Loading...
08090021uW' OpF �ZuZ� =Z iq of-yC� �to 5.0� C �0C IRE _2> CITY OF CUPERTINO L�����sa,,��T '►Qa�,�S�x.T�.tF}yO lYy �AVii BUILDINGDIvISION Pl`.S�1Y111 waC�t\ull�l4 BULKING'' ..I off hR:rDGE PARK CT CASTILLO'S ROOFING PERMIT NO. 08090021 OWNER'S NAME: PERMIT ISSUE DATE !',NGEI.RAN PNINA AND ELI 1703 CATHAY DR 09/04/2008 Ng (408)251-3565 SANITARY NO, CONTROL NO. ARCHI ECTYENGINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MECH LICENSED CONTRACTOR'S DECLARATION - OeSCrIp Ib Description 1 hereby affirm that 1 am licensed under Provisions prompter 9 (commencing with Section 7") ofDivision 3ofdte Business and Professions Code, and my license is RE -RF 'RMV OLD RF & INSTL $30LB FLT&GAF COMP th full force and efree -9 License Clau SHNGLS Dam - CHTBCTSDEC` yN CLS A 19SQ I undersand my pWs sl I M ound as pts tic Ida . Licensed Profeaiona OWNER -BUILDER DECLARATION 1 hereby M. that 1 am exempt from the Contraeroes License Law for ale following mason. (Section RD 1.5, Business and Profeasuns Cole: My city or county - which nequires •permit an construct, alun. improve. demolish. M repair any suucturd ! priorm its issuance, also requires theapplicant formch permit to rile a signed summcns that he is licensed pursuant to the provisions of the Comsmmri UmMc Law (Chapter 9 Sq. Ft. Floor Area Valuation (commencing with Section 70(30) of Division 3 of the Business and Prorrsions Coda) M $9500 that he is exempt thamrmm and the bases for she alleged uemptim My Halation of 36652051 fiff Number Occupancy P y 1Ype Secton 7031.5 by any applicant for a porous subjects the applicant to a civil penalty of nos more man five hundred dollars ({5)0). ofnd pressruc Mmy wpmycm Or wgnasthe'San. a Lo ' .Beams will dothesict. andt ran ContisnmmmndedMaw clo Tartanpply race, Beams thewo offered and ons Cost Tm ContrmmYi License Law dam ms apply m an awMr Required Inspections arty wh Mthmu{h his propertywhobuilds insphaseschicon,andwm anusstilt work is oroffi awn rte, provided seas such improvements am not intended oroRmed fns i ver. th owner. or wide did one Weld ofimproefarmeowner- buwder, inbuildinguimprovementg milGr win have the burden of proHng mat Ins did not beim M improve far purpose of uk.). ❑ 1. as owner or tiro prurient, am exclusively contracting with Rcan ed mnummrs m srortsms-s the project (Sec. 1000, Business and Rogesdons Code) The Ccauacm/s Li- . cumse Law cons Out apply m an owner of property who builds or improves thereon, and who contracts for such pmjcm with a conhrmmr(s) [!caused purstant m the Contrames License taw. ❑ Iammemprunder See .R&PCfmmiswon Owner Data WORKERS COMPENSATION DECLARATION 1 thereby afRm under penally of pecjusy one of the following declarations: . love and will maintain a Cmificeleof Consent to self-lmum for WmYees Cout , as provided for by Section 3100 of the Labor Code. for the performance of the wort for which this permit is issued. ❑ 1 have and will mainWn Worsens Compensation I... u required by Section 3700ofthe Labor Code. to, the performanceafthe were for which this pcmtit is issued. ' MY Wahefs Compensation Iwrance cash aM PWlry number Ita�e: �y5 /� Camcn._!: gf 1--ynQ Policy No.��A DI1 r/T T CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE (Thusectmn need not be completed if the permit is foroac mndrad dollars (SIM) 1 certfy ems to the performance W the work for which this permit is issued, [ shall apt employ anypenon in my manner¢ as to become subject to the Workers' Compensadon laws of Califoroit Data Appfisam NOTICE TO APPLICANT: If, after making this Certificate of Exemption, you should become subject to the Worker! Compensation provisions of the laser Cade, you am ermwith comply with such Proviso. or this permit c1W I he decmW revoked. CONSTRUCTION LENDING AGENCY 1 ser Wr them u c lemm�{ agertry fns Ins pertomarice of whaRrm work for which Thu pemhit is issued (Sec. 7WT, Civ. C.) s d (Sce. 30 , Lo Ltnder's Name Lender Address 1 cenlfy that 1 have mad :his applicuion and sum tha the above information is COMCL I asma On comply with all city and county ordinances and sole laws relating to Wilding coruvecton. and thereby authpriae representatives of this city to on= upon the above-mantoMd property fm inspection purymea (we) agree to cent, indemnify and hicp harmless the City against Wgmenu cents and eapcusm which may in any way aarntagairm std City n e Mainst l in in cortstyuence of the {tantin{ of Nu permit. APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON -PO SOURCEREGU Issued by: Date Re -roofs / of pelican Canusehor Da HAZARDOUS MATERIALS DISCLOSURE Type of Roof .�/ the applicans or future Wilding aeupml Mie M mMk haysdom materia U derived by the Cupertino Mtenciipal ode. Chapter 9.11. and the Health and Safety Cale, Schon 25531(x)+ El Yu All roofs shall be inspected prior to any roofing material being installed. Will thea Brent or rut It Id' or devices which pp pant use equipment Avardpm If a roof is installed without first obtainingan inspection, I agree to remove P g al, emumimn a d br ale eat Aroaar owny Management Qu all new materials for inspection. aT ❑Yrs ❑No , I have road the hvandwsmaeriaumquimmmuunderCmpler 6.95 ofthe Caifen. vis Hmldh&Safety Com. Smater 355W, 25533 and 25530.1 undcrsund thaif ale building dons rapt currency ha a anL der, it u my unporsbilitY m entry cele nectpanla Ule mquhcmerus whit bedletpriM o!a 'Txale of y Signature of Applicant Date All roof coverings to be Class'W' or better Owmcr1(atA1h22fd.gcm1 Date 2 :ITEMS OF 2 • CITY OF CUPERTINO PERMIT RECEIPT Sec: Twp: Rng: Sub: Blk: Lot: APN ........: 36652051.00 DATE ISSUED.......: 09/04/2008 RECEIPT #.........: BS000005995 REFERENCE ID # ...: 08090021 SITE ADDRESS .....: 11652 BRIDGE PARK CT SUBDIVISION ....... CITY CUPERTINO IMPACT AREA ....... OPERATOR: patg COPY # : 1 OWNER ............: ENGELMAN PNINA AND ELI ADDRESS. ..........: 11652 BRIDGE PARK CT CITY/STATE/ZIP ...: CUPERTINO CA, 95014-5100 RECEIVED FROM ....: CASTILLO'S ROOFING CONTRACTOR .......: JOSE CASTILLO LIC # 25850 COMPANY ..........: CASTILLO'S ROOFING ADDRESS ..........: 1703 CATHAY DR CITY/STATE/ZIP ...: SAN JOSE, CA 95122 TELEPHONE ........: (408)251-3565 • FEE ID UNIT QUANTITY AMOUNT PD -TO -DT THIS REC NEW BAL IBSEISMICR VALUATION 9,500.00 1.00 0.00 1.00 0.00 IREROOFRES SQ FEET 19.00 247.00 0.00 247.00 0.00 TOTAL PERMIT ---------- 248.00 ---------- ---------- 0.00 ---------- 248.00 0.00 METHOD OF PAYMENT ----------------- CHECK TOTAL RECEIPT : AMOUNT --------------- 248.00 --------------- 248.00 VOICE ID DESCRIPTION -------- ---------------------------- 601 ROOF TEAR OFF 604 ROOF IN -PROGRESS REFERENCE NUMBER -------------------- #15316 VOICE ID DESCRIPTION -------- ---------------------------- 602 ROOF PLYWOOD NAIL 605 FINAL REROOF ' ; too TY OF •FUPEkTINO CITY OF CUPERTINO REROOF PERMIT APPLICATION 0$Oq C)C),-�,( APN # Date: , Building Address: ' I S n Owner's Name: a Phone #: / p / Gf l �a kX % vQ " U� O / Contractor: C ��� Phone #: N L S Fax #: Cupertino Business License #: Contractor Li ense #: 3� S� Type of Roof Covering: Existing: Proposed: ❑ Built -Up Roof ❑ Bui t -Up roof Shingles �o phalt sphalt Shingles ood Shakes o Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other (Specify) ❑ Other (Specify) Nu�b er of existing coverings o Provide I.C.B.O. Report # g/T o be Removed ❑ Provide Mfgr. Installation Specs. Job Description:-, k Q-eX e- o I CL P_U-0 __Tn�' IJ�b FE_ i J 1 Zf Residential Commercial Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: El applicable, include in plan set & the sheet index. Valuation: and Will Comply with Cupertino's Tear -Off Policy: Revised 6/16/08 CI OF CUPEkTINO CITY OF CUPERTINO REROOF FEESCHEDULE • Number of Squares Fee ID Fee Description Fee Group Permit Type 1RER00FC0M Re -roof Commercial B 1COMMLROOF 1BSEISMICO Seismic Commercial B 1RER00FRES Re -roof Residential B 1SFDWLROOF 1BSEISMICRE Seismic Residential B 1RER00FMRES Re -roof Multi -Family B IMFDWLROOF 1BSEISMICRE Seismic Residential B 1BUSLIC Business License B Revised 6/16/08 J • Community Development Department ' Building Division City of Cupertino • 10300 Torre Avenue Telephone: (408) 777-3228 Fax: (408) 777-3333 Building Department Subject: Re -roofing policy for the City of Cupertino 1. Prior to permit issuance, you must agree to comply with 2007 IBC Standards and manufacturers specifications on re -roofing. All roofs are Class "A" per Cupertino municipal code 16.04.080. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re -roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City, the following steps are required: 1) Pre -inspection and/or tear off approval. 2) In -progress inspection approval. 3) Final inspection approval. • a) Spark arrester installation. 5. If plywood is installed, a plywood nail inspection is required. 6. Any roofing which is applied without first obtaining an inspection,. will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re -inspection fee of $176.18. The re -inspection fee must be Paid before another inspection can be scheduled IMPORTANT. 1. Flat roofs must have a mirumum of I/4 " per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be on the job site at the time on inspection. I understand and will comply with the above stated policy on re -roofing. Homeowner's Name:�.Ar? G} -I- Job Site Address: ZI 6 S_oZ 13 tI p(� jaGv� C Roofing Company Name: /tf % l &Z_0_1 • Applicant's Signature Date: �— U Greg Casteel Building Official Revised 07/30/08 • U Plan Review Process Work Book Page -12-Revised 3/25/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I -Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding,(Note/Spec.)A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Ener Star Refrigerator, (Note/Spec.)A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point TOTAL POINTS1 40 points • U Plan Review Process Work Book Page -12-Revised 3/25/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types, assigning a °total points" value to a project to be considered environmentally friendly is . not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for "greening" your project. 114PUT Resources Energy IAG/Heafth A. Site Vit. Recycle Job Site Construction & Demolition Waste 65%=1 point; 75%= 2 points; 60%= 4 points + up to 4 Resource ;2_ Salvage Reusable Building Materials _ 4 Resource pts y- 3. Remodel for Mixed Use, Adaptive Reuse, and 2. Use FSC Certified Wood for framing .' Historic Preservation 4 Resource pts y= 4. Protect Native Soil 2 Resource pts y- 5. Minimize Disruption of Existing Plants & Trees 1 Resource pt y= 6. Implement Construction Site Slormwaler Practices 2 Resource pts y= 7. Protect Water Quality with Landscape Design 2 Resource pts y= (B. Dzsign Resource-tfficiantL_ capes and Gardens _ 4 Resource pts y= 9. Reuse MatedaWUse Recycled Content Materials 2 Resource pts y=yes for Landscape Areas 2 Resource pts y=. 10. Install High-Eficiancy Irrigation Systems 2 Resource pts y_ 11. Provide for On -Site Water Catchment / Retention 2 Resource pts y= B. Foundation 3 Energy pts y=yes 1. Incorporate Recycled Flyash in Concrete 4 Resource pts y=yas 25% Recycled Flyash = 2 points; Add 1 point for every 10% 3 Resource pts y=yes • increase of flyash, up to 5 points up to 5 Resource 2. Use Recycled Content Aggregate 2 Resource pts Y=1 3. Insulate Foundation/Slab before backfill 3 Energy pts yq C. Structural Frame (1. Substitute Solid Sawn Lumber with Engineered Lumber - 3 Resource pts 2. Use FSC Certified Wood for framing .' y=yes (For every 10% of FSC lumber used = 2 points, up to 10) up to 10 Resource pts. 3. Use Wood I -Joists for Floors and Ceilings 2 Resource pts y=yes 4. Use Web Floor Trusses 2 Resource pts y=yes 5. Design Energy Heels on Trusses 6" or more 2 Energy pts y=yes 6. Use Finger -Jointed Studs for Vertical Applications 2 Resource pts y=yes 7. Use Engineered Studs for Vertical Applications 2 Resource pts y=yes B. Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 9. Use Structural Insulated Panels (SIPS) a. Floors 3 Energy pts y=yes b. Wall 3 Energy pts y=yes c. Roof 3 Energy pts y=yes 10. Apply Advanced Framing Techniques 4 Resource pts y=yas 11. Use Reclaimed Lumber for Non Structural Applications -— 3 Resource pts y=yes 12. Use CSB - a. Subfloors 1 Resource pt y=yes b. Sheathing • _ _ 1 Resource of Y --yes 1. Use Sustainable backing Materials a. Recycled content 3. Resource pts y=yE b. FSC Certified Wood 3 Resource pts y=yE 12. Use Treated Wood That Does Not Contain ChromiurNArsenic 1 IAQ/Health pt y=yf I3. Install House Wrap under Siding 1 IAQ/Health of y=yE 'I4. Use Fiber -Cement Siding Materials 1 Resource pt y=yes E. Plumbing 1. Install Water Heater Jacket - - - 2. Insulate [Tot and Cold Water Pipes sul '3. Retrofit all Faucets and Showerheads with Flow Reducers a. Faucets (1 point each, up to 2 points) i b. Showerheads (1 point each, up to 2 points) 4. Replace Toilest with Ultra -Low Flush Toilets I I(1 point each, up to 3 points) 5. Install Chlorine Filter on Showerhead 6. Convert Gas to Tankless Water Heater 7. Install Water Filtration Units at Faucets (2 points each, up to 4 points) S. Install On -Demand Hot Water Circulation Pump r. trecmcar I1. Install Compact Fluorescent Light Bulbs (CFLs) (L6 bulbs—_2 points, 10 bulbs =3 points, 12 bulbs = 4 points) 2. Install IC -AT Recessed Fixtures with CFLs (1 point each, up to 5 points) 3. Install Lighting Controls (1 point per fixture, up to 4 points) 4. Install High Efficiency Ceiling Fans with CFLs (1 point each, up to 4 points) 1 Energy pt 2 Energy pts Up to 2 Resource pts. Up to 2 Resource pts. Up to 3 Resource pts. 1 IAO/Health pt y=yes 4 Energy pts y=yes Up to 4 IAQ/Health 4 Resource pts y: Up to 4 Energy pts. 0 Up to 5 Energy pts. 0 • Up to 4 Energy pts. 0 Up to 4 Energy pts. 0 1 1 G. Appliances it. Install Energy Star Dishwasher - - y 1 Energy pt y=yes I2. Install Washing Machine with Water and Energy Conservation Features 1 Energy pt y=yes I3.Install Energy Star Refrigerator 1 Energy pt y=yes �4. Install Built -In Recycling Center 3 Resource pts y --yes H. Insulation 1. Upgrade Insulation to Exceed Title 24 Requirements a. Walls b. Ceilings 2. Install Floor Insulation over Crawl Space !3. Install Recycled -Content, Fiberglass Insulation with !No Added Formaldehyde 4. Use Advanced Infiltration Reduction Practices 5. Use Cellulose Insulation a. Walls b. Ceilings 6. Alternative Insulation Products (Cotton, spray -foam) a. Walls o. uemngs 2 Energy pts y=yes 2 Energy pts y=yes 4 Energy pts Y_—Yes 31AQ/Health pts 2 Energy pts 4 Resource pts 4 Resource pts 4 Resource pts 4 Resource pts • 1. Install Energy -Efficient Windows i a. Double -Paned 1 Energy pt • b. Low -Emissivity (Low -E) 2 Energy pts c. Low. Conductivity Frames 2 Energy pts 2. Install Low Heat Transmission Glazing 1 Energy pt J. Heating Ventilation and Air Conditioning '1. -Use Duct Mastic on All Duct Joints 2. Install Ductwork wthin Conditioned Space 3. Vent Range Hood to the Outside 4. Clean all Ducts Before Occupancy 5. Install Solar Attic Fan S. Install Attic Ventilation Systems 7. Install Whole House Fan S. Install Sealed Combustion Units a. Furnaces b. Water Heaters 2 Energy pts y=yes 3 Energy pts y=yes 1 IAQ/Health pt y=yes 21AQ/Health pts y=yes 2 Energy pts Y --yes 1 Energy pt y=yes 4 Energy pts y=yes 31AQ/Health pts 31AQ/Health pts 9. Replace Wall -Mounted Electric and Gas Heaters with Through -the -Wall Heat Pumps 3 Energy pts 10. Install 13 SEER/11 EER or higher AC with aTXV 3 Energy pts 11. Install AC with Non -HCFC Refdaerants 2 Resource pts 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace 2 Energy pts y=yas 13. Retrofit Wood Burning Fireplaces 3. Pre-Nrre for Future Photovoltaic (PV) Installation 4 Energy pts y= • a. Install EPA certified wood stoves4nserts b. Install/Replace 1 IAQ/Health pt y=yes Dampers 1 Energy pt y=yes c. Install Airtight Doors 1 Energy pt y=yes 14. Install Zoned, Hydronic Radiant Heating 3 Energy pts y=yes 15. Install High Efficiency Filter 4 IAQ/Health pts y --yes 16. Install Heat Recovery Ventilation Unit (H RV) 5 IAQ/Health pts y_=yas 17. Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes K. Renewable Energy and Roofing 1. Pre -Plumb for Solar Water Heating 4 Energy pts y= 2. Install Solar Water Heating System 10 Energy pts y= 3. Pre-Nrre for Future Photovoltaic (PV) Installation 4 Energy pts y= 4. Install Photovoltaic (PV) System (1.2 kw = 6 points, 2.4 kw =12 points, 3.6 kw = 16 points) Up to 16 Energy 6. Select Safe antl Durable Roofing Materials_ _ 1 Resource pt y= _ _ _ 7 Install Radiant Barrier 3 Enerov ots V= L. Natural Heating and Cooling 1. Incorporate Passive Solar Heating 5 Energy pts y=yes 2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts . y=yes 3. Plant Deciduous Trees on the West and South Sides 3 Energy pts Y --yes L J 1. Use Lciw&o-VOC Paint - _ 1 IAQ/Health pts y=yes 2. Use Low VO—C, Water-Based Wood Finishes 2 IAQ/Health pts y=yes '3. UseLowMo VOC Adhesives - _ 3 IAQ/Health pts y=yes 4. Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 5. Use Engineered Sheet Goods with no added Utea Formaldehyde 61AQ/Health pts y=yes 6. Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 7. See all Exposed Particleboard or OF 41AQ/Health pts y=yes B. Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 9. Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 10. Install Whole House Vacuum System 3 IAQ/Health pts y=yes N. Flooring 1. Select FSC Certified Wood Flooring B Resource pts y=yes i2. Use Rapidly Renewable Fldoring Matenal-s - 4 Resource pts y=yes 3. Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 4. Install Natural Linoleum in Place of Vinyl 51AQ/Health pts y=yes 5. Use Exposed Concrete as Finished Floor 4 Resource pts yges 6. Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes Total Points Available: Total Points Project Received: • 1401 130 57 01 0 0 • Com- Gi- D G:daarpmgsrgreen lildingguidelineslremodelersrgmenp�inlsfinal2.12.04pro7ecled.ds 0 4 CITY Of �UPEkTINO I 41 JOB ADDRESS: OWNER'S NAME: GENERAL CONTI Buil a r? r I am not using any subcontract/ Please check anolicable subcontractors De artm PERMIT # PHONE# FAX # Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax(408)777-3333 nt �CoS'- F319 SI'�SCos rmmnlPta tha fnllnwino infnr ma nn - Date Owner/ Contractor Signature Date SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock 'e Owner/ Contractor Signature Date