Loading...
06-03-2013TESTING ENGINEERS,; INC. 2811 Teagarden St. 510-835-3142 510-834-3777 fax San Leandro, CA 94577 800-660-3142 San Leandro • San Jose • Martinez INSPECTION REPORT Week Ending: 4/27/12 PROJECT # 54864 TYPE OF INSPECTION: FILE�( Expansion Anchors PROJECT: PLACE OF INSPECTION: Apple Forge Phase 1 Jobsite 18920 Forge Dr% Cupertino; CA ~ - - - Permit # 11080134; 11070044 DATE 4/23/12 HOURS 4 INSPECTOR J. Souza Reported to Jack of Devcon Construction at the jobsite as requested. Inspected predrilled holes for proper diameter and depth. Observed the cleaning of holes and witnessed the proper insertion of thirty-six (36) 5/8" diameter Hilti KB -TZ expansion anchors, 4-3/4' in length, embedded 3-1/8" for 150Hz anchor chamber. The preceding work was, to;the best of my knowledge, in compliance with engineer approved plans and specifications, including revisions by engineer Reviewed by:� r� David,-- hippero Special Inspection Division Manager 1cc: Apple Computer Inc./J. Rickard Devcon Construction/J. Garfinkel Structural Engineers, Inc./J. Fishpaw Studios Architecture/A. Clem enza City of Cupertino/Bldg. Inspection Dept. This report can be reproduced only in its entirety unless written permission from TEI is obtained. Page 1 of 1 90 L� V L TESTING ENGINEERS, INC.�I J U L B 0 2J1? L I� l 11 U v 2811 Teagarden St. 510-835-3142 fax San Leandro, CA 94577 800-660-3142 San Leandro • San Jose • Martinez INSPECTION REPORT Week Ending: 6/22/12 PROJECT # 54864 PROJECT: Apple Forge - Phase 1 18920 Forge Drive Cupertino, CA �� HOURS Permit #s: 11080134; 11070044 6/19/12 4 INSPECTOR M. Ardizzone TYPE OF INSPECTION: Concrete Placement PLACE OF INSPECTION: Jobsite 6/20/12 4 Reported to Jack of Devcon Construction at the jobsite as requested. 6/19/22 Inspected predrilled holes for proper diameter and depth. Observed the cleaning of holes and witnessed the proper insertion of forty-eight (48)1/2' diameter Hilti KB -TZ expansion anchors, 4-1/2' in length, embedded 2-5/a" anchoring 150HZ Anechoic chamber at chamber AC2. The preceding work was, to the best of my knowledge, in compliance with engineer approved plans and specifications, including revisions by engineer. 6/20/22 Inspected predrilled holes for proper diameter and depth. Observed the cleaning of holes and the injection of Hilti Hit RE 500 -SD epoxy (exp. 4/13). Witnessed the proper insertion of sixteen (16) #4 reinforcing steel bars, 48" in length, embedded 6"; sixteen (16) #5 reinforcing steel bars, 48" in length, embedded 6" and ten (10) #6 reinforcing steel bars, 48" in length, embedded 6" all into concrete wall at large long wave chamber Inspected the placement of reinforcing steel for wall at long wave chamber. The preceding work was, to the best of my knowledge, in compliance with engineer approved plans and specifications, including revisions by engineer. Reviewed by: Apple Computer Inc./J. Rickard Devcon Construction/J. Garfinkel Structural Engineers, Inc./J. Fishpaw Studios Architecture/A. Clemenza City of Cupertino/Bldg. Inspection Dept. Chippero RE, I Inspection Division Manager This report can be reproduced only in its entirety unless written permission from TEI is obtained. Page 1 of 1 Testing Engineers, Inc. Quality Assurance Services Materials Consulting Since 1954 Regular Concrete Compression Test Report Project No.: 54864 Client: APP337 Project Name: Apple Forge - Phase 1 ? 18920 Forge Drive, Cupertino; -CA Permit #s 11070044: 11080134 Supplier: Central Concrete Mix: 3FOCE902 Ticket No.: 18469350 Location: Isolation slab power test chamber. Phase IV. Sample No.: 241324 I r, II Report Date: 06/04/12 Sample Date: 05/07/12 ��N �' Time Sampled: 0635AM Date Received : 05/08/12 Inspector: N. C. Goard, TEI Specimens Cast (ASTM C-31) : 5 Air Temperature (ASTM C-1064) : 53 deg F Mixture Temperature (ASTM C-1064) : 60 deg F Slump (ASTM C-143) : 4-1/4 inches Date Tested 05/14/12 06/04/12 06/04/12 06/04/12 HOLD ID Number 22A 22B 22C 22D 22E Mark Sample Dimension, Inches Diameter 4 4 4 4 Length 8 8 8 8 Area, sq. inches 12.57 12.57 12.57 12.57 Ultimate Load, Ibs 50000 77000 74000 79000 Ultimate Str., psi 3980 6130 5890 6280 Average, Str., psi 6100 Age Tested, Days 7 28 28 28 HOLD Fracture Type 1 1 1 1 Dry Unit Weight, pcf Specified Strength, psi 4000 4000 4000 SPECIMENS NOT SCHEDULED FOR TESTING WILL BE DISCARDED AFTER 28 DAYS OLD The Material _C WAS WAS NOT The Material Tested _?C MET DID NOT MEET THE SAMPLED AND TESTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE BLDG. DEPT. OR DSA APPROVED DOCUMENTS. REQUIREMENTS OF THE BLDG. DEPT. OR DSA APPROVED DOCUMENTS. Remarks: Samples Tested in General Conformance with ASTM C-39 1 cc. City of Cupertino 1 cc. Structural Engineers, Inc. 1 cc. Studios Architecture 1 cc. Apple Computer Inc. 1 cc. Devcon Construction Reviewed By: Robert Green Concrete Lab Supervisor Corporate Office - 2811 Teagarden Street, San Leandro, California 94577 - (510) 835-3142 - Fax (510) 834-3777