Loading...
8461 OFIRE DA IMT CERTIFICATION STATEIENT BEFORE FINAL ELECTRICAL PERMIT No. �7�( BUILDING ADDRESS: DATE: l I certify that before final electrical approval, that a written signed statement by the electrical, contractor who is in compliance with the state licensing law or the owner/occupant, that all electrical cir- cuits have been tested for the following: 1. Grounding conductor continuity. 2. Correct wiring polarity, 3. Overcurrent devices. • 4. Appliances and special equipment. S. G.F.I. circuits. 6. Integrity of wire insulation. The tests required above shall be recorded and shall be made avail- able before final to Building Department. The recorded tests shall be signed and dated by the testor. Additional testing may be necessary on special installations. A determination will be made at time of. final inspection, Owners signature Contractors sigma Owners a ress ontractors is nse Num er ontractors A ress, ity ZZip