe,and slightly tighten cap.
Use 15 lbs-ft.nominal torque. ��"'. '` ,
2. Clean sawdust,and fill hole with
sealant.Install AL shoe to roof by ` '= �- hR" 4, Using the 318 inch flange bolt
using 5116 lag bolt(Use GE 1200 (supplied with AL"L"foot)attach
Construction Silicon Sealant or 2. Make sure the sealing washer is to the tap of the standoff.
Eq-ulvalen9 positioned correctly on the
threaded shank of the Aluminum
Shoe Use roofer bar to lift roof
✓ __ _ -- _-- shingle,slide the flashing under
- 5. Install AL rail to"L"foot to the shingle,and insert the flashing r
a r `✓ aver the threaded shank.
specific orientation. Then,tighten
AL hex cap and flange nut to 20
lbs-ft torque.
5. Then the Rail can be mounted to
the"L"foot as shown below.
EZ Roof Mount Installation 0 SunModo 2012 Document if 2012-K10069a EZ Roof Mount InstVatlon®5unModo 2012 Document rt 2012-K10068a
Page i7
starting from 1)the date of Installation at the
original site or 2)30 days after the original
purchase-The Finish Warranty does not apply to
any foreign residue deposited on the fnlsh.The
. Finish Warranty Is void If the practices specified
by HAMA 608&610-02=Gleaning and
Maintenance for Architecturally Finish
Aluminum"Iwww.aamanet.oril are rat followed
by Purchaser.The limited warranty Is vold K the
products are not Installed properly in accordance
with SunModo's wrimn Insts7allon Instructions,
or is not used for the purpose forwhlch It Is
designed,or the product has been modified,
Installation of the EZ Roof Mount with repaired,or reworked not authorized by
C Bracket Kit K12005-001 SunModo.
1. Mount the"C"Bracket using
steps 1-3(See above)of the"L" SunModo Limited warranty
EZ Roof Mount Kit K10068-001. The Warranty does not cover the product that Is
damaged reeuking from shipping,storage,end
2. Mount the"C"bracket instead of misuse or abuse during Installetba.The limited
an"L°foot,using the Hex Nut. warranty covers the cost of parts to repair or
The"C"bracket can be used to replace the products to a properworking
mount a variety of rails and other condition.Transportation and Incidental costs
ro0ft0 a til Ment, associated with warranty items are not
relmbursabie SunModo Limited Warrantyonly
covers its products and under nocircumstances
will be liable for Indirect or mnseu
�. damages resulting from or relateddusese by
original purchaser of the product
Address all inquiries to:
10 Year Product Warranty and 5 Year
Finish Warranty SunMcdo Corporation
1905 E 5Lh St.
Terms and Conditions Vancouver,WA 98661
SunModo warrants the original Purchaser that Ph:360-B44-0048
each Mounting Structure to be free from defects
In materials and workmanship for a perlod of 10 Web:wvwl.sunmodo.com
years except for the fnlsh,Which shall be free
from visible peeling.or cracking under normal
atmospheric conditlons for a period of 5 years
E2 Roof Mount Installation 0 SurModo 2012 Document p 2012-K10068a
j
New Square C3 Existing Challenger
c/"�� /�Q 240VAC/100A SUB PANEL 240VAC1200A SERVICE ENTRANCE PANEL
VVL.t"!1!AR Y (Labeled as per NEC 690-54) (Labeled as per NEC 690-54) I
' 10 ET Solar ET P660260VVBAC AC PV MODULES - _
Integrated inverterACPV module
RATED OUTPUT EACH MODULE: STC-260W —
k 20AY-
J-Box
-_ -_— 20A
I ! #8 AVG THWN-2 I {
I #10 AVG THWN-2 � in 3/4" EMT
in 3/4' EMTI(?LjPERT14N
— d M
L
Lnt
l {
_-___-__-r____----- --_.-------------------- UTILITY
UNEIN i
J
}
f
copper GEC gnd
Grid Tie Details
' !
L -__--_----------------------------- ---- -- --- �--------- r _---- j
#10 AVG ACPV Cable from array to J-Box
#10 AVG THWN-2 in 3/4" EMT from -
a
J-Sox to Subpanel
System size: •340 kW DC, STC #3 AVG THWN-2 in 3/4"""" EMT from
4■102 WAC, CEC Sub-panel to Main Service panel
Service Panel Calculations
Z
Sum (inputs) <= 12010 of bus
c;,
g 20A 1 <-' 1 2 !
u a ,
�.
+ + 25A -- 2 0
155A <= 240A
43
= �'� 3" � Sp+3 � i � �e
I
�,. 1- �t� —— — a annet
j{� j�{� n t.}j�!{E'i}�
3 r { 7 Z �.'a y, f^XE �v-z _ ... tV VV 6VVM
1 ree 0r� oar,
1 Wfomia B License Cay loll{ CA 95� 4 )
�
�-�y p� IRESIDENTIA�GRED TIED SOLAR PV SEM
� R�E V�..!i"1 John&Jenny Bartas `
� ,
Ai#. tithe fnr SnrA€nct.Mtxdcil��nw R�ks ..4�� ''� j SOL—AR 10230 Lebanon Drive '
Use of ILSCO G64-DBT with 6610m32 x `` _ Cupertino,GA {408}2357-0605 Assessor's ParceE Nu P1): 4214-014
__. ____ _n_ _ E4
SIZE *SC 4 �. ��7 'G NO, � �
( 314"machine screw at grid foie of � DRAWN$Y Marina Zierk � $
_ l 1 A
i
DATE;04/10/14 SCALE not to scale) SINGLE LINE DRAIMNG SHEET 1 Of 3 !
I
1b ET Solar ET=P66026Q �AC ACPV Modules
�F_ i
I 241" Front Door NoRTry
f
I i ,
1 Roof Details °' ` t
Comp t I
Pitch: roof- 320
Rafters: 2" x 6" on 24" centers _ 3.0E
Span: 9' -i- 3.9
t
Mounting System Details
Mfgr: CreoTecc
_ 4
Product: CreoMount o i
Weight of PV modules, j
mounts & racking: 1142 lbs.
I
Weight per attachment: 32.6 lbs. Imo~ 1 CUPERTINO
Weight per square foot: 3.43
r uilc ng Department
Area of Array: 332.8 sq. ft. 1801270 Azimuth .�
Details for mounting screw locations for standoffs to be code compliant. Standoff locations depicted ! � rr�-ttg k pp��N�q
Et ti E# !'3 ��#t f..-.:`~ t ��:"^, r�F.....L—) , '.,r L,;» #"`t�,�d"4i� .
with • above are withing these tolerances.Allowable spacing is 72 typical spacing used will
be 48"or 72"for a total of 35 standoffs. v,8d 1:d B�
CreoTecc
a Racking
CNe'r0htla�ng Rail Spacing/
26%Lm Span,L=.-. (
_9G
_SMCGIingLane Y8TmEvwMFreed_om_
Sdar_n_e�t
(408)61MIA
DL� Freedom Solar, Inc.
ClfiB L 972
module RESIDENTIAL GRID TIE�OARPVS
aett(rrF) FREEDOM II
I
�John&Jenny Bartas I
�" ,« 10230 Lebanon Drive
I
Cupertino,CA 408 8557-06055 Assessor's Parcel Number(APN);342-14-014
.SO .R 11
__��
FtuEsii
DRAWN BY: Marina Zierk I - - _ -------
B A 1
_ 72"Max
Rafters
(Buildng Structure) _ sca��not to scale! SITE PLAN .7�;e��' 2 of 3 �
DATE 04/10/2014 _
I
j I Combiner Box,Circuits/EMT/Conduit Combier Bowclosures/Raceways 6 AC Disconnect j
Adhesive fastened signs
may be acceptable if
. t . properly adhered. I
Vinyl signs to be �
weather resistant.
IAC 605.11.1,3
i
i
Roof mount DC Disconnect a p The markings shall be ! j
Net Meter �A gg of sufficient durability to i
U inverter withstand the environment I
� BuMldm Structure C involved-NEC11�:2�� i
I
Main Service Disconnect and/or Sub aneI
ENDAmBEL' I'L "Aft"" LLEwft
Transformerless Inverter ,
i
3 �
4 I
i
7 DC Disconnect
Igem=
Freedom Solar Inc. �5 s��O pane ��1 �����1.1,�t
' 408 !
sn
Califomia B license 940612 C II,C�9 00$ _ __( )613.2300
RESIDENTIAL GRID'TfED RPV SYST
John&Jenny Bartas , �`�. ,
FREEDOM10230 Lebanon Drive ftifdinDepartment
SOLAR I Cupertino, CA (408)857-060���ss�r's parcel Number{ PN} 34_2-14-014
� ( SIZE �;��C�f fvU. �4'�t '�., � �� . � — rFv �
DRAWN BY. Marina Zierk � B � ��
A
3I_����not to alSOLAR LAB sn �T DATE: 04/16/2014 .