Loading...
Reso 6709 ASA-2012-09 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6709 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL PERMIT TO ALLOW THE CONSTRUCTION OF A 24,056 SQUARE FOOT CAFETERIA AND ASSOCIATED SITE IMPROVEMENTS, INCLUDING, BUT NOT LIMITED TO PAVING,OUTDOOR AREAS, LANDSCAPING, AND STREET FRONTAGE IMPROVEMENTS LOCATED AT 20625 ALVES DRIVE SECTION I: PROTECT DESCRIPTION Application No.: ASA-2012-09 Applicant: John Noori Property Owner: Apple, Inc. Location: 20625 Alves Dr (APN: 326-34-069) SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL: WHEREAS, the Planning Commission of the City of Cupertino received an application for an Architectural and Site Approval as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held at least one public hearing in regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Plaruling Comnussion finds as follows with regard to this application: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; 2. The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale have been avoided. A gradual transition related to height and bulk has been achieved between new and existing buildings. b) Design harmony between new and existing buildings have been preserved and the materials, textures and colors of new buildings harmonize with adjacent development with design and color schemes, and with the future character of the neighborhood and purposes of the zone in which it is situated. The location, height and materials of walls, fencing, hedges and screen planting harmonize with adjacent development. Unsightly storage areas,utility installations and unsightly elements of parking lots have been concealed. Ground cover or various types of pavements have been used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees have been avoided. Lighting for development is adequate to meet safety Resolution No. 6709 ASA-2012-09 September 11,2012 requirements as specified by the engineering and building departments, and shielding to adjoining property owners. NOW,THEREFORE, BE IT RESOLVED: That after careful consideration of the initial study, maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on Page 2 thereof,: The application for an Architectural and Site Approval, Application no. ASA-2012-09 is hereby approved, and that the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Hearing record concerning Application no. ASA-2012-09 as set forth in the Minutes of Planning Commission Meeting of September 11, 2012, and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set dated August 22, 2012, consisting of 35 sheets labeled 0.0, 0.1, 1.1, 2.0, 2.1, 2.2, 2.4, 3.0, 3.0.1, 3.1, 3.1.1, 3.2, 3.3, 4.0, 4.1, 4.2, 5.0, 5.1, 5.2, 6.0, 6.1, 6.2, 6.3, 6.4, 7.0, 7.1, 7.2, 7.3, 7.4, 7.5, 7.6, 7.7, 8.0, 8.1, and 8.2 entitled, "Alves Restaurant, Apple, Planned Development Permit," prepared by Foster + Partners; Kier & Wright Civil Engineers & Surveyors, Inc.; and Carducci & Associates Landscape Architects, except as may be amended by conditions in this resolution. 2. SITE DETAILS, STREETSCAPE,FRONTAGE,WALLS, AND LANDSCAPING The applicant shall work with City staff to finalize site details,including but not limited to: sidewalk, walkway, and lounge area paving material, streetscape and sidewalk design, building frontage, treatment of perimeter and garage ramp walls, and landscaping prior to issuance of building permits. It shall closely resemble the attached conceptual plan and prepared to the satisfaction of the Director of Community Development and Public Works Department. 3. LANDSCAPE PROTECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full landscape project submittal per section 14.15.040 of the Landscaping Ordinance. The Water-Efficient Design Checklist (Appendix A of Chapter 14.15), Landscape and Irrigation Design Plans, and Water Budget Calculations shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits. The final project landscaping details (including landscaping features/trees located within the City's public right-of-way) shall be reviewed and approved by the City prior to issuance of building permits. 4. LANDSCAPE INSTALLATION REPORT A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow,and preparation of an irrigation schedule. The landscape installation report shall include the following statement: "The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit." Resolution No. 6709 ASA-2012-09 September 11,2012 5. LANDSCAPE AND IRRIGATION MAINTENANCE A maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package,with the landscape installation report, or any time before the landscape installation report is submitted. a) Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b) Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de-thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. c) Failed plants shall be replaced with the same or functionally equivalent plants that may be size- adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments in water, nutrients, pest control or other factors as recommended by a landscaping professional. 6. EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments and/or embellishments, outdoor lounge area, trellises, canopy structures) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble the details shown on the original approved plans. Any exterior changes determined to be substantial by the Director of Community Development shall require a modification approval. 7. CONCURRENT APPROVAL CONDITIONS The Conditions of Approval delineated herein shall supercede those outlined in ASA-2012-04. Unless otherwise specified or modified by these conditions, the conditions of approval within U- 2012-04, DP-2012-04, and TR-2012-04, shall remain effective. 8. NOTICE OF FEES DEDICATIONS RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020,you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 11th day of September, 2012, at a regular Meeting of the Planning Commission of the City of Cupertino,State of California,by the following roll call vote: AYES: COMMISSIONERS: Chair Miller,Vice Chair Sun, Brophy, Lee, Brownley NOES: COMMISSIONERS: none ABSTAIN: COMMISSIONERS: none ABSENT: COMMISSIONERS: none ATTEST• �``� APPROVED: � ; i ,_�--�.s.�.-- /� ry C 6,City Planner ill r,Chair Community Development Planrun 'ssion