16179 POST THIS CARD NEAR FRONT OF BUILDING
PERMIT NUMBER
CITY OF CUPERTINO 16179
INSPECTION DIVISION
JOB INSPECTION RECORD
• _ '/�� PERMIT EXPIRATION
JOB ADDRESS .� S- (.mac i�c �� UNIT# _LOT#
?" PERMIT EXPIRES IF WORK
DINNER J_S w:LL CONTRACTOR IS NOT STARTED WITHIN
INSPECT ON DATE INSPECTOR INSPECTION RECORD 180 DAYS OF PERMIT ISSU-
ANCE OR 180 DAYS FROM
FOUNDATION O _10- NOTE: -
UFER ALL GRADING AND DRAINAGE SHALL BE INSTALLED LAST CALLED INSPECTION.
TO COMPLY WITH THE APPROVED PLANS AND CIN OF PERMIT VALIDATION
PREGUNITE CUPERTINO STANDARDS. _
GARAGE SLABS
n
POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED /),6 ' S- @r/^IY7ty` OQa �
UNDERGROUND /SLAB
PLUMBINGMCI-
ELECTRICAL 1 w ISSUANCE DATE
MECHANICAL BLDG ELECT PLG. MECR.
J MU t" ❑ ❑ 1 ❑
DD NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED BUILDING'PERMIT,y,g�?,
WOOD FLOOR _ INFORMATION;:-- z,�:
VALUATION SIFT.
PLUMBING 3 C
MECHANICAL
ELECTRICAL PBRo.m TO
FRAMING L
INSULATION STORIES TYPE CONSTR,
UCC GROUP RES UNITS
PLACE NO SUBFLOOR UNTIL'.ABOVE HAS BEEN SIGNED
ROOF SO FT,FLOORAREA TOTALACREAGE
•f DIAPHRAGM
THE CONSTRUCTION TAX ISLPAID MADE BEFORE
BUILDING ON USE
ROOF SHEATHING Is IND coN Pe Um"
APPLY NO ROOFING UNTIL ABOVE HAS BEme
S,: '- DATE INSP. ❑ ❑ ❑ ❑ ❑
ASSESSORS PARCEL NO
ROUGH
PLUMBING GYTRACT NO PARCEL NO
TUBS&SHOWER PAN ERGYMECHANICAL YELECTRICAL ACC.DATE ACC.FILE NO
ERGY
FRAMING G01+L `- b_6 ELECT.FINAL TEST
INSULATION PLUMBING ZONING ENG SITE No.
GAS TEST GAS
FIRE SPRINK ENERGY i]<
MECHANICAL Y ❑ N❑ Y [3 N[:COVER NO WORi<UNTIL ABOVE HAS BEEN SIGNED HEATING
EXTERIOR SHEAR ELECTRICAL RELEASE FLOOD ZONE A,L UC.
INTERIOR SHEAR FIRE DEPT. Y❑ D ` ❑ NC
SHEETROCK GRADE
FEE SUMMARY
EXTERIOR LATH BUILDING qty
INTERIOR LATH TEMPORARY APPROVALS BUILDING62
SCRATCH COAT ELECTRIC FEE CHECK
GAS
NO TAPE OR PLASTER UNTIL ABOVE HAS BEEN SIGNED occuPgNcv SEISMIC FEE S�
OCCUPANCY OF BUILDING IS NOT PERMITTED UNTIL BUILDING FINALISSIGNED BY BUILDING INSPECTOR. MICROFILM
ARRANGE FOR INSPECTION BY PHONING 252-4505, ELECTRIC
'
U.1 ONE WORKING DAY BEFORE REQUIRED INSPECTION. PLUMBING
Z PLEASE GIVE JOB ADDRESS WHEN PHONING.
— SEE PERMIT FOR EXPIRATION DATE — MECHANICAL
IMPORTANT! CONST.TAX
PLEASE READ REVERSE SIDE BEFORE TOTAL
CALLING FOR FINAL INSPECTION.
OFFICE COPY