03050152 (4) F �
11
ATY OF CUPERTINOCITY
3 0
OCUPEr�TiNO PERMIT APPLICATION FORM
qlk—PN # Date: n
fY Q
z 2oo3
Buildin Ad ess:
I Ll—
Owner's Name: Phone#•
/ —/ — Z3
Co ractor: License#:
Cl
Contact: Cupertino Business License#:
Buil mg Permit Info:
Bldg — Ele �PlunxbMe
Jobescri tion:[3 *0 MMrr'' ,• �,�,_,
Residential bcg) `�—
Sq.Ft. Floor Area: p Y.
Cost of Project: �a ccupancy Group:
e of Constructio
Quantity Fee ID Fee Description Fee Group
BAPPLOTHER Other Appliances MECHANICAL
BBLDGFEE Bldg Permits . foot BUILDING
BBOILERI Boiler<= 100,000 Btu MECHANICAL
BBOILER2 Boiler> 100K to 500K Btu MECHANICAL
BBOILER3 Boiler> 500K to 1M Btu MECHANICAL
BBOILER4 Boiler> 1M to 1.75 M Btu MECHANICAL
BBOILER5 Boiler> 1.75M Btu MECHANICAL
BCONSTAX Construction Tax BUILDING
BCONSTAX Ind/Off/Comm/Quasi BUILDING
BCONSTAXBQ Con. Tax for BQ Zone BUILDING
BCONSTAXH Hotel and Motel BUILDING
BCONSTAXR Constax—Resi/Mobile BUILDING
BELEC1000 Elec 600V <= IOOOA ELECTRICAL
BELEC1001 Elec 600V > IOOOA ELECTRICAL
BELEC200 Elec Svcs 600V <=200A ELECTRICAL
BENERGY Energy BUILDING
BENERGYADD Energy Add Multi BUILDING
BINVESTIGA Investigation fee BUILDING
BMITIGATC Comm. Housing Mit. Fee BUILDING
zl �97
ig
I of 3 �i_ �DS/
Q/. 36
r° � ATY OF CUPERTINO
CUPEY OF PERMIT APPLICATION FORM
QuantityFee ID Fee Description Fee Group
BMITIGATR Res. Housing Mit Fee BUILDING
BMNEWMULTI New Multi-Family Res' MECHANICAL
BMNEWSF&2F New Sf&2F Res Bldgs MECHANICAL
BNEWMULTI Multifamily Res ELECTRICAL
BNUCOMME New Comm Electric ELECTRICAL
BNUCOMMM New Comm Mechanical MECHANICAL
BNUCOMMP New Comm Plumb PLUMBING
BNUMULTI New Multifamily Res PLUMBING
BNUSFD New Single Family Res BUILDING
BOVERTIME Inspection Overtime BUILDING
BPBACKFLOW Atmospheric Vacuum PLUMBING
BPCESSPOOL Cesspool PLUMBING
BPERMFEE Bldg Permit Fees BUILDING
BPFIXTURE Pb1g Fixture PLUMBING
BPGAS Gas Piping System Fee PLUMBING
BPINTERCEP Ind Waste Interceptor PLUMBING
BPLANCHK Plan Check Fee BUILDING
BPLANCKADD Plan Check Add Multi BUILDING
BPLANCKREP Plan Check Repeat Fee BUILDING
BPREPIPE Re i e Of Fixtures PLUMBING
BPSEWAGE Sewage Disposal PLUMBING
Z BPSEWER Sewers PLUMBING
BPSPRINK Lawn S rinklerBackflo PLUMBING
BPSTORM Storm/Rain Water PLUMBING
BPTRAP Kitchen Trap PLUMBING
BPVENT Alt of Drain &Vent PLUMBING
2 BPWATER Install/Alter Water Pie PLUMBING
BPWHEATER WaterHeater/Vent PLUMBING
BPWSVCS Main Water Service PLUMBING
BREINSPECT Reinspection Fee BUILDING
BREMACOVER A/C Unit> 10,000 c&n MECHANICAL
BREMAMIAN A/C Units<= 10,000 cfm MECHANICAL
BREMAPPLI Appliance Install MECHANICAL
BREMBUSWAY Remodel Busways ELECTRICAL
BREMFIXT Lighting Fixtures ELECTRICAL
2 BREMFURN Relocation of Furnace MECHANICAL
BREMFURNOV Relo Furnace> l OK btu MECHANICAL
BREMHEAT Heater Installation MECHANICAL
BREMINHOOD Installation of Hood MECHANICAL
BREMMISC Misc Apparatus ELECTRICAL
BREMNRAPP Rem Non-Res Appliance ELECTRICAL
BREMPOLE Pole/Platform Fixture ELECTRICAL
2 of 3
CITY OF CUPERTINO
'ICOF PERMIT APPLICATION FORM .®
CUPEkTINO
Quantity Fee ID Fee Description Fee Grou
BREMPOWER Power Device/Apparatus ELECTRICAL
BREMRECEPT Rc tl, Switch& Outlets ELECTRICAL
BREMRELOCA Relocation of Hood MECHANICAL
BREMREPALT Repair/Alter Heating MECHANICAL
BREMRESAPP Remodel Res Appliance ELECTRICAL
BREMSIGNAD Rmdl Signs Add Branch ELECTRICAL
BREMSIGNS Remodel Signs,Marquee ELECTRICAL
BREMTHEATR Theatrical Lighting Fix ELECTRICAL
BREMVENFAN Vent Fan Single Duct MECHANICAL
BREMVENSYS Ventilation Systems MECHANICAL
BSCBLVD Scb Specific Plan BUILDING
BSEISMICOM Seismic Commercial BUILDING
BSEISMICRE Seismic Fee Res BUILDING
BSPECIAL Special Insection BUILDING
BSWIM Swimming Pool BUILDING
BTEMP Temporary Power ELECTRICAL
BTEMPPERM Temporary Bldg Permit BUILDING
BTEMPSVCS Temp Dist Svcs ELECTRICAL
BUSLIC Business License BUILDING
ELECTRIC Electrical sq foot ELECTRICAL
EPERMITFEE Elec Permit Issuance ELECTRICAL
MPERWEE Mechanicals . foot MECHANICAL
MPERMITFEE Mech Permit Issuance MECHANICAL
PPERMITFEE P
lumbing Permit Issuance PLUMBING
PPLBG Plumbin Fee sq foot PLUMBING
ZADDCHG Address Chane BUILDING
•
3 of 3