08090181 CITY OF CUPERTINO °/, y�T' =
BUILDING DIVISION PERMIT
PERMIT NO
Bu1Lg13TO'hNTA PAULA AVE #A JEREMY MAO INC 08090181
OWNER'SNAMEE: S PERMIT ISSIfE DATE
PAUL CHIU 1041 WINDSOR ST 09/29/2008
NE SANITARY NO. CONTROL NO.
(408) 449-9942
ARCHI ECTIENGINEER: BUILDING PERMIT INFO
BLDGELECT PLUMB MECH
0 t 0 0
u-o LICENSED CONfRACrOWS DECLARATION
taJob Description
w I hereby affirm Wt I am licensed under provisions of Ciapms 0SCi1 9(commencing p
with Section POWER CONN & MTR RELEASE FOR DTCHD GARG BLDG
in full forte and effect.
Ll Z License Cissa Le.L
C F, Dam Comncmr
o
qqw ARCHITEC`rS DECLARATION
W1 understand my plans Mall he used as public records
LG Licensed Profcssiowl
`y5OWNER-BUILDER DECLARATION
1 herthy nlirm Nat I am exempt from the ConVanoYs License Law for On
ZOO following reason.(Section IIT 1.5,Business and Pmfestians Code:Any city of county
�a which mquirw a permit to crrram rt alcor,hnprow,demolish,or repair any=.,a.
-iy prior an its issuance.also requires Neapplicam for such permit to file a signed statement
Ezii Nat heuliccwedpusmmtmtMpmvisiansofucContmcmrYLi¢nsel�w(Chapter9 Sq.Ft.Floor Area 2 Valuation
eF (curnmcrcingwithSeeuon7000)[.Diver.3aftltcBminessmdPrommmuCode). S t)00
l S s than he- anpt Used= d Bre basis f.the alleged excerption.Any violation of
m
Seon 7031Ciem.7 by my applicant fees Permit mbjc[ta On,applicant In a CMI Penalty or �,pi�I Number Occupancy
rot mOneere thfw huMmd"Ines(SRIO} 35705065 .'PlX' P Y Type
❑I,u awns of time propny,a mY wployw Nth wgn a ticv role compewOm,
aid dothewma,CndI-The C ebrotlnLi.La c¢d s net apply iOan owner
Required Inspections
and Ra who lot ender The Crntrcmf,Lieu law doe ml apply lf rt awrcr is q P
properlywho bumIda.ireprovesch imn,andwho areaaucAwmk oreffeorthrough his
own
ewr.m building
dean achimprowmmtaartnot earofcomentafor alees,
bond'' NeunicthLunhnprowmmtVmid withinore year of c.opletim,themwors-
Wiader vIB love the border of coving that he did rot duW or improve for purpose of
.1c.),h/1,a owner of On property,am exclusswly contracting with licensed Contraction to
construct tate project(Sec.7044,Business and Fafecslons Code:)The Cmbmsnr's U.
cense Law dos nm apply m an owner of property who Wild,.improves thereon,and
who corttmN for such projects with a contractor(,)licensed palmar,in the Conmmtor'a
License Law.
❑"'resempn Se/c' Bk PC for this roawa
owner. /-sis�/ /fvt/ Date-��
WORKERS COMPENSATION DECLARATION
1 hereby affirm under pensRY of perjury oro of the following declarations:
I haw and will mountain aCeniGnm of Convent to self-eau¢forWohch Comper,
aurn,as provided for by Scutum;3700.1'the labor Code.W the performer¢of the
were for which tis Permit is issued.
0 I law and will maroon Worlmes Compensation Insurer¢,u rn idired by Section
POO or the labor Code.1.the perform.ofthe wart for whichmi,permit Is Lound. '
My Wooled/Cmucana tion Insuterce carrier and Polly number ate:
Carrier. Policy No.:
CERTIFICATE OF EXEMPTION FROM WORKERS
COMPENSATION INSURANCE
(Tds,mdmneed not he cmnpleted if the Permit isforrm hundred dollars($I00)
or ksc)
I certify W,in the perforn.of On,work for which this Permit Is burned.l shat rot
employ any person in my maorcrss��yybbe¢me rot mile Workers.Compensation,
Laws of Cslifomia,Wm- -
NOTICE TO APPLICANT IC after making this Ccninum of Exemption,you should
become subject to the Wohcf.Cumpemduon pmvisiona of the Labor Cade,you muss
.J O forthwith comply with such Provisions or Nu permit,hall be decmed revoked.
.za V1 CONSTRUCTION LENDING AGENCY
4 I hereby affirm that there the is a construction lending agency for perfurmama of
a> the work[.r which this Permit Is issued Sec.3097.Gins C.)
W lender,Name
Z Lender,Address .
U Q I certify that 1 have mad this application and main Nu the show information is
IP. correct.1 ogres m comply with all city and county ordinance and sus law,misting to
Q building construction.and hereby authodre representatives of this city to enterupon the
HW above-mmurrcd property for exNe rn purposes
G (We)agree to saw.indemnify and trop harmless On City of Cuperdm against
to incoiuea.JWgmenu,co,u and expo•...which may in my way mane.gamtsold City
in comeq. sof the LrmtinL of do
r APPLIC UNDERSTANDS AND WILL COMPLY WITH ALL NO Issued by: Date
SOUR U 0 S.
Re-roofs
sig u r ppheuu/Cma.etor Dale
HAZARDOUS MATERIALS DISCLOSURE T ype of Roof
Will the applicant.futum Wilding occupant stow or haMie hruadow materia
as O11mol by f Cupcnire Municipal Code.mapmr 9.1;and the Hwlth and Samy
Code.se V553240?V553240?❑Y. ❑Nr
All roofs shall be inspected prior to any roofing material being installed.
tier
Will thea Bcert or[.tore building meta If a roof is installed without first obtainingan inspection,I agree to remove
pp L pmt me cqui it Qu or de ata which P g
Dist w air conumimna u defined by tW Bay Area Air Quality Management all new materials for inspection.
❑Yns ON.
I haw read the h smote materials requirements,under Chapter 6.95 ofthe Calder.
Was Health&SactyCede,Sections 25505,25533 and 25534.1 understand One if Om Wilding
dors not cu 'Rd how•tenerL Out It u my responsibility to notify the oceupert of tie
requimm which w,hemetprior toian. f.CeniB[amofOecnpm[y. Signature of Applicant Date
2 0
All roof coverings to be Class'%g"
er or mthrrirsd agent Dam" g or better
CITY OF CUPERTINO
• 3 ITEMS OF 3 PERMIT RECEIPT OPERATOR: patg
COPY # 1
Sec : Twp: Rng: Sub: Blk: Lot:
APN . . . . . . . . : 35705065 . OA
DATE ISSUED. . . . . . . : 09/29/2008
RECEIPT # . . . . . . . . . : BS000006212
REFERENCE ID # . . . : 08090181
SITE ADDRESS . . . . . : 22450 SANTA PAULA AVE #A
SUBDIVISION . . . . . .
CITY . . . . . . . . . . . . . : CUPERTINO
IMPACT AREA . . . . . . .
OWNER . . . . . . . . . . . . : PAUL CHIU
ADDRESS . . . . . . . . . . : 20450 SANTA PAULA AVE #A
CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-2757
RECEIVED FROM . . . . : JEREMY H MAO
CONTRACTOR . . . . . . . : JEREMY HAI-PING MAO LIC # 26422
COMPANY . . . . . . . . . . : JEREMY MAO INC
ADDRESS . . . . . . . . . . : 1041 WINDSOR ST
CITY/STATE/ZIP . . . : SAN JOSE, CA 95129
TELEPHONE . . . . . . . . : (408) 449-9942
• FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
------- ----------- ---------- ---------- ---------- ---------- ----------
1BSEISMICR .VALUATION 2 , 000 . 00 0 . 50 0 . 00 0 . 50 0 . 00
1EPERMITFE FLAT RATE 1 . 00 40 . 79 0 . 00 40 . 79 0 . 00
1TRAVDOC FLAT RATE 1 . 00 40 . 79 0 . 00 40 . 79 0 . 00
---------- ---------- ---------- ----------
TOTAL PERMIT 82 . 08 0 . 00 82 . 08 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
----------------- --------------- --------------------
CREDIT CARD 82 . 08 VISA
---------------
TOTAL RECEIPT 82 . 08
•
0809oIk1
CITY OF CUPERTINO
circ of
• CUPERTINO GENERAL BUILDING
PERMIT APPLICATION FORM
APN # 3S^7
Building Address: 2ZCy�f} SGtn�Gt A�uu�at #�� C
Cupe.-4
Mailing Address (if different from building address):
Z s-o S' f7n ✓e, u e r , n
Owner's Name: Phone#:
Paul 01i a-, qOF cif J0-307
Contractor: Phone: 44C9
U-0 rE rn al 610 Fax: l�cog -gK /6.S` 2—
Contractor
Contractor License#: 6144Gf?- 1
Cupertino Business License#: p2 (P y
Contact: Phone: 9p<cZ
•
Residential Commercial Fax:
Job Description:
AU/e-✓ C 0-n t7 eC,� d- m e,3Le,- re l e-a S e 6 -'-
C�eJ�rGLler1 9G.rciG2 6ui�c�.� r
Building Permit Info: Q `J
Bldg Elect (� Plumb ❑ Mech ❑
Type of Construction (Usage Class): Occupancy Type:
1-A, 1-B ❑ II/III/V-A ❑ IUIII B, IV-HT, V-B ❑
Valuation: Square Footage:
Project Size: Express ❑ Standard ❑ Large ❑ Major ❑
Green Building: Please complete relevant portion of the Green Building/LEED Checklist& attach it
to the application or if applicable, include in plan set & the sheet index.
• Points Achieved:
For help, contact Build it Green at www.builditgreen.org
Revised 7/01/08
D CITY OF CUPERTINO
CITY OF
CUPEkTINO GENERAL BUILDING
PERMIT APPLICATION FORM
Quantity/Sf Fee ID Fee Description Fee Permit Type
Group 1GENRES or
1GENCOM
1BBOILERI For the installation or relocation of ea M
boiler/compressor to & including 3
horsepower, or ca absorption sys to &
incl 100,000 Btu/h (29.3kw
1 BBOILER2 Installation/relocation of ea M
boiler/compressor over 3 horsepower
to & incl 15 horsepower, or ea
absorption sys over 100,000 Btu/h
1BBOILER3 Installation/relocation of ea M
boiler/compressor over 15 horsepower
to & incl 30 horsepower, or ca
absorption sys over 500,000 Btu/h to
&incl 1,000,000 Btu/h
1BBOILER4 Installation/relocation of ca M
boiler/compressor over 30 hosepower •
to & incl 50 horsepower, or for ea
absorption sys over 1',000,000 Btu/h to
& incl 1,750,000 Btu/h
IBBOILER5 Installation/relocation of ca boiler or M
refrigeration compressor over 50
horsepower, or ea absorption sys over
1,750,000 Btu/h
1BAPPLOTH For ca appliance or piece of equip M
regulated by this Code but not classed
in other appliance categories, or for
which no other fee is listed in this
code.
1 ELECINSP Other Electrical Inspections (per hour) E
1MECHINSP Other Mechanical Inspections (per M
hour)
1PLMBINSP Other Plumbing& Gas Inspections P
(per hour)
IMEETINGIHR Application Meeting B •
GC~ - CITY OF CUPERTINO
CITY OF GENERAL BUILDING APPLICATION
• CUPEI�TINO
• FEE SCHEDULE
Quantity/Sf Fee ID Fee Description Fee Permit Type
Group 1GENRES or
IGENCOM
ACOUSTICAL
REVIEW
IACOUSFDW SFDWL/Duplex New B
IACOUSRESAD SFDWL/Duplex-Addition/Alteration B
IACOUSCOM Multi-Family/Commercial B
CHIMNEY'S
1 CHIMNEY Chimney B
1 CHIMNEYR Chimney Repair B
FENCES
AIL
1FENCE>6FT Non-masonry, over 6 ft in height B
I FENCEMAS>6 Masonry, over 6 ft in height B
FIREPLACES
1FIREPLMAS Fireplace Masonry B
1FIREPLFAB Fireplace Pre-Fabricated/Metal B
1 FLAGPOL>20 Flag pole (over 20 ft in height) B
1MODUSTRU Modular Structures B
FOUNDATIONS
1FOUNDREP Foundation Repair B
1PILECAST Pile Foundation Cast in place concrete B
1PILEDRIV Pile Foundation Driven (steel, pre- B
stressed concrete)
3 of 5
Stm CITY OF CUPERTINO
CITY OF GENERAL BUILDING APPLICATION
CUPEkTINO
FEESCHEDULE •
Quantity/Sf Fee ID Fee Description Fee Permit Type
Group 1GENRES or
1GENCOM
RETAINING
WALL(CONCRETE
OR MASONRY
1RETSTN Standard (up to 50 ft) B
1RETSP310 Special Design, 3-10' high (up to 50 `) B
1 RETSP 10 Special Design, over 10' high (up to B
50')
1RETCRB< Gravity/Crib Wall, 0-1O'high (up to B
50 ft)
1RETCRB> Gravity/Crib Wall over 10' high (up to B
50 ft
SHED-(EACH) Shed Over 120 sq ft B •
SIDING
1 SIDEST/BK Siding, Stone & Brick Veneer B
(interior/exterior
1 SIDEOTHER Siding all other B
SKYLIGHTS
1 SKYL<10 SF Skylight less than 10 sf B
1 SKYL>1 OSF Skylight greater than 10 sf or B
structural
1STAIRS Stairs-first flight/ea addt'l B
STORAGE RACKS
1 SRACKS<=8 Storage Racks 0-8' high (up to 100 sf) B
1 SRACKS>8 Storage Racks over 8' high (up to 100 B
st)
•
4of5
� %- CITY OF CUPERTINO
CITY Of GENERAL BUILDING APPLICATION
• CUPEIZTINO
• FEESCHEDULE
Quantity/Sf Fee ID Fee Description Fee Permit Type
Group 1GENRES or
1GENCOM
1STUCOAP Stucco Applications (up to 400 sf) B
additional stucco application
1 WINREP Replacement windows/sliding glass B
door (ea 8 windows)
1WINMEWSTR New Window-structural shear B
wall/masonry includes plan ck Tee)
1 IEPERMITFEE Electrical Permit Fee E
1 MPERMITFEE Mechanical Permit Fee M
1 PPERMITFEE Plumbing Permit Fee P
MV
IELCPLNCK Stand Alone Electric Pln Ck (hourly) E
1 MECPLNCK Stand Alone Mechanical Pln Ck (hrly) M
1PLMBLNCK Stand Alone Plumbing Pln Ck (hrly) P
1 STPLNCK43 Hr Min Standard Plan Check (when no E/M/P) B
when not over counter) hourly-stand alone
/ 1BSEISMICR Seismic Residential B
1BSEISMICO Seismic Commercial B
1 ITRAVDOC Travel & Documentation B
1BUSLIC Business License B
5of5
Green Building Plan Check
Index of Green Building Points/Categories
A. Category Example of an Index or Table of Green Plan Sheet or Page Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
Y..
B. Site 9. Install H.E. Irrigation, (details/spec)" L-1 2 points
11. Permeable Paving, Note L-1 2 points
C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points
D. Structural . 3. Uses Wood I-Joist,.(See Spec.) S-2 2 points
5. Use Truss with heels, (detail) S4 2 points
6. B. OSB Sheathing, detail S-2 2 points
E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points
F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 2 points
11. A 2500 Gal. Tank, (Note/Spec L-1 10 points
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Energy Star Refrigerator, (Note/Spec. A-3 1 oint
P. Other 1. List Green Features on Plans A-1 1 point
TOTAL POINTS1 40 points
•
Plan Review Process Work Book Page-12-Revised 3/25/08
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types,assigning a"total points'value to a project to be considered environmentally friendly is
• not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for"greening"your project.
A.Site
1.Recycle Job Site Construction&Demolition Waste
65%=1 point;75%= 2 points;80%=4 points up to 4 Resource pts D
12.Salvage Reusable Building•Materials 4 Resource pts y=yes D
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y=yes D
4.Protect Native Soil 2 Resource pts y=yes D
5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes D
B.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0
7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0
Design Resource-Efficient Landscapes and Gardens j 4 Resource pts y=yes 0
9.Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yes 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0
1 1 1
B.Foundation
1.Incorporate Recycled Flyash in Concrete
• 25%Recycled Flyash=2 points;Add 1 point for every 10
increase of flyash,up to 5 points up to 5 Resource pts 0
2.Use Recycled Content Aggregate 2 Resource pts y=yes 0
3.Insulate Foundation/Slab before backfill 3 Energy pts y=yesF F 0
1 1
C.Structural Frame 1
1_•Substitute Solid Sawn Lu ober with Engineered Lumber 3 Resource pts y=yes 0
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 1 D) up to 10 Resource pts. 0
3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0
4.Use Web Floor Trusses 2 Resource pts y=yes D
5.Design Energy Heels on Trusses 6"or more 2 Energy pts y=yes 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0
7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0
B.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y==yes 0
9.Use Structural Insulated Panels(SIPS)
a.Floors 3 Energy pts y=yes 0
b.Wall 3 Eneroy pts y=yes
a Roof 0
3 Energy pts y=yes p
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0
12.Use b5B — -
a.Subfloors 1 Resource pt y=yes 0
• b.Sheathing _
1 Resource pt y=yes p
1 1
D.Eztenor Frmsh
INPUT ResDuTces Energy IAQ?Heafth
1.Use Sustainable Decking`Materials -
a.Recycled content 3.Resource pts y=yes D
b.FSC Certified Wood 3 Resource pts y=yes 0
12.Use Treated Wood That Does Not Contain ChromiumlArsen_ic I
1 IAQ/Health pt y=yes D
3.Install House Wrap under SidingI IAQ/Health pt y=yes 0
4.Use Fiber-Cement Siding Materials 1 Resource pt y=yes D
i ! t
E.Plumbing
1.Install Water Heater Jacket 1 Energy pt y=yes D
2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 0
3.Retrofit all Faucets and Showerheads with Flow Reducers
a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0
b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0
4.Replace Toilest with Ultra-Low Flush Toilets i
(1 point each,up to 3'points) Up to 3 Resource pts. D
5.Install Chlorine Filter on Showerhead 1 IAQ/Health pt y=yes 0
6,Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0
7.Install Water Filtration Units at Faucets
(2 points each,up to 4 points) Up to 41AQ/Hsalth pts. D
S.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes 0
1 t 1
r.rrecmcar
�1.Install Compact Fluorescent Light Bulbs(CFLs)
46 bulbs=2 points,10 bulbs=3 points,.12 bulbs=4 points) Up to 4 Energy pts. 0
2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to •
5 points) Up to 5 Energy pts. 0
3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0
4.Install High Efficiency Ceiling Fans with CFLs
(1 point each,up to 4 points) Up to 4 Energy pts. D
1 t 1
G.Appliances
T.Install Energy Star Dishwasher 1 Energy pt y=yes 0
!2.Install Washing Machine with Water and Energy
!Conservation Features 1 Energy pt y=yes 0
I3.Install Energy Star Refrigerator ! 1 Energy pt y=yes D
4.Install Built-In Recycling Center 3 Resource pts y=yes 0
L_.- -- - -- — -- --- - - - -
1 1 1
H.Insulation
1.Upgrade Insulation to Exceed Title 24 Requirements
a.Walls 2 Energy pts y=yes 0
b.Ceilings 2 Energy pts y=yes 0
2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0
1Install Recycled-Content,Fibs glass Insulation with
�No Added Formaldehyde _ 3 IAC/Health pts y=yes D
4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0
5.Use Cellulose Insulation -
a.Walls 4 Resource pts y=yes 0
b.Ceilings 4 Resource pts y=yes 0 •
6.Alternative Insulation Products(Cotton,spray-foam)
a.Walls 4 Resource pts y=yes 0
I).uemngs 4 Resource pts y=yes 0
1 1
INPUT Resources Energy IAQ113ealth
Windows
1.Install Energy-Efficient Windows
• a.Double-Paned 1 Energy pt y=yes 0 .
b.Low-Emissivity(Low-E) 2 Energy pts y=yes 0
c.Low.Conductivity Frames 2 Energy pts Y--yes 0
2.Install Low Heat Transmission Glazing 1 Energy of y=yes 0
1 1 1
J.Heating Ventilation and Air Conditioning
1.Use Duct Mastic on Ali Duct Joints _ 711AQfHealth
pts y=yes 0
2.Install Ductwork within Conditioned Space pts y=yes 0
3.Vent Range Hood to the Outside pt y=yes 0
4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 0
5.Install Solar Attic Fan 2 Energy pts Y_—Yes 0
6.Install Attic Ventilation Systems 1 Energy pt y=yes 0
7.Install Whole House Fan 4 Energy pts y=yes 0
8,Install Sealed Combustion Units
a.Furnaces 31AQ/Health pts y=yes 0
b.Water Heaters 3 IAQ/Health pts y=yes 0
9.Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy pts y=yes 0
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0
11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts Y--yes 0
13.Retrofit Wood Burning Fireplaces
• a.Install EPA certified wood stoveslnserts 1 IAQ/Health pt y=yes 0
b. Install/Replace Dampers 1 Energy pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filter 4 IAQ/Health pts y=yes 0
16.Install Heal Recovery Ventilation Unit(HRV) 5IAQ/Health pts y=yes 0
17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0
1
K.Renewable Energy and Roofing ! 1
1.Pre-Plumb for Solar.Water Heating 4 Energy pts y=yas0
2.Install Solar Water Heating System 10 Energy pts Y=yas 0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4.Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0
6.Select Safe and Durable Roofing Materials 1 Resource pt y=yes o
7.Install Radiant Barrier, - 3 Energy pts y=yes p
1 1 1
L.Natural Heating and Cooling
1.Incorporate Passive Solar Heating 5 Energy pts y=yes p
2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes p
3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes . p
1 1 1
INPUT Resnurres Energy IAO/Hmfth
M. Toor rr Quality an Flnrshes
'1.Use Low&C-VOC-Point 1 IAQ/Health pts y=yes 0
2.Use Low VOID,Water-Based Wood Finishes 2 IAQ/Health pts y=yes D •
13.Use Low/No VOC Adhesives 3 IAQ/Health pts y=yes 0
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 6lAQ/Health pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0
,7.Seal all Exposed,Particleboard or MDF 4 IAQ/Health.pts y=yes 0
B.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0
10,Install Whole House Vacuum System 3 IAQ/Health pts y=yes 0
! 1 1
N.Flooring
1,Select FSC Certified Wood Flooring a Resource pts y=yes 0
L2.Use Rapidly Renewable Flooring Materials 4 Resource pts y=yes 0
3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0
4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0
5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0
6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0
1 I 1
Total Points A 1 1401 130E--77
Total Points Project Received: 01 0 0 •
G:datarpmgs/gmenbuildngguidelineshemodelers/greenpdn!sfinal272.04prmededxls
•