Loading...
14030018 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 22578 LAZY OAK CT CONTRACTOR:IQV CONSTRUCTION PERMIT NO: 14030018 INC OWNER'S NAME: JENNIFER MORI 820 CHARCOT AVE DATE ISSUED:03/10/2014 OWNER'S PHONE: 4084483080 SAN JOSE,CA 95131 PHONE NO:(408)582-9200 LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL COMMERCIAL REMOVE EXISTING BUILT UP ROOF AND INSTALL License Class Lic.# CV SECURE ROCK AND 60 MIL CARLISLE ROOFING SYSTEM(560 SQ Contractor Date 3: FT). I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$3800 _1have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:34232005 00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITfIIN 180 DAYS OF P IT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS FR ALLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the �� I granting of this permit. Additionally,the applicant understands and will comply Date: with all non-point sour regulations per the Cupertino Municipal Code,Section 9 18. / RE-ROOFS: Signature Date _ r-( � All roofs shall be inspected prior to any roofing material being installed.If a roof is installed without first obtaining an inspection,I agree to remove all new materials for inspection. ❑ OWNER-BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of Signature of Applicant: Date: the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505,25533,and 25534. I will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections05,25533,and 25534. Section 3700 of the Labor Code,for the performance of the work for which this ,3/a-# permit is issued. Owner or authorized agent: Date: -,3 certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional 918. Signature Date REROOF PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION. 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 (408)777-3228• FAX(408)777-3333•building ftupertino.org CUPEFt'1"INO. PROJECT ADDRESS 72" t"Q z Q�I!� c+ APNk n 32 QQS OWNERNAMF enn11� 1 v I - PHO Dr'14,gK.3f 0 [. EMAII o STREET ADDRESS CITY, STATE,ZIP b t1 FAX CONTACT NAMEIn PHONFlej� Z l`5 - S"7 Z.7 EMAIL STREET ADDRESS CITY,STATE,ZIPFAX S Sc,u �.A C,se ❑ OWNER ❑ OWNER-BUIDEP ❑.OWNERAGENT ❑ CONTRACTOR ❑CONTRACTOR AGENT ❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER ❑TENANT CONTRACTOR NAME LICENSE NUMBER LICENSE TYPE BUS.LIC. ftke Gi : ev E �r� c.-� c 3 COMPANY NAME E-MAIL FAX i STREET ADDRESS CITY,STATE,Z PHONE ARCHITECT/ENGINEER NAME LICENSE NUMBER BUS.LIC.k COMPANY NAME E-MAIL FAX STREET ADDRESS CITY,STATE,ZIP PHONE USE OF ❑ SFD or Duplex ❑ Multi-Family ROOFAREA: VALUATION: STRUCTURE: ❑ Commercial 2-.5 /J lI(,)o. C EXISTING ROOF TYPE: BUILT-UP ROOF ❑ASPHALT SHINGLES ❑WOOD SHAKES ❑WOOD SHINGLES ❑OTHER(SPECIFY) REMOVE/REPLACE 1g1YES IF NO, PLYWOOD El %­ ❑ PLYWD ❑ OSB PITCH: ROOF ❑NO I iq LAYERS: THICKNESS: ❑ s/8" TYPE: ❑ CDX 'I Z CLASS: A PROPOSED ROOF TYPE: ❑BUILT-UP ROOF ❑ASPHALT SHINGLES ❑WOOD SHAKES ❑WOOD SHINGLES OTHER ICC-ES REPORT# DESCRIPTION OF WORK Cat-I1 I� t; Eco By my signature below,I certify to each of the following: I am the property owner or authorized agent to act on the property owner's behalf. I have read this application and the information I have pro ided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relating to ild g construction. I authorize representatives of Cupertino to enter the above-identified property for inspection purposes. Signature of Applicant/Agent: Date:_ SUPPLENM AL INFORMATION REQUIRED _If building is associated with a Home Owner's Association,provide letter iL cHE�xY�E� ROITrmc tiles, a rr of approval from HOA. _Provide Planning approval to verify if there any restrictions. 4 ERPF-FESS "PI: G •REYIEW'� n - —Provide copy of Manufacturer's Installation Specifications. � r _Provide signed copy of Cupertino's Tear-OffPolicy. Reroof4pp_2011.doc revised 0311.6111. { REROOF TEAR-OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION ALBERT SALVADOR, P.E.,C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE• CUPERTINO,CA 95014-3255 GUPSRTIN0 (408)777-3228• FAX(408)777-3333•buildino(5.cupertino.org PROJECT ADDRESS •�f �� ^r/ _ I APN w OWNERNAMEVJ�j (/1`(•� PHONE (/ E-MAIL� STREET ADDRESS CITY, STATE,ZIP FAX co-N7RACTORNAME LI S I'm ER LI SET PE I BUS.LIC. I�t PTV COMPANY NAME,— J E-MAIL FAX �ti STREET ADDRESS CITY STATE,ZIP CA S-!l(./ I PHONE T C.keS � S Swv `�s� I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re-roof project shall comply with all applicable provisions of the 2010 California Codes. 2. An inspection request can be scheduled up to one business day before the requested inspection date. Please call (408) 777-3228 from 7:30-3:30pm(Mon-Thurs) or 7:30-2:30pm(Friday) to schedule inspection. For Tear-Off and Naiag Inspections,you must also call on the day of the inspection only after that phase of the work is completed. The building inspector will be available within one hour. Final Inspections will be given a two hour window. 3. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this inspedtioh. Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either completely knocked-down or removed prior to this inspection. 4. If plywood is installed, a plywood Nailing Inspection is required. . Roofing shall not be applied without first obtaining all prior inspection and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 6. A Final Inspection and approval shall be obtained from the building inspector when the re-roofing is completed. To receive a final sign-off, the following items will be verified: a. Flat roofs shall have a minimum of I/4"per foot of slope and demonstrate there is no ponding. b. Listings from approved testing agencies for all pre-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation,vents painted, gutter/downspouts installed, debris removed. 7. NOTE: If'you call for a tear-off or plywood nailing inspection and the work is not complete, you will be ZD charged a re-inspection fee. The re-inspection fee shall be Daid before another inspection can be scheduled. By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf. I understand and agree to comply with the re-roof policy stated above. I also understand that smoke detectors and carbon monoxide det tors are required to be installed in accordance with Sections R314 and R315 of the 2010 California Residential Code. j Signature of Applicant/Agent: Date: Reroof"olicy_2012.doc revised 10/7/12