Loading...
12010159-Calcs AKC Engineering 1200 Industrial Road,Suite 13 San Carlos.CA 94070 (650)591-3050 Avery Construction I.. 1 FI L. 130 E. Dana Street Mountain View,CA 94041-1599 Date: March 19, 2012 Re: Village Green 2.( X HDrn Cg t dap /3.01 o 1 45- Site Site Reviews of Repairs due to Fire Damage Dates: 2/1/12, 2/24/12,and 3/15/12 Proj: AVRY2105 Via: Email &U.S. Mail Attn: Matt Lagoe As requested, we have performed periodic site visits during construction with respect to the referenced project. Please accept this letter as our certification that we have made field reviews of the following items. • New and existing anchor bolt placement including washers and nuts. • Exterior and interior stud framing including window and door headers. • Exterior plywood sheathing material and nailing pattern. • Interior floor plywood sheathing material and nailing pattern. • Roof truss placement and lateral bracing. • Interior diagonal bracing using timber blocking and steel straps. • Spot checks of the vertical load bearing system including joists, beam sizes, lumber grade,and installed hardware. Our certification was based on a visual inspection of the construction as it existed at the, time of our inspection. The inspection was made to verify compliance with the basic parameters of the design. No measurements were taken, nor did we attempt to verify the quality of work. Uniform compliance with the designs and specifications is the responsibility of the contractor and is not guaranteed by this letter. AKC Engineering 1200 Industrial Road,Suite 13 San Carlos,CA 94070 (650)591-3050 Exclusions of Warranties: Our services consist of professional opinion only. NO WARRANTY, EXPRESS OR IMPLIED, INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR THE PURPOSE IS MADE OR INTENDED. Sincerely AKC Engineering eROFESS/ A Left^ W No. C048711 m * Exp. 30 Sep[. 2012 Rick Lennen, P.E. rTq c 1\ Principal jF 0 CA��FOJ 2