Loading...
Reso 6729 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6729 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING THAT THE CITY COUNCIL APPROVE THE REZONING OF AN APPROXIMATELY 1.1 ACRE AREA FROM PARK AND RECREATION (PR) TO PLANNED 1.2 INDUSTRIAL PARK (P(MP)) LOCATED AT APN 316 06 050 AND 316 06 051 The P1aruluzg Commission recommends approval of the rezoning to the City of Cupertino Municipal Code with the findings reflected in the Draft Ordinance attached hereto as Exhibit Z. PASSED AND APPROVED this 2nd day of October 2013, at a Special Meeting of the Planning Commission of the City of Cupertino by the following roll call vote: AYES: COMMISSIONERS: Chair Sun, Vice Chair Brophy, Takahashi, Gong NOES: COMMISSIONERS:none ABSTAIN: COMMISSIONERS:none ABSENT: COMMISSIONERS: Lee ATTEST: APPROVED: r ------�------- ✓� �'�-i�'�-=' --------_• Aarti Shrivastava '�Don Sun Director of Community Development Chair, Planning Commission EXHIBIT Z ORDINANCE N0. 13- AN ORDINANCE OF THE CUPERTINO CITY COUNCIL APPROVING THE REZONING OF AN APPROXIMATELY 1.1 ACRE AREA FROM PARK AND RECREATION (PR) TO PLANNED INDUSTRIAL PARK(P(MP)) LOCATED AT APN 316 06 050 AND 316 06 051 WHEREAS, an application was received by the City (Application no. Z-2011-03) for the rezoning of a property from PR(Park and Recreation) to P(MP) (Planned Industrial Park);and WHEREAS, immediately prior to the Council's consideration of this rezoning, and following the Commission's recommendation, the Council adopted Resolution No. 6727, adopting a General Plan Amendment covering the property which is the subject of this rezoning ordinance; and WHEREAS, the rezoning will be consistent with the City's General Plan land use map, proposed uses and surrounding uses; and WHEREAS, the Rezoning application is part of the Apple Campus 2 Project, which consists of demolition of all existing structures within the project site and the construction of 3,420,00 square feet of office, research, and development uses; 245,000 square feet of auditorium, fitness center, and Valet Parking Reception uses; 92,000 square feet of utility plants; and parking and ancillary buildings (such as security reception areas and landscape maintenance buildings), of which the proposed buildings are designed to be energy efficient and to use renewable energy (including energy produced on site via photovoltaic infrastructure and fuel cells), all as fully described and analyzed in the June 2013 Apple Campus 2 Project Environmental Impact Report ("Draft EIR") (State Clearinghouse No. 2011082055), as amended by text revisions in Chapter IV of the September 2013 Apple Campus 2 Project EIR Response to Comments Document ("Response to Comments Document") (together, the Final EIR); WHEREAS, the Final EIR was presented to the Planning Commission and City Council on October 1, 2013 at a Joint Planning Commission and City Council Study Session; and WHEREAS, the Planning Commission has recommended that the City Council certify that the Final EIR has been completed in compliance with the California Environmental Quality Act, Public Resources Code Section 21000 et seq., and reflects the independent judgment and analysis of the City, adopt the Findings and Statement of Overriding Considerations for the Project, and make conditions of approval all of the mitigation measures for the Project that are within the responsibility and jurisdiction of the City that are identified in Findings; and WHEREAS, the necessary public notices have been given and the Planning Commission held one public hearing, recommending to the City Council that the rezoning be granted per resolution No. (Z-2011-03); WHEREAS, upon due notice, the City Council has held at least one public hearing that the amendment to the Zoning map be granted; and Resolution No.6729 Z-2011-03 October 2,2013 WHEREAS, the City Council finds the following: 1. That the proposed zoning is in accord with this title of the Municipal Code and the City's Comprehensive General Plan. Tlie majority of the site is designated Industrial/Residential in the General Plan Land Use Map, whicli allows, among other uses, research and development and supporting uses. T7ie Zoning designation for most of the site is Planned Development (Planned Industrial Park) (P(MP)), which similarly allows, among otlzer uses, researcli and development and supporting uses. The Planned Development district allows tlie City flexibility to approve project specific development standards different from the standards outlined in the Zoning regulations for the site. A small portion of tlie project site is currently designated for use as a public park in both the General Plan and Zoning; 12owever, tlie concurrent General Plan Amendment and Rezoning of a portion of the site will ensure tliat the project is in compliance with tlie General Plan and the Zoning regulations governi�ig the project site. In 2005, the City approved tlie rezoning of 1.1-acre area of a proposed townhouse development project as Park and Recreation to serve the future residents of tlie development and residents living in the northern portion of tlze City. However, neither t12e townhouse development project nor public park were developed, althougli tlie site of tlle proposed park(currently a parking lot) remains designated as park space in the City of Cupertino General Plan and Zoning Ordinance. The change will make the zoning of this portion of the Project consistent witli the balance of the Project and enhance and accommodate tlie Project. 2. 'The proposed zoning is in compliance with the provisions of the California Environmental Quality Act(CEQA). The proposed project includes the rezoning of tlze site from Parks and Open Space to Planned Industrial Park. With tliis change in designation, the amount of land designated for future parks in the City will be reduced. T{iis would exacerbate an existing shortage of parkland in tlzis part of tlie City. None of tlie private open space in the proposed development is proposed to be accessible by tlle public as a recreational use. Because the change in the designation and subsequent rezoning of tlle park would be considered a significant impact under CEQA, as n mitigation measure the applicant sl2all either (i) provide sufficient funds for tlle acquisition of 1.1 acres of property b� the City for future park development, or (ii) agree to purchase (unless other property currently owned b� the applicant is proposed) and dedicate to tlle Cit� 1.1 acres elsewlzere in the City as Parks and Open Space, subject to tlie satisfaction of the City, provided tlie land would be publicly accessible, as well as pay for tlie construction of park improvements and for long te��m maintenance of tlTe park. This obligation of the applicant to provide eitl2er funds for purchase, construction and maintenance of parkland or provide parkland,fund construction of improvement and maintenance of tlze pa��k would adequately offset the loss of tlie park and recreation area. Tliis mitigation measure reduces the impact to less t12an significant and tlTerefore, tlie change in tlie zoning designation is in compliance wit1T tlie provisions of CEQA. As set out mor•e fully in tl2e Resolution of tlie Planning Commission of tlie City of Cupertino recommending certification of An Environmental Impact Report for tlie Apple Campus 2 project; and recommending Adoption of Findings and a Statement of Overriding Considerations, Mitigation Measures, and a Mitigation Monitoring and Reporting Program, tlie yroject complies witli CEQA. Resolution No.6729 Z-2011-03 October 2,2013 3. The site is physically suitable (including, but not limited to, access, provision of utilities, compatibility with adjoining land uses, and absence of physical constraints) for the requested zoning designation(s) and anticipated land use development(s). The Project site as designed is physically suitable for this development. Tlie Project is designed to not be visible to adjacent property owners and thus, will lzave limited impacts upon the adjacent land uses. The existing utilities to the Project will be enhanced, modified, replaced or parallel systems constructed to accommodate tlie increased needs of tliis development. In addition, In order to reduce its impact on the environment, tlie Project will utilize onsite photovoltaics and fuel cells and obtain tlie remainder of its energy needs from the State of California Direct Access Program, off-site Apple-owned renewable energy projects or grid-purchased renewable energy. Tlie Project will be compatible witli the surrounding uses and minimize its impacts upon the neigJ2borliood and tlie environment. 4. The proposed zoning will promote orderly development of the City. Tlie Zoning Map designates the majority of tlie site Planned Development (Industrial Park) (P(MP)), wlzich similarly allows, among other uses, researcli and development and supporting uses. Tlie Planned Development district allows tlie City flexibilit� to create project specific development standards. The existing development on tlie project site is not a unified co��porate campus. Tlie new Project will demolisli numerous buildings across the site and consolidate tlze office usage mainly into one large building witli additional buildings located east of Tantau Avenue. The single user campus will be an organized, orderly development within the City and will be constructed in a relatively sliort period of time. Tliis project would also furtller General Plan policies related to Maintaining Cohesive Office Parks (Policy 2-44) and provide significant revenues to tlie City from increased sales tax ��evenue (Policy 2-42) Tlie Project also promotes: Policy 2-40 (maintaining tlie vitality of business and manufacturing) and Policy 2-20, Strategy 3 (diversity of land use, major companies). Finall�, tlie project also pro�oses to make improvements for the alternate Calabazas Creek trail furthering Policy 2-73, Trails. Therefore, tlie proposed development substantially conforms to tlie General Plan and is substantiall�consistent with tlie underlying Zoning. 5. That the proposed zoning is not detrimental to the health, safety, peace, morals and general welfare of persons residing or working in the neighborhood of subject parcels. The Project is designed to minimize tlie im�act upon tlie sur�•ounding community and the environment. In order to reduce its impact on tlze environment, tlze Project will utilize onsite pliotovoltaics and fuel cells and obtain tlie��emainder of its energy needs fi�om tlie State of California Di1•ect Access P��ogram, off- site Apple-owned renewable energy projects or grid-purcliased renewable energy. The P�•oject has been designed to incorpor•ate passive heating and cooling in the main office building wlzid2 will use ambient air. Tliis will reduce tlie use of inechanical cooling making for a more efficient and better work envi�ronment. Tlie �roject has been designed to minimize its impact upon the neiglibors, adjacent �•oads and fi�eeways and the environment. A�propriate mitigation measures to address t��affic impacts along witli tlze adoption of an aggressive but achievable Transportation Demand Management Plan will furtlier reduce the traffic impacts of the project. Adequate buffer lias been �rovided around tlze project to allow privacy and to reduce impacts to neiglibors. 'The site lias a Cor�porate Fitness Center wliicli would enable employees to attend to tlzeir general 1lealtli and incorporates many jogging trails and an on-site bike Resolution No.6729 Z-2011-03 October 2,2013 sharing program. The project also has a large on-site restaurant with several smaller indoor and outdoor dining facilities. The project increases the amount of landscaped green space to over 100 acres. Tlie landscape design of meadows, and woodlands will create an ecologically ricli oak savanna reminiscent of t12e early Santa Clara Valley. It will incorporate both young and mature trees, and native and drought tolerant plants, that will tlirive in Santa Clara County with minimal water consumption. In addition, the project includes some orchard fruit trees, tlie fruit from which will be used at t12e on-site dining facilities furtJiering sustainability principles that the project is striving for. The p�roject �roposes to add at least 1,700 additional trees to tlie site and increase the pei•vious surface areas on site significantly improving stormwater quality and reducing run-off. Site access 11as been designed to consolidate entry and exit in order to reduce conflict with pedestrian and bicycle activity and is directed away from tlze residential neighborhood. Adequate emergency access has been p�•ovided on site. The design of the Project and its environmental attributes are not detrimental to tlie healtlz, safety, peace, morals and general welfare of persons residing or working in the neighborhood of the subject parcels. NOW, THEREFORE, BE IT ORDAINED AS FOLLOWS: That after careful consideration of the, maps, facts, e�ibits, testimony and other evidence submitted in this matter, the City Council based upon the findings described above, the public hearing record and the Minutes of Plarining Commission Meeting of October 2, 2013, and subject to the following, finds: Section 1. That the property described in attached Exhibits Z-1 & Z-2, is hereby rezoned to: P(MP), Planned Industrial Park; and that Exhibit Z-2 attached hereto is made part of the Master Zoning Map of the City of Cupertino; and Section 2. That this ordinance shall take effect and be in force thirty (30) days after its passage, as modified above. INTRODUCED at a regular adjourned meeting of the City Council of the City of Cupertino the 15th day of October 2013 and ENACTED at a regular meeting of the City Council of the City of Cupertino the day of , 2013, by the following vote: Vote: Members of the City Council: AYES: NOES: ABSENT: ABSTAIN: ATTEST: APPROVED: Grace Schmidt, City Clerk Orrin Mahoney, Mayor, City of Cupertino EXHIBIT Z-1 EXHIBIT Z-1 LEGAL DESCRIPTION FOR REZONING AREA TO BE REZONED TO P(MP) BEGINNING AT THE MOST SOUTHERLY CORNER OF PARCEL 6 AS SHOWN ON THAT CERTAIN PARCEL MAP RECORDED IN BOOK 329 OF MAPS AT PAGE 49, SANTA CLARA COUNTY RECORDS, SAID POINT BEING ON THE NORTHEASTERLY RIGHT-OF-WAY LINE OF THE JUNIPERO SERRA FREEWAY (I 280); THENCE NORTH 39°51'28" EAST,A DISTANCE OF 713.89 FEET TO THE TRUE POINT OF BEGINNING; THENCE NORTH 59°59'32"WEST,A DISTANCE OF 192.00 FEET;THENCE SOUTH 30°00'28"WEST,A DISTANCE OF 47.00 FEET;THENCE NORTH 59°59'32" WEST,A DISTANCE OF 45.55 FEET;THENCE ALONG THE ARC OF A NON-TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 41.00 FEET, THE CENTER OF WHICH BEARS NORTH 5°51'S5" WEST, THROUGH A CENTRAL ANGLE OF 43°14'25", AN ARC DISTANCE OF 30.94 FEET; THENCE NORTH 40°53'40" EAST,A DISTANCE OF 27.17 FEET; THENCE SOUTH 49°06'20" EAST,A DISTANCE OF 49.00 FEET;THENCE NORTH 40°53'40" EAST,A DISTENCE OF 235.83 FEET TO A POINT ON THE CENTERLINE OF PRUNERIDGE AVENUE, 92 FEET WIDE;THENCE ALONG SAID CENTERLINE OF PRUNERIDGE AVENUE SOUTH 49°06'20" EAST,A DISTANCE OF 51.82 FEET;THENCE ALONG THE ARC OF A NON-TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 600.00 FEET, THE CENTER OF WHICH BEARS NORTH 40°53'08" EAST, THROUGH A CENTRAL ANGLE OF 6°59'S4", AN ARC DISTANCE OF 76.29 FEET; THENCE SOUTH 39°51'28"WEST,A DISTANCE OF 302.30 FEET TO THE TRUE POINT OF BEGINNING. CONTAINING AN AREA OF 1.18± ACRES, MORE OR LESS. This page intentionally left blank. EXHIBIT Z-2 L=73.28' PRU R=600.00' � _ _ NERIpG 0=6'S9'51" �� �I —'qVENUE � �I w� — �- °� �° I `° �� "' I � S49 06'20"E Z� � ( z �/' � 1.82' .� N49'06'20"W N 49.00' 3� S40'S3'40"W ^�� REZONE TO � � 27.17' � P(MP) M� � �s� O �.�sf nj � �s`�,\ � ACRES o I � `s�,� L=30.94' w ��� R=4i.00' � 0=43'14'25" p — — � N59'S9'32"W i 192.00' T.P.O.B. P(MP) N30'00'28"E 47.00' a, P r I . ;� cfl LEGEND =��'���`��A�JJ�I� � �rl. J��i�JIXJ � �rl• 1 (R) RADIAL ���--,�i1r\PS—�,� °c.i° �?��i�i1�1P�—�,� POB POINT OF BEGINNING o 0 0 � � � � Ni � O�� � SA� � P.O.B. � � � P(MP) � � PLAT TO ACCOMPANY LEGAL DESCRIPTION EXHIBIT Z-2 � � DAiE: 9/23/13 ZONING PLAT MAP SHEET S A N D I S C'Y"�MfIN[[Ilf SCALE: 1"=150� suwaro�� � � �•••N..= DRAWNBY: RMS PRUNERIDGE AVE AT � APPROYED BY: ASC (�DGEVIEW COURT 936EDwneAve.�Sunnyvak,G91065�R�OB.636.OD00�F.10B.636,0999�ww���n�ltia�t �qWING NO: � •� � � 213103 CUPERTINO CA oF i s�E�rs