Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
B-2016-2098
CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: CONTRACTOR: PERMIT NO: B-2016-2098 921 SAGE CT CUPERTINO, CA 95014-4217 (359 06 006) WEST COAST SOLAR INC BRENTWOOD, CA 94513 OWNER'S NAME: YUEN MAN FU AND YANG ALICE DATE ISSUED: 6/9/2016 OWNER'S PHONE: 408-834-6839 PHONE NO: (925) 516-3900 LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: License Class C-46. C-39 Lic. #90�549. Contractor WEST COAST SOLAR INC Date 12/31/2017 X BLDG X ELECT _ PLUMB MECH X RESIDENTIAL COMMERCIAL I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing _ with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. JOB DESCRIPTION: (N) 19 PANEL ROOF -MOUNTED PV SYSTEM (4.94 W); (1) SUB - I hereby affirm under penalty of perjury one of the following two declarations: PANEL (125AMP) 1. I_have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this Sq. Ft Floor Area: Valuation: $16000.00 permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances APN Number: Occupancy Type: and state laws relating to building construction, and hereby authorize 359 06 006 representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which PERMIT EXPIRES IF WORK IS NOT STARTED may accrue against said City in consequence of the granting of this permit. WITHIN 180 DAYS OF PERMIT ISSU CE OR Additionally, the applicant understands and will comply with all non -point , source regulations per the Cupertino Municipal Code, Section 9.18. 180 DAYS FROM LAST C D CTION.. Signature- Date 6/9/2016 Issued by: ALEX VALLELUNGA Date: 6/9/2016 OWNER -BUILDER DEC] ARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the RE -ROOFS: following two reasons: All roofs shall be inspected prior to any roofing material being installed. If a roof is 1. I, as owner of the property, or my employees with wages as their sole installed without first obtaining an inspection, I agree to remove all new materials for - compensation, will do the work, and the structure is not intended or offered for inspection. sale (Sec.7044, Business & Professions Code) 2. I, as owner of the property am exclusively contracting with licensed Signature ofApplicant: contractors to construct the project (Sec.7044, Business & Professions Code). Date: 6/9/2016 I hereby affirm under penalty of perjury one of the following three declarations: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER 1. I have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. HAZARDOUS MATERIALS DISCLOSURE 2. I have and will maintain Worker's Compensation Insurance, as provided for by I have read the hazardous materials requirements under Chapter 6.95 of the Section 3700 of the Labor Code, for the performance of the work for which this California Health & Safety Code, Sections 25505, 25533, and 25534. I will permit is issued. maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the 3. I certify that in the performance of the work for which this permit is issued, I Health & Safety Code, Section 25532(a) should I store or handle hazardous shall not employ any person in any manner so as to become subject to the material. Additionally, should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I Worker's Compensation laws of California. If, after making this certificate of will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and exemption, I become subject to the Worker's Compensation provisions of the the Health & Safety Code, Sections 25505, 25533, and 25534. Labor Code, I must forthwith comply with such provisions or this permit shall be deemed revoked. Owner or authorized agent: APPLICANT CERTIFICATION Date: 96/ /2016 I certify that I have read this application and state that the above information is CONSTRUCTION LENDING AGENCY correct. I agree to comply with all city and county ordinances and state laws I hereby affirm that there is a construction lending agency for the performance relating to building construction, and hereby authorize representatives of this city of work's for which this permit is issued (Sec. 3097, Civ C.) to enter upon the above mentioned property for inspection purposes. (We) agree Lender's Name to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in Lender's Address consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal ARCHITECT'S DECLARATION Code, Section 9.18. 1 understand my plans shall be used as public records. Date 6 201 Licensed Signature l� Si 9 Professional mr%,��:' b! ALTERNATIVE ENERGY PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) T77-3333 m building(a)cupertino.org PROJECT ADDRESS Z /�� L APN # _ �C w O n — /j� OWNER NAME,,,j,_ PHONE STREET ADDRESS 2- CITY, STATE? ZIv,P G� /'l /, FAX CONTACT NAME )) PHONE Z� 3� �+ 7 E-MAIL co y O.�G,�r[J XX_T ��,e �1e LJFsrCo�rsTsoc�.e. STREET ADDRESS lam/ CITY, STATE, ZIP �7 u FAX ❑ OWNER . ❑ O R-BUILDER ❑ OWNER'AGENT ❑ CONTRACTOR ❑ CONTRACTOR AGENT ❑ ARCHITECT ❑ ENGINEER ❑ DEVELOPER ❑ TENANT CONTRACTOR NAME ��� LICENSE 1 D BED ' T LI( SE TYPE BUS. LIC # �f L(� COMP NY NAME �' E- � FAX S r o�/�.� wFs cv�sTSGc�G .cam z - -3 STREET ADDRESS CITY, STATE, ZIP PHONY ARCHITECT/ENGINEER N ME .. LICENSE NUMBER BUS. LIC # COMPANY NAME E-MAIL FAX STREET ADDRESS CITY, STATE, ZIP PHONE USE OF Ld JTD Or Duplex ❑ Multi -Family PROJECT IN WILDLAND PROJECT IN STRUCTURE: _ ❑ Commercial URBAN INTERFACE AREA ❑ Yes ❑ No FLOOD ZONE ❑ Yes ❑ No SOLAR PANELS ❑ ELECTRIC VEHICLE CHARGING STATION ❑ SOLAR WATER HEATING ❑ OTHER: FOR SOLAR PANELS. NUMBER OF PANELS/UNITS: """ /// KILOWATTS (COMMERCIAL ONLY): . N� S't TOTAL VALUATION: n� �} 4 0 7 I DESCRIPTION OF WORK �IJSfitLtilT/d�cJ d /�U� f4� t CA A—r RECEIVED B,Y �W) By my signature below, I certify to each of the following: I aIn the property owner or authorized agent to act on the property ow iS 's beh . I have read this application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state.laws relating to buildingconsttliption. I authorize representatives of Cupertino to enter the above -identified prrooperty forinspectionpurposes. Signature of Applicant/Agent: Date: [S7 / t /o SUP ENTA INF_,qRMATION REQUIRED - `"OFFICE TJSEONLY W �"f'OVER-THE COUNTER 7777 EXPRESS �p STANDARD %U 0 LARGE;' MAJOR a PVApp_2011.doe revised 03116111 PHOTOVOLTAIC SYSTEM 4.94KW DC CID PHOTOVOLTAIC }—T RECEIVED PLOT PLANS ECKE B � / d� JUN ! OQ aI� YUEN RESIDENCE DAT l� BY 921 SAGE CT. , PLANS DEPT E. w CUPERTINO z � CUPERTINO CA 95014 Wv 10 N PROJECT DATA GENERAL NOTES VICINITY MAP PROJECT 921 SAGE CT., 1. ALL COMPONENTS ARE UL LISTED AND CEC CERTIFIED, WHERE WARRANTED.It ADDRESS: CUPERTINO CA 95014 a _— � c CfilyDr-; 2. THE SOLAR PV SYSTEM WILL BE INSTALLED IN ACCORDANCE WITH ARTICLE 690 OF THE 2013 CEC AND 2013 CBC. Lincolni 4 *.Elernenaary,5elwc"( s _ irizlsClellaitiR+� n LU MAN YUEN 3. WHERE METALLIC CONDUIT CONTAINING DC CONDUCTORS IS USED INSIDE THE BUILDING, IT SHALL BE IDENTIFIED AS OWNER: 921 SAGE CT., t "CAUTION: SOLAR CIRCUIT" EVERY 10FT. m a a F1mwaY "y' Z d' N CUPERTINO CA 95014 :Pres+dio6r a ._ o �._ Q IGtrnntnc W 07 o 408-834 6839 4. A DC DISCONNECTING MEANS SHALL BE INSTALLED AT A READILY ACCESSIBLE LOCATION EITHER OUTSIDE OF THE ! a '` , ° ' w_ Cl d Q o� BUILDING OR STRUCTURE OR INSIDE NEAREST POINT OF ENTRANCE OF THE SYSTEM CONDUCTORS AS PER SECTION HFanrs sportor I ' , y U m 690.14 OF THE CEC. :; oe Foe pr s, 7ne y16me Qepat ,, W Z � o CC)CONTRACTOR: WEST COAST SOLAR INC. JohnF.tCennety z t+ Dwnas o : a l .S To Mkie Schxi a a :jofiyrvran Pak a N _ N '� , 5. HEIGHT OF THE INTEGRATED AC/DC DISCONNECT SHALL NOT EXCEED 6-7" PER NEC CODE 240.24. _,� a,+m "?+2` ;_ ;d Z Q QZ cRasano Ate i Q. ":� ` c r�r Iteatherxvod 6r v W U Q s v 6. A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH CEC 690.47 AND 250.50 THROUGH 60 AND 250-166 SHALL BE Qc'sard at o DESIGNER: W FaPeniebtin p PROVIDED. Caiumbu Ate 9 tptoe In a Q PER CEC GROUNDING ELECTRODE SYSTEM OF EXISTING BUILDING MAY BE USED AND BONDED TO THE SERVICE " ENTRANCE. IF EXISTING SYSTEM IS INACCESSIBLE OR INADEQUATE A SUPPLEMENTAL GROUNDING ELECTRODE SHEET INDEX 9 T4 R r ^' (gdT r WILL BE USED AT THE INVERTER LOCATION CONSISTING OF A UL LISTED 8 FT. GROUND ROD WITH ACORN CLAMP. SCOPE: COMi..U� J! z 4.9�icWIDC'ROOF INO�ITTME(V! BUILD50LA}2�SYSTf WITTEa jlO GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS THAN #8 AWG AND NO LARGER THAN #6 AWG COPPER Ea FbYUNDAWIS-S26ORG AND BONDED TO THE EXISTING GROUNDING ELECTRODE TO PROVIDE a FOR A COMPLETE SYSTEM. PV-1: COVER SHEET PVsMODCIL'ESlaNDA/ 19 REVISIONS Thl^ ^fit of 0-ins aANRHASEjEMjR MUST be kept t *h: 7. PHOTOVOLTAIC MODULES ARE TO BE CONSIDERED NON-COMBUSTIBLE. PV-2: SITE PLAN PV-3: ROOF PLAN IV�2�5;60�2LL-IS2�C-IDC� I. +� a lawful to make _ _ an y _ PV-4: FRAMING PLAN _ or alterations on same, or to deviate 8. PHOTOVOLTAIC INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING. MECHANICAL, OR BUILDING ROOF VENTS. PV-5: SINGLE LINE DIAGRAM APN: kl i _ 8i'us`n, �VIhQtU`1 a'37o=oil som the Building Offi ti91NE SMOKE ALARMS SHALL BE INSTALLED OR VERIFY TO ENSURE THE SMOKE ALARMS ALREADY EXISTING WHEN PV-6: SIGNAGE SCHEDULE ALTERATION OR REPAIR TO GROUP R-30CCUPANCY EXCEEDS $1,000 CRC R314.6. PV-7: OPTIMIZER MAP LOT ARO. '_ '' ?T I" (-;f trd§ a . specifications SHALL NOT SP-1: MODULE SPEC. p :nlllt o be an approval of the violai ICN• ON THE CEILING OR WALLS OUTSIDE OF EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF BEDROOMS SP-2: INVERTER SPEC. LIVING AREA:;,:, I r v� •ior 33a:,5Qi5Tl Ordinance or State L W RACKING B' IN EACH ROOM USED FOR SLEEPING PURPOSES, SP-4: SPEC. SP-5: GROUNDING SPEC. �nN EACH STORY WITHIN A DWELLING UNIT, INCLUDING BASEMENTS BUT NOT INCLUDING CRAWL SPACES AND L„ UMNHABITABLEATTICS. °c "o-,"IT No. iV�-- CODE REFERENCES =D—ALL SMOKE ALARMS SHALL BE LISTED IN ACCORDANCE WITH UL217 AND INSTALLED IN ACCORDANCE WITH THE PROVISIONS OF THIS CODE AND THE HOUSEHOLD FIRE WARNING EQUIPMENT PROVISIONS OF NFPA 72. SYSTEMS AND COMPONENTS SHALL BE CALIFORNIA STATE FIRE MARSHAL LISTED AND APPROVED IN ACCORDANCE WITH CA CODE OF REGULATIONS, TITLE 19, DIVISION1 FOR PURPOSE FOR WHICH THEY ARE INSTALLED. CARBON MONOXIDE ALARMS IF NOT ALREADY EXISTING ARE REQUIRED TO BE INSTALLED WITHIN A DWELLING WHEN PROJECT TO COMPLY WITH THE FOLLOWING: 11111111 00000000 0' x t._ a `• 4 - THE VALUATION OF AN ADDITION, ALTERATION OR REPAIR TO GROUP R-3 OCCUPANCY EXCEEDS $1,000 CRC R315.2 CARBON MONOXIDE ALARMS ARE REQUIRED AT THE FOLLOWING LOCATIONS: ON THE CEILING OR WALLS OUTSIDE OF EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF BEDROOMS B. ON EACH STORY WITHIN A DWELLING UNIT, INCLUDING BASEMENTS. U r E CALIFORNIA CODE OF REGULATIONS, TIT? s Building kV � a � 2013 CALIFORNIA BUILDING CODE ( BG� -�� , 7 �°r f }� 2013 CALIFORNIA MECHANICAL CODE JUN {, 2016 2013 CALIFORNIA PLUMBING CODE ('CPC)- J �! L 9 2013 CALIFORNIA ELECTRICAL CODE (CEC) ' wN EMI X lam• »iL �� 6/9/2016 scuE SHEET ttrLE: C. THE CARBON MONOXIDE ALARMS SHALL BE LISTED AS COMPLYING WITH THE REQUIREMENTS OF UL 2034. CARBON 2013 CALIFORNIA ENERGY CODE REVIEWED FOR CODE_' C( MPLIANCE MONOXIDE DETECTORS SHALL BE INSTALLED IN ACCORDANCE WITH THIS CODE, THE CURRENT EDITION OF NFPA 720! "STANDARD FOR THE INSTALLATION OF CARBON MONOXIDE (CO) DETECTION AND WARNING EQUIPMENT" AND THE MANUFACTURER'S INSTALLATION INSTRUCTIONS PER 2010 CRC SECTION R315.3. INSTALLATION TO COMPLY WITH ARTICLE 690 O eviewed By. THE 2013 NEC. /YftE'SHEET SHEET: PV-1 88.50' -- ----\ I � I I I I I (N) I SC I I I 1 I I I I I I I I I co J I0 1 1 _ I I I I I I I I I I I I I I I a U 0 cn � I N co Zrn w ax LC 0 CD F-0 Lu 3: Z IJdJ w Lo Lo U w� V Y Z d- �� ' N LLI O� T p U i o N� rn0rl- LLB Z U) 0 00 c� O Z Q rn az � 2 c) Q LL 0 U a a REVISIONS Iiiiiiii mommommo cuplIRMZm 6 Building r pc'�.'6/9'981, 10201 SHEET Tmz ti REVIEWED FOR CODE COMPLIANCE Review0d By: , -:�SI ,OF PLAN I SHEET: PV-2 co 3' VENT NT T (N) 125 A SOLAR ONLY SUB -PANEL MAIN PV DISCONNECT VENT I VENT z `"' i 0 ® f] ® 0 ® M a ® a ® a ® a 1-1 VENT /oVENT E— VENT O (E) 125A MAIN SERVICE PANEL T 1 KEY / COMPONENTS SYMBOL DESCRIPTION LLJ NEMA 3R JBOX ENPHASE ENERGY M215-60-2LL-S2X-IG — — — — — 4" EMT CONDUIT PV MODULE GENERAL NOTES: 1. 16 DEGREE 2. 2X4 DF TRUSS @ 24" O.C. 3. COMPOSITION SHINGLE 4. (19) HYUNDAI HIS-S260RG PV MODULES 5. (19) ENPHASE ENERGY M215-60-2LL-S2X-IG 6. IRONRIDGE XR-10 RAIL 7. IRONRIDGE FLASHFOOT 8. WEEB CLAMPS & LUGS FOR PV GROUNDING v rn Q U p "Toco 0f�1 z oq uj CD m le; i m � . V)t—a } eo a t� z rn T`wLo Y ` J W Lo N W L) Y Z v rn W m U 0.59 U) rn V � W Z o co — :E 0 Z Q az _� UQ }. LL 0 a 111111 11om eaao DRAWN BY: PUildir 6)9/2016 A SHEET TRLE: R1II v+J iJ FtIE�]F C ,FC7i.k-WF4PLAN SHEEP: PV-3 LEGEND: OIRONRIDGE FLASHFOOT SPAN -6FT. TO MEET ASCE 7-10 WITH WIND SPEED AT 110 MPH ZONE 1 (TYPICAL) IRONRIDGE FLASHFOOT OSPAN -417T. TO MEET ASCE 7-10 WITH WIND SPEED AT 110 MPH ZONE 2 (TYPICAL) LOAD CALCULATION System Size 4.94 KW DC Module: HYUNDAI HIS-S260RG Total Modules 19 Module weight-Ibs. 46.7 Total moduleweight 887.30 Racking Ibs./module 1 total racking weight-] bs 19 TOTALARRAY WEIGHT 906.30 MODULE AREA 17.485 TOTAL ARRAY AREA 332.215 Lbs./Sq.ft. (Less than 5 - OK) 2.73 number of vertical supports 25 Lbs. per support (less than 45 -OK) 36.252 PV MODULE SEE MOUNTING DETAIL IRONRIDGE XR-10 RAIL & IRONRIDGE FLASHFOOT 2X4 DF TRUSS @ 24" O.C. FRAMING CROSS SECTION SCALE: N.T.S. r— — — — — — — — — — — — — — — — — —1 PV MODULE IRONRIDGE XR-lq i RAIL COMPOSITION SHINGLE ROOFING L— — IRONRIDGE FLASHFOOT Lo m a U Om 0 / z�I�� ui Q 11� ` Q V UJ uj f �.. cn c? � � wpm z 04 ui W u� N U 0 W VY Z tt vrn E ' N W � �- U V) F— rn V c i WZ �000 O NEO � °' Z ?2 a. UQ } LL O of s a �1111111 �0000�0 / 5/16"x3" LAG SCREWS ON 2.5" f ° ` l - .. _.� 1'M � - ma i ,LK/AB 1. EMBEDMEN SHEATHING .. ,uilding� 00, � `•�"R%9/2016 2X'44, D�F RRUE & I I sH�r mm @ 24" O.C. REVIEWED FOR CODE d)jv,;gl L.If�%JCF ——ey!pwed By jJ�F..ARAMING PLAN MOUNTING DE�AfL SCALE: N.T.S. ,T� m (E) 125A/240V MAIN SERVICE PANEL (N) 125 A/240V SOLAR ONLY SUB -PANEL (D E)O O NEUTRAL NEUTRAL (E)100A MAIN DISC. BREAKER (N)40A 2P I BREAKER SUB -PANEL (N) 15A 2P SOLAR MONITORING DEVICE BREAKER GROUND° GROUND ®❑ _ SOLAR_ — MONITORING DEVICE AC CURRENT 2 —#8 THWN-2 CONDUCTORS 1 —#8 THWN-2 NEUTRAL j I 1 —#8 THWN-2 GROUND ETHERNET CABLE TO ROUTER IN 1 — 3/4" EMT CONDUIT WIRE RUN NOT MORE THAN 10' NOTES: (N)2-15A 2P BREAKER J-BOX NEMA 311 AC CURRENT 2 —10/3 ROMEX (IN ATTIC) 1 —#6 GROUND AND/OR 4—#10 THWN-2 CONDUCTORS 4 410 THWN-2 NEUTRAL 1 —#8 THWN-2 GROUND IN 1 —%CONDUIT WIRE RUN NOT MORE THAN 100' 1. 19 HYUNDAI HIS-S260RG PV MODULES 2.19 ENPHASE ENERGY M215-60-2LL-S2X-IG INVERTERS. 3. PV SOURCE CIRCUIT(S) ARE TO BE SUNLIGHT -RESISTANT ENPHASE TRUNK CABLE AS PERMITTED BY CEC 690.31(B). 4. ALL DIRECT CURRENT CIRCUITS ARE TO BE INSTALLED IN METAL RACEWAY FROM THE POINT OF PENETRATION OF THE SURFACE OF THE BUILDING OR STRUCTURE TO THE MAIN SERVICE PANEL AS MANDATED BY CEC 690.31(E). THERE ARE NO DIRECT CURRENT CIRCUITS PAST THE MODULE TO INVERTER CONNECTION. 5. WEATHERPROOF J-BOX — NEMA 3. 6. (N) 125A SUB -PANEL. ADD TWO(2) 2 POLE 15A FOR SOLAR BREAKERS AND 2 POLE 15A FOR SOLAR MONITORING DEVICE. 7. (E) 125A MAIN SERVICE PANEL. ADD ONE 2 POLE 40A FOR NEW SUB -PANEL. 9. ALL WORK SHALL COMPLY WITH THE 2013 CALIFORNIA ELECTRICAL CODE (C.E.C.) AND ALL OTHER LOCAL CODES AS APPROVED BY THE AUTHORITY HAVING JURISDICTION. 19 HYUNDAI HIS-S260RG MODULES AND 19 ENPHASE ENERGY M215-60-2LL-S2X-IG INVERTERS BRANCH CIRCUIT #1 -10 MODULES AND MICROINVERTERS Ior0101 INVERTER BRANCH CIRCUIT #2 -9 MODULES AND MICROINVERTERS WNW INVERTER ��e C e■o a PV SOURCE CIRCUITS AC CURRENT- 2 — ENPHASE INVERTER TRUNK CABLE 1 —#6 GROUND 71 U P E R ., REVIEWED FOR. CODE COMPLI, I�t�Ic�Ev�d to a U cl0. ov- co ui / i_.. " U ' V Lc !A M Ek r� ;f, V u.1 �iIJB z m i.d. J v w u0 uo N W Z d- c" W m -U o U 0)3cC i W Z 0 00 `E Z Q N rn az �CL 2 ci a >. LL- 0 a a a��nanNc 1111 1111 DRAWN BY: LK/AB DATE• �'4: h 6/9/2016 SHEET WLE: LINE DIAGRAM PV-5 O O (STICKER TO BE LOCATED ON CONDUIT WITH AC CURRENT EVERY 4' HORIZONTALLY OR 10' VERTICALLY AND 1' FROM EACH SIDE OF A BEND) LABEL SCHEDULE J 10 m (STICKER LOCATED INSIDE PANEL NEXT TO PV BREAKER) (STICKER LOCATED INSIDE PANEL BELOW PV BREAKER) METE MAIN SERVICE OPANEL O 10 11 CD m U O n IP1 co x / 0 VR Q 1!/ m O m J 16 '. �1�;' , v: I 6E 1 u p Ili � � Lu Y ` J W In In N U Lu Y Z �t v rn `— N W C� T—O U� Vim mUci W Z u) o oo N:Cp Z Q az =� UQ >.LL O W a RFVICIf1AIC iiiiiiii m0m00©00 �C LK/AB UiIdir D ap or --WF.Ini .i ty,6/9/2016 .iU S: SHEET TRLE: REVIEA'ED FOR GODE COMPLI ivf:E laElvlevved /—/; ;SIGNAGE SCHEDULE PV-6 cq 4.94 kW DC (STC) 19-HYUNDAI HIS-S260RG MODULES & 19-ENPHASE ENERGY M215-60-2LL-S2X-IG INVERTER ARRAY 1 19 MODULES 1310 AZIMUTH lU 160 TILT m a U 00) o IE o ft l �. J E, IL� Ir ��.. ti: v 1 t+r•. O e':.' F..- ICp."a. ir-,_ � Q O I�' t LLJ Z rn iLz,i: Y J W u0 L0 N U 0 w Z, pN W O� T��0 U Vim mUci W Z u') O ao c— `-=Ea z p N az _2 UQ V- O W Ea a a 11111111 lammommom _ DRAWN BY: DA7E: s ^, oUild.i q Det-ic-ati e(li 6/9/2016 >,x SCALE: 1 N D B 2016 SKM7 ,BLE: REVIE1A'ED LOP CODE COMPLIA! 1C1.= Reviewed By _��� � �s OPTIMIZER MAP PV-7 www,hhi-green.com/solar FLJ n n DI P, �uj caj d 0 M a d Hyundai Heavy Industries was founded in 1972 and is a Fortune 500 company. The company employs more than 48,000 people, and has a global leading 7 business divisions with sales of 60.2 Billion USD in 2012. As one of our core businesses of the company, Hyundai Heavy Industries is committed to develop and invest heavily in the field of renewable energy. Hyundai Solar is the largest and the longest standing PV cell and module manufacturer in South Korea. We have 600 MW of module production capacity and provide high -quality solar PV products to more than 3,000 customers worldwide. We strive to achieve one of the most efficient PV modules by establishing an R&D laboratory and investing more than 20 Million USD on innovative technologies. Multi -crystalline Type HiS-M250RG HiS-M255RG 1 HiS-M260RG RG-Series Mono -crystalline Type HiS-5260RG l HIS-S265RG I HiS-S270RG Mechanical Characteristics 998 min (39 29 �(W) x 1 640 min (64 57-)(L) x 35 mm (138 �(H) - _ _.. ,. ...m._...� .._ ......._... . , .,,.. , .._ _ .... Approx.17.2 kg (37.9 Ibs) 60 cells m series (6 x10 matrix) (Hyundai cell Made m Korea) _ series .. r ... _. ._..., cell, .., n or ..,. ..._ . .__ ..,.. _. __.. ._. _ 4 mmz (12AWG) cables with polarized weatherproof connectors, IEC certified UL listed Length 1 0 m ( ) 9 (39 4 ) I168 weatherproof IEC certified (UCI Sted) 3 bypass diodes to prevent power decrease by partial shade Front:`W h transmissionlow-iron tem Bred lass 2:8 mm 0.11 , Encapsulant EVA Back Sheet Wea'herprooffilm Gy' Clear anodized aluminum alloy type 6063 • IEC 61215 (Ed.2) and IEC 61730 by_VDE_ • UL listed (UL 1703), Class C Fire Rating • Output power tolerance +3/-0 % • ISO 9001:2000 and ISO 14001 :2004 Certified • Advanced Mechanical Test (5,400 Pa) Passed (IEC) / Mechanical Load Test (40 Ibs/ft') Passed (LIQ • Ammonia Corrosion Resistance Test Passed • IEC 61701 (Salt Mist Corrosion Test) Passed East and Inexpensive IMountin Delivered ready for connection • IEC (UL) certified and weatherproof connectors Integrated bypass diodes Limited Warranty • 10 years for product defect • 10 years for 90 % of warranted min. power • 25 years for 80 % of warranted min. power X Important Notice on Warranty The warranties apply only to the PV modules with Hyundai Heavy Industries Co., Ltd.'s logo (shown below) and product serial number on it D 4L US mx-it ® � DVE C E O 1",, s~Y PVC � ^""�f�!� usm Electrical Characteristics Multi -crystalline Type Nominal output (Pmpp) W 250 255 260 Voltage at Pmax (Vmpp) V 30.9 31.0 31.1; Current at Pmax (Impp) A 8.1 8.2 8A Open circuit voltage,(Voc) V 37A 37.6 37.7 Short circuit current (Isc) A 8.7 8.8 8.9 Output tolerance, I °h +3/ 0 No of cells & connections IPCs 60 In series Ceil type. _ 6" Multi -crystalline silicon (Hyundai cell, Made in Korea) _ Module efficiency % 15.3 15.6 15.9 TemperaturecoefficientofPmpp %1K -043 043 -043 Temperature coefficient of Voc %/K -032 I 0 32 0.32 Temperature coefficient oflsc -m °/p/K 0048 ( 0048 0048 XAII data at STC (Standard Test Conditions). Above data may be changed without prior notice. Mono -crystalline Type s $ 8", I( M-1-3 t A- I Nominal output (Pmpp) W 260 265 I 270 Voltage at Pmax (Vmpp) „ ,, V ; 31 1 313 31.4 , Current at Pmax (Impp) A 8A 8.5 8.6 Open circuit voltage (Voc)1 V . = . .37:9 38:1 f 38:2 I Short circuit current (Isc) A 8.9 9.0 9.2 ut' ttoerance'^ O pq 9b' Y +31.4 No. of cells & connections PCs 601n series Cell type „ _ _ 6 Mono -crystalline silicon (Hyundai cell; Made in Korea) Module efficiency % 15.9 16.2 I 16.5 Temperature coefficient of Pmpp 1 Temperature coefficient of Voc %/K -0.33 -0.33 -0.33 Temperature coefficient of lsc "h/K 0.032 0.032 0.032 XAII data at STC (Standard Test Conditions). Above data maybe changed without prior notice Module Diagram l Installation Safety Guide • Only qualified personnel should install or perform maintenance. • Be aware of dangerous high DC voltage. • Do not damage or scratch the rear surface of the module. • Do not handle or install modules when they are wet. (unit: mm, inch) IN Curves eu"entfAI ° -BSc 4 - 4sc Vc DETALLA 4 3 &Wstor7Hau t °a s 1° is 1° z Kt as dD tS V curtait W olugeM DETAB.B ° 1810.71-) L WINA lEf�` -s eO De (-I IR -BJ"Ci I i ti) t u , +.8.-zoowma cx. t 301.1 120.0 C•-� I n RU SEMON CL .2016 VnihB° M REVIEVVED FOR LODE COMIF WL-49- � DC 1,000 V IIEQ DC 600 V (UL) t'I�•.(F (1'�"%ii('7-i"ai..a7r`L "i :."`-"""""""'°"• 15 A HYU 1� DAI Sales&Marketing -,P°"red alFsccer(fiee" 21H., Hyundai Bldg., 75,Yulgok-ro,Jongno-gu, Seoul 110-793, Korea -. eco-friendrypapr. HEAVY INDUSTRIESCO.,LTD• Fsc` Tel:+82-2-746-8406,7422,8525 Fax:+82-2-746-7675 (Printed Date: January 20141 HYU N DAI HEAVY INDUSTRIES CO.,LTD. m 1n •r, U o O rn I L00 - CD I. N= Q LU �i ED O r m I1< \ co "goILU to z J v w (n N U W U Z d• 6, o N W ❑ d: 0)o U o CO)m a .) coW Z U O o0 Z N1EO Z O °' C LLI UQ } LL O O W c a 11 DFi'AViN'V.. I— / K/AB SCALE SHEET TmF: MODULE SPEC SHEET: SP-1 Enphase Microinverter Model M215 M215 Specifications Enphase M215 Mlcrolnverter Parameters I Enphase M215.Microinlierter Parameters it Topic Unit Min Typical Max j #pp Topic Unit Min 'Typical Max At Parameters I Features and Specifications' Rated (continuous) AC output Power (40 to +65°C) W 215 Outputpowerfactor 0.95 0.99 1 Nominal AC output voltage range 240 VAC (split phase) 208 VAC (three phase) Vrms Vrms 211 183 240 208 264 229 Extended AC output voltage range 240 VAC (split phase) 208 VAC (three phase) Vrms Vrms 206 179 269 232 Maximum AC output current at nominal voltage 240 VAC (split phase) 208 VAC (three phase) Arms Arms 0.9 1.0 Nominal AC output frequency range Hz 59.3 60 60.5 Extended AC output frequency range Hz 57 60 1 60.5 Maximum AC output over current protection device A 20 Maximum AC output fault current & duration Arms/cycles 1.05 Arms over 3 cycles 1.04 Arms over 5 c Iles High AC Voltage trip limit accuracy % ±2.5 Low AC Voltage trip limit accuracy % ±4.0 Frequency trip limit accuracy Hz ±0.1 Trip time accuracy me ±33 i.. Miscall! Maximum inverters per 20 amp AC branch circuit 240 VAC (split phase) 208 VAC (three phase) Peak inverter efficiency CEC weighted efficiency Static MPPT efficiency (weighted, ref EN 50530) Total Harmonic Distortion Operating temperature range (internal) Ambient temperature range Night -Tare toss --- " Storage temperature range Min.,, Typical , iMax MPPT voltage range V 22 36 Operating range V 16 36 Maximum DC input voltage V 45 Minimum I Maximum start voltage V 22 45 Maximum DC input short circuit current A 15 Maximum DC input current A 10.5 Ground fault protection mA 1000 Maximum input source backfeed current to input source A 0 Compatibility Pairs with most 60-cell PV modules Dimensions not including mounting bracket (approximate) 17.3 cm x 16.4 cm x 2.5 cm (6.8" x 6.45" x 1.0") Weight 3.5 Lbs (1.6 Kg) Enclosure environmental rating NEMA 6 Torque specifications for fasteners 6 mm (114") mounting hardware: 5 N m (45 to (Do not over torque.) 50 in-Ibs) 8 mm (5116") mounting hardware: 9 N m (80 to 85 in-Ibs) Torque specification for 10/32 ground cleat 2 N m (20 to 25 in-Ibs) (Do not over torque.) Cooling Natural convection: no fans Communication Power line Standard warranty term hlin://anph-qse.com/warranty Compliance UL1741, IEFE1547, FCC Part 15 Class B CAWCSA-=2 NO. O-M91, 0.404, and 107.1-01 Integrated DC disconnect The DC connector has been evaluated and approved for use as the load -break disconnect required by the NEC. Integrated AC disconnect The AC connector has been evaluated and approved for use as the load -break disconnect required by the NEC. 17 25 Engage Cable Specifications I "°Speoificationa Value % 96.3 System temperature range (ambient) -40°C to +65°C (-40°F to 149°F) % 96.0 Cable temperature rating 90°C Dry / 90°C Wet % 99•6 Cable type TC-ER % 3.0 5 Cable insulator THWN-2 °C -40 conductor rating 85 °C -40 65 Environmental protection rating IEC 60529 IP67- nW 46 UV-exposuree ratfngT termmalorengage coupler, and drop connector body UL 746 C. F1 °C -40 65 Sunlight resistance (cable) UL 1277 Compliance Conductor size Cable diameter Minimum bend radius Drop connector dimensions Terminator cap dimensions UL486A/B, UL 514C, UL6703, UL 9703. IEC 60529 IP67, CAN/GSA 22.2 No. 21, 182.3 12 AWG 1.25 cm (0.49") 4.75 inches (12 cm) 11.8 cm x 6.0 cm x 3.2 cm (4.64" x 2.36" x 1.25") 3.6 cm diameter x 5.1 cm tall (1.4" x 2") ('� u11i�liil L.1 �%�-4111�116nZ . cs 2- JUN Is RIEVIEWEEL) r u", $ JC_ t,OMPLIANCE Reviewed By V m a U o on fIF, i- U o � I�, W� w� I, / m J r: o� U Luc: 0 Y) > u; IL . W L IE:. ZCN IF: W N U W LU M r to U S CS U mr) W Z cn goo C � NCO Z p 0)(Dz M2i C)a IL 0 a RFVIRInNS �1'11111 DRAWN BY. LKIAB DATE: SCALE: SHEET TITLE INVERTER SPEC. SP-2 M Zip IRON RIDGE Solar Is Not Always Sunny Over their lifetime, solar panels experience countless extreme weather events. Not just the worst storms in years but the worst storms in 40 years. High winds capable of ripping panels from a roof, and snowfalls weighing enough to buckle a panel frame. XR Rails are the structural backbone preventing these results. They resist uplift, protect "' against buckling and safely and efficiently_ transfer loads into the building structure. / Their superior spanning capability requires fewer roof attachments, reducing the number of roof; penetrations and the amount of installation time. *' t Sloped roofs generate both vertical and lateral forces on mounting rails which can cause them to bend and twist. The curved shape of XR Rails is specially designed to increase strength in both directions while resisting the twisting. This unique feature ensures greater security during extreme weather and a longer system lifetime. Compatible with Flat & Pitched Roofs XR Rails are IronRidge offers compatible with a a range of tilt leg FlashFoot and options for flat other pitched roof Ifs roof mounting attachments. applications. XR Rail Family XR Rail Family The XR Rail Family offers the strength of a curved rail in three targeted sizes. Each size supports specific design loads, while minimizing material costs. Depending on your location, there is an XR Rail to match. Corrosion -Resistant Materials All XR Rails are made of marine -grade aluminum alloy, then protected with an anodized finish. Anodizing prevents surface and structural corrosion, while also providing f a more attractive appearance. XR10 XR10 is a sleek, low -profile mounting rail, perfectly matched to regions without snow. It achieves 6 foot spans, while also staying light and economical 6'spanning capability Moderate load capability Clear anodized finish Internal splices available XR100 XR 100 is the ultimate residential mounting rail. It supports a range of wind and snow conditions, while also maximizing spans. 6'spanning capability Heavy load capability Clear & black anodized finish Internal splices available XR1000 XR1000 is a heavyweight among solar mounting rails. It's built to handle extreme climates and spans 12 feet or more for commercial applications. 121spanning capability Extreme load capability Clear anodized finish Internal splices available Rail Selection The following table was prepared in compliance with applicable engineering codes and standards. Values are based on the following criteria: ASCE 7-10, Roof Zone 1, Exposure B, Roof Slope of 7 to 27 degrees and Mean Building Height of 30 ft. Visit IronRidge.com for detailed span tables and certifications. 120 t€ r None ` 140 XR10 I XR100 XR100, t l 160 ff � - �l 100 10-20' 120 i 140 ,= - �ILI 160 1.00 { '` 30 160 100 i 40 Jf,160 , 50 70 160d -< *:Ui ,I, C ?;?, rtrt n 80-90 160 n A gnip REVIEWED t-Ok UO'DE C:(.iIVIPLI 0 m a U O I O u`ri `t m / 0 t- to t m ��;r. 1 Q 04 LC m U, W rn L.' rn r:i F' U11 r� w ol M Y W W LD UJI V Y 0 0) d' LU ~ W Z) UJ n� }O O a d' 0) � O N� �Qo @Ur? to O 00 :C O N Z UQ 11111111 00000000 DRAWN BY'. LK/AB DATE: SCALE: SHEEr ME: RACKING SPEC. SP-3 Did IRONRIDGE IronRidge FlashFootTM is an all -in -one solar mounting product for composition shingle roofs that eliminates the need for separate standoffs, flashings, and L-feet. FlashFoot incorporates a number of structural and waterproofing features to securely attach IronRidge Rails to roof structures, while also protecting against water intrusion and weather damage. Load Distribution Plate A solid metal plate below the L-foot increases the FlashFoot's structural strength and prevents any deformation of the flashing during installation. Certified compliant with IBC and IRC. ES FlashFootTM N " f i Dual Mechanical Seal At the core of the FlashFoot, a pre -installed rubber bushing forms a dual mechanical seal, with its exterior compressed against the cavity of the L-foot and its interior tightly wrapping around the shaft of the lag bolt. Water Shedding Design A wide flashing layer combined with an elevated sealing platform maximizes the FlashFoot's water shedding ability. Installation Overview Tools Required: tape measure, chalk line, stud finder, roofing bar, caulking gun with an approved sealant, drill with 1 /4" bit and 1 /2" socket. Locate rafters and snap vertical and horizontal lines to mark locations of flashings. Drill 1/4" pilot holes, then backfill with an approved sealant. Line up pilot hole with flashing hole and insert lag bolt through bonded washer, L-Foot, and flashing. Tighten lag bolt until fully seated. Testing & Certification Slide flashing, between 1 st and 2nd course, so the top is at least 3/4" above the edge of the 3rd course and the bottom is above the edge of the 1 st course. The FlashFoot is now installed and ready for IronRidge Rails. With provided L-foot fasteners pre - loaded into rails, drop rails into open L-foot slots. FlashFoot is certified for compliance with the International Building Codes (IBC) & International Residential Codes (IRC) by IAPMO-ES. Mechanical testing conformed to the standard for Testing and Analysis of Joist Hangers and Miscellaneous Connectors (EC002-2011), and rain testing conformed to the Underwriters Laboratory Standard for Gas Vents (UL 441-96 Section 25). Douglas Fir, Larch .50 798 Douglas Fir, South .46 705 Engelmann Spruce, Lodgepole Pine (MSR 1650 f & higher) .46 705 Hem, Fir i �"� a.tt,.,;., .43 636 Hem, Fir (North) 46 '7�i�C�li i� n�'="T�'t`" ` 705 Southern Pine i .55 921 Spruce, Pine, Fir ,, n :{ �' � .42 11 otj png( 615 Spruce, Pine, Fir (E of 2 million psi and higher grades of MSR and MEL) '"�'""' ` ""' .5o " ' e - k' ` ' 798 awrws.wmerran W—C n, Nos 20as, Table 1,.M. 11.s :Naves:pin—. mum we—.-marenerarcaner seummmw memcer.,q aee ink 1w revm eage wmen . U) IT m U O m Ic.. I— roa1 to 3 o h Q �# 0`' mI'IzV� w o►- M I�. (/)® 19 ir`'` w Zrn W N 0 0 LU U Z I- a, �p CV LU rn 93 4U -� o U) �_ o1U M LU Z (n o co �� c .— NCp Z 0 az �IL 2 Ua LL 0 W a a RFVISInKlq 11111111 DRAWN I3Y: LK/AB DATE: SCALE: SHEET TITLE: FLASHFOOT SPEC. SHEET: SP-4 Z� IRONRIDGE Simplified Grounding For Greater Safety & Lower Cost Traditionally, solar modules are grounded by attaching lugs, bolts or clips to the module frame, then connecting these to a copper conductor that runs throughout the array. This process adds time and cost to the installation, and often results in improper grounding, creating significant long-term safety risks. The IronRidge Integrated Grounding System solves these challenges by bonding modules directly to the mounting rails. This approach eliminates separate module grounding hardware, and it creates many parallel grounding paths throughout the array, providing greater safety for system owners. li Grounding Strap 1r , Grounding Straps are used to Y bond rail -to -rail connections. :- They are only required on the x rail with the grounding lug. ech ref Integrated Grounding System I Installation overview J Install Roof Attachments f ;' -� • Install appropriate roof flashing and/or standoff for roof type. r • Attach L-Feet to flashing or standoff.-�J Prepare Rail Connections • Insert splice into first rail, then secure with Grounding Strap and/ self -drilling screw. • Slide second rail over splice, then secure with opposite end of Grounding Strap and self -drilling screw.L J ,. •L "''�J %, f Mount & Ground Rails I' ! • Attach rails to L-Feet and level rails. Grounding Mid Clamp •Install one Grounding Lug per row of modules. Each Grounding Mid Clamp pierces through the anodized coatings of both the module frame and • Connect Grounding Lug to grounding conductor. the mounting rail to form secure electrical bonds, which are repeated throughout the array. 3 Grounding Lug A single Grounding Lug connects an entire row of PV modules to the grounding conductor. Install Modules & Clamps • Install first module using End Clamps and Grounding Mid Clamps. =� - • Install additional modules using Grounding Mid Clamps. • Finish row with a second pair of End Clamps. Testing & Certification The IronRidge Integrated Grounding System has been tested and certified to UL 2703 by Intertek Group plc. UL 2703 is a proposed UL standard for evaluating solar module mounting and clamping devices. It ensures these devices will maintain strong electrical and mechanical connections over an extended period of time in extreme outdoor environments. The testing process closely mirrors that of UL 1703, the solar module testing standard, including temperature and humidity cycling, electrical and mechanical load testing, and manufacturing quality reviews. l e� Module Frame Compatibility A Any module frames whose parameters are not listed in the provided table have not been tested for compatibility. The Grounding Clamp has proven robust in,groundi gGf�OVc �t� ndC 72-cell solar module framesVith box constr6tio a d a r0le�f' b < A0— 4 . I anodization thick s � Suildi; �� De,_ `�.Yf All solar modules is t d` o IL;1703 and with frame construction t" "s ,.. nn a A 6e 9S .W?A IC. within the parame rs stated above arej'compatlbC with the IronRidge Integrat ' "6rncJing System. -� �' OR coUlr cOMPLI icy I � Go to iron y M,. t i l�evlewed BY Dimension Range A 31.Omm - 51.Omm B 5.08mm (minimum)' a m a U W VY Z �0) W M � w; � o U N Endo W Z DRAWN BY: LK/AB DATE: SCALE: SHEET TfTLE: GROUNDING SPEC. SHEET: SP-5 SMOKE /,,G,XR-BON O'N 0XVIDEALARM OME CIE FICATE OFIGORPULANCE C,DMM,UNITYD:E,VEL'OPMENT'DE-PA',RTME,,NT 0, BUILDING DIVISION 10300 TORREAVENUE -,CUJNERT,'I,NG,,,CA 95 4-32 5 (4,08) 777-3228 - FAX (408) 777-3383w ��tt, �bull. ing(a) Ip _ gL , e . itijo,orq F URPO S, E -2.014- qo` [� This affidavit is a sellf=certlfication for the installation of all required Smoke and Carbon Monoxide Alarms for compliance', with 2�13 CRC Section R314,, 2013 CSC Sections 420.6 and 907.2.11.2 where no interior access for inspections are teq� lred. GV-NXVR,,At P-Xistming- sl, ngle-faiftily and multi -family dwellings shall be provided with Smoke Alarms and Carbon M.c-,ftqxla,.e alarms.:,W' hen the valuation of additions, alterations, or repairs to exist-ing dwelling units exceeds $1000.00." C AKE Section. R,314 and CBC Sections 507.2.11.5 and 420.6 require that Sinok-e lar mms and Carboni M..'Onlaxide Alanu-,5 be installed in the following lacaticals: AREA SUDICE AtA\-g H- CO AILLAULAII OUWd.e of each-, separate sleeping, area in the immie-d-late, vicinity of the bedi, n, X Qh qVq level 1, of a, d",wellin , unit iricjuding irfteras, _ ye g X X Within evc, It die ing,_ room Carbon,, �MicRoxide' lalarms are not req, ilredind wellifig-s- which die not cantain-, fuel -bur ri ng, app liances an, that: do not 1'2a�ve a anti cltied garage. Car:T or rno ZoxScle alarms comber ed with s t ohe alar s sl a+ll co I'y wrth CIC Section, 420.6a.rads-ha-111, be, approved by the Olfice of the State Fire M',, arshaill. Power Supply. I n -ft-14ts With no, cum- t m iercial power supply, alax, m(s) 1, nay, be SDAely, h8me.q gyre te-d, It nm existktig, units, alarms are permitted fted to, be solely battery ope rated where re , :amrs or ailltevatilalis,, d,,E), not result an the r, E: MMMERal of, waffl, aiiitldll ceffirLig, fmis-he's ar there Is no, access by nm.eanis of atfic .1 b=asernent or crawl space., Defer to CPCSecton� ROMI and CBIC Sec i t tions'907.2.11.4, and, 4210.6.1 An, electric perwk is required for allarias which{ m,-,u,$! t be comrLectedto, the buildling wir"kL.g. As awner of the, aboive--refere-iitcedl property, 1, hereby certify that: the allaxiin(p) referenced alove, has/lheave, b"eeirL, in-stailled, in, ace oralaixice, with the m,, ai-tufactularer's ins: timctions, ajftdi in, cam- p Ifiazc e w, Hh, the Cal,-dar aiai -ff)ndd&Fq-,, and Cafifo nua, Re�idenftiaill Codes,.. Ih, e, alarms tested and are aperatlairiall, asi &fffie, date, slgpitedl below. yam CU Owner Name Address WATER -CONSERVING PLUMBING FIXTURES OWNER CERTIFICATE OF COMPLIANCE COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 • FAX (408) 777-3333 • bui1din9(�7cupert1no.org rd 1. Is your real property a registered historical site? ❑ Yes Civil Code Sections 1101.1.through 1101.8 do not apply. Skip the rest of the form and sign bottom of form. it No Go to Question 2. 2. Does your real property have a licensed plumber certifying that, due to the age or configuration of the property or its plumbing, installation of water -conserving plumbing fixtures is not technically feasible? El Yes Civil Code Sections 1101.1 through 1101.8 do not apply. ❑ 'iThe licensed plumber's certification has been provided to the Building Division. Slop the rest of the form and sign bottom of form. No Go', to Question 3. El 5. Is water service permanently disconnected for your building? ❑ Yes Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the form and sign bottom of form. R No Go'to Question 4. Is your real pri operty built and available for use or occupancy on or before January 1, 1994? ❑ No My real property is built and available for use or occupancy after January 1, 1994. Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the form and sign bottom of form. R"Yes My real property is built and available for use or occupancy on or before January 1, 1994. Civil Code Sections 1101.1 through 1101.8 apply. Check. one of the three following statements and sign bottom of form.. Please check ONE of the following: [ My property is a single-family resid6ntial real property. See Civil Code Section 1101.4. On and after January 1, 2014, building alterations or improvements shall require all non -compliant plumbing fixtures to be replaced with water -conserving plumbing fixtures throughout the building. On or before January 1, 2017, all non- compliant ',plumbing fixtures shall be replaced with water -conserving plumbing fixtures (regardless of whether property undergoes alterations or improvements). El Myprope4 is a multifamily residential real property. See Civil Code Section 1101.5. On and after January 1, 2014, specified building alterations or improvements shall require non- compliant plumbing fixtures to be replaced with water -conserving plumbing fixtures. On or before January 1, 2019, all non -compliant plumbing fixtures shall be replaced with water- conservinglJplumbing fixtures throughout the building (regardless of whether property undergoes alterations or ❑ My property is a commercial real property. See Civil Code Section 1101.5. On and after January 1, 2014, specified building alterations or improvements shall require non- compliant plumbing �xtures to be replaced with water -conserving plumbing fixtures. On or before January 1, 2019, all non -compliant plumbing fixtures shall be replaced with water- conserving plumbing fixtures throughout the building (regardless of whether property undergoes alterations or improvements). I, as the owner or owner's agent of this property, certify under penalty of perjury that non -compliant plumbing fixtures will be replaced prior',to date specified above with water -conserving plumbing fixtures in accordance with Civil Code Sections 1101.1 through 1101.8, the current California Plumbing Code and California Green Building Standards Code, and manufacturer's installation requirements, and that the water -conserving plumbing fixtures comply with the requirements as indicated in the - table on the following page. Owner or Owner Agent's Signature: C Date: Szl r Upon completing and signing this Certificate, please return it to the Building Division in order to final your building'permit. SB407 2015. doc revised 08126115 Non -Compliant Water -Conserving Plumbing Fixture Plumbing Fixture (Fixture Complying with Current Code Applicable to New Construction) Fixture Type Maximum Water Usage/Flow Rate 2013 CPC Ch. 4 2013 CPC Ch. 4 2013 CPC Ch. 4 Water Usage /Flow Rate. 2013 CALGreen Div. 4.3 2013 CALGreen Div. 4.3 2013 CALGreen Div. 5.3 Single -Family Multi -Family Commercial Residential Residential Water Closets Exceed 1.6 Single flush toilets: 1.28 gallons/flush (Toilets) Gallons/flush Dual flush toilets: 1.28 gallons/flush effective flush volume (the composite, j C Urinals Exceed 1.0 average flush volume of two reduced flushes and one full flush Gallons/flush 0.5 gallons/flush Showerheads Exceed 2.5 2.0 gallons per minute @ 80 psi. Also certified to the performance criteria of gallons per minute U.S. EPA WaterSense Specification for Showerheads (A hand-held shower is considered a showerhead.) For multiple showerheads serving one shower, the combined flow rate of all showerheads and/or other shower outlets controlled by a single valve shall not exceed 2.0 gallons per minute @ 80 psi, or the shower shall be designed to allow only one shower outlet to be in operation at a time. Faucets — Exceed 2.2 gallons Maximum 1.5 gallons per Within units: _ 0.5gallons per minute @ 60 Lavatory per minute minute @ 60 psi; minimum Maximum 1.5 gallons psi Faucets 0.8 gallons per minute @ per minute @ 60 psi; 20 psi minimum 0.8 gallons i per minute @ 20 psi In common and public {I i use areas: 0.5 gallons i per minute @ 60 psi 1.8 gallons per minute 60 psi ! Faucets — Exceed 2.?_.gallons 1.8 gallons per minute @ 1.8 gallons per minute 1.8 gallons per minute @ 60 Kitchen per minute 60 psi @ 60 psi psi Faucets .May temporarily increase May temporarily up to 2.2 gallons per increase up to 2.2 minute @ 60 psi, and must gallons per minute @ default to maximum . 60 psi, and must 1.8 gallons per minute @ default to maximum 60 psi 1.8 gallons per minute (. Where faucets meeting @ 60 psi the above are unavailable, 'Where faucets meeting aerators or other means the above are may be used to achieve y unavailable aerators or , reduction. other means may be used to achieve reduction. If the existing plumbing fixture water usage/flow rate is equal to or lower than the figure shown, it is not required to be upgraded. SB407 2015. doe revised 08126115