Loading...
08070209 • CITY OF CUPERTINO •g zokirsiim*sa+„r i,o. **•+"-''' `% BUILDING DIVISION PERMIT S6CO1TRA.CTOR INF�ORMA.TION;1 amLl�lyc�pggFsSHELLY DR JS MILLER • PERMIT NO.08070209 . OWNER'S NAUM2E: PERMIT ISSUE DATE ' -ANNY CHID 87 WESTMONT DR 07/29/2008 NE: SANITARY NO. CONTROL NO. (408) 674-2306 • ARCHITECT/ENGINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MECH C .:1 CM C I= tr00 LICENSED CONTRACTOR'S DECLARATION Job Dl Don w I hereby affirm that I am licensed under provisions of Chapter 9(commencing Description O withSecdon7000)of ividon3ofthe Businwofand io Code,an license is RMDL 40SQ FIX DMG WRNG JOISTS STDS RAFTRS IN ^ in full farce and eh. 77. ?ti_ License Class Lie.It (/ GARGE&SHTRCK pp9 Dale Contractor • e R ITECPS DECLARATION C I undo-stand my plans shall he used as public records E C• Licensed Professional to 3 OWNER-BUILDER DECLARATION I I hereby affirm that I am exempt from the Contractor's license Law for the • 0 0 following reason.(Section 7031.5,Business and Professions Code:Any city or county 2 which requires a permit to construct alter,improve,demolish.err repair any swnum -Z2 prior to its issuance,also requires the applicant for such permit to file a signed statement < dui hc is licensed pursuant to the provisions of the Contractor's License Law(Chapter 9 Sq.Ft. Floor AreaValuation YO (commencing with Section 7000)or0ivuion3 of the Business and Professions Code)or $4000 e`<-• that he is exempt therefrom and the basis for the alleged exemption.Any violation of . Section 7031.5 by any applicant fora permit subjects the applicant to a civil penalty ofNumber Occupancy Type not more than five hundred dollars(S503). 35915010 Cllr L as owner of the property,or my employees with wages as their sole compensation. will do the work,and the swan is not intended or offered(or sale(Sec.7014.Business and Professions Code:The Contractor's License Law does not apply to an owner of Required Inspections property who builds or improves thereon.and who does such work himself or Wough his own employees,provided that such improvements are not intended or offered for sale.If, however,the building or improvement Is sold within one year of completion,the owner- . builder will have the burden of proving that he did not build or improve for purpose of . sale.). ❑I.as owner of the property,am exclusively contracting with licensed convenors to construct the project(See.7044,Business and Professions Code:)The Contractors Li. cense Law does not apply to an owner of property who builds or improves thereon.and who contracts for such projects with a contractor(s)licensed pursuant to the Contractor's License Law. 0 1 am exempt under Sec ,B&P C for this reason . Owner Date . WORKER'S COMPENSATION DECLARATION 41, 1 hereby aMsrm under penalty of perjury one of the following declarations I ham and will maintain a CerdBcete of Consent to self-Insure for Workers Compen. sation,as provided for by Section 3703 of the Labor Code,for the performance of the work for which this permit is issued. . o I have and will maintain Worker's Compensation Insurance.as required by Section 3700 of the Labor Code.for the performance of the work for which this permit is issued. My Worker's Compensation Insurance/win Policy number are: /��I 2 VI Cartier •T�ICbfli19I-1,VI. No.: 7I; °C Z1- • C RTIFICATE0 EXEMPTION FROM WORKERS' COMPENSATION INSURANCE • (Thu section need not be completed If is permit Is for one hundreddollars(S I00) or less.) I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Workers'Compensation ' • Laws of California Date Applicant NOTICE TO APPLICANT:If.after making this Certificate of Exemption.you should ' become subject to the Worker's Compensation previsions of the Labor Code,you must ..../Z forthwith comply with such provisions or this permit shall be deemed revoked. z"" CONSTRUCTION LENDING AGENCY (n.�., I hereby arf that there is a construction lending agency for the performance of • Ce> the work for which this permit is issued(Sec.3097,Civ.C.) • W A Lender's Name =z Lenders Address ' V 0 I certify that I have read this application and state that the above information is ' W ...obis.I agree to comply with all city and county ordinances and state laws relating to 0- building construction,and hereby authorise representatives of this city to enter upon the Gabove-mentioned property for inspection purposes / (We)agree to save,indemnify and keep harmless the City of Cupertino against ▪ N liabiiisiesjudgmenu,costs uses which may in any way accrue against said City _I ()z in consequence of the gran permit Alli i APPLIC . •ERSTA D WILL COMPLY WITH ALL NON-POINT Issued by: r. 4k��lo/ Date 7- 2 /o, • U k SOUR ;REGU I• S. ^- Il 7 I� (9 ice Re-roofs Signature. pplican.g ontractor Date H 1 RDOU`,'' ' ALS DISCLOSURE Type of Roof Will the riper- or future•• g occupant store or handle hazardous material as defined by is Cupenin Municipa C .Chapter 9.13,and the Health and Safety Cork,Section 25532(a)? ❑Yea o All roofs shall be inspected prior to any roofing material being installe . If a roof is installed without first obtaining an inspection,ection,I agree to remove Will the applicant or future building occupant use equipment or devices which it hazardous air conumi nts as defined by the Bay Area Air Quality Management all new materials for inspection. District? ❑Yes Nu I have read the hazardous maleriau requirements under Chapter 6.95 of the Califor- nia Health&SafetyCode,Secti•• 505.25533 and 25534.1undersuM duff the (ding does not cunensl • m a en I, .t my responsibility to notify occupan of the requOwner or authorized nm. .!for to' p.• .rat Reaeel yp,nsg. en Signature of Applicant Date Owner or authorized a.T /� Date' , All roof coverings to be Class a%¢"or better c?o7c2 / CITY OF CUPERTINO ADDITION/REMODEL • CUPE(�TINO PERMIT APPLICATION FORM APN # 359/5D/a �1 Date: Building Address: 1..0100-7UV5tri eDAv '9( G A9oaf` l(_o\ ' Mailing Address (if different from building address): Owner's Name. ', ((Avon cketicH'iu)hone# : to?_3Q0_ 846- f AN Ni j CA-11U\ Contractor: Phone#:f-t cf3,bl -k--t 06 C7 r M�-1 �� A — Fax #: Contractor License#: 7 4 a 71.1 Cupertino Business License#: S 0011 Contact: tn.Sopitvct vtegL. Phone#: Loy_ 67.1 _230-6 Fax #: Building Permit Info: Bldg. N Elect. ❑ Plumb. ❑ Mech. ❑ Hillside ❑ •Job Description: Addition (adding sq footage): What is being remodeled (not including addition)? HD s r,�- c-c X v& ec( w: 2i AJ6 �cActS S1v0S '(1-CA4CPX15 "1-N1 s‘u-t1( (Laky_ , Remodel Includes Re-Roof: Yes \ No Ms. If yes list number of square 1 S S Remodel Includes Structural: Yes N. No ❑ -51sU(_ (2 hc-lc(t�S Square Footage: Addition: Porch: Deck: Garage: Detached Attached V Q Remodel: Kitchen Bath Other Type of Construction (Usage Class): Occupancy Type: 1-A, 1-B ❑ IUIII/V-A ❑ IUIIl B, IV-HT, V-B Valuation: Please check this box if the project is a second-story addition ❑ Project Size: Express Standard ❑ Large El Major El Please complete relev , t portion of the Green Building Shecklist & attach it to the application or if applicable, Green Building Points Achieved: include in plan set & the sheet index. 15— ***For Office Use Only*** Over-the-Counter 111 Revised 7/01/08 CITY OF CUPERTINO 7 ADDITION/REMODEL CUPEI]TINO FEE SCHEDULE • Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft ADDITIONS 1R3SFDADD PLLONGRNGR Long Range PL Planning/Residential 1R3INSP Dwellings Inspections B 1R3PLNCK Dwellings plan check B 1R3REPINSP Dwellings Repeat B Inspection 1 R3REPPLNC Dwellings Repeat Plan B Check 1R3HINSP Dwellings Hillside B inspection 1R3HPLNCK Dwellings Hillside plan B check IR3HREINSP • Dwellings Hillside B Repeat Inspection • 1R3HREPLNC Dwellings Hillside B Repeat Plan Check 1R3ALTINSP Dwellings Alternate B Materials Inspection 1 R3ALTPLNC Dwellings Alternate B Materials Plan Check 1PCESS Cesspool P 1PPRSEWG Ea. Private Sewage P Disposal System 1PRSEWER Sewers P 1BPSPRINK Lawn Sprinkler/Backflow P 1BPWSVCS Main Water Service P I BSEISMICRE SeismicResidential B DECKS 1R3SFDADD OR 1R3SFDREM 1DECKWOOD Deck (Wood)-Each B (Each) • 1DECKRAIL Deck Railing-Each B (Each) • • CITY OF CUPERTINO ADDITON/REMODEL • FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft GARAGES 1R3SFDADD OR DETACHED 1R3SFDREM 1GARDTW<=1K Wood Frame up to B 1,000 SF (each) 1 GARDTM<=1 K Masonry up to 1,000 SF B (each) BCONSTAXR Construction Tax Res (new detached garage) PATIO'S OPEN 1R3SFDADD OR 1R3SFDREM 1PATIOWOOD Wood Frame up to 300 B SF 1PATIOMETAL Metal Frame up to 300 B SF , IP ATIOOTHER Other Frame up to 300 SF B PATIO'S CLOSED 1R3SFDADD OR • & SUN ROOMS 1R3SFDREM 1 PATIOENCLW Enclosed Wood up to 300 B SF 1PATIOENCLM Enclosed Metal up to 300 B SF 1 PATIOENCLO Other Enclosed Patio up B to 300 SF 1COVPORCH • Porch Covered-Each B (Each) REMODELS 1R3SFDREM 1 REMRESKIT _ Kitchen Remodel up to B (Deduct "$"for ea plan 300 SF check) 1 REMRESBAT Bath Remodel up to 300 B 66 SF AO 1 REMREOTH Other Remodel up to 300 B 66 (j SF 1REMRES2 Remodel Residential B Greater than 1000 sq ft • 1REMRES3 Remodel Residential B Greater than 2500 sq ft. 3 of 3 CITY OF CUPERTINO ADDITON/REMODEL FEE SCHEDULE • Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft REMODEL PLNCK 1STPLNCK (1-3 for Standard Plan Check B NOT FOR OVER THE (( remodel) COUNTER PLAN CKS. 1REROOFRES Residential Re-roof Each B 100 SF • WINDOW/SLIDING 1R3SFDREM GLASS DOOR 1 WINREP Replacement windows B (ea 8 windows) I WINNEWNSTR New Window (non- B structural) 1 WINMEWSTR New Window (Structural B Shear Wall/Masonry) 1 WINBAYSTR Bay Window (Structural) B SKYLIGHTS 1R3SFDREM • 1 SKYL<10 SF Skylight less than 10 sf B ISKYL>1OSF Skylight greater than 10 B sf or structural ISTAIRS Stairs-first flight/ea addt'l B (( 1EPERMITFEE Electrical Permit Fee E 1MPERMITFEE Mechanical Permit Fee M 1 PPERMITFEE Plumbing Permit Fee P 1 ELCPLNCK Stand Alone Electric Pln E Ck (hourly) 1 MECPLNCK Stand Alone Mechanical. M Pln Ck (hourly . 1PLMPLNCK Stand Alone Plumbing P Pln Ck (hourly) 4of3 CITY OF CUPERTINO ADDITON/REMODEL • FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft ( / 1BSEISMICRE Seismic Residential B / 1TRAVDOC Travel & Documentation B 1BUSLIC Business License B • • 5 of 3 • Green Building Plan Check Index of Green Building Points/Categories *•A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below f a 7 -- .:� ,..:, ..^'i+ � _:.... 'r a!v`,° a?5". 2 ;' snt. a'" -.14}-• . -:... 'y;fi ,' ' .r B. Site 9. Install H.E. Irrigation, (details/spec)* L-1 2 points 11. Permeable Paving,.(Note) L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) 5-1 5 points 1 D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, (detail) S-2 . 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec.) A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal.Tank, (Note/Spec) L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec.) , A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point •' ` id r TOTAL POINTS 40 points MP • • Plan Review Process Work Book Page-I2-Revised 3/25/08 Green Points Rating System for Remodeling Projects •• Due to the diversity of remodeling project types,assigning a"total points'value to a project to be considered environmentally friendly is not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for'greening°your project. INPUT Resources Energy IAQIHealth •. rte 11.Recycle Job Site Construction&Demolition Waste 65%=1 point;75%= 2 points;B0%=4 points up to 4 Resource pts 0 , 2.Salvage Reusable Building Materials 4 Resource pts y=yes 0 3.Remodel for Mixed Use,Adaptive Reuse,and Historic Preservation 4 Resource pts y=yes 0 4.Protect Native Soil 2 Resource pts y=yes 0 5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0 6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0 7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0 j8.Design Resource-Efficient Landscapes and Gardens 4 Resource pts y=yes 0 9.Reuse Materials/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes _ 0 10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0 11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0 0 0 0 B.Foundation 1.Incorporate Recycled Flyash in Concrete • 25%Recycled Flyash=2 points;Add 1 point for every 10% increase of flyash,up to 5 points up to 5 Resource pts 0 2.Use Recycled Content Aggregate 2 Resource pts y=yes- 0 3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes_ 0 • o of 0 C.Structural Frame 1.Substitute Solid Sawn Lumber with Engineered Lumber _ 3 Resource pts y=yes 0 2.Use FSC Certified Wood for framing (For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0 3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0 4.Use Web Floor Trusses 2 Resource pts y=yes 0 5.Design Energy Heels on Trusses 6"or more 2 Energy pts y=yes 0 6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0 7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0 8.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0 9.Use Structural Insulated Panels(SIPs) a.Floors 3 Energy pts y=yes 0 b.Wall 3 Energy pts y=yes 0 c.Roof 3 Energy pts y=yes 0 10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0 11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0 '12.Use OSB --- -- - - - - - � a.Subfloors 1 Resource pt y=yes 0 • , b.Sheathing 1 Resource pt y=yes 0 0 0 0 INPUT Resources Energy IAO/Health D. xtenor Finis . 1 1.Use Sustainable Decking Materials . a.Recycled content 3 Resource pts y=yes I_ 0 • b.FSC Certified Wood • 3 Resource pts y=yes- 0 12.Use Treated Wood That Does Not Contain Chromium/Arsenic 1 IAQ/Health pt y=yes 0 3.Install House Wrap under Siding 1 1AQ/Health pt y=yes IIIIIIIIIIIIIIIII■ 0 4.Use Fiber-Cement Siding Materials • 1 Resource pt y=yes IIIIIIIIIIIIIIIIIIIII, 0 0 0 0 E.Plumbing 1.Install Water Heater Jacket 1 Energy pt y=yes 0 I 2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 0 I 13.Retrofit a Faucets and Showerheads with Flow Reducers a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0 b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0 1 4.Replace Toilest with Ultra-Low Flush Toilets , (1 point each,up to 3 points) _ J Up to 3 Resource pts. 0 5.Install Chlorine Filter on Showerhead 1 IAQ/Health pt y=yes 0 6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0 • .7.'Install Water Filtration Units at Faucets (2 points each,up to 4 points) Up to 4 IAQ/Health pts. 0 8.Install On-Demand Hot Water Circulation Pump 4 Resource pts' y=yes 0 U 0 0 r.metrical I1.Install Compact Fluorescent Light Bulbs(CFLs) (6 bulbs=2 points,10 bulbs=3 points,12 bulbs=4 points) Up to 4 Energy pts. 0 2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to • 5 points) Up to 5 Energy pts. 0 3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0 4.Install High Efficiency Ceiling Fans with CFLs (1 point each,up to 4 points) Up to 4 Energy pts. 0 0 0 0 G.Appliances t.Install Energy Star Dishwasher 1 I Energy pt y=yes- 0 2.Install Washing Machine with Water and Energy Conservation Features 1 Energy pt y=yes- 0 3.Install Energy Star Refrigerator 1 Energy pt y=yes- 0 • 4.Install Built-In Recycling Center 3 Resource pts y=yes_ 0 0 0 0 H.Insulation 1.Upgrade Insulation to Exceed Title 24 Requirements a.Walls 2 Energy pts y=yes 0 b.Ceilings • 2 Energy pts y=yes 0 2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0 ',S.Install'RecyCled-COrilinf,Fiberglass Insulation with INo Added Formaldehyde _ 31AQ/Health pts y=yes 0 4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0 5.Use Cellulose Insulation a.Walls 4 Resource pts y=yes 0 b.Ceilings 4 Resource pts y=yes 0 . 6.Alternative Insulation Products(Cotton,spray-foam) a.Walls 4 Resource pts y=yes 0 • D.uenings 4 Resource pts y=yes 0 0 0 0 • INPUT Resources Energy IAO/Health . • I.Windows 1.Install Energy-Efficient Windows - • , a.Double-Paned 1 Energy pt y=yes 0 b.Low-Emissivity(Low-E) 2 Energy pts y=yes 0 • c.Low.Conductivity Frames 2 Energy pts y=yes 0 h2.[nsfallLow Heat Transmission Glazing - - 1 Energy pt y=yes 0 0 0 0 J.Heating Ventilation and Air Conditioning • it Use Duct Mastic on All Duct Joints _ __ i 2 Energy pts y=yes 0 2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0 3.Vent Range Hood to the Outside 1 IAO/Health pt y=yes 0 4.Clean all Ducts Before Occupancy 2 IAO/Health pts-y=yes 0 5.Install Solar Attic Fan 2 Energy pts y=yes 0 6.Install Attic Ventilation Systems 1 Energy pt y=yes 0 7.Install Whole House Fan 4 Energy pts y=yes _ 0 8.Install Sealed Combustion Units a.Furnaces 3lAQ/Health pts y=yes 0 b.Water Heaters • 3 IAQ/Health pts y=yes 0 9.Replace Wall-Mounted Electric and Gas Heaters with Through-the-Wall Heat Pumps 3 Energy pts y=yes 0 10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0 11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0 12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0 13.Retrofit Wood Burning Fireplaces • a.Install EPA certified wood stoves/inserts 1 IAQ/Health pt y=yes 0 b. Install/Replace Dampers 1 Energy pt y=yes 0 c.Install Airtight Doors 1 Energy pt y=yes 0 14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0 15.Install High Efficiency Filter 4 IAO/Health pts y=yes 0 16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0 17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0 0 0 0 K.Renewable Energy and Roofing 1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0 2.Install Solar Water Heating System 10 Energy pts y=yes 0 3.Pre-W re for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0 4.Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) ___ Up to 18 Energy pts 0 16.Select Safe and Durable Roofing Materials 1 Resource pt y=yes 0 7.Install Radiant Barrier 3 Energy pts y=yes 0 0 0 0 L.Natural Heating and Cooling 1.Incorporate Passive Solar Heating 5 Energy pts y=yes Cl 2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts . y=yes - 0 3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0 • 0 0 0 • • • INPUT Resources Energy IAO/Health • 1.In.00r -m Qua ay an. mishes • 1.Use Low/No-VOC Paint 1 IAQ/Health pts y=yes 0 2,Use Low VOC,Water-Based Wood Finishes 2 IAO/Health pts y=yes 0 • �9.Use Low/No VOC Adhesives 3lAQ/Health pts y=yes 0 4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 6IAQ/Health pts y=yes 0 6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0 '7.Seal all Exposed Particleboard or MDF 4 IAQ/Health pts y=yes 0 8.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0 9.Use Anger-Jointed or Recycled-Content Trim 1 Resource pts y=yes - 0 10.Install Whole House Vacuum System 3 IAQMealth pts y=yes 0 0 0 0 N.Flooring 1.Select FSC Certified Wood Flooring _ 8 Resource pts y=yes 0 12. Use Rapidly Renewable Flooring Materials - 4 Resource pts y=yes 0 3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0 4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0 6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 0 0 0 Total Points Available: 1401 1301 57 Total Points Project Received: 01 01 0 • G:datarprogslgreenbuildingguidelineshemodelersNgreenpoinlsfmal2.12.o4protected.xls • • • CITY OF CUPERTINO • 5 ITEMS OF 5 PERMIT RECEIPT OPERATOR: patg COPY # : 1 Sec : Twp: Rng: Sub: B1k: Lot: . APN • 35915010 . 00 DATE ISSUED • 07/29/2008 RECEIPT # • BS000005624 REFERENCE ID # . . . : 08070209 SITE ADDRESS • 20608 SHELLY DR SUBDIVISION CITY • CUPERTINO IMPACT AREA OWNER • ANNY CHIU ADDRESS • 20608 SHELLY DR CITY/STATE/ZIP CUPERTINO CA, 95014-2924 RECEIVED FROM • JASON MILLER CONTRACTOR • JASON MILLER LIC # 30014 COMPANY • JS MILLER ADDRESS • 87 WESTMONT DR CITY/STATE/ZIP . . . : DALY CITY, CA 94015 TELEPHONE • (408) 674-2306 • FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL 1.BSEISMICR VALUATION 4, 000 . 00 1 . 00 0 . 00 1 . 00 0 . 00 1EPERMITFE FLAT RATE 1 . 00 81 . 58 0 . 00 81 . 58 0 . 00 1REMRESOTH SQ FEET 80 . 00 367 . 00 0 . 00 367 . 00 0 . 00 1STPLNCK HOURS 2 . 00 244 . 00 0 . 00 244 . 00 0 . 00 ].TRAVDOC FLAT RATE 1 . 00 81 . 58 0 . 00 81 . 58 0 . 00 TOTAL PERMIT : 775 . 16 0 . 00 775 . 16 0. 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER CREDIT CARD 775 . 16 VISA TOTAL RECEIPT : 775 . 16 • • - AMA Consulting Engineers, Inc. , 1623 Wright Avenue Sunnyvale Ca 94087 • Ph# : 408-735-1524 Fax : 408-733-1548 July 25, 2008 • City of Cupertino Planning, Building Division Attn: Building Inspector Subject: 20608 Shelly Dr. Replace Fire Damaged Rafters. Property owner : Ching Chi Chiu Dear Sir, On July 23, 2008 at about 1:30 pm we were requested to make a site Observation of the garage roof of the above property slightly damaged by fire. The above property Garage Wood Shake roofing was damaged by fire. A few Rafters were damaged and reinforced with 2 sister joists ( 2x6 joists @ 24" o/c). Please refer to the attached sketch. The ceiling joists (2x8 @ 24" o/c) were completely replaced /added to add ceiling board to the garage ceiling. From our observation we confirm that the main structural roof members-( 2x8 Hips • and ridge) were not damaged and the repairs and replacements are more than adequate. Structurally the original roof framing is sound. -- . - If you have any questions please call. • \)j! J Yours truly, / D0 f MHA Consulting Engineers Inc. em-:--)) W WO nit �—` )4 CUPanlir.in AND OF ,./, t-vQROFESSiOy i Z 9_ 2 `44. 0OSS.yv 4•\ • be MIS�0`� i•� -21, pt°n tine '° SPegile _"'ovtrl m )tel t° Malec ai a I hrnes S' * �° e nMUS7 witho°, , r..: npos °rend it is°n Exp. l E( 08 or) he building Uc w itrtn Per aferahon< g of this�'i} t Cu ssi°n 4 i <H PoOr be pp ° brio Perry°p fron 9T �/ • j°pal rvf�he vi°1adf on ofmit o Pectofi etia°< F�F CAL FOPN`4 0 nee or srAo aprowsmr • • ALL ELECTRICAL WIRING AND FIXTURES TO LATEST NEC SPECIFICATIONS. 200-7 tEraetita 200-1 �1 C 2GL.' COL 20'-0' DOCK GFl co0 x 0 N a: O ti - (il A a au GARAGE N I I (xi RT +3) +,9 -.11111 Damaged Joists & etc. Repaired -f RF JST 2x6 2 24' 0/C --N.— .0)op,OFESSj tvQ'41C- C058502 m 1* EXp .� r- TIF I / CALIfe. DAa 7/23/8003 CHID CHICIG CHI W.Nom. scat , N.T.e MHA CONSULTING ENGINEERS Inc 20808 SHELLY DR M. 0 1829 1MIGHT AVENUE, SUNNYVALE CA 84087 CUPERTINO, CAI.D?ORMA 408-735-1524, 408-733-1548 FAY SK—I mheen`rocomceetnet GARAGE ROOF (Ati.1air '\ Community Development 10300 Torre Avenue Cupertino CA 95014 Y, I CITY OF Telephone(408)777-3228 U^E RJ'N O Fax(408)777-3333 Building Department All Cupertino building permits must meet certain conditions related to maintaining environmental quality and public peace and safety. The two most common conditions are described below. STORMWATER POLLUTION CONTROL State law requires that Cupertino, 12 other Silicon Valley cities, Santa Clara County and the Santa Clara Valley Water District control stormwater pollution. Educating local residents and businesses and enforcing stormwater pollution control laws are key parts of the City's compliance efforts. Stormwater pollution prevention: It's up to us • In northern Santa Clara Valley, storm drains flow directly to local creeks and San Francisco Bay, with no treatment. Stormwater pollution is a serious problem for wildlife dependent on our waterways, for people living near streams and baylands, and for the local water supply. Common sources of stormwater pollution include: • Dripped oil, fuel, and antifreeze from vehicles and heavy equipment; • Construction debris, including dirt, concrete and paint; • • Landscaping runoff containing pesticides or weed killers; and • Any material dumped or spilled into streets or storm drains The property owner and the contractor share ultimate responsibility for activities occurring at a construction site and will be held responsible for any environmental damage caused by subcontractors or employees. For more information on construction-related stormwater requirements, see the Stormwater Quality Regulations section of the City of Cupertino web site at: http://www.cupertino.orq/city government/departments and offices/ environmental services COMMUNITY NOISE CONTROL The basic noise control requirements for construction sites are as follows: • Typical construction work hours are: - Weekdays - 7 a.m. to 8 p.m. - Weekends - 9 a.m. to 6 p.m. • Construction other than street construction is prohibited on holidays. • Residential daytime noise levels from complaint site - 60 dBA • Nonresidential daytime noise levels from complaint site - 65 dBA For more information on noise control, please see Chapter 10.48 of the Cupertino Municipal Code, which can be accessed at http://www.amlegal.com/cupertino ca/ • Greg Casteel Building Official • MHA Consulting Engineers, Inc. 1623 Wright Avenue Sunnyvale Ca 94087 Ph# : 408-735-1524 • Fax : 408-733-1548 July 25, 2008 City of Cupertino Planning, Building Division Attn: Building Inspector Subject: 20608 Shelly Dr. Replace Fire Damaged Rafters. Property owner : Ching Chi Chiu Dear Sir, On July 23, 2008 at about 1:30 pm we were requested to make a site Observation of the garage roof of the above property slightly damaged by fire. The above property Garage Wood Shake roofing was damaged by fire. A few Rafters were damaged and reinforced with 2 sister joists ( 2x6 joists @ 24" o/c). Please refer to the attached sketch. The ceiling joists (2x8 @ 24" o/c) were completely replaced /added to add ceiling board to the garage ceiling. From our observation we confirm that the main structural roof members ( 2x8 Hips • and ridge) were not damaged and the repairs and replacements are more than adequate. Structurally the original roof framing is sound. If you have any questions please call. Yours truly, MHA Consulting Engineers Inc. 9 tP� Qtp PROFESS/Dy C:058502 l'n n0 'k Ewa. 6 at og A Ii */ • of CAL FOPN • ALL ELECTRICAL WRING AND FIXTURES TO LATEST • NEC SPECIFICATIONS. 200-7 I! DOOR at co x 0 N o a CFl GARAGE • M N AI tck Damaged Joists & etc. Repaired -f- RF JST 2x6 2 24' ❑/C —► OS)paOFESS/0 • ¢t) 0 it CF2CJ y CI C058502 77 * Exp &2(-F Pk s � / CALIF"%y III DATE 7/MA000 CHING CHI CHBET..Nobs N SCALE : R.T.s MHA CONSULTING ENGINEERS Inc mos SHELLY DR �>. a 1629 WRIGHT AVENUE, SUNNYVALE CA 94087 CUPERTINO, CALIFORNIA mhsengrOcomcastnet99-1648 FAX SK-I GARAGE ROOF yn, _ Community Development 10300 Tone Avenue Cupertino CA 95014 Telephone(408) 777-3228 CITY OF Fax(408)777-3333 •UPERTINO Building Department JOB ADDRESS: ()013 S1„ ELl y P2 PERMIT #0102Q20C/ OWNER'S NAME: f�N MI (.V \v PHONE # 467-6? I- 'Z 3 0(-, GENERAL CONTRACTOR. S S M-L�l.l _ co- FAX # I am not using any subcontractors: Signature Date Please check applicable subcontractors and complete the following information: LA SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets &Millwork Cement Finishing \./ Electrical 5 PCX,SOLJ abec-W w.G Excavation Fencing Flooring: Carpeting 411 Linoleum/ Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting/ Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal - Sheet Rock Tile • 712c �Uv • \ Con or Signature Date