Loading...
Reso 6685 ASA-2011-24 CITY OF CUPERTINO 10300 Torre Avenue Cupertino,California 95014 RESOLUTION NO. 6685 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING APPROVAL OF A SITE AND ARCHITECTURAL APPROVAL FOR TWO FOUR-STORY OFFICE BUILDINGS TOTALING 289,750 SQUARE FEET,A 3-and 4-LEVEL 50-FOOT HIGH PARKING STRUCTURE WITH UNDERGROUND PARKING,62,200 SQUARE FEET OF RETAIL SPACE(RETAIL SHOPS 1-7 AND RETAIL PADS 1-3),A FIVE-STORY 180 ROOM HOTEL,AND 0.8 ACRE TOWN SQUARE ON A 17.4 ACRE SITE LOCATED NORTH OF STEVENS CREEK BOULEVARD BETWEEN FINCH AVENUE (INCLUDING BOTH SIDES OF FINCH AVENUE) AND N.TANTAU AVENUE,SOUTH OF VALLCO PARKWAY IDENTIFIED BY APNS 316-20-085,316-20-078 AND 316-20-079 SECTION I: PROTECT DESCRIPTION Application No.: ASA-2011-24 Applicant: Kevin Dare Property Owner: 500 Forbes,LLC Location: North of Stevens Creek Boulevard bettiveen Finch Avenue (including the both sides of Finch Avenue) and N.Tantau Avenue,south of Vallco Parkway (APNs 316-20-085,316-20-078 AND 316-20-079) SECTION II: FINDINGS WHEREAS, the Planning Commission of the City of Cupertino received an applicaHon for Architectural and Site Approval of a two four-story office buildings totaling 289,750 square feet, 62,200 square feet of retail space (retail shops 1-7 and retail pads 1-3),a five-story 180 room hotel, a 3-and 4-leve150-foot high parking garage,and 0.8 acre town square, as described in Section I of this Resolution;and WHEREAS, the necessary public notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held one or more public hearings on this matter;and WHEREAS, an Addendum to the 2009 Final Environmental Impact Report was prepared to adequately address the environmental review of the proposed application in accordance with the California Environmental Quality Act (CEQA);and WHEREAS, the applicant has met the burden of proof required to support said application; and has satisfied the following requirements: 1) The proposed project, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience;and 2) The proposed project will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan, the purpose of the Architectural and Site Review Chapter of the Cupertino Municipal Code,and complies with the California Environmental Quality Act(CEQA);and 3) The proposed development is consistent with the zoning regulations and the South Vallco Special Center and South Vallco Master Plan;and 4) The proposed development is consistent with the Heart of the City Specific Plan. Resolution No. 6685 ASA-2011-24 March 27,2012 NOW,THEREFORE,BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, the application for Architectural and Site Approval, is hereby recommended for approval, subject to the conditions which are enumerated in this Resolution beginning on Page 2 thereof;and That the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the public hearing record concerning Application No. ASA-2011-24 as set forth in the Minutes of the Planning Commission Meeting of March 27, 2012, and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS The approval is based on Exhibits Htled: "Main Street Cupertino, Sand Hill Property Company,Cupertino, California" consisting of 98 pages, dated March 2012, labeled Title Sheet, AO through A14, A2.0 through A2.19, H-01 through H-03, C0.0 through C6.5, and L2.1 through L2.10, except as may be amended by the conditions contained in this resolution. 2. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. M-2011-09 and TM-2011-04 shall be applicable to this approval. 3. NOTICE OF FEES,DEDICATIONS,RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code SecHon 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 27th day of March 2012, at a Regular Meeting of the Planning Commission of the City of Cupertino,State of California,by the following roll call vote: AYES: COMMISSIONERS:Chair Miller,Vice Chair Sun,Brophy,Brownley NOES: COMMISSIONERS:Lee ABSTAIN: COMMISSIONERS:none ABSENT: COMMISSIONERS:none ATTEST: APPROVED: `. _ —`� A ti ava,Director Marty Chair Community Development Department Planning Commission G:�Plaririing�PDREPORT\RES�2011\ASA-2011-24 res.doc