Loading...
14705 POST THIS CARD NEAR FRONT OF BUILDING PERMIT NUMBER CITY OF CUPERTINO 14705 INSPECTION DIVISION • JOB INSPECTION RECORD PERMIT EXPIRATION JOB ADDRESS 10181 EMPIRE UNIT# LOT# PERMIT EXPIRES IF WORK OWNER J. TORRES CONTRACTOR CLARKE PLBG/HTG. IS NOT STARTED WITHIN INSPECTION DATE INSPECTOR INSPECTION RECORD 100 DAYS OF PERMIT ISSU ANCE OR 180 DAYS FROM FOUNDATION NOTE: LAST CALLED INSPECTION. UFER ALL GRACING AND DRAINAGE SHALL BE INSTALLED TO COMPLY WITH THE APPROVED PLANS AND CITY OF PERMIT VALIDATION PREGUNITE CUPERTINO STANDARDS. GARAGE SLABS POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED UNDERGROUND /SLAB PLUMBING ELECTRICAL ISSUANCE DATE SLUG ELECT. PLG. MECH MECHANICAL O El E] D ❑ 00 NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNEDBUILDING PERMIT 1 INFORMATION - WOOD FLOOR VALUATION S/FT. PLUMBING y MECHANICAL C1D0 PERMIT i0 ELECTRICAL FRAMING STORIES TYPE CONSTH INSULATION OCG GROUP RES UNITS PLACE NO SUBFLOOR UNTIL ABOVE HAS BEEN SIGNED • su.Fr FtooR AREA TOTAL Aw EAGE ROOF NOTE:NO FINAL INSP.SHALL BE MADE BEFORE DIAPHRAGM THE CONSTRUCTION TAX IS PAID BUILDING USE ROOF SHEATHING RES IND CON PR o, ' APPLY NO ROOFING UNTIL ABOVE HAS BEEN SIGNED FINALS DATE INSP. ❑ ❑ ❑ ❑ ❑ ASSESSORS PARLE L NO ROUGH SANA PLUMBING ELECT.ENERGY TRACT No, PARCEL No. TUBS 8 SHOWER PAN PLUMBING ENERGY MECHANICAL MECR ENERGY ELECTRICALBUILDING ENERGY ACC DATE ACL FILE NO FRAMING ELECT.FINAL TEST ZONING ENG,SITE NO. INSULATION PLUMBING GAS TEST s'41 GAS �/7� FIRE SPOINK ENERGY"T-]< MECHANICAL Y ❑ N❑ Y ❑ N❑ COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED HEATING . EXTERIOR SHEAR ELECTRICAL RELEASE FLOOD ZONE ALU.0 INTERIOR SHEAR FIRE DEPT. ❑ N❑ Y ❑ N❑ SHEETROCK GRADE FEE SUMMARY _• .'„ EXTERIOR LATH BUILDING INTERIOR LATH TEMPORARY APPROVALS BUILDING SCRATCH COAT ELECTRIC PLAN CHECK GAS ( ZD #-/7 FEE NO TAPE OR PLASTER UNTIL ABOVE HAS BEEN SIGNED OCCUPANCY SEISMIC FEE I OCCUPANCYOF BUILDING ISNOTPERMITTED UNTILBUILDING FINALISSIGNEDBY BUILDING INSPECTOR, MICROFILM ARRANGE FOR INSPECTION BY PHONING 252-4505, ELECTRIC o� ONE WORKING DAY BEFORE REQUIRED INSPECTION. PLUMBING r z PLEASE GIVE JOB ADDRESS WHEN PHONING. — SEE PERMIT FOR EXPIRATION DATE — MECHANICAE IMPORTANT! conTsT. TAX PLEASE READ REVERSE SIDE BEFORE TOTAL CALLING FOR FINAL INSPECTION. OFFICE COPY