08060098 CITY OF CUPERTINO �a�a,��
BUILDING DIVISION PERMIT �COF�TRAG�TOR?�NI`'�QBNIA�.M7ON '
BUIL I G ESS: PERMrr NO.
MANZANITA CT C & C VALLEY CONST 08060098
OWNER'S NAME: PERMR ISSUE DATE
JAIME CARRILLO & ISABELL 2405 KLEIN RD 06/12/2008
terra no SANITARY NO. CONTROL NO.
(408) 238-1244
ARCHITECT/ENGINEER: BUILDING PERMIT INFO
BLDG ELECT PLUMB MECH
O p LICENSED CONTRACTOR'S DECLARATION Ib Description
1 hmby affirm Nn OeSGrI I am licensed under provisions Of Chapmr 9(commencing P
Zx withSefcfion7M(f)ofDivision3ofohBuumasandProfessionsCode,atWmylicemeu OUTSIDE GAS LINE FOR FIREPLACE & BBQ
n< tali forte ande !'P�br
j Licence Class Lk.M
=p Dal[ Convaclar
RCHItECIM DECLARATION
�y 1 undasatand my plats shall h used a public mcmds
JyU
g
Licensed professional
3 OWNER-BUILDER DECLARATION
iI hrtby affirm that 1 am acmpt from the Conlmeto's license Law for Ile
a O following moon.(Section 7031.5,Business and Professions Code:Any city or county
$fLi which.quires a permit b contract.eller,impur e,dare.ILah,nr repair any su mum,
_iy prior b is issuance.also requires the applicant for such pernitto file a signed statement
s< that he isliccmed pursuant On Ne provisions of NC Conmetori License Law(Chaper9 Sq.Ft. Floor Area Valuation
yF- (commencing wire es
section 7000)of Division 3 of the Business and professions Core)or $500
f 5$^ Nu h u exempt therefrom and de India for Use alleged exemption.My violation of
Section 703L5 by airy applicant for a petmiuubjects the applicant in a civil penalty ofNumber Occupancy
.1 mart dun five hundred dollars 450y. 34261007 ? Parc Y Type
0I,uowner oflh pmperty,mmY employes will wage ssteir sale compewtion,
wig do Ne work and Neswctub h netkrended ar.Rertd tarsale(Sec.7014.Rea maS
and Procasiam Cade:Th CanuacanrS Limns,law duo net apply in an axis of Required Inspections
property w ho builds m im prows tie....and who does such want himself.,through his
two employes,provided dust such improvements are not initiated OroRered for We.R.
however,the Wilding or improvement i Sold within one year of completion,Ne owner.
builder will have Ih Nudes of proving tut h did not build m'regrow far of
le
J.
❑ nen of the pm.7(d..B exclusively contracts :)Th.Cmower's U. T
cUtmrtml Ne tt(Se[.7004.Business am am CadaO Th Coowebrs I.i. L
pers"
comma law docs no ban ower o(p Y who builds or improve Merton,and
whocordrscufarsuchp with bKs)licenxd punuanlmthe eanvmlars
I.kens law.
❑lam eumpl un ,R&P C f NNis/evon'
Oa g"WORKERS MPENSA ONDEC O
1 herby a(ftrm ande,Krulty of perjury one of date following six one
❑I have and will maintain aCcnifiamof Consent to self-insure forworYees Compcn.
sarion.in provided for by section 37M of the Labor Cade,for the performance of tie
work which Nu permit is issued.1 haw and will maintain Wmkcrs C.mpensallon Insurance,as mquimd by Section
37000 to labor Code.for the performance of lis were for which Nu permit Is id. '
My Workers C pe an Insurance artier and Policy number
Cartier. Polity No.:J8N
ERT• ATE OF EXE ON FROM WORKE
COMPENSATION INSURANCE
(ITU xNon need not h completed if the permit is Were hundred dollars(SIM)
or leu)
I certify that in to performance of the won for which this permit is;used,I dull not
employ any person in any manner an u On become subject to Ih Workers'Compensation
laws of Califomia Das
AMU.,
NOTICE TO AMUCANT:IL after making this Ccnifreale of Eaempdon.you should
becorne Subic"in the Wtrk[ra Compensation pmvhiom of Ih IaWw Code.you mom
.J z forthwith comply wit such provisions or this permit&hall be deemed rev.kcd,
?O CONsrRucrION LENDING AGENCY
f+ I hrchy alfinn that then is a crosuuctinn lending agency for the peffurmena of
ork
a the wfor which this Permit Is Land(Sm.3099,Civ.C.)
nc
Q Laers Name
0.. z laAdd.[es Add
V Q 1 certify that I Mw rail this application and sue dm Use Show information is
In^ mnctt 1 agree t comply with all city and county ordinances and Some laws relating b `
.0 SV^ building c.muuction.and hemby antorim repmaenudws oftu city to merupon to
LQ ahw-mentioned property for lex a which mpurpecis
gL (we)agree to ssw,indemnify and kap hatmlea 0e City of Cupertino against
Z incoieameram fh•e.auaM espema which may us my way sense against aid City
t)z inconsequence of the BantinB of this permit.
APPLICANT UNDERSTANDS AND WILL COMPLY WITH A NON-POINT Issued by:%V�
Date ^ Fj
so cu �narvs. S ' /", (� Re-roofs
Shgnat Applo��aWCone"con ,/ Dab d
HAZARDOUS MATERIALS DISCLOS EType of Roof
Will tie applicant or future building amupantatorc ar M1andle hams dons msmrial
ss defined by tie Cupeniw almocipyl Coda.ChAMS 9.12.and tri HalthaM safety
Code,Section 35532(3)7
❑vex �_'N/
All roofs shall be inspected prior to any roofing material being installed.
Will the applicant or future building Occupant use equipment or devices which If a roof is installed without first obtaining an inspection,I agree to remove
emh haardnm sir cmtaminants ss da d by to Bay Area Air Quality Management all new materials for inspection.
District?
❑Yes Nu
I have mad the ha»Sdms mamriabmquimmens under Chaper6.95 of the Califon
ria Health&SafetyCade Sm6ons 35505,25533 and 25534.1 understand rhatiflle building
does WE cunendy haw a eehne that a h my r onsiOM Y b rion the omupanr Of de C
myaiaa ens whkhmuaticompriormiauan mraccrtiE e.faawey. Sign eof Applicant Date
Own utori.'d agent �m All roof coverings to be Class'%¢.'or better
CITY OF CUPERTINO
•5 ITEMS OF 5 PERMIT RECEIPT OPERATOR: patg
COPY # 1
Sec : Twp: Rng: Sub: Blk: Lot:
APN . . . . . . . . .. 34261007 . 00
DATE ISSUED. . . . . . . : 06/12/2008
RECEIPT #. . . . . . . . . : BS000005107
REFERENCE ID # . . . : 08060098
SITE ADDRESS . . . . . : 10458 MANZANITA CT
SUBDIVISION . . . . . . .
CITY . . . . . . . . . . . . . : CUPERTINO
IMPACT AREA . . . . . . .
OWNER . . . . . . . . . . . . : JAIME CARRILLO & ISABELL SUARE
ADDRESS 10458 MANZANITA CT
CITY/STATE/ZIP . . . : CUPERTINO, CA 95014
RECEIVED FROM . . . . : JOE S COTA
CONTRACTOR . . . . . . . : JOE COTA •LIC # 24388
COMPANY . . . . . . . . . . : C & C VALLEY CONST
ADDRESS . . . . . . . . . . : 2405 KLEIN RD
CITY/STATE/ZIP . . . : SAN JOSE, CA 95148
TELEPHONE . . . . . . . . : (408) 238-1244
FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ------------- ---------- ---------- ---------- ---------- ----------
1BPWSVCS WATER SERVICE 1. 00 20 . 40 0 . 00 20 . 40 0 . 00
1BUSLIC FLAT RATE 1 . 00 110 . 00 0 . 00 110 . 00 0 . 00
1PGASRES OUTLETS 1 . 00 61 . 19 0 . 00 61 . 19 0 . 00
1PPERMITFE FLAT RATE 1 . 00 40 . 79 0 . 00 40 . 79 0 . 00
1TRAVDOC FLAT RATE 1 . 00 40 . 79 0 . 00 40 . 79 0 . 00
---------- ---------- ---------- ----------
TOTAL PERMIT 273 . 17 0 . 00 273 . 17 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
----------------- --------------- --------------------
CREDIT CARD 273 . 17.- MC
--------------- ..,
TOTAL RECEIPT 273 . 17 '
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
-------- ---------------------------- -------- ----------------------------
106 SEWER & WATER 301 ROUGH PLUMBING
507 FINAL PLUMBING
•
o,�o�o oo 9j
CITY OF CUPERTINO
REPIPE/SEWER/MAIN SERVICE
• CUPEkTINO PERMIT APPLICATION FORM
AP Ll,g &/
(q0 7g ft, NL(+m)LT � Date: /2
Building Address:
L C) ii t5 gQ�
Owner's Name: Phone#:
i AA-4 co (\�k i' 0 6SQ s-
Contrac or: 11 Phone#:
C- :. e UOQ l ' e✓ C&,Y� Fax #: OF 2
Contact: Phonee/#:
g Cr, Fax #L t�� 6�1� � p.72
11
Contractor License#:
Cupertino Business License#:
Job Description:
G
Residential Commercial Q
Valuation: Ay
Green Building: Please complete relevant portion of the Green Building Checklist & attach it to the
application or if applicable, include in plan set & the sheet index.
Quantity Fee ID Fee Description Fee Permit Type
Grou
1PCSEWER Commercial building P 1CPSS
sewer/sanitary sewer
1BPREPIPE Commercial re-pipe per fixture P 1CPRP
1 PGASCOM Commercial Gas Piping System P
1-4 Outlets
1BSEISMICOM Seismic Commercial P
/ 1BSEISMICR Seismic Residential P
1PRSEWER Residential building P 1RPSS
sewer/sanitary sewer
CITY OF CUPERTINO
..... REPIPE/SEWER/MAIN SERVICE
CUPEkTINO FEE SCHEDULE
Quantity Fee ID Fee Description Fee Permit Type
Group,
1PRREPIPE Residential re-pipe per fixture P 1RPRP
1BPWSVCS Water Service P 1CPWS or
1RPWS
1PPRSEWG Private Sewage Disposal System P
1 PCESS Cesspool P
1BPWATER Install/alter Water Pipe P
1 BPFIXTURE Plumbing Fixture P
J I PGASRES Residential Gas Piping System P
1-4 Outlets
1 BPGAS Gas Piping System 5+ Outlets P
1PPERMITFEE Plumbing Permit Fee Issuance P •
1 PLMBLNCK Plumbing Plan Check P
1PLMBINSP Other Plumbing/gas Insp. P
/ 1TRAVDOC Travel & Documentation Fee B
/ 1BUSLIC Business License B
•
Green Building Plan Check
Index of Green Building Points/Categories
A. Category Example of an Index or Table of Green Plan Sheet or Page Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
A.
B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points
1 . Permeable Pavin Note L-1 2 points
C. Foundation 1tUse5 % Flyash Concrete, (note) S-1 5 points
D. Structural 3Wood I-Joist, (See Spec.) S-2 2 points
5russ with heels, (detail) S-2 2 points
6B Sheathing, detail S-2 2 points
E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points
F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 2 points
11. A 2500 Gal. Tank, (Note/Spec L-1 10 points
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Energy Star Refrigerator, (Note/Spec. A-3 1 point
P. Other 1. List Green Features on Plans A-1 1 point
TOTAL POINTS1 40 points
•
•
Plan Review Process Work Book Page-12-Revised 3/25/08
Green Points Rating System for Remodeling Projects
• Due to the diversity of remodeling project types,assigning a"total points'value to a project to be considered environmentally friendly is
not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for"greening"your project.
A.Site
1,Recycle Job Site Construction&Demolition Waste
65%=t point;75%= 2 points;80°%=4 points I up to 4 Resource pts 0
2.Salvage Reusable Building Materials 4 Resource pts y=yes 0
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y=yes 0
4.Protect Native Soil 2 Resource pts y=yes 0
5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0
6.Implement Construction Site Stormwaler Practices 2 Resource pts y--yes 0
7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0
B.Design Resource-Efficient Landscapes and Gardens 4 Resource pts y--yes 0
9.Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yes 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0
1
B.Foundation 1 1
• 1.Incorporate Recycled Flyash in Concrete
25%Recycled Flyash=2 points;Add 1 point for every 10%
increase of Flyash,up to 5 points up to 5 Resource pts 0
2.Use Recycled Content Aggregate 2 Resource pts y=yes 0
3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes 0
1
C.Structural Frame 1 1
1.Substitute Solid Sawn Lumber with Engineered Lumber 3 Resource pts y=yes 0
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0
3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0
4.Use Web Floor Trusses 2 Resource pts y=yes 0
5.Design Energy Heels on Trusses 6"or more 2 Energy pts y=yes 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0
7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0
8,Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0
9.Use Structural Insulated Panels(SIPS)
a.Floors 3 Energy pts y=yes 0
b.Wall 3 Ener is
c.Roof gyp y—yeS 0
3 Energy pts y=yes p
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0
�1.dse 0SB --
• a.Subfloors 1 Resource pt y=yes0
b.Sheathing ( 1 Resource pt y=yes 0
.Exterior Finish INPUT ReSOUTCeS Energy IAQ/Heafth
1.Use Sustainable Decking Materials •
a.Recycled content 3 Resource pts y=yes 0
b.FSC Certified Wood 3 Resource pts y=yes 0
2.Use Treated Wood That Does Not Contain Chromium Arsenic 1 IAQ/Health pt y=yes 0
3.Install House Wrap under Siding 1 IAO/Health pt y=yes 0
4.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0
E.Plumbing
1.Instal WaterHeater Jacket 1 Energy pt y=yes 0
2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes D
3.Retrofit all Faucets and Showerheads with Flow Reducers 1
a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0
b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0
4.Replace Toilest with Ultra-Low Flush Toilets
(1 point each,up to 3 points) J Up to 3 Resource pts.0 0
5.Install Chlorine Filter on Showerhead 1 IAQ/Health of y=yes 0
6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0
7.Install Water Filtration Units at Faucets
(2 points each,up to 4 points) Up to 4 IAQ/Health pts. 0
8,Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes 0
1 1 1
r.ciectncar
11.Install Compact Fluorescent Light Bulbs(CFLs)
(�6 bulbs=2 points,10 bulbs=3 points,12 bulbs=4 points)_J Up to 4 Energy pts. 0 •
2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to
5 points) Up to 5 Energy pts. 0
3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0
4.Install High Efficiency Ceiling Fans with CFLs
(1 point each,up to 4 points) Up to 4 Energy pts.1 0
1 1 1
G.Appliances
1.Install Energy Star Dishwasher 1 Energy pt es 0
2.Install Washing Machine with Water and Energy
Conservation Features + 1 Energy pt y=yes 0
I3.Install Energy Star Refrigerator 1 Energy pt y=yes 0
4.Install Built-In Recycling Center 3 Resource pts y=yes 0
H.Insulation
1,Upgrade Insulation to Exceed Title 24 Requirements
a.Walls 2 Energy pts y=yes 0
b.Ceilings 2 Energy pts y=yes 0
2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0
3.Install Recycled-Content,Fiberglass Insulation with
No Added Formaldehyde 3 IAQ/Health pts y=yes 0
4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes
5.Use Cellulose Insulation
a.Walls 4 Resource pts y=yes 0
b.Ceilings 4 Resource pts y=yes 0
6.Alternative Insulation Products(Cotton,spray-foam)
a.Walls 4 Resource pts y=yes 0
o.uemngs 4 Resource pts y=yes 0
' INPUT Resources Energy IAD/Health
1.Windows
• il.lnstall Energy-EfficW
ientt indows
a.Double-Paned 1 Energy pt y=yes 0
b.Low-Emissivity(Low-E) 2 Energy pts y=yes 0
c.Low.Conductivity frames ___ 2 Energy pts y=yes 0
2.Install Low Heat Transmission Glazing 1 Energy pt y=yes D
t 1 1
J.Heating Ventilation and Air Conditioning
1.Use Duct Mastic on All Duct Joints 2 Energy pts y=yes D
2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0
3.Vent Range Hood to the Outside 1 IAO/Health pt y=yes D
4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 0
5.Install Solar Attic Fan 2 Energy pts y=yes 0
6.Install Attic Ventilation Systems 1 Energy pt y=yes 0
7.Install Whole House Fan 4 Energy pts y=yes 0
B.Install Sealed Combustion Units
a.Furnaces 31AQ/Health pts y=yes 0
b.Water Heaters 3 IAQ/Health pts y=yes 0
9. Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy pts y=yes 0
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0
11.Install AC with Non-HCFC Refrigerants 2 Resource pts y--yes 0
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0
• 13.Retrofit Wood Burning Fireplaces
a.Install EPA certified wood stovesfinserts 1 IAO/Health pt y=yes 0
b. Install/Replace Dampers 1 Energy pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filter 41AQ/Health pts y=yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 51AQ/Health pts y=yes 0
17,Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes p
1 1 1
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0
2.Install Solar Water Heating System 10 Energy pts y=yes 0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4.Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=1 B points) Up to 18 Energy pts 0
16.Select Safe and Durable Roofing Materials 1 Resource t es 0
7 Install Radiant Bamer -- y_y
3 Energy pts y=yes 0
I 1 1
L.Natural Heating and Cooling
1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0
2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes 0
3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0
• 1 1 1
INPUT Resources Energy 1AWHeafth
.Indoor Air Qua Ity and Finishes
t Use Low/No-V0C-Paint AQ Health pts y=yes 0 •
2.Use Low VOC,Water-Based Wood Finishes J 2 IAQ/Health pts y=yes 0
3.Use Low/No_VO C Adhesives 3IAQ/Health pts y=yes 0
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 61AQ/Health pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAO/Health pts y=yes 0
7.Seal all Exposed Particleboard or MDF T ; 4IAQ/Health pts y=yes 0
8.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0
10.Install Whole House Vacuum System 31AQ/Health pts y=yes 0
1 1 1
N.Flooring
1.Select FSC Certified Wood Flooring 8 Resource pts y=yes 0
2.Use Rapidly Renewable Flooring Materials _ + 4 Resource pts y=yes 0
3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0
4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0
5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0
6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0
1 1
Total Points Available: 14011301 57 •
Total Points Project Received: 1 01 0 0
G:daWprogsrgraenbulldln9guidelineshemodelers/greenpointslinal2.12.04proieded.xls
•
Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone(408)777-3228
CITY OF
&UPERTINO Fax(408)777-3333
Building Department
JOB ADDRESS: PERMIT #
16HC r Ckc�E D07FS
OWNER'S N PHONE # O$ 238 2 L
GENERAL CONTRA OR: AX # tqab 2
31t
I am not using any subcontractors: {s' � ' �-
Signature Da e
Please check applicable subcontractors and complete the following information:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
D;th&-
' r1
Owner/Contractor Signature ate
Ward Manufacturing
Training Certificate
4his is to cert that
Eduardo J. Garcia .®
10458 mansanita ct
Cupertino, ca
Permit# 08060098
•J �y WARD MANUFACTURING
Training Cerff icate
This is.ro certify that
Eduardo J.Garcia
has saccessfuily comyletedrh&
lNA7tDFLEX qwrallatij Trainin Sesfian.
r
11th MaFcn 31 2003 Ward%lanufacwrinD Inc
x
....--•.y.. Mme+,.__ ..
.y.-r.sly.Y+ecc.�-.-.y:.a::•..v_'�:C+�:.�'vav-
Q �0 6ov q�
�6•