Loading...
Reso 6708 DP-2012-04 CITY OF CUPERTINO 10300 Torre Avenue Cupertino,California 95014 RESOLUTION NO. 6708 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPROVING A DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 24,056 SQUARE FOOT CAFETERIA AND 27,785 SQUARE FOOT UNDERGROUND GARAGE; AND DEMOLITION OF AN EXISTING 4,010 SQUARE FOOT RESTAURANT BUILDING FOR A NET SQUARE FOOTAGE INCREASE OF 20,046 SQUARE FEET LOCATED AT 20625 ALVES DRIVE SECTION I: PROTECT DESCRIPTION Application No.: DP-2012-04 Applicant: John Noori Property Owner: Apple, Inc. Location: 20625 Alves Dr (APN: 326-34-069) SECTION II: FINDINGS FOR DEVELOPMENT PERMIT: WHEREAS, the Planning Commission of the City of Cupertino received an application for a Development Permit as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held at least one public hearing in regard to the application; and WHEREAS,the applicant has met the burden of proof required to support said application; and WHEREAS, the Planning Commission finds as follows with regard to this application: a) The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; b) The proposed development will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan and the purpose of the City's zoning ordinances. NOW,THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution begiruling on page 2 thereof,: The application for a Development Permit, Application no. DP-2012-04 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Hearing record concerning Application no. DP-2012-04 as set forth in the Minutes of Planning Commission Meeting of September 11,2012 and are incorporated by reference as though fully set forth herein. Resolution No.6708 DP-2012-04 September 11,2012 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT 1. APPROVED EXHIBITS Approval is based on the plan set dated August 22, 2012, consisting of 35 sheets labeled 0.0, 0.1, 1.1, 2.0, 2.1, 2.2, 2.4, 3.0, 3.0.1, 3.1, 3.1.1, 3.2, 3.3, 4.0, 4.1, 4.2, 5.0, 5.1, 5.2, 6.0, 6.1, 6.2, 6.3, 6.4, 7.0, 7.1, 7.2, 7.3, 7.4, 7.5, 7.6, 7.7, 8.0, 8.1, and 8.2 entitled, "Alves Restaurant, Apple, Planned Development Permit;' prepared by Foster + Partners; Kier & Wright Civil Engineers & Surveyors, Inc.; and Carducci & Associates Landscape Architects, except as may be amended by conditions in this resolution. The above Condition of Approval shall supercede Condition of Approval No. 1,under conditions admininstered by the Community Development Department, delineated in U-2012-04. 2. CONCURRENT APPROVAL CONDITIONS The Conditions of Approval delineated herein shall supercede those outlined in DP-2012-01. Unless otherwise specified or modified by these conditions, the conditions of approval within U-2012-04, ASA-2012-09, and TR-2012-04,shall remain effective. 3. DEVELOPMENT APPROVAL AND PROTECT AMENDMENTS Development Permit approval is granted to a new 24,056 square feet cafeteria building; and demolition of an existing 4,010 square foot restaurant building for a net square footage addition of 20,046 square feet. The P1aruling Commission shall review amendments to the project considered major by the Director of Community Development. 4. DEVELOPMENT ALLOCATION The City shall deduct 2,588 square feet of commercial General Plan allocation from the City Center Area to the North De Anza Blvd Area. 5. CIRCULATION IMPROVEMENTS With staff approval, the following revisions to the plan set will be incorporated to improve circulation, as outlined in the report prepared by Fehr & Peers Transporation Consultants dated September 4,2012: a) Underground circulation improvements, including: • Ensure the elevator is large enough to accommodate cyclists and their bikes • Add a 'Stop' bar and pavement legend where circulating vehicles meet entering vehicles at the base of the ramp • Add'Only One-Way' pavement legend within parking aisle • Optional: Reduce the number of bicycle parking spaces zuithin enclosed spaces to no more than 10. to qualifij as Class I bici�cle facilities b) Street level and ramp circulation improvements,including: • Create a buffer between bike path and pedestrian entrance along north elevation, or encourage bicyclists to walk bikes • Concentrate more bicycle racks near the entrance off of Bandley Dr • Provide overhead cover for outdoor bicycle racks • Add double yellow line on garage ramp to delineate opposing directions of traffic • Install a stop sign,bar, and pavement legend at the garage exit ramp • Align accessible ramps off of the northwest and northeast corner of Bandley Dr and Alves Dr to face center of crosswalk • Add sign prohibiting pedesirian use on garage ramp The above Condition of Approval shall supercede Condition of Approval No. 5,under conditions admininstered by the Community Development Department, delineated in U-2012-04. Resolution No.6708 DP-2012-04 September 11,2012 6. NOISE ANALYSIS Prior to issuance of building permits, a noise analysis must be performed measuring the noise levels generated by the mechanical plant room adjacent to the northern property line. If any recommended mitigation measures are identified as part of the report, they shall be implemented to the satisfaction of the Director of Community Development. 7. OPEN SPACE MAINTENANCE DISTRICT Prior to final occupancy, a written agreement (covenant) agreeing to join an open space maintenance district is required to be submitted to ensure that off-site landscaping is uniformly maintained if/when such a district is formed. In the interim, the property owner shall maintain the landscaping to the satisfaction of the City. 8. RECIPROCAL CROSS ACCESS EASEMENT Prior to final occupancy a reciprocal cross access easement agreement for the pedestrian walkway to the north will be required to be recorded, the final language of which will be reviewed by the City Attorney's office. 9. HOUSING MITIGATION The project is subject to a$5.33/square foot housing mitigation fee (FY 2012-2013). Said payment shall be fulfilled prior to the issuance of building permits. PASSED AND ADOPTED this 11th day of September, 2012, Regular Meeting of the Plaruling Commission of the City of Cupertino,State of California,by the following roll call vote: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSTAIN: COMMISSIONERS: ABSENT: COMMISSIONERS: ATTES�� APPROVED: s * � / ,._a� _ _ a � % �`'r� d i __ `�1___- ary oy�iiy Planner Marty i er, hair mm nity Development Planning 'ssion