06100153 77777
CITY OF CUPERTINO I ' ' �N*
BUILDIN6DIVISION PERMIT
E
BUILDING ADDRESS: R E ROOFING & CONSTRUCTIO 06100153
22311 JANICK AV PERMIT ISSUE DATE
OWNER'S NAME:
Z I GURS EDMOND E SANITARY NO. CONTROL NO,
NE:
408 626-
BUILDING PERMIT INFO
ARCHITECTIENGINEER: BLDG ELECT PLUMB MECH
p G LICENSED CONTRACTOR'S DECLARATION Job Description
UI hereby affirm that I am licensed under provisions of Chapter 9(commencing
Z w with Section 7000)of Division 3 of the Business and Professions Code,and my license is
t<e in full force andeffectr I 'it:, ('� � ) REROOF- TEAR OFF EXISTING 1 LAYER OF COMP,
tt2z License Class Contras - INSTALL NEW 30LB FELT & 40YR ASPHALT COMP.
:
'In Date f
ARCHITEC`T'S DEC LA CLASS A, 11 . 2 5 S QUARE S
a< I understand my plans shall be used as pubhc records
>yU
H Licensed Professional
: OWNER-BUILDER DECLARATION
rn
'>• 1 hereby affirm that I am exempt from the Conuactor's License Law for the
I C O following reason.(Section 7031.5.Business and Professions Code:Any city or county
which requires a permit to construct,alter.improve,demolish,or repair any structure
prior to its issuance,also requires the applicant for such permit to file a signed statement S Ft.Floor Area Valuation
< that he is licensed pursuant to the provisions of the Contractor's License Law(Chapter 9 q
t=- (commencing with Section 7000)of Division 3 of the Business and Professions Code)or $5000
r that he is exempt therefrom and the basis for the alleged exemption.Any violation of Occupancy Type
Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of APN Number
not more than five hundred dollars(5500).
❑1,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7043,Business Required Inspections
and Professions Code:The Contractor's License Law does not apply to an owner of
property who builds or improves thereon,and who does such work himself or through his
own employees,provided that such improvements are not intended or offered for sale.If,
however,the building or improvement is sold within one year of completion•die owner-
builder will have the burden of proving that he did not build or improve for purpose of
sale.).
❑I,as owner of the property,am exclusively contracting with licensed contractors to
construct the project(Sec.7041.Business and Professions Code:)The Contractor's Li-
cense Law does not apply to an owner of property who builds or improves thereon,and
who contracts for such projects with a contractor(s)licensed pursuant to the Contractor's
License Law.
[3I am exempt under Sea B&P C for this reason
Owner Date
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
Cl I have and will maintain a Certificate of Consent to self-insure for Worker's Compen-
satio as provided for by Section 3700 of the Labor Code,for the performance of the
w for which this permit is issued.
1 have and will maintain Worker's Compensation Insurance,as required by Section
00 of the Labor Code,for the performance of the work for which this permit is issued.
My Worker's Compel tion Insurance carrier and Policy number ate:
Carrier. Policy No.
CERTIFICA OF EXEMPTION FROM WORKERS'
CO PENSATION INSURANCE
(rhis section need not be completed if the permit is for one hundred dollars($100)
or less.)
I certify that in the performance of the work for which this permit is issued,I shall not
employ any person in any manner so as to become subject to the Workers'Compensation
Laws of California.Date
Applicant
NOTICE TO APPLICANT:If,after making this Certificate of Exemption,you should
become subject to the Worker's Compensation provisions of the Labor Code,you must
Z forthwith comply with such provisions or this permit shall be deemed revoked.
Z CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance of
> the work for which this permit is issued(Sec.3097,Civ.C.)
W A Lender's Name
0 Z Lender's Address
I certify that I have read this application and state that the above information is
correct.1 agree to comply with all city and county ordinances and state laws relating to
0 U building construction.and hereby authorise representatives of this city to enter upon the
above-mentioned property for inspection purposes.
>"a (We)agree to save,indemnify and keep harmless the City of Cupertino against
rn liabilities,judgments,costs and expenses which may in any way accrue against said City /
U Z in consequence of the granting of this permit. Date
►A APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL ON POINT Issued by:
SOURCE REGULA O'
Re-roofs
Signature of Applicant/Contractor Date Type of Roof
HAZARDOUS MATERIALS DISCLOSURE yP
Will the applicant or future building occupant store or handle hazardous material
as defined by the Cupertino Municipal Code,Chapter 9.12,and the Health and Safety
Code,Section 25532(a)? All roofs shall be inspected prior to any roofing material being installed.
❑Yes ❑No'
If a roof is installed without first obtaining an inspection,I agree to remove
Will the applicant or future building occupant use equipment or devices which
emit hazardous air contaminants as defined by the Bay Arca Air Quality Management all new materials for inspection.
District?
❑Yes ONO
1 have mad the hazardous materials requirements under Chapter 6.95 of the Califor-
nia Health&Safety Code,Sections 25505,25533 and 25534.t understand that if Ute building
docs not currently have a tenant,that it is my responsibility to notify the occupant of the
mquitgmCpts which must met prior issuance a certificate of Occup - ' _ • Signature of Applicant
7Date
!1 `- - - 2,)l All roof coverings to be Class"B"or better
Owner or authorized agent Date
Community Development Department
Building Division
City of Cupertino
.� 10300 Torre Avenue
Telephone: (408)777-3228
CITY OF Fax: (408)777-3333
t'UPEkTINO
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must agree to comply with 1997 UBC Standards
and manufacturers specifications on re-roofing.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City,the following steps are
required:
1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed, a plywood nail inspection is required.
. 6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
IMPORTANT:
1. Flat roofs must have a minimum of 1/4" per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O.report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re-roofing.
Homeowner's Name: �b
job Site Address: 2 Z'�
9
Roofing Company Name: L� �'� i
m Y
A plicant's Signature: Date: ,
07
Greg teel
Building Official
Revised 1/30/03
Printed on Recycled Paper
CITY OF CUPERTINO
2m 1 of 2 PERMIT RECEIPT OPERATOR: amyw
COPY # 2
Sec : Twp: Rng: Sub: Blk: Lot :
APN 35701019 . 00
DATE ISSUED. . . . . . . : 10/20/2006
RECEIPT # . . . . . . . . . : 36508
REFERENCE ID # 06100153
SITE ADDRESS 22311 JANICE AV
SUBDIVISION . . . . . . .
CITY CUPERTINO
IMPACT AREA
OWNER ZIGURS EDMOND E
ADDRESS . . . . . . . . . .
CITY/STATE/ZIP . . . :
RECEIVED FROM . . . . : R E ROOFING
CONTRACTOR . . . . . . . : PROCTOR, PAUL LIC # 20615
COMPANY . . . . . . . . . . : R E ROOFING & CONSTRUCTION INC
ADDRESS 15230 CLYDELLE AVENUE
CITY/STATE/ZIP . . . : SAN JOSE, CA 95124
TELEPHONE . . . . . . . . : (408) 626-9320
FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
- - - - - --- - - ---- ----- -- -- -- - ------ - --- ---- --- - ---------
BPERMFEE VALUATION 5 , 000 . 00 115 . 56 0 . 00 115 . 56 0 . 00
BSEISMICRE VALUATION 5, 000 . 00 0 . 50 0 . 00 0 . 50 0 . 00
----- ----- ---------- ---------- - ------ -- -
TOTAL PERMIT 116 . 06 0 . 00 116 . 06 0 . 00
k . Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone(408) 777-3228
CITY OF Fax(408)777-3333
:UPERTINO
Building Department
JOB ADDRESS: Z PERMIT #
OWNER'S NAME: PHONE #
GENERAL CONTRACTOR: -f,otiX FAX # �-
I am not using any subcontractors: w=�
ature Date
Please check applicable subcontractors and complete the following information:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner/Contractor Signature Date
CITY OF CUPERTINO C�Dl CD I rD3
RE ROO F
CUPEkTINO PERMIT APPLICATION FORM
APN# Date:
Building Address: 02 2 2511 _/
Owner's Name: / Phone#: ,
Contractor: Phone#: License #: ��
��r N 4��-�L� - 11VU .
Contact: / /1 Phone#: n ` Cupertino Business License #:
Type of Roof Covering:
Existing: Proposed:
❑ Built-Up Roof ❑ Built-Up roof
Asphalt Shingles )4�, Asphalt Shingles
❑ Wood Shakes ❑ Wood Shakes
❑ Wood Shingles ❑ Wood Shingles
❑ Other(Specify) ❑ Other(Specify)
Number of existing coverings ❑ Provide I.C.B.O.Report#
To be Removed ❑ Provide Mfgr. Installation Specs.
I Have Read, Understand and Will Comply With Cu ertino's Tear Off Policy:
Job Description: ` (' Move alsoi � I L�N uY�_ o-- .�1�'
Y
4b-`(lL, \ . �DR F
Residential Commercial ❑ iL'� 1
/1 11 .2 �j
Fire Zone: Yes EJNo F1 ConfiTWed with P ng Det. if
there are estrictions: LJ
Cost of Project: ` '' Type of Cyst,ruction: Occupancy gro
Qty. if
Applicable Fee ID Fee Description Fee Group
BPERMFEE Bldg Permit Fees BUILDING
BENERGY Energy BUILDING
BSEISMICRE Seismic Fee Res BUILDING
BSEISMICOM Seismic Commercial BUILDING
BPLANCHK Plan Check Fee BUILDING
BUSLIC Business License BUILDING