Loading...
10080025 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 921 SAGE CT CONTRACTOR:CD ROOFING PERMIT NO: 10080025 OWNER'S NAME: MAN FU&ALICE YANG 2909 WILBUR AVE DATE ISSUED:08/03/2010 NER'S PHONE: 4082104616 SAN JOSE,CA 95127 PHONE NO:(408)898-6605 ❑ LICENSED CONTRACTOR'S DECLARATION BUILIIING PERMIT INFO: BLDG r- ELECT F PLUMB F License Class C� 2> Lic.# XS Z- ' q F F MECH RESIDENTIAL COMMERCIAL Contractor 2 ty c Date 3 t JOB DESCRIPTION:RE-ROOF FROM WOOD SHINGLE TO COMPOSITE I hereby affirm that I am licensed under he provisions of Chapter 9 SHINGLE,30 (commencing with Section 7000)of Division 3 of the Business&Professions YEARS 2600 SF Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this Sq.Ft floor Area: Valuation:$9500 permit is issued. APPLICANT CERTIFICATION APN Number:35906006.00 Occupancy Type: I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save PERMIT EXPIRES IF WORK IS NOT STARTED indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the WITHIN 180 DAYS OF PERMIT ISSUANCE OR granting of this permit. Additionally,t applicant understands and will comply 180 DA ROM LAST CALLED INSPECTION. with all non-point source regulation er the upertino Municipal Code,Section 9.18. Issued by: l Date: Signature / Date r- LJ OWNER-BUILDER DECLARATION RE-ROOFS: I hereby affirm that I am exempt from the Contractor's License Law for one of All root:shall be inspected prior to any roofing material being installed.If a roof is the following two reasons: installec without first obtaining anins ti ,I a ,. ategve all new materials for I,as owner of the property,or my employees with wages as their sole compensation, inspection. l will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) Signatui a of Applican /' / Date: I,as owner of the property,am exclusively contracting with licensed contractors to construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I hereby affirm under penalty of perjury one of the following three declarations: I have and will maintain a Certificate of Consent to self-insure for Worker's HAZARDOUS MATERIALS DISCLOSURE Compensation,as provided for by Section 3700 of the Labor Code,for the I have read the hazardous materials requirements under Chapter 6.95 of the performance of the work for which this permit is issued. California Health&Safety Code,Sections 25505,25533,and 25534. 1 will maintain I have and will maintain Worker's Compensation Insurance,as provided for by compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health& Section 3700 of the Labor Code,for the performance of the work for which this Safety Code,Section 25532(a)should I store or handle hazardous material. Additio rally,should I use equipment or devices which emit hazardous air permit is issued. contain nants as defined b the Ba Area Air y y Quality Management District I will I certify that in the performance of the work for which this permit is issued,I shall maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the not employ any person in any manner so as to become subject to the Worker's Health.3:Safety Code,Sections 25505,25533,and 25534. Compensation laws of California. If,after making this certificate of exemption,I become subject to the Worker's Compensation provisions of the Labor Code,I must Owner ►r authorised aIyu ge forthwith comply with such provisions or this permit shall be deemed revoked. Date:.? i CD APPLICANT CERTIFICATION CONSTRUCTION LENDING AGENCY I certify that I have read this application and state that the above information is I hereby affirm that there is a construction lending agency for the performance of work's correct.I agree to comply with all city and county ordinances and state laws relating for which this permit is issued(Sec.3097,Civ C.) to building construction,and hereby authorize representatives of this city to enter Lender's Name upon the above mentioned property for inspection purposes.(We)agree to save •mnify and keep harmless the City of Cupertino against liabilities,judgments, Lender's Address s,and expenses which may accrue against said City in consequence of the granting of this permit.Additio Ily,the applicant understands and will comply ARCHITECT'S DECLARATION with all non-point soumCre tions-per a Cupertino Municipal Code,Section 9.18. 1 unders and my plans shall be used as public records. Signature/' Date-1� � License]Professional G� CITY OF CITY OF CUP:ERTINO REROOF CUPERTINO PERMIT APPLICATION APN # Date: Building Address: ,e_ 4 v-� C Owner's Name: �-�1J � Phone #: HOA: Yes ] No ❑ If es, rovide letter fra m HOA - to IL C� r Contractor: e� P c�o` r`-' (r- Phone #: a �• 6 S Fax#: 2S' 1 - 12 Cupertino Business License #: Contractor License #: Type of Roof C c)vering: Existing: Proposed: ❑ Built-Up Roof ❑ Built-Up roof ❑ Asphalt Shingles ❑ Asphalt Shingles V Wood Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other (Specify) ❑ Other (Specify) Number of existing coverings Provide I.C.C.E.S. Report# be"'To be Removed ❑ Provide Mfgr. Installation Specs. �,,� r✓ o acr( aS t Job Description: vjsj�z coc)v- Residential - Commercial Green Building: Please complete relevant portion cif the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: ❑ applicable,include in plan set & the sheet index. Valuation 6'S o_o I Have Read, Understand and Will Comply with Cupertino's Tear-Off Policy: Revised 02/05/09 CITY OF CUPI:RTINO FEE ESTIMATOR- BUILDING DIVISION ADDRESS: 4qA C-4- TDA`rE: REVIEWED BY: GS APN: a-0 l 0(0 BP#: U)Rccl� s "VALUATION: 1$9,500 R'PERMITTYPE: Minor Building Permit PLAN CHECK TYPE: Re-roof PRIMARY SFD or Du lex TOTAL APPLICATION USE: P IROOFAREA: 2,600 S f TYPE: OLREROOF �4a 00 3U FEE ID 1 REROOFFRE,c• FT71 NOTE. Thesefees are based on the preliminary information available and are only an estimate. Contact the De t or addn'l info. FEE ITEMS (Hee Resolution 09-1151,F f.' 7.1:7)9) FEE Q'rY/FEE MISC ITEMS Permit Fee: $338.00 ikIf �'. Work Without Permit? Q Yes (F) No $0.00 rlirit,` V( l, . Strong Motion Fee: 1BSEISMICR $0.95 Select an Administrative Item Bldg, Stds Commission Fee: IBCBSC $1.00 SUBTOTALS: $339.95 $0.00 TOTAL FEE: $339.95 Revised: 7/27/2010 CITY OF CUPERTI:JO PERMIT RECEIPT' OPERATOR: Traci( 4 ITEMS OF 4 COPY # 1 Sec: Twp: Rng: Sub: Blk: Lot: APN . . . . . . . . : 35906006 .( 0 DATE ISSUED. • 08/03/2010BS0000110 )9 RECEIPT #. . . . . . . . . . 10080025 REFERENCE ID # • • SITE ADDRESS 921 SAGE -_T SUBDIVISION • • • . . CUPERTINC CITY . . . . . . . . . . . . IMPACT AREA . • • • • • OWNER . . . . . . . . . . . . MAN WNERMAN FU & ALICE YANG ADDRESS 921 SAGE CT CITY/STATE/ZIP CUPERTINC), CA 95014 RECEIVED FROM CHARLIE :)UONG • ' CHARLIE OUONG LIC # 28245 CONTRACTOR • " ' CD ROOFING COMPANY 2909 WILBUR AVE ADDRESS . . : SAN JOSE, CA 95127 CITY/STATE/ZIP (408) 898-6605 TELEPHONE . . . . . . . • UNIT QUANTITY AMOUNT' PD-TO-DT -THIS-REC_ --NEW-BAL- FEE ID ----- --- ------ -00 1.00 _____ ---------- ---------- 0 .00 0 .00 0 .00 VALUATION 9, 500 . 00 :_.00 0 . 00 4. 00 1BCBSC 9, 500 . 00 114 . 00 0 .00 1BSEISMICR VALUATION 1.00 11.1 . 00 0 .00 0 .00 1BUSLIC FLAT RATE 0 .00 -338_00 ---------- 26 . 00 333 .00 1REROOFRES SQ FEET ---- 45 4 .00--- ------0 .00 --- - 454 .00 0 .00 45 TOTAL PERMIT : AMOUNT REFERENCE NUMBER METHOD OF PAYMENT --------- ------------- --------- -- 454 .00 979285 CREDIT CARD -------- 454 . 00 TOTAL RECEIPT VOICE ID DESCRIPTION __ _ ____ VOICE ID DESCRIPTION __ _ ---------------------- _ ___ --------- 602 ----- -_ ROOF PLYWOOD NAI 601 ROOF TEAR OFF 605 FINAL REROOF 604 ROOF IN-PROGRESS MLU REROOF TEAR-OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION ALBERT SALVADOR, P.E.,C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE-CUPERTINO,CA 95014-3255 CUPERTINO (408)777-3228•FAX(408)777-3333•buildingc9cugertino.orq 4PN# PROJECT ADDRESS PHONE E-MAIL OWNER NAME q A ` ` CITY, STATE,ZIP FAX STREET ADDRESS 7] G{ ,&0 CONTRACTOR NAME LICENSE NUMBER LICENSE TYPE BUS.LIC.# O i.� C/ E-MAIL � FAX COMPANY NAME - ` �( L4 O S2 oj� co 'D 1' ~ "��' PHONE CITY,STATZIP rS�;TRADDRESS ,�oE,E, S CZ 3C C71 (gyp O I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re-roof project shall comply with all applicable prc visions of the 2007 California Building Code. 2. You must schedule all needed inspections a minimum of one day before the requested inspection date. Please schedule inspections online or call (408)777-32 '8 between 7:30-3:30 (Mon-Fri). 3. Tear-off roof inspection is required. Please call for t,-ar-off inspection after the roof is torn off and all the nails/fasteners have been removed. Any and all 4iry-rotted wood shall be replaced prior to this inspection. A building inspector will be available with in one hour. There are special hours for this service: 7:30 — 10:3(am and 1:00— 3:30pm (Mon—Thurs); 7:30 — 10:30am and 1:00—2:30pm (Friday). 4. If plywood is installed, a plywood nailing inspection .s required. 5. In-Progress roof inspection is required. Call for an n-progress roof inspection to verify building is weather tight after installation of approximately 25% c f the roofing material. 6. New roof coverings shall not be applied without first cbtaining all inspections and written approvals from the building inspector. Any roofing which is apflied without first obtaining an approved inspection will require the removal of all new material down to tl e sheathing so a proper inspection can be performed. 7. A final inspection and approval shall be obtained from the building inspector when the re-roofing is complete. To receive a final sign-off, the following itl.ms will be verified: a. Flat roofs shall have a minimum of per foot oi'slope and must demonstrate there is no ponding. b. Listings from approved testing agencies for all pr,;-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation. 8. NOTE: If you call for a tear-off or plywood nailing i lspection and the work is not complete,you will be charged a re-inspection fee of$126.00. The re-inspection fee shall be paid before another inspection can be scheduled. By my signing below, I certify each of the folio g is._tn e am the property owner or authorized agent to act on the property owner's behalf I and nd a e to cc y with the re-roof policy stated above. Signature of Applicant/A _- -,_ Date: ReroofPolicy_2010.doc revised 05/17/10 Building Department City Of Cupertino 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 C U P E RTI N O Fax: 408-777-3333 CONTRACTOR / SUBCDNTRACTOR LIST JOB ADDRESS: q2t �'fi C -� PERMIT# / D 20 Z OWNER'S NAME: �j �c PHONE# L-Q 0 6 --7 ) q , GENERAL CONTRACTOR: Kf 1 BUSINESS LICENSE # ADDRESS: pCITY/ZIPCODE: *Our municipal code requires all businesses working in the c ty to have a City of Cupertino business license. NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBCONTRA j�4�11S HAVE OBTAINED A CITY OF CUPERTINO BUSINESS LICENSE. I am not using any subcontractors: Signer a Date Please check applicable subcontractors and complete th 2 following information: SUBCONTRACTOR BUSINESS NikME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring/ Carpeting Linoleum /Wood Glass /Glazing Heating Insulation Landscaping Lathing Masonry Painting/Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/Contractor Signature Date