Loading...
Reso 6787 DP=2014-07 � ' : CITY OF CUPERTINO : 10300 Torre'Avenue ' Cupertino, Califorriia 95014 RESOLUTION NO. 6787 ,; � OF THE PLANNING COMMISSION;OF THE CITY OF CUPERTINOAPPROVNG A DEVELOPMENT PERIVIIT TO ALLOW THE CONSTRUCTION OF A PERSONAL � ' WIRELESS SERVICE FACILITY, CONSISTING OF A 80-FOOT TALL TREEPOLE WTTH SIX PANEL ANTENNAS AND ASSOCIATED BAS;E EQUI['NlENT STATION AND EMERGENCY POWER GENERATOR AT CIVIC CENTER, 10300 TORRE AVENUE SECTION I: FINDINGS WHEREAS, the P1a��u1i�1g Coininission of the City of Cupertino received an application for a ; Development Permit;as described in Section II. of this Resoiution;and WHEREAS, the necessary public notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held one or more public � hearings on this matter; and WHEREAS,the applicant has met the burden of proof required to support said application;;and has satisfied the following requirements: , 1) The proposed use, at the proposed location, will not be detrimental'or injurious to property or improvements in the vicinity; and will not be detrirnental to the public health,:safeiy; '' general welfare, or convenience. The project will utilize an unused corner of t11e, Civic Center propexty and generate radio frequency energy. emissions and noise in.quantities that will be below Federal safety standards and City standaxds respectively.. The antenna mast ' will<1oe designed to mimic a tree to blend into.the.existing landscaping. .;Other constructed - features will utilize high quality materials and not block sight lines for vehicles or . pedestrians; 2), The.proposed use will be located and conducted:in a manner in accord with the Cupertino ' � Comprehensive General Plan,,' the",.Wireless . Facilities Master Plan, the Wireless Communications Facilities Ordinance and the purpose of this title. 3) That the operation of the facility will comply with federal safety standards for radio frequency energy emissions. '� , � Resolution No. 6787 DP-2014-07 August 25,2015 Page 2 NOW, THEREFORE, BE IT RESOLVED: � That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, the application for Development Permit is hereby approved with the landscaping and irrigation plan deferred for City Council approval, subject to the conditions which are enumerated in this Resolution beginning on Page 2 thereof; and That the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the public hearing record concerning Application No. DP-2014-07 as set forth in the Minutes of the Planning Commission Meeting of August 25, 2015 and are incorporated by reference as though fully set forth herein. SECTION II: PROJECT DESCRIPTION Application No.: DP-2014-07 Applicant: Jenny Blocker (for Verizon Wireless) Property Owner: City of Cupertino Location: 10300 Torre Avenue SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS � Approval is based on Exhibits titled: "Verizon Wireless/DEANZA STEVENS CREEK/ 10800 TORRE AVENUE/CUPERTTNO, CA 95014/ APN: 369-31-033/ LOCATION #: 249535" prepared by MST ARCHITECTS dated 05/26/15 and consisting of ten sheets labeled T1.1, C- 1, C-2, A1.1, A2.1, A2.2, A3.1, A3.2, A3.3, L1.1, except as may be amended by the conditions contained in this resolution. 2. NOTICE OF FEES DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Govemment Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. 3. COLOCATION OF ANTENNAE The treepole shall be structurally designed to accommodate the collocation of additional antennae from other wireless carriers. The co-location agreement shall be at market rates with reasonable compensation to the mast owner. � ^ ..>. � , �:.t. . .,� Resolution No.6787 DP 2014-07 August 25,2015 Page 3 ., 4:`'ABANDONIVIENT �_ i ` � , , . If after installation, the aerial is not used for its permitted purpose for a continuous period of 18 moriths, said.:aerial and associated facilities shall be removed. The applicant shall bear :�the entire cost of.demolition and removal. 5. EXPIRATION DATE This development permit shall expire ten(10) years after the effective date of the permit. The applicant may apply for a renewal of the development permit at which time the Plannulg CoiYunission� may review the `state of wireless .cornrnunication technologies, camouflage techniques and maintenance to determine if the visual impact of the aerial facility can be reduced'. 6. 'TREE POLE;APPEARANCE AND MAINTENANCE T'he applicant shall construct a eucalyptus style treepole to raise the height of the antennas and shall meet the following design criteria: , ' a) Use a sufficient number of;artifieial branches to obscure the appearance of the;panel antennas and,any associated mounting framework. b) Panel antennas mounted away from the mast shall be covered in leaf socks to blend with ' the green foliage of the`artific'ial branches: , c) The mast sliall be'wrapped with a faux bark and'any:antenna mourited close to the mast shall be painted brown to mimic a tree trtullc. � d) The foliage shall have a mottled green coloratiori. The building permit shall be reviewed and approved to`the satisfaction of the Coimmunity ''Development Director to ensure tlle above condition 'is met. The applicant shall perform regular maintenance of fhe tree pole to maintain its appearance and obscure t.�ie panel , antennas from public view: � _ ,__ . , 7. E�C UIPMENT ENCLOSURE The base equipment enclosure shall be constructed of high quality materials and/or be screened.by.appropriate landscaping as determined by the City Council. The final enclosure design shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 8. TREB REMOVAL The applicant shall apply to the City Streets and Trees Supervisor for permission to remove any Park trees associated with tlie construction of this wireless facility. 9. ACOUSTICAL EN,CLOSL-JRE FOR ElVIERGENCY POWER GENERATOR - . : . . . : , To meet City Noise standards, the power generator shall be ericlosed with a Leve12,Acoixstic Enclosure. TI12 aCLClltlOri�of the acoustic enclosure shall be no,ted on the building plans. ' � Resolution No. 6787 DP-2014-07 August 25,2015 Page 4 10. SETBACK OF ENCLOSURE FENCING FROM TRASH ENCLOSURE & PARKING LOT � CURBING At the building permit stage, the applicant shall provide revised drawings of the equipment enclosure demonstrating a minimum 2-foot setback of the enclosure fencing from the parking lot curbing and a minimum 3-foot setback of the enclosure fencing from the trash enclosure fencing. 11. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. ASA-2014-10 and EXC-2014-12 shall be applicable to this approval. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT DEPT. 12. WIRE CLEARANCE EASEMENT Prior to building permit approval, Applicant shall coordinate with Public Works staff to vacate or otherwise address the wire clearance easement that affects the project. 13. LANDSCAPING AND IRRIGATION APPROVAL Prior to building permit approval, Applicant shall coordinate with Public Works staff to obtain City approval for new/replacement landscaping and irrigation for the project. 14. CONSTRUCTION STAGING PLAN � Prior to building permit approval, Applicant shall provide a construction management plan that identifies the timing/duration of construction activities, and construction staging and temporary construction improvement locations that shall be reviewed and approved by the Director of Public Works. PASSED AND ADOPTED this 25th day of August 2015, at a Regular Meeting of the Planning Commission of the City of Cupertino by the following roll call vote: AYES: COMMISSIONERS: Chair Lee, Vice Chair Takahashi, Gong, Sun,Paulsen NOES: COMMISSIONERS: none ABSTAIN: COMMISSIONERS:none ABSENT: COMMISSIONERS:none ATTEST: APPROVED: � Winnie Lee Asst. Community Development Director Chair, Planning Commission G:/planning/pdreport/res/2014/DP-2014-07 res.doc �