Loading...
.02 DIR-2007-27 Gregg Bunker CITY OF CUPERTINO 10300 Torre Avenue, Cupertino, California 95014 DEPARTMENT OF COMMUNITY DEVELOPMENT REPORT FORM Application: DIR-2007-27 Applicant: Gregg Bunker Owner: Gregg Bunker Location: 1357 South De Anza Boulevard Agenda Date: September 11,2007 Application Summary: Review of Use Permit U-2003-03, Condition 10 (Wolf Camera), related to the Construction Management Plan. RECOMMENDATION: 1. The Planning Commission should review the previously approved construction management plan and provide input or further directions. Environmental Assessment: Categorically Exempt BACKGROUND: On August 21, 2007, the Planning Commission directed staff to schedule the construction management plan for the Wolf Camera mixed-use project (U-2003-03) for review and comments. DISCUSSION: Construction Management Plan According to the original use permit approval (condition #10), a construction management plan is required to address the following: .:. Construction vehicle routing .:. Construction equipment staging area .:. Dust control .:. Patron parking Prior to the issuance of the building permit for the condominium building, the applicant submitted a construction management plan (see exhibit A). The plan provides specific measures that deal with the location of the construction trailer, materials storage, construction parking and general construction site maintenance. In addition, the property owner (Greg Bunker) has entered into a parking agreement with the Original Pancake House across the street from De Anza Boulevard so the construction work and employees from Wolf Camera could park there during construction of the site. Since the August 21, 2007 Planning Commission meeting where we received concerns from the neighbors, the Building Department has investigated into the site maintenance ~-l Applications: DIR-2007-27 Wolf Camera Mixed-Use August 28, 2007 issues and have found the construction site to be generally in good standing since all the heavy construction work have been completed. We did receive additional confirmation from the construction manager of the project that addition construction management measures will be enforced to further minimize future impacts to the adjacent neighborhood (see exhibit B). A sign will be placed right before the entrance to the residential area that there shall not be any construction traffic beyond the point of the project's frontage. The Planning Department is in the process of working with the Public Works Department to investigate into the claim by several adjacent residences that there has been some damage caused by construction trucks to the curb and sidewalk leading into Wildflower Court. According to Public Works Department, the applicant is required to. repair and resurface the street and another other damages associated with the project on the public right-of-way prior to the final occupancy release of the project. The City also has collected a performance bond in the amount of $149,319 and a labor and material bond in the amount of $149,319 that will ensure the improvement and repair work to the public right-of-way will be completed to the City's satisfaction. Staff has not received any email or correspondence from the neighbor with regard to the construction site issues since the August 21, 2007 Planning Commission meeting. Enclosures: Construction Management Plan Email from the Project Construction Manager, August 31, 2007 Submitted by: Gary Chao, Senior Planner Approved by: Steve Piasecki, Director of Community Development S -f I ~ 2 &,':l '.'~ )',: . ',:' '. u Ll IC5) (,.' If::?) I~ July 9, 2003 I:'" /,/ ~'.."'.'... "\ J '~\, In Mr. G~ry Chao Assist.~nt Planner Cit)' of Cupertino 10300 TOITe Avc,nue Cupel1~ino, CA 95014-3255 via fAX 408.777.3333 f':' li,.'..~~. ~'.\~ '.'. ~;.'j ~~~;i,:: !-..~..;'.: :;,., '" 't. ,",,': ~ij.' ~:':d tr'i Re: Construcfion Operation Plan Mixed Use Project 1357 De Anza Blvd. Cupel1ino, California Dear Mr. Chao. Attached please find Ollr Construction Operation Plan as prepared by Melro Design Group after discussions between Metro Design, our company and Mr. Bunker. ;.... ~ ; {N' },/., The following outline is a summary of the construction operations covered by the ConstruCtion Operation Plan along with additional details not shovm on the Construction Operation Plan. Construction Trailc." The con~\ructioJl trailer is to be located south-east corner orthe Phase I site (adjacent to the existing driveway off of Wildtlower Way). The portable toilct(s) will be lo<.:ated in the sanl.e area. I;, ' :(.' ,.. it,' I:. '. t: . . f:" l.l;: Matcrinl Stonlgc The material slorage and staging location will be in the landscaped area south of the existing retail building (nt the south-east corner of the Ph:1sC 1I site). Ad,' '.ionalmutcrials wiil also be stored 011 top of the new COI~st'llction as it n:aches appropriate stagc~. of completion. ,'. ~.~:~:, ;' r..-; :;' ~r:'; ~.' , t> t rr' Pi;':: I'i 'i~_': ' ;) J ~ i. Constrtilction Parking ConstI11(~tion parking \vill be curbside along Wildl10wcr \VflY. We will also ulili7e tlw n('l,.v garage ,.",hen work has progressed enough to <!lIow construction worker parking without interference with ongoing work. i. I~f~ : ~,." I': ::; !'- il '.'3..\"[".'.' " ~. ~ . ,,' '. . ,;ii~~'~.i~ , ij(;;--~ j I I i I I I 1 TPS - fa Construction Operation r-Jan July 9, 2003 Page 2 UtiliHes Construction of on-site utilit.ies that may impact the existing driveway, of access points will be scheduled in advanr.c to minimize any i.nconvenicnce to tbe tenants or customers. Gerleral The site will be fenced to provide site security and safety. The project superimendent will maintain an on-going line of communication to make sure all tenants are aware ot any upcC'ming construction activities that may impact them or their customers. Plea.se contact me if you have any questions, or if you require any additional information. Sinc;erely, BARR~ENSON_~U,LDER Oo.~~~-/), Wv{A<1VV' David .\. Gibbo~ I Vice President Cc: Greg Bunker Tom Sloan I: Ii Ii J ~t.f .. '.;;'\.Q%;'" . .',,~;) . , ...,: 'S' - '~::l!~ ....;~.,.<.:s;~,.. .. .c. --, '-;'i .--., -~; '"," -.- .' '.01.' tl. 11 Hllln~ fU'flll IIJlhlh ~ !JHHU " . v~Ciliik> ,,:? ~911l)J.~ia.~n-:) 'ot-,a ,,!%I'4,,\;;q ~)..!JG~ . .t':l~I"O'2ll'" iiign oiaxll,..' ,":', ";' _ -r- a^"'~V%NV ila .-c; rl . .~J~W~" ..-- - -...,.. - ,- , I I i ., I I , I ; , , i I '1 i. I 1 , I , I I . . I =::.';..:=-.=~::::-~=;=.:...- I ., rJ f' I L, ;, r-' ;: ..m:: ". t., :1 p~: . : I .1 I. , I I p " 1 .1 -j ~l i ,Ir' ::~~-fj --tc]r- ~.- .1' L] Ili l-- ,iii' .\~.' .9 "'''II.t~.: " ,:;.~,J . ......11,.....: . (). I ~' ..--.....~,..:-~~~~~............~' ..~..;... ....._~.- ._---.......--_.---..~... ) .(. .~ It III: .s: () ...I IL 1.\ -I f : ~ .4 .1. 'IIi I I I I i I .\ , 'j I I I I " I .J .~ " I z .( ...J Il Z () .... .( It III 0.:. () Z o .... \) :;:) It f- dl Z 0' \) ~"'5 Page 1 of1 Gary Chao From: Greg Casteel Sent: Wednesday, September 05,20071 :22 PM To: Gary Chao Subject: FW: Wildflower Project and Complaint to City FYI -----Original Message----- From: Jim Shydlowski [mailto:jshydlowski@barryswensonbuilder.com] Sent: Friday, August 31, 2007 10:02 AM To: Larry Squarcia Cc: Greg Casteel; steved@cupertino.org; Jason Chou Subject: Wildflower Project and Complaint to City Larry- Thank you for reviewing the jobsite issues yesterday. With regards to the issues discussed, this is how we will proceed. 1. Tree installation- Steve and Jason are copied on this e-mail. In the near future, we will meet with them to discuss the procedures for city installed heritage tree. Work will not proceed in this area until we do so. 2. Site c1eanup- While the site appeared fairly clean, we will have a crew touch up the site. 3. Debris box- the debris box was put on the street temporarilly while some underground work was occuring. It will be moved on site. 4. Street Encroachment- Apparantly our encroachment permit does not cover trailer or fencing. We will remove them off the street. 5. Private street parking- We are unaware of any people parking on this street. All workers have been informed. we will be ordering a sign to located near the street entrance, which will state "No Construction Parking". Sorry for the inconvenience and we will work more diligently so that there are no future issues. If you have any questions, please do not hesitate to contact me. Thanks, Jim Shydlowski Senior Project Manager Barry Swenson Builder Phone (408)938-6325 Fax (408)287-0299 9/612007 c1. -~