B-2016-1996CITY OF CUPERTINO BUILDING PERMIT
BUII DINGAI2DRES5: CONTRACTOR: PERMIT NO: B•2616-1996
HOMESTEAD TEAD RD CUPERTINO, CA 95014-0499 (326 10 066) BUILDRITE
Ar�} �(� o CONSTRUCTION
CORP
KENNESAW, GA 30144
R'S NAME: SOBRATO INTERESTS i ETAL 'DATE ISSUED: 09/27/2016
1OWNER°S PHONE: 408-45.3-7430
PHONE NO: (770) 971-47$7
Lic nse Class j} Lic. #97-6028
Cor actor BUILDRITECONSMLICTION CORP Date 12/3112016,
eby affirm that I am licensed under the provisions of Chapter,9. (commenemg
Section 7000) of Division 3 of the Business & Professions Code and that my
se is in full foree and effect.
eby affirm under penalty of perjury one of the following two declarations:
1. I have and will maintain 'a. certificate of consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
>z 'I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code; for the performance of the work for which this
permit is issued:
APPLICANT C>i RTIFI ATION
ify that I have read this application and state that the above
nation is correct. i agree to comply with all city and county ordinances
state laws relating to building construction, and hereby authorize
sentatives of this city to enter upon the above mentioned property for
sction purposes. (We) agree to save indemnify and keep harmless the
)f Cupertino against liabilities, judgments, costs, and expenses which
accrue against said City in consequence of the granting of this permit..
tonally,, the applicant understands and will comply with all non -point
;e regulatt gA er the Cupertino Municipal Code, Section 9.18.
Date 09/27/2016
reby affirm that I am exempt from the Contractor's License Law for one of the
Wing two reasons:
1. I, as owner of the property, or my employees with wages as their sole
compensation, will do the work,. and the stnicture is not intended or offered for
sale (Sec.7044, Business & Professions Code)
z. 1, as owner of the property, am exclusively contracting with licensed
contractors:. to construct the project (See.7044, Business & Professions Code).
I hereby affirm under penalty of perjury one of the following three declarations:
[I. I have and will maintain a Certificate of Consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
2. I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3704 of the Labor Code, for the perfoimance of the work for which this
permit is issued.
3. I certify that in the performance of the work for Which this permit is issued, I
shall not employ any person in any manner so as to become subject to the
Worker's Compensation laws of California. if, aftermalang this certificate of
exemption, Ibecome subject to the Worker's Compensation provisions of the
Labor Code, I must forthwith comply with such provisions or this permit shall
be deemed revoked.
i
APPLICANT CERTIFICATIOliT
certify that I have read this application and state that the above information is
Cortat I agree to comply with all city and county ordinances and state laws
rela ing
to building construction, and hereby authorize representatives of this city
toe. er upon the above mentioned property for inspection purposes. (We) agree
to s ve indemnify and keep harmless the City of Cupertino against liabilities,
judments, costs; and expenses which may accrue against said City in
consequence of the granting of this permit. Additionally, the applicant understands
and will comply with all non -point source regulations per the Cupertino Municipal
Code; Section
BUILDING PERMIT INFO:
BLDG —ELECT -PLUMB
MECH _ RESIDENTIAL X COMMERCIAL
JOB DESCRIPTION:
T.L -1459 SQ FT - H&R BLOCK
/0 -:a -
Sq. Ft Floor Area: l Valuation: $100000.00
APN Number: Occupancy Type:
32610 066 B (Tenant Improvements)
PERMIT EXPIRES -IF WORK IS NOT STARTED
WITHIN 180 DAYS OF PERAUT ISSUANCE OR
180 DAYS FROM LST-C.A&L-Eft ECTION.
by:
RE -ROOFS:
All roofs shall be inspected prior to any roofing material being installed. If a roof is
installed without first obtaining an inspection, I agree toremove all new materials for
inspection.
Signature ofAppiicant:
Date: 09/27/2016
"All
HAZARDOUS' MATERIALS. DISCLOSURE
I have read the hazardous materials requirements under Chapter 6.95 of the
California Health & Safety Code, Sections 25505, 25533, and 25534. 1 will
maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
Health & Safety Code, Section 25532(a) should I store or handle hazardous
material ' Additionally, should i use equipment or devices which emit hazardous
air contaminants as defined by the Bay Area Air Quality Management District I
will maintain compliance with the Cupertino Municipal Code; Chapter 9.12 and
the Heaith�& Safety Cod ns 25505, 25533, and 25534.
Owner or authorized a ant.
Date: 09/27/2016
I hereby affirm that there Is a construction lending agency for the performance
of`worles for which this permit is issued- (Sec. 3097, Civ C. )
Lender's Name _
Lender's Address
ARCHITECT'S DECLARATION
understand my plans shall be used as pub Ni records.
Licensed -
Sign, ° .-_� _ - - Date 09/27/2016 Professtoi
CONSTRUCTION PERMIT APPLICATION
EM r COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
10300 TORRE AVENUE CUPERTINO,CA-95014-3255
(498) 777.3228 • FAX 1408) 7773333 • building@cupertino-ora
. 0 N6W CONSTRUL n0N D ADDITION A ALTERATION / TI ® REVISION! DEFERRED ORICTINAL PERMIT ii
YROICCTAt)llRli
��p AD �
AIN#
_ 1t6M S ��
il "„ 10µ'
STREETADDRE9S =-
ry ID 9'h ..
.. .
C[TY, STATS ZIP f� 6A
FAX -
CONTACT NAME
N$ -2-7r-" 777
t cixt�l7tiG:" . CO
S7RRETADDR9S8'
pd v
-33M4
CITY,STATE, l70lvl
GA
'PAXa
13 OWNIM 13 DwNERHUAvaa. M owNHd AOBNT ❑ CONTRACTOR r- CONrRAGToit AGENT I ARcurracr EI ENarreEER ID. nmviJLOPErt ( TENANT
CONTICACTORNAMB'..i LICENSE----.- 1dCEN5ETYPS.
. BUS..LiC#
(./'..
p. /}
COMPANYNAML> - /j♦ • _�'� fs' R-V�AIL . - • �:�._�,
a d ii(J
FAX
STRP,RT ADORSSS C1 a
ARC1IITliCTIk SO1NBHRNAT3L ..
LMENSENUMBEa ..+ l-77 ... ...
-
EUS•LIC# -
-
COMPANYNAMd _. -.
fj�
..
B-Mhu. -
FAX _
231,
SCRIifiTADIHtESS j/- : '" ..
Cr'�� TA
TR 1, dV -..
MD
PIiONt;12 .e Zit 1.57P6 '
DEsmu"1011 OF WORK jj� _
[C�
-_ TQpJrfUSL' /g�ttJF�0g8¢O U56 -
Uv$iA2SS. .1,1] pV}�iL.•GC�S
CONS TYPE
~
aSTORMS-
USI& TYPE OCC. SQ.Fr. VAWATIONtSI.
-
JO NEW Omit- DEMO
.AREA - AREA AREA
TOTAL
NET AREA
J� iC. W" /0 �s°i+.. g hf� •6i' .
V dd 1✓ Rif/ I
sATHRooM xlrcusnt otsJeR
REMOOM.Al(GARJ }ci REMODEL ARRA /(/ � - R¢MOOHLARB&
—MIA t/(t _ 111
P6¢A
J7LGKi ' ' 7Oi'AL Q ORCH ARRh (i ATTACH
MDNJ'LLINGUNrfS7
FSASECONDUNCT Elym
1HUNGADDEm
sECONDSTORY E]YES
ADD1T[ON9 ONO
A
QNO
PRE-APPLrATiON MyEs ntYrim ROvJDECUPYOP ISTHBHLUGAN .[3Yns G...._ D.$1`" "'� TO LVALUATION.
i7-ANNIN6 APP.LR 1]NO PIr1NNDI�APPROYALLETTER - RICHLERnOMLB [IND ?a
-
By may signature; bolow, I certify to each of the following: Iain the property owner or authorized Spat 0 act on lh . property owner's behalf. I have rcad this
application and the information I have provided is correct. I have read the Description of Work and verify it is grcurate. I agree to compiy with all applicable local
ordinances and state laws relating to'Idinsconstrp Imtthotizerepresentatives ofCupertinotoenter the abo-idmflfiedprop/ertyfor impoctionptrrposes.
\
"bdSigoattaeofApplicallU ZL%1
i; - Date:
9UPKBMMqM INFORMATION REQ RED
- = ' �€I g y�� � g � -,
� gc2rl�?I<itts>trJy-�=-•-
_ :�- Mme_
-��DODiDIIt`Si:PtESSt=s;
New SFD or Multifamily dwellings; Apply for demolition: pen -alt. for
existing building(s). Demolition permit is required prior to issuance o€building-
pmnit for new building.
Cotnmoreial Bldgs: Provide a.completed Hazardous Materials Disclosure
rf si3ntn' z a=te x
PulSza'C d>=='w
_
form ifany Hazardous Materials -tire Ueingused as part ofthis project,
='�:.',.». W_.._._� _,;
.. -,.... -�:-•_ __.W_ _•
-
_ Copy of Planting Approval Lector or Meeting with Plannigg priarto
- _ _ _= _ =-
== ` `-
submittal ofB iiding Permita lication.
Budding, . Fp
Bk[9APP 201LdocJ•evftd0021111
CUPERTINO
CONTRACTOR / SUBCONTRACTOR LIST
Building Department
City Of Cupertino
10300 Torre Avenue
Cupertino, CA 95014-3255
Telephone: 408-777-3228
Fax: 408-777-3333
JOB ADDRESS:
j` �o J & PERMIT # 7
OWNER'S NAME:
PHONE # j
GENERAL CONTRACTOR:
`— -9,P Tal BUSINESS LICENSE #
ADDRESS:
l > CITY/ZIPCODE: `�-
-vur municipal code requires all businesses working in the city to have a City of Cupertino busi'negs license.
NO BUILDING FINAL .OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE
GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO
BUSINESS LICENSE.
I am not using any subcontractors =
--� "S�inature Date
Please check applicable subcontr�s and complete the following information:
V
SUBCONTRACTOR
BUSINESS NAME
BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring / Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry.
Painting / Wallpaper
d
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner / Contractor Signature Date
CALGREEN NON-RESIDENTIAL CHECKLIST —
MANDATORY ITEMS
I M I I COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
cupriRTINO ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE • CUPERTINO, CA 950114-3255
(408) 777-3228 • FAX (408) 777-3333 • building(Dcuoertino.org
PURPOSE:
The non-residential provisions of the 2013 CalGreen Code outline planning, design and development methods
that include environmentally responsible site selection, building design, building siting and development to
protect, restore and enhance the environmental quality of the site and respect the integrity of adjacent
properties; establishes the means of conserving water used indoors, outdoors and in wastewater conveyance;
outlines means of achieving material conservation and resource efficiency; and outlines means of reducing the
quantity of air contaminants.
Project Name: + R 131 0A
L p
Project Address: 4_0 ) �D k oa d
Project Description: 2n&ntIQ�Q
Instructions:
1. The Owner or the Owner's agent shall employ a licensed professional experienced with the 2013
California Green Building Standards Codes to verify and assure that all required work described herein
is properly planned and implemented in the project.
2. The licensed professional, in collaboration with the owner and the design professional shall initial
Column 2 of this checklist, sign and date Section 1 - Design Verification at the end of this checklist
and have the checklist printed on the approved plans for the project.
3, Prior to final inspection by the Building Department, the licensed professional shall complete Column 3
and sign and date Section 2 - Implementation Verification at the end of this checklist and submit the
completed form to the Building Inspector,
Column 2 Column 3
MANDATORY FEATURE OR MEASURE Project Verification
Re uirements
CHAPTERNONRESIDENTIAL MANDATORY MEASURES
The project meets all the requirements of Divisions 5.101 through 5,508. ❑
Division PLANNING I DESIGN
'4--3
`
1?1an Sife'Develo merit �� ��t �5, k��,
InJanUJbesign , {<x�ts
'uz t4L.F r 3.H `a ..7 , "'h.ry '4 U aY. „'u�-Ir4".i t,��L'� s,.�+, ��'. ...:�.._t51•� .-i `X-4 t'S _._, ii Yv`� � 5.�. } -.ts l.:�._?z
5.106.1 Storm wafter pollution prevention. For projects of one acre or less,
develop a Storm Water Pollution Prevention Plan (SWPPP) that has been
P lA
designed, specific to its site, conforming to the State Storm water NPDES
Construction Permit or local ordinance, whichever is stricter, as is required for
❑
projects over one acre. The plan should cover prevention of soil loss by storm
water run-off and/or wind erosion, of sedimentation and/or of dust/particulate
matter air pollution.
Page 1 of 9
C U P E RT I N( ,'Green Non -Res CheckhAdoc revised 01/23114
Building Department
REVIEWED FOR CODE COMPLIANCE
Reviewed By:ArnOld Hom
Date: 09/13/16
5.106.4 Bicycle parking. Comply with Sections 5.106.4,1 and 5,106.4.2; or
❑
❑
meet local ordinance, whichever is stricter.
5.106.4.1.1 Short-Term bicycle parking. If the qualified project is
anticipated to generate visitor traffic, provide permanently anchored bicycle
racks within 200 feet of the visitors' entrance, readily visible to passers-by,
❑
❑
for 5 percent of visitor motorized vehicle parking spaces being added, with
a minimum of one two-bike capacity rack.
5.106.4.1.2 Long-Term bicycle parking. For qualified buildings with over
�_ ► l��y
Iv lC
❑
10 tenant-occupants, provide secure bicycle parking for 5 percent of tenant
vehicle parking spaces being added, with a minimum of one space.
5.106.5.2 Designated parking. Provide designated parking for any
combination of low-emitting, fuel-efficient and carpool/van pool vehicles as
--0 - N/A
❑
shown in Table 5,106.5.2.
5.106.8 Light pollution reduction. Outdoor lighting systems shall be
_❑N/A
❑
designed and installed to comply with the following:
1. The minimum requirements in the California Energy Code for lighting zones
N/A
❑
1 -- 4 as defined in Chapter 10 of the California Administrative Code; and
2. Backlight, Uplight and Glare (BUG) ratings as defined in IES TM-15-11; and
-'❑-'__ N/A
❑
3. Allowable BUG rating not exceeding those shown in Table 5.106.8, or
Comply with a local ordinance lawfully enacted pursuant to Section 101.7,
whichever is more stringent.
5.106.10 Grading and paving. The site shall be planned and developed to 1 fn
Construction indicate how
❑
keep surface water away from buildings. plans shall Il f t
site grading or a drainage system will manage all surface water flows.
Division
—`.l1'F ';F :-'`j;`..t -. i�J% j is .r4rr'`s"v
�` .sv;'•: };Y� :,it=:. Rf��i �t }-�i F ":� . 5�fn- - 'm.1.19-11-.-� . p i` 2`S:INK
','�`..5.: •.Ll[r - ai'Y•'t'7Ls's{�^iry '�W F '.i�J-
„ r�
S� YFr'
5.201.1 Scope, The California Energy Commission will continue to adopt � ❑
mandatory building standards.
Division i AND CONSER
Pndgor,1(a#e f' z
`1
5.303.1 Meters. Separate meters shall be installed for the uses described in
Sections 503.1.1 and 503.1.2.
5.303.1.1 New building or additions in excess of 50,000 square feet.
N/A
❑
Separate submeters shall be installed as follows:
1. For each individual leased, rented or other tenant space within the
_�N/A
❑
building projected to consume more than 100 gal/day.
2. Where separate submeters are unfeasible, for water supplied to the
following systems:
a. Makeup water for cooling towers where flow through is greater
N/A
❑
than 500 gpm.
b. Makeup water for evaporative coolers greater than 6 gpm.
c. Steam and hot-water boilers with energy input > 500,000 Btu/h.
Page 2 of 9131
C U P E RT I N O CalGreen Non -Res Checkltst.doc revised 01/23/14
Building Department
REVIEWED FOR CODE COMPLIANCE
Reviewed By:ArnOld Hom
Date: 09/13/16
5.303.1.2 Excess consumption. A separate submeter shall be provided
for any tenant within a new building or within an addition that is projected
N/A
❑
to consume > 1,000 gal/day.
5.303.2 Water reduction. Plumbing fixtures shall meet the maximum flow rate
values shown in Table 5.303,2,3,
❑
Exception: Building that demonstrate 20 -percent overall water use reduction,
5.303.2.1 Areas of addition or alteration. For those occupancies within
the authority of the California Building Standards Commission, as specified
in Section 103, the provisions of Section 5.303.2 and Section 5.303.3 shall
❑
apply to new fixtures in additions or areas of alterations to the buildings.
5.303.4 Wastewater reduction. Each building shall reduce by 20 percent
wastewater by one of the following methods:
1. The installation of water -conserving fixtures or
❑
2. Utilizing non -potable water systems,
-94)/-A
❑
5.303.6 Standards for plumbing fixtures and fittings. Plumbing fixtures and
fittings shall be installed in accordance with the California Plumbing Code
y-_11_1
❑
(CPC), and shall meet the applicable standards referenced in CPC Table
.�;
1401,1 and CalGreen Chapter 6,
y
�5M"a;
5.304.1 Water budget. A water budget shall be developed for landscape
t�
�LI
❑
irrigation use,
5.304,2 Outdoor potable water use. For new water service or for addition or
alteration requiring upgraded water service for landscaped areas of at least
p p_
/ �T
❑
1,000 sq,ft. but not more than 5,000 sq.ft., separate submeters or metering
devices shall be installed for outdoor potable water use.
5.304.3 irrigation design. In new nonresidential construction or building
addition or alteration with at least 1,000 but not more than 2,500 sq.ft. of
cumulative landscaped area, install irrigation controllers and sensors which
���
El
the following criteria, and meet manufacturer's recommendations,
5.304.3.1 Irrigation controllers. Automatic irrigation system controllers
installed at the time of final inspection shall comply with the following:
1. Controllers shall be weather- or soil moisture -based controllers that
automatically adjust irrigation in response to changes in plants' needs as
WN
❑
weather conditions change.
2, Weather -based controllers without Integral rain sensors or
communication systems that account for local rainfall shall have a
separate wired or wireless rain sensor which connects or communicates
NSA
—EWA
❑
with the controller(s), Soil moisture -based controllers are not required to
have rain sensor input.
z
5.407.1 Weather protection. Provide a weather -resistant exterior wall and
foundation envelope as required by California Building Code Section 1403.2
.� ��
❑
and California Energy Code Section 150, manufacturer's installation
instructions or local ordinance, whichever is more stringent.'
Page 3 of 9 C U P E RT I N 0 c&Greert Nott Res Checklist.doc revised 01123114
131 Building Department
REVIEWED FOR CODE COMPLIANCE
Reviewed By:ArnOld HOm
Date: 09/13/16
5.407.2 Moisture control. Employ moisture control measures by the following
methods; d
—e—�1'
❑
5.407,2.1 Sprinklers. Prevent irrigation spray on structures.
5.407.2.2 Entries and openings. Design exterior entries and/or openings N�
❑
to prevent water intrusion into buildings.
5.407.2.2.1 Exterior door protection. Primary exterior entries shall
be covered to prevent water intrusion by using nonabsorbent floor and--8-���
❑
wall finishes within at least 2 ft around and perpendicular to such
openings plus at least one of the following:
1. An installed awning at least 4 ft in depth.
2. The door is protected by a roof overhang at least 4 ft in depth.
3. The door is recessed at least 4 ft.
4. Other methods which provide equivalent protection.
5.407.2.2.2 Plashing, Install flashings integrated with a drainage �► V1�
❑
plane.
,gvlg 1#Ss
am
,��
5.408.1 Construction waste management. Recycle and/or salvage for reuse
a minimum of 50 percent of the nonhazardous construction and demolition
waste in accordance with Section 5.408.1.1, 5.408.1.2, or 5.408.1.3; or meet a
❑
local construction and demolition waste management ordinance, whichever is
more stringent.
5.408.1.1 Construction waste management plan. Submit plan per this
❑
section to enforcement authority.
5.408.1.2 Waste management company. Utilize a waste management
company that can provide verifiable documentation that the percentage of
construction and demolition waste material diverted from the landfill
complies with CalGreen Section 5.408,
5.408.1.3 Waste stream reduction alternative. The combined weight of
new construction disposal that does not exceed two pounds per square
❑
foot of building area may be deemed to meet the 50 percent minimum
requirement as approved by the enforcing agency.
5,408.1.4 Documentation. Provide documentation of the waste
❑
management plan that meets the requirements listed in Section 5.408.1.1
through 5.408.1.3.
5.408.3 Excavated soil and land clearing debris. 100 percent of trees,
stumps, rocks and associated vegetation and soils resulting primarily from land
—❑—��
❑
clearing shall be reused or recycled.
44,5,� _ 1.� - - __ :tA, t`"".t.-v �L tiz..:. _
�S"_,E YA *�-4 �y utt A. 1 1 � � � �L 7 �t 4`y.
at�ti`�.r. t F � yM1t 3F.� 3 L }E } f3� �1•iG 3�'�"`.���R�L �54
"uilitlg IVI�,I}�;fe�dgCe �dt,V�G�jctk��i�dd � t # � v i1 y � 4 4
_ - Lam:='t:IC;>.r. _._{{y_ r µ':s.4:.t.:,c:v.,':Y`:ic@e.ti4iti
LTh� � � '.� �k1n
� f �l ami t
7�5 `�c�
—t'�yh�6f
,
5.410.1 Recycling by occupants. Provide readily accessible areas that serve
the entire building and are identified for the depositing, storage and collection
❑
of nonhazardous materials for recycling.
5.410.2 Commissioning. For new buildings 10,000 square feet and over,
building commissioning for all building systems covered by T24, Part 6,
process systems and renewable energy systems shall be included in the
Q'
-BImo/ A
❑
design and construction processes of the building project. Commissioning
requirements shall include items listed in Section 5.410.2.
Page 4 of 9131
C U P E RT I N O CalGreen Non -Res Checklist. doe revised 01123114
Building Department
REVIEWED FOR CODE COMPLIANCE
Reviewed By:ArnOld HOm
Date: 09/13/16
5.410.2.1 Owner's Project Requirements (OPR). Documented before the
design phase of the project begins the OPR shall include items listed in f� ❑
Section 5.410,4,
5.410.2.2 Basis of Design (BOD). A written explanation of how the design
of the building systems meets the OPR shall be completed at the design
phase of the building project and updated periodically to cover the systems - -[�- hid ❑
listed in Section 5.410.2.2.
5.410.2.3 Commissioning plan. A commissioning plan describing how the
project will be commissioned shall be started during the design phase of
P )A..
PJA-
❑
the building project and shall include items listed in Section 5.410.2.3.
Functional performance testing. Functional performance
testing shall demonstrate the correct installation and operation of each
`-❑ �/%
❑
component, system and system -to -system interface in accordance with the
❑
approved plans and specifications.
5.410.2.5 Documentation and training. A Systems manual and systems���
❑
operations training are required.
5.410.2.5.1 Systems manual. The systems manual shall be delivered to
❑
the building owner or representative and facilities operator and shall
�' (�1
Include the items listed in Section 5.410.2.5.1.
5.410.2.5.2 Systems operations training. The training of the
appropriate maintenance staff for each equipment type and/or systemNI
❑
shall include items listed in Section 5.410.2.5.2.
5.410.2.6 Commissioning report. A complete report of commissioning
process activities undertaken through the design, construction and
"�IV/
❑
reporting recommendations for post -construction phases of the building
project shall be completed and provided to the owner or representative,
5.410.4 Testing and adjusting. Testing and adjusting of systems shall be
required for buildings less than 10,000 square feet or new systems to serve an
addition or alteration subject to Section 303,1,
5.410.4.2 Systems. Develop a written plan of procedures for testing and
adjusting systems. Systems to be included for testing and adjusting shall
❑
Include, as applicable to the project, the systems listed in Section
5.410.3.2.
5.410.4.3 Procedures. Perform testing and adjusting procedures In
accordance with industry best practices and applicable national standards
❑
on each system.
5.410.4.3.1 HVAC balancing. Before a new space -conditioning system
serving a building or space is operated for normal use, the system
should be balanced In accordance with the procedures defined by
❑
national standards listed in Section 5,410,3.3.1.
5.410.4.4 Reporting. After completion of testing, adjusting and balancing,
provide a final report of testing signed by the individual responsible for
n
performing these services.
5.410.4.5 Operation and maintenance manual. Provide the building
owner with detailed operating and maintenance instructions and copies of ❑
guaranties/warranties for each system prior to final inspection,
5.410.4.5.1 Inspections and reports. Include a copy of all inspection El
and reports required by the enforcing agency.
Page 5 of 9 FMIJ] C U P E RT I N OCalGreen Noir Res Checklist, doe revised 01/23114
Building Department
REVIEWED FOR CODE COMPLIANCE
Reviewed By:ArnOld HOm
Date: 09/13/16
st.. { k. Vit' '1.� { ty ,Its t i £1LI i tf 'w�' FlC'c_.
1 1� t L yi l t ] ci I -iF
` E i, .
k��y*(( i JF } i
hhrG'(��aCeS {61y IC k n S { Ew4
e ;, aEsl�tix Pti�
t�� u5
.4�. �a r.4r . •ii r
5.503.1 Install only a direct -vent sealed -combustion gas or sealed wood-
El
fireplace or a sealed woodstove and refer to residential requirements
in the California Energy Code, Title 24, Part 6, Subchapter 7, Section 150.
5.503.1.1 Woodstoves. Woodstoves shall comply with US EPA Phase If
`6
emission limits.
'�" !"!
❑
5.504.3 Covering of duct openings and protection of mechanical
equipment during construction. At the time of rough installation or during
storage on the construction site and until final startup of the heating and
cooling equipment, all duct and other related air distribution component
❑
openings shall be covered with tape, plastic, sheet metal or other methods
acceptable to the enforcing agency to reduce the amount of dust or debris
which may collect in the system.
6,604.4 Finish material pollutant control. Finish materials shall comply with
Sections 5.504.4.1 through 5.504.4.4.
5.504.4.1 Adhesives, sealants, caulks, Adhesives and sealants used on
the project shall meet the requirements of the following standards,
1. Adhesives, adhesive bonding primers, adhesive primers, sealants,
sealant primers and caulks shall comply with local or regional air pollution
control or air quality management district rules where applicable or
❑
SCAQMD Rule 1168 VOC limits, as shown in Tables 5.504.4.1 and
5.504.4.2.
2. Aerosol adhesives and smaller unit sizes of adhesives and sealant or
caulking compounds (in units of product, less packaging, which do not
weigh more than one pound and do not consist of more than 16 fluid
El
shall comply with statewide VOC standards and other
requirements, including prohibitions on use of certain toxic compounds, of
California Code of Regulations, Title 17, commencing with Section 94507.
5.504.4.3 Paints and coatings. Architectural paints and coatings shall
❑
comply with Table 5.504.4.3 unless more stringent local limits apply.
5.504.4,3.1 Aerosol paints and coatings. Aerosol paints and coatings
shall meet the Product -Weighted MIR Limits for ROC in Section
94522(a)(3) and other requirements, including prohibitions on use of
❑
certain toxic compounds and ozone depleting substances (CCR, Title 17,
Section 94520 et seq).
5,504.4.3.2 Verification. Verification of compliance with this section
❑
shall be provided at the request of the enforcing agency.
5.504.4.4 Carpet systems. All carpet installed in the building interior shall
meet the testing and product requirements of at least one of the standards
IV<❑
listed in Section 5.504.4.4.
5.504.4.4.1 Carpet cushion. All carpet cushion installed in the building
interior shall meet the requirements of the Carpet and Rug Institute
ElGreen
Label program.
5,504.4.4.2 Carpet adhesive. All carpet adhesive shall meet the
❑
requirements of Table 5,504.4,1.
Page 6 of 9 C U P E RT I N O CalGreen Non -Res Cheddist.doc revised 01123114
131 Building Department
REVIEWED FOR CODE COMPLIANCE
Reviewed By:ArnOld HOm
Date: 09/13/16
5.504.4.5 Composite wood products. Hardwood plywood, particleboard
and medium density fiberboard composite wood products used on the
interior or exterior of the building shall meet the requirements for
❑
formaldehyde as specified in Table 5,504.4.5.
5.504.4.5.3 Documentation. Verification of compliance with this section
shall be provided as requested by the enforcing agency. Documentation
shall include ahea§t one of the following standards listed in Section
5.504.5.3,
5.504.4.6 Resilient flooring systems. For 80 percent of floor area
receiving resilient flooring, installed resilient flooring shall meet at least one
�tx
�l
of the following standards listed in Section 5.504.4.6,
5.504.5.3 Filters. In mechanically ventilated buildings, provide regularly
occupied areas of the building with air filtration media for outside and
return air prior to occupancy that provides at least a MERV of 8.
5.504.7 Environmental tobacco smoke (ETS) control. Prohibit smoking
within 25 feet of building entries, outdoor air intakes and operable windows
where outdoor areas are provided for smoking and in buildings; or as enforced
❑
by ordinances, regulations or policies of any city, county, city and county,
California Community College, campus of the California State University or
campus of the University of California, whichever are more stringent.
t
�.1�
�
5,505.1 Indoor moisture control. Buildings shall meet or exceed the
provisions of California Building Code, CCR, Title 24, Part 2, Sections 1203 �V
❑
and Chapter 14.1.
A�rrQualriy+and�halast ti , 5 ; RP,Y
ty;,k
s
t , .3.,_ : _
_ _
5.506.1 Outside air delivery. For mechanically or naturally ventilated spaces
in buildings, meet the minimum requirements of Section 121 of the California
Energy Code, CCR, Title 24, Part 6 and Chapter 4 of CCR, Title 8 or the
applicable local code, whichever is more stringent.'
5.506.2 Carbon dioxide (CO2) monitoring. For buildings equipped with
demand control ventilation, CO2 sensors and ventilation controls shall be
latest
specified and installed in accordance with the requirements of the edition
of the California Energy Code, CCR, Title 24, Part 6, Section 121(c).'
t� r;; .. �, r
J� _71U7
i 1 ik
vilronrrteq-al Comfdrt 7 i 4 k # t EY
�-
i
7 F SL EF h1
}
�1=n77
5.507.4 Acoustical control. Employ building assemblies and components
Where applicable
❑
with STC values determined in accordance with ASTM E 90 and ASTM E 413.
5.507.41 Exterior noise transmission. Wall and floor -ceiling assemblies
making up the building envelope shall have an STC of at least 50 and
Where applicable
exterior windows shall have a minimum STC of 30 for any of the building
❑
locations listed in Items 1 through 3 in Section 5.507.5.1.
5.507.4.2 Interior sound. Wail and floor -ceiling assemblies separating
Where applicable
tenant spaces and tenant spaces and public places shall have an STC of
❑
at least 40.
Page 7 of 9 C U P E RT I N O CalGreen Non -Res C6ecklist.doe revised 01/23/19
131 Building Department
REVIEWED FOR CODE COMPLIANCE
Reviewed By:ArnOld HOm
Date: 09/13/16
��w 5t � - kr-?,... ..r. kft�l,y21 � � 4.: �.. 5}'i`«��'r§iii, .iF .,'•.it-,t.,.is �t-5 .::?4 pct`-r','l�;�cc i x,.:.�'ry �-i-S�L.�l� a._.f�',i t �4 `tF `-f
i,i%:.i�F zrr. .. h' _':..—•....l.i 1 f L .... 4 _..... ,..r .. .. ... ,i ';:...«.1�.
5.508.1 Ozone depletion and greenhouse gas reductions. Installat7o?fHVAC,
refrigeration and fire suppression equipment shall comply with
5,508.1.1 and 5.508.1.2.
5.508.1.1 Chlorofluorocarbons (CFCs). Install HVAC and refrigeration
jA.
equipment that does not contain CFCs.
5.508.1.2 Halons. Install fire suppression equipment that does not contain
❑
Halons.
Page 8 of 9 C U P E RT I N O CalOreen Non -Res Checklist. doc revised 01123114
131 Building Department
REVIEWED FOR CODE COMPLIANCE
Reviewed By:ArnOld HOm
Date: 09/13/16
CALGREEN SIGNATURE DECLARATIONS
Project Name: k i P_ r-3(ock.
Project Address: !i OtjS 0 L} 0Me_8k/(, 6(
Project Description:
SECTION I - DESIGN VERIFICATION
Complete all lines of Section 1 — "Design Verification" and submit the completed checklist (Columns 1 and 2) with the
plans and building permit application to the Building Department.
The owner and design professional responsible for compliance with CalGreen Standards have revised the plans and
certify that the items checked above are hereby Incorporated into the project plans and will be implemented into the
project in accordance with the requirements set forth in the 2013 California Green Building Standards Code as
adopted by the City of Cupertino.
Owner's SignatureDate
�,r / 511, ;, q-, e, 5 4 q ,�'� ��� � . -���4 / �s Z,-4 A �
Design Professional's Signature Date
uer
Design Professional's Name (Please Print)
A U d 4 �,eanga, 9/12/16
Signature of License Professional responsible for CalGreen compliance Date
Paul Correa 650.269.:
Name of License Professional responsible for CalGreen compliance (Please Print) Phone
Email Address for License Professional responsible for CalGreen compliance
SECTION 2 - IMPLEMENTATION VERIFICATION
Complete, sign and submit the competed checklist, including column 3, together with all original signatures on Section
2 to the Building Department prior to Building Department final inspection.
I have inspected the work and have received sufficient documentation to verify and certify that the project identified
above was constructed in accordance with this Green Building Checklist and in accordance with the requirements of
the 2013 California Green Building Standards Code as adopted by the City of Cupertino.
Signature of License Professional responsible for CalGreen compliance bate
Name of License Professional responsible for CalGreen compliance (Please Print) Phone
Address for License Professional responsible for CalGreen
Page 9 of 9 C U P E RT I N O CalGreen Non -Res Checkllst.doc revised 01123114
�0"l Building Department
REVIEWED FOR CODE COMPLIANCE
Reviewed By:ArnOld HOm
Date: 09/13/16