Loading...
11100095 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10121 LEBANON DR CONTRACTOR:MAXIMUM ROOF CARE PERMIT NO: 11100095 CORP OWNER'S NAME: WILLIAMS PATRICIA L AND JAMES 1182 OLIVE BRANCH LN DATE ISSUED: 10/13/2011 JWNER'S PHONE: 4089960920 SAN JOSE,CA 95120 PHONE NO:(408)441-0933 ❑ LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL❑ COMMERCIALE] License Class Lic.# RE-ROOF 20 SQ-TEAF OFF SHAKE, INSTALL 1/2"OSB, 30LB FELT GAF CLASS A Contractor I��( '(� tt- .2�Yate '- I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$13174 I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:34214003.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF PERMIT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAYS R M LAST CALLED INSPEC IO . indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the i granting of this permit. Additionally,the applicant understands and will comply Issued by: Date: with all non-poin ou a regulations per the Cupertino Municipal Code,Section 9.18. f ?,_ S ( RE-ROOFS: Signature gt�:: Date / 1 All roofs shall be inspected prior to any roofing material being installed.If a roof is installed without first obtaining an inspection,I agree to remove all new materials for inspection. ❑ OWNER-BUILDER DECLARATION V� I hereby affirm that I am exempt from the Contractor's License Law for one of 44�;A,,� Signature of Applicant: Date: S the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) 1,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505,25533,and 25534. I will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Secti s 25505,25N3,and 25534. Section 3700 of the Labor Code,for the performance of the work for which thist Owner or authorized agent: Date permit is issued. I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code,1 must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter -tion the above mentioned property for inspection purposes.(We)agree to save emnify and keep harmless the City of Cupertino against liabilities,judgments, ARCHITECT'S DECLARATION ,,sts,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional 9.18. Signature Date CITY OF CUPERTINO 4 ITEMS OF 4 PERMIT RECEIPT OPERATOR: SylviaM COPY # 1 Sec: Twp: Rng: Sub: Blk: Lot: APN . . . . . . . . : 34214003 . 00 DATE ISSUED. . . . . . . : 10/13/2011 RECEIPT #. . . . . . . . . : BS000015037 REFERENCE ID # . . . : 11100095 SITE ADDRESS . . . . . : 10121 LEBANON DR SUBDIVISION . . . . . . CITY . . . . . . . . . . . . . . CUPERTINO IMPACT AREA . . . . . . OWNER . . . . . . . . . . . . : WILLIAMS PATRICIA L AND JAMES ADDRESS . . . . . . . . . . CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-2645 RECEIVED FROM . . . . : STEVEN HUNTER CONTRACTOR . . . . . . . : STEVE HUNTER LIC # 22369 COMPANY . . . . . . . . . . : MAXIMUM ROOF CARE CORP ADDRESS . . . . . . . . . . : 1182 OLIVE BRANCH LN CITY/STATE/ZIP . . . : SAN JOSE, CA 95120 TELEPHONE . . . . . . . . : (408) 441-0933 FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ------------- ---------- ---------- ---------- ---------- ---------- 1BCBSC VALUATION 13, 174 .00 1. 00 0. 00 1 . 00 0. 00 1BSEISMICR VALUATION 13, 174 . 00 1.32 0. 00 1 .32 0. 00 1BUSLIC FLAT RATE 1. 00 115 . 00 0 . 00 115 .00 0. 00 1REROOFRES SQ FEET 20 . 00 280 . 00 0 . 00 280 .00 0. 00 ---------- ---------- ---------- ---------- TOTAL PERMIT 397.32 0 . 00 397 .32 0. 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER ----------------- --------------- -------------------- CREDIT CARD 397.32 ax --------------- TOTAL RECEIPT 397.32 VOICE ID DESCRIPTION VOICE ID DESCRIPTION -------- ---------------------------- -------- ---------------------------- 309 EXTERIOR LATH 311 SCRATCH COAT 601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL 604 ROOF IN-PROGRESS 605 FINAL REROOF REROOF TEAR-OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE •CUPERTINO, CA 95014-3255 CUPERTINO (408)777-3228• FAX(408)777-3333•building(a)cupertino.org PROJECT ADDRESS y APN# OWNER NAME , PHON E-MAIL l�'l� C< o-L S J Q� STREET ADDRESS, , _ CITY, STATE,ZIP FAX CONTRACTOR NAME f { LICENSE NUMBER LICENSETY E BUS.LIC.# COMPANY NAME E-MAIL FAX STREET ADDRESS ��s { CITY,STATE,ZIPr_a PHONE L��'�jJ I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re-roof project shall comply with all applicable provisions of the 2010 California Codes. 2. An inspection request can be scheduled up to the day before the inspection date. Please call (408)777- 3228 from 7:30 - 3:30pm (Mon-Thurs) or 7:30 - 2:30pm (Friday) to schedule the next day inspection. For Tear-Off and Nailing Inspections, you must also call on the day of the inspection only after that phase of the work is completed. The building inspector will be available within one hour. Progress and Final Inspections will be given a two hour window. 3. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this inspection. Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either completely knocked-down or removed prior to this inspection. 4. If plywood is installed, a plywood Nailing Inspection is required. 5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 6. Progress Inspection is required when approximately 50% of roof covering is installed. 7. A Final Inspection and approval shall be obtained from the building inspector when the re-roofing is completed. To receive a final sign-off, the following items will be verified: a. Flat roofs shall have a minimum of'/" per foot of slope and demonstrate there is no ponding. b. Listings from approved testing agencies for all pre-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed. 8. NOTE: If you call for a tear-off or plywood nailing inspection and the work is not complete, you will be charged a re-inspection fee of$126.00. The re-inspection fee shall be paid before another inspection can be scheduled. By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf. I understand and agree to comply with the re-roof policy stated above. I also understand that smoke detectors and carbon monoxide detectors are required to be installed in accordance with Sections R314 and R315 of the 2010 California Residential Code. Signature of Applicant/Agent: Date: ReroofPolicv 2011.doc revised 02/16/11 Building Department City Of Cupertino 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 .;U P E RT I N O Fax: 408-777-3333 CONTRACTOR/ SUBCONTRACTOR LIST JOB ADDRESS: PERMIT# OWNER'S NAME: �� PHONE# GENERAL CONTRACTOR: , r BUSINESS LICENSE # ADDRESS: CITY/ZIPCODE: { *Our municipal code requires all businesses working in the city to have a City of Cupertino business license. NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL S BCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO BUSINESS LICENSE. I am not using any subcontractors: A Signature Date Please check applicable subcontractors and complete the following information: SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring / Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Painting/Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/Contractor Signature Date REROOF PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 CUPERTINO (408)777-3228 • FAX(408)777-3333 • buildingecupertino.org PROJECT ADDRESS aDA ) C TAPN# :�,;? 1 �z i(4 lO/ o r OWNER NAME PHONE r PHONE —1 E-MAIL J Cjo4a (a L STREET ADDRESSr CITY, ST�ZIP ` FAX 9G APPLICANT NAME „` PHONE STREET ADDRESSCITY,STATE, ZIP _ ` FAX 3 ❑OWNER ❑ OWNER-BUILDER ❑ OWNER AGENT N6oNTRACTOR ❑CONTRACTOR AGENT ❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER ❑ TENANT CONTRACTOR NAMELICENSE NUMBER LI�SE TYP BUS.LIC.# IL . COMPANY NAME E-MAIL FAX STREET ADDRESS i� ` �p CITY.STATE PHOS ARCHITECT/ENGINEER NAME ` LICENSE NUMBER BUS.LIC.# COMPANY NAME E-MAIL FAX STREET ADDRESS CITY,STATE,ZIP PHONE USE OF '<SFD or Duplex ❑ Multi-Family ROOF AREA: VALUATION: STRUCTURE: ❑ Commercial EXISTING ROOF TYPE{{ ❑BUILT-UP ROOF ❑ASPHALT SHINGLES WOOD SHAKES 13 WOOD SHINGLES ❑OTHER(SPECIFY) REMOVE/REPLACE Ko ES IF NO, PLYWOOD 'K” cKo4l PLYWD �iOSB PrrCH_ ROOF ❑ NO #LAYERS: THICKNESS: ❑ 5/8" TYPE: ❑ CDX 12 CLASS: A PROPOSED ROOF TYPE: ❑BUILT-UP ROOF 4CI.SPHALT SHINGLES ❑WOOD SHAKES ❑WOOD SHINGLES ❑OTHER ICC-ES REPORT# DESCRIPTION OF WORK ;46 (b By my signature below,I certify to each of the following: I am the property owner or authorized agent to act on the property owner's behalf. I have read this application and the information I have provid d is correct I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relating to buildin o ction. au _rite representatives of Cupertino Lc enter the above-identified property for inspection purposes. Signature of Applicant/Agent Date: SUPPLEMENTAL INFORMATION REQUIRED Ifbuilding is associated with a Home Owner's Association,provide letter _ of approval from HOA. _Provide Planning approval to verify if there any restrictions. _Provide copy of Manufacturer's Installation Specifications. °E � a n7wY1T � s _Provide signed copy of Cupertino's Tear-Off Policy. ReroofApp_2011.doc revised 03/02111