12010159-Calcs AKC Engineering
1200 Industrial Road,Suite 13
San Carlos.CA 94070 (650)591-3050
Avery Construction
I.. 1 FI L.
130 E. Dana Street
Mountain View,CA 94041-1599
Date: March 19, 2012
Re: Village Green 2.( X HDrn Cg t dap /3.01 o 1 45-
Site
Site Reviews of Repairs due to Fire Damage
Dates: 2/1/12, 2/24/12,and 3/15/12
Proj: AVRY2105
Via: Email &U.S. Mail
Attn: Matt Lagoe
As requested, we have performed periodic site visits during construction with respect to
the referenced project.
Please accept this letter as our certification that we have made field reviews of the
following items.
• New and existing anchor bolt placement including washers and nuts.
• Exterior and interior stud framing including window and door headers.
• Exterior plywood sheathing material and nailing pattern.
• Interior floor plywood sheathing material and nailing pattern.
• Roof truss placement and lateral bracing.
• Interior diagonal bracing using timber blocking and steel straps.
• Spot checks of the vertical load bearing system including joists, beam sizes,
lumber grade,and installed hardware.
Our certification was based on a visual inspection of the construction as it existed at the,
time of our inspection. The inspection was made to verify compliance with the basic
parameters of the design. No measurements were taken, nor did we attempt to verify the
quality of work. Uniform compliance with the designs and specifications is the
responsibility of the contractor and is not guaranteed by this letter.
AKC Engineering
1200 Industrial Road,Suite 13
San Carlos,CA 94070 (650)591-3050
Exclusions of Warranties: Our services consist of professional opinion only. NO
WARRANTY, EXPRESS OR IMPLIED, INCLUDING ANY IMPLIED
WARRANTY OF MERCHANTABILITY OR FITNESS FOR THE PURPOSE IS
MADE OR INTENDED.
Sincerely
AKC Engineering eROFESS/
A Left^
W No. C048711 m
* Exp. 30 Sep[. 2012
Rick Lennen, P.E. rTq c 1\
Principal jF 0 CA��FOJ
2