08070224 (2) BUILDING DIXISION PERMIT CO1 TR`ACLEIR IIVRORMATION
BUILDING ADDRESS: PERMIT NO,
10656 LARRY WAY ANGELO RAIN GUTTERS 08070224
OWNER'S NAME: PERMIT ISSUE DATE
M1313FPT DANIEL R TRUSTEE 802 WELLINGTON PL 07/30/2008
NE: (408) 379-6189 SANITARY NO. CONTROL NO.
ARCHITECT/ENGINEER: BUILDING PERMIT INFO
BLDG ELECT PLUMB MECH
0 0 0 0
300 LICENSEDCONTRACTOR'S DECLARATION
fChap
vC 1 hemby affirm this 1 em li¢vcd miler provisimu of rJupmr 9(comminuting lob Description
�ZW with Section 70M)Of Division Sof ds Busircu and Padessm.Code,and my license u RE—RF T/0 2LYR SDSHK/WD SHNLS& RSHEET OSB CLS A
oh
P in full fottt endoLk
��z License Glasr 23 SQ 30LB FLT
F Dam �- Cantruso
pp A CHRECI'S DEC ON
tl 1 understand my plans shall an used u public accords
JyU
g��
Licensed Prefaced anal
chi OWNER-BUILDER DECLARATION
i F 1 hereby affirm that I am exempt from the Contractor's License Law for me
too following warn.(Section 111313,Business and Pmfecsons Coda:Any city m county
$ which central.a Permit m common,alter.Wine..demolish.or term any structure
pros m its issuance.also inquires the applicant fmUch permit o file a signed summcnt
pp <
tat he is licensed pursuant o the provisions of dm Cantactees mucase Law(Chapter 9 Sq.Ft.Floor Area Valuation
Y�$ (cormcnoing sWth Sauon I000)af Divisonlof the Bus;^<••arM Pmfrasians Cadc)r $12000
E R 2 Nn Tis exempt therefrom and 0m basis for the alleged...option.Any violation of
Section 7031.5 by airy applicant fears permit subjects the applicant is a civil penalty of
an,m 316 0 2 0 3 3 .�( Y Type
Number Oceu ane T e
arc than Ew hundred dollars 55001 P
1,as owner of Ne pmpmty,or my employees with wages as theb spin comperwuon,
will do the worlL and Ne structure is not intended or offered fed sale(Sec.TOue,Becomes
and Pmfewos,Cade The Cootrcmra Licarsse Uw does ml apply to an ower of Required Inspections
property who Wilds or im prow ummon,aw who does such work himself or tlueugh his
Own employees,provided shat such improvements are,not intended araffered forsale.If.
however,Ne building or improvement is said within one year of completion,the owner-
builder will have the buNus of proving that W did not Mild or imprvm for purpose of
sale.).
0 1,as owner of the property am exclusively conuscting with licensed ctarmoom to
construct the project(Sec]Ord,Business and Professions Cade:)Tim Commove.U.
cove Taw does not apply to in owner of property who builds or improves th'mun,and
who convects for such prakos with a commetar(s)recved pursuant to the Conuxtar's
License Law.
❑I are exempt under See ,B&P C fm this maven
Owner Dam
WORKER'S COMPENSATIONDECI RATION
I hereby affirm under penalty of perjury one of the following MCIarWov:
have and will maintain a Certificate of Consent to self4same fur Wmker'a Coupon.
'ins.as provided far by Section 3100 of the Labor Code.fm the pertemnanca of 1M
wort for which this permit is issued.
❑1 have ave will maintain Wufkees Compensation Inuum¢,as required by Sccuan
3M of the labor Code,far do,ponfomsm a of um were fm which this permit is issued. '
My Worteer C/omplemalma Insane'1=canier and Policy numberam: d/
cant'. _s 4 L.. 'C--'-'t Policy No.: rJd.p8 9/ .
CERTIFICATE OF EXEMPTION FROM WORKERS
COMPENSATION INSURANCE
(Thu scour need rmlbocomplemd if dm patent.tat..hundred dollars(5100)
m less)
1 Cmih Nal In to performammc of the work fm which this permit is issued.l shall not
employ anyperson in any mmtmrso a an become subject to um Worked'Compevaden
Laws of Califon..Dam
Applicant
NOTICE TO APPLICANT.IL after making this Certificate of Eaempuon,you smut
become subject to Ne Wo seei eompenuuon provisions of the labs Cade,you muss
.J O forthwith comply whit such provisions or Nu permit shall be deemed mvakcd,
'EC CONSTRUCTION LENDING AGENCY
F+ I Wraby air,.Nat there I..emuauctico lending agency far the performsnm of
FL> to work it which tis permit Is iasued(Sec.1097,Civ.C.)
Q Lender's None
Z Undoes Address
U Q 1 certify Nat 1 have read this application and sum Nu the shave iNwmaum u
comet I agree m Comply wit all city and county Urdinsnes ave sum laws ralmmll to
.0 building construction,and hereby authors mpresenuuws of this city an enter upon the
pro
purpo
aMvcmcnudgm judgment,
crey Tori expenses
which ms
fns"W (Wer)agree to saw,indemnify and keep humlest to City of Cupertino against
N in
ancmcnto Swung
and es penuawhich may Is my way acme against said City
V z APPLICANT
PLICA T of Ncdrmung o(this permit - --'7
~ SOURCEREGUND NDS AND WILL COMPLY WITH ALL NON-POINT Issued by: Date /,
Smgnuum of App snHA7A DOU
��' am 6T Re-roofs
HAZAR[ture MATERIALS DISCLOSURE Type of Roof �J
Wit]him Cupmtmfuture buildinga,Chapter 9.12.
Ha.l and
az dented by dm Cupertino Municipal Code.Clupmr 9.11,and the HcaIN and Sa@p
ewe,[3 on 2ss12(a)T o All roofs shall be inspected prior to any roofing material being installed.
Yea
Will thea semi or fume Wilding Occupant are If a roof is installed without first obtainingan inspection,I agree to remove
g p equipmrnt or dcviva which P
Ft as,cunuminmu�.&fihaad by the Bay Area Air Quality Management a materials for inspection.
❑Yv
I haus mw use hna auregmmimments under Chapmr&95 ofthe califs.
nia Health&SafciyCedc,Section�M'
,15533 and]353d.l understand Netifdm Wilding .yrs
dra ntly haw.mass, it u my amponsibilay m notify do asupmt ofcar - , C, —
tCqui WiCll mLLV be t b IarUanCCof a CC(IlfKim of DL(LpNLY.
Signature of Applicant U Date
Owner or aurhasgCok Dam'
All roof coverings to be Class'%¢"or better
CITY OF CUPERTINO
2 ITEMS OF 2 PERMIT RECEIPT OPERATOR: patg
. COPY # 1
Sec : Twp: Rng: Sub: Elk: Lot:
APN . . . . . . . . : 31602033 . 00
DATE ISSUED. . . . . . . : 07/30/2008
RECEIPT # . . . . . . . . . : BS000005636
REFERENCE ID # . . . : 08070224
SITE ADDRESS . . . . . : 10656 LARRY WAY
SUBDIVISION . . . . . . .
CITY . . . . . . . . . . . . . : CUPERTINO
IMPACT AREA . . . . . . .
OWNER . . . . . . . . . . . . : RABBITT DANIEL R TRUSTEE
ADDRESS . . . . . . . . . . : 10656 LARRY WAY
CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-2057
RECEIVED FROM . . . . : EDWARD A GREGORY
CONTRACTOR . . . . . . . : JOHN ANGELO LIC # 30122
COMPANY . . . . . . . . . . : ANGELO RAIN GUTTERS
ADDRESS . . . . . . . . . . : 802 WELLINGTON PL
CITY/STATE/ZIP . . . : CAMPBELL, CA 95008
TELEPHONE . . . . . . . . : (408) 379-6189
• FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
---------- --- ---- ---------- ---------- ---------- ---------- ----------
IBSEISMICR VALUATION 12 , 000 . 00 1 .20 0 . 00 1 . 20 0 . 00
1.REROOFRES SQ FEET 23 . 00 299 . 00 0 . 00 299 . 00 0 . 00
---------- ---------- ---------- ----------
TOTAL PERMIT 300 . 20 0 . 00 300 .20 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
----------------- --------------- --------------------
CREDIT CARD 300.20 VISA
---------------
TOTAL RECEIPT 300 . 20
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
-------- ---------------------------- -------- ----------------------------
601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL
604 ROOF IN-PROGRESS 605 FINAL REROOF
•
CITY OF CUPERTINO
(dpi , REROOF
•CUPERTINO PERMIT APPLICATION
APN # ! O 3 00
Date: 7-30-02'
Building Address:
/0656
Owner's Name: Phone #:
L. orCo �� 66-`"7/]� '��/�e� `lob- zs-7 379z
Contractor: / Phone #: Yo 8-- .r 79- �/j y
Fax #: yD(f- &6- 8 zoo
Cupertino Business License #: Contractor License #:
'TD! ZZ-
Type of Roof Covering:
Existing: Proposed:
❑ Built-Up Roof ❑ Built-Up roof
❑ Asphalt Shingles �W Asphalt Shingles
Wood Shakes �LGyers ❑ Wood Shakes
41 Wood Shingle ❑ Wood Shingles
❑ Other(Specify) ❑ Other (Specify)
Number of existing coverings Z o Provide I.C.B.O. Report #
`yv Tobe Removed ❑ Provide Mfgr. Installation Specs.
Job Description:
7/29 W
e,4's-lrKy Z LGye.-s W vhes/w /,ej 34 eoF OS 4?
3,D16 ��l� Ce p clsss , s s
Residential Commercial
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions:
applicable, include in plan set & the sheet index.
Valuation: /ZCJJv
I Have Read, Understand and Will Comply with Cupertino's Tear-Off Policy:
•
.�LM 941 AA_An�l
Signature
Pbm� CITY OF CUPERTINO
n REROOF
OF
CUPERTINO FEE SCHEDULE
Number of Fee ID Fee Description Fee Permit Type
Squares Group
1RER00FC0M Re-roof Commercial B 1COMMLROOF
1BSEISMICO Seismic Commercial B
�3 1REROOFRES Re-roof Residential B 1SFDWLR00F
IBSEISMICRE Seismic Residential B
1RER00FMRES Re-roof Multi-Family B 1MFDWLROOF
1BSEISMICRE Seismic Residential B
1BUSLIC Business License B
Revised 6/16/08
•
I
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
. Telephone: (408)777-3228
Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must agree to comply with 1997 UBC Standards
and manufacturers specifications on re-roofing.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City, the following steps are
required:
1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed,a plywood nail inspection is required.
. 6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re-inspection fee of$176.18. The re-inspection fee must
be paid before another inspection can be scheduled.
IMPORTANT:
1. Flat roofs must have a minimum of 1/4" per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re-roofing.
Homeowner's Name: Lo r t ry v /`S 6 % 4 -1'_e,Ael-
Job Site Address: 106S-6 &ql-1 W�y
Roofing Company Name: A t,<//o A7aoffin aWe,rS
Applicant's Signature: Date: '7—�J-0 P
Greg Casteel
Building Official
Revised 11/2/04
Green Building Plan Check
Index of Green Building Points/Categories
A. Category Example of an Index or Table of Green Plan Sheet or Page Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points
11. Permeable Paving, Note L-1 2 points
C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points
D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points
5. Use Truss with heels, (detail) S-2 2 points
6. B. OSB Sheathing, detail S-2 2 points
E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points
F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 2 points
11. A 2500 Gal. Tank, (Note/Spec L-1 10 points
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Energy Star Refrigerator, (Note/Spec. A-3 1 point
P. Other 1. List Green Features on Plans A-1 1 point
TOTAL POINTS1 40 points
r
•
Plan Review Process Work Book Page-12-Revised 3/25/08
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types,assigning a'total points'value to a project to be considered environmentally friendly is •
not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for"greening"your project.
Energy IAD/Health
INPUT Resources
.Srte
1.Recycle Job Site Construction&Demolition Waste
65%=1 point;75%= 2 points;80%=4 points up to 4 Resource pts _ 0
2.Salvage Reusable Building Materials 4 Resource pts y=yes 0
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y--yes 0
4,Protect Native Soil 2 Resource pts y--yes 0
5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0
6.Implement Construction Site Stonnwater Practices 2 Resource pts y=yes 0
7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0
8.Design Resource-Efficient Landscapes and Gardens 4 Resource pts y=yes 0
9.Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yes , 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0
1
am
B.Foundation
1.Incorporate Recycled Flyash in Concrete
25%Recycled Flyash=2 points;Add 1 point for every 10% •
increase of flyash,up to 5 points up to 5 Resource pts 0
2.Use Recycled Content Aggregate 2 Resource pts y=yes 0
3.Insulate Foundation/Slab before_backfill 3 Energy pts y=yesF; 0
1 1 1
C.Structural Frame
1.Substitute Solid Sawn Lumber with Engineered Lumbei' 3 Resource pts y=yes 0
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0
3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y--yes 0
4.Use Web Floor Trusses 2 Resource pts y--yes 0
5.Design Energy Heels on Trusses 6'or more 2 Energy pts y=yes 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0
7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0
8.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0
9.Use Structural Insulated Panels(SIPs)
a.Floors 3 Energy pts y=yes 0
b.Wall 3 Energy pts y=yes 0
c.Root 3 Energy pts y=yes 0
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0
12,Use OSB
a.Subfloors 1 Resource pt y=yes 0
b.Sheathing 1 Resource pt y=yes 0 •
1 1
Windows
1.Install Energy-Efficient Windows
• a.Double-Paned 1 Energy pt y=yes p
b.Low-Emissivity(Low-E) 2 Energy pts y=yes 0
c.Low.Conductivity Frames 2 Energy pts y=yes 0
2.Install Low Heat Transmission Glazing 1 Energy pt y=yes 0
1 1 1
J.Heating Ventilation and Air Conditioning
1.Use Duct Mastic on All Duct Joints 2 Energy pts y=yes 0
2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0
3.Vent Range Hood to the Outside 1 IAQIHealth pt y=yes 0
4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 0
5.Install Solar Attic Fan 2 Energy pts y=yes 0
6.Install Attic Ventilation Systems t Energy pt y=yes 0
7.Install Whole House Fan 4 Energy pts y=yes 0
8.Install Sealed Combustion Units
a.Furnaces 3 IAQ/Health pts y=yes 0
b.Water Heaters 31AQ/Health pts y=yes
0
9.Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy pts y=yes 0
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes p
11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0
13.Retrofit Wood Burning Fireplaces
• a.Install EPA certified wood stoves/inserts 1 IAQ/Health pt y=yes 0
b. Instafi/Replace Dampers 1 Energy pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filter 4[AD/Health pts y=yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0
17.Install Separate Garage Exhaust Fan 31AQ/Health pts y=yes 0
1 1
K.Renewable Energy and Roofing 1
1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0
2.install Solar Water Heating System 10 Energy pts y=yes 0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4.Install Photovoltaic(PV)System
2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0
L!6,,26lect Safe and Durable Roofing Materials 1 Resource pt y=yes B 0
7.Install Radiant Barrier 3 Energy pts y=yes 0
1
L.Natural Heating and Cooling 1 1
1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0
2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts . y=yes p
3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes p
1 I 1
Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone(408)777-3228
CITY OF Fax(408)777-3333
`CUPEkjINO
Building De artment
JOB ADDRESS: l !� c J G / f f` ��y PERMIT (�-o 7 D'I
OWNER'S NAME: or;o To.yb,w - eya) PHONE
GENERAL CONTRACTOR:
I am not using any subcontractors: Q 7 Jo 0
Signafti e Date
Please check applicable subcontractors and complete the following information:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
• Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
y Roofing „t Q
Septic Tank
Sheet Metal
Sheet Rock
Tile
• 7- 30-D 8
Owner/CWitracyor Signature Date