Loading...
08050084 CITY OF CUPERTINOa:t,--gyp BUILDING DIVISIGN PERAUT kcoINT�RAFC, T.ORINFXORRMAT,I01V PERMITNO. POWNEWS 'Yff 'F AXLEY CT STEVENSON' S ROOFING 08050084 NAMES: PERMIT ISSUE DATE ABA SATHYA 1594 MAIN STREET 05/09/2008 Nr. - (650) 969-5134 SANITARY NO, CONTROL NO. ARCHTIECT/ENGINEEA: BUILDING PERMIT INFO ' BLDG ELECT PLUMB MECH 0 � � 0 moZ, LICENSED CONTRACTOR'S DECLARATION Job Description 1 hereby sffism this 1 we 1'rtenad under provisions of Chapter 9(commencing with Smtion70 )of Division3oflMBusinw Mdprofeuimns Codc,andmyl&cnscis RE-ROOF FINAL; ORIG PERMIT EXPIRED - STEVENSON' S n full for¢and efrnt 'q_ Lic..Clua Lk.0 ROOFING VALID AT TIME WORK DONE r p Dem Conuaemr 7th ARCHITECT'S DECLARATION m u 1 u okossa d my plans shall W used a re public cords Ld ywt; Licensed Pmfuasionel OWNER-BUILDER DECLARATION f I hereby afnmm Net 1 am exempt from the Contactors License Law for Ne p O following mason.(Seedon ss 7031.5.Business;and Prolusions Code:Any city or Monty i$�i which mquiru a Permit In construct,slm..ice crow.xmNLth,or repair any mecum to ph.,to its issuame.slats mgdres Wespplicant for such permit to file asigrcm d statement ££ss� that lit is licensed purowd to the provisions of the Contractors license Law(Chapter 9 Sq.Ft.Floor Area Valuation YFe� (eommencingwith Section 70110)of Division 3 ofthe Bummusand Professions Codc)or $100 _ thd he is counam therefrom and the basis for the alleged!assumption.My violation of Section 7031.5 by any applicant for a permit wbjc=the aPplkauo a civil penalty OfNUmbei Occupancy Type at momthan Anhundred dalhra(SIMI 35606022 P y yp 0 I,u owns of the pmpcny,err mr cmployca with ego u theuwle campenudm, send Pr the wart,and the he Cont armes Livens err a w does t o1a,Business and en,wh ons Cade:The Cantrumn.License who Law dohs rot apply lf an owns err Required Inspections manprocnYwho Weradwel Chat at such uthirnpransursts .at inducuch ed for his sen cmr.me W.pmWxd W ove rent is sold wthin not eat!of c m iwor.me Owner. wsad.if. however.me Wilding or duce a pmMtuhat withinmusWild of compleuaa,drop.of Wilder will have the Wrxn of pmvug Wert K did trot Wild m improve fm pogo¢of . 7. - n Owner of the property,am exclusively contracting with flamed Mnmaetan to construct the project(Sec.70aa,Business and Professions Cade:)The Commuch rs L, Mere law does al appy to M owner of propenr who builds or impmw Woman.and. who contracts for such projects with•comesmor(s)licensed purswnt In the Contractors Liar:Law. 0 lammem t Intim See. — .B&PCfor thus n Owner Dam OS O WORKERS OMPEN9 ECLARATION 01 1 hereby aRnd ren uer penalty of perjury oro of the following declarsuons: have nd awill mainifio maintain a Cem of Consent to sell-insom fawor4YM scomp - ation.u provided for by Section 37M of time Labor Code,for the Performance of use work for which this Permit is Caused 0 1 have and will maintain Wmkees Compensation Insurance.u hummed by Section 3700 ofthe Lunn Cade.for We performance of the wok for which this Permit is issued ' My Workers Compassed.I....urkr and Policy number am: - Carrier. Policy No.: CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE (lhuaccuon reed at be completed if the permit is fmane humdsedxllars(SIM) mkaa) 1«pity that in the perrormavce of dos work for which this Permit is laded.l shill and Implayanyperwninanymarom m Leo c 'u time Workers'Compenauon laws of Califomu.Dam ApplicarnNOTICE � h $. NOTICE TO APPLICANT: f.Caeomalting this sm th ^ tun,on,you sham .J.Obcemne abjcel m the Waiters('mnawuan ermiit imus of the reed Code,you muss faMwithcomply with such pmviaions m Nis permit shall be domed revoked. Z M cONsmucnON LENDING AGENCY _ I hereby affirm that thea u a cotmuucunn lending agency far the pmfmmana of C r�.t the work for which this ward,is issued(Ser.3097,Civ.C.) 0 Lemmen Name z Leaders Addhaa U O 1 certify that 1 bare mad this application and sem ala the salve iu femme is I%, P cmreea 1 agile to comply with all city and county o dindmes and state laws relating a . p building construction,and hereby mthotim rcprownamns of this city m enter upon the r W above-menuamm t property,for inspection purpowhich may , t„t gy (We)agree to ave.indemnify and kap h.rmma Ile City of Cupertino against fI1 IiabilitieyjudgmenW corm and expenses which may th any way act7ue yainsl Cid City U z APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON-POINT Issued by: Date � SOURcE REGULATIONS. /_ 05109 Re-roofs Smgoatuse of Appliun omnwwr ' Daie HAZARDOUS MATERIALS DISCLOSURE Type Of Roof Will the applicdm or I.,.Wilding ottmpent stere Or handle haardou rismrial u @Rned by the Cupertino Municipal Cade.Chapter 9.13.and the Health and Safety cox,sextan s532(a)+ ❑Ins g4 0 All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtainingan inspection,I agree to remove Will the aalinnt or future Wining by the Bl taw equipment or xviaa which P g v ht? air contaminants u x0ned by U¢Bay Arta Air Qumily Mansgcmcnt all new materials for inspection. wtr ct7 ❑ler 0<1 I have read the huand.mamriaumquirc!ems unxrch imer6.95Ofthe Califor- M.Hulth&SafetYCax.Sections V5505,25533 and 755M.1 understand thdlf the Wilding Own not curcntly bow s meant.this it is my eaponubitity to notify mite uecupmt of me reyuyemPnu�a'It mtm tpdor iastonaaf.CerdnMf, Signature of Applicant Date�o �., All roof coverings to be Class'%W'or be tterOwner mwOlunagcm Dam CITY OF CUPERTINO • 2 ITEMS OF 2 PERMIT RECEIPT OPERATOR: pdtg COPY # 1 Sec : Twp: Rng: Sub: Blk: Lot: APN . . . . . . . . . 35606022 . 00 DATE ISSUED. . . . . . . : 05/09/2008 RECEIPT # . . . . . . . . . : BS000004717 REFERENCE ID # . . . : 08050084 SITE ADDRESS . . . . . : 22023 BAXLEY CT SUBDIVISION . . . . . . . CITY . . . . . . . . . . . . . : CUPERTINO IMPACT AREA . . . . . . OWNER . . . . . . . . . . . . : SABA'SATHYA ADDRESS . . . . . . . . . . : 22023 BAXLEY CT CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-4744 RECEIVED FROM . . . . : SABA CHOCKALINGAN S CONTRACTOR . . . . . . . : MICHAEL STEVENSON LIC # 22847 COMPANY . . . . . . . . . . : STEVENSON' S ROOFING ADDRESS . . . . . . . . . . : 1594 MAIN STREET CITY/STATE/ZIP . . . : SANTA CLARA, CA 95050 TELEPHONE . . . . . . . . : (650) 969-5134 FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ------ - ---------- ---------- ------ -- - ---------- 1BSEISMICR VALUATION 100 . 00 0 . 50 0 . 00 0 . 50 0 . 00 1REROOFRES SQ FEET 30 . 00 390 . 00 0 . 00 390 . 00 0 . 00 ---------- ---------- ---------- ---------- TOTAL PERMIT 390 . 50 0 . 00 390 . 50 0 . 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER ----------------- --------------- -------------------- CREDIT CARD 390 . 50 .DISCOVER --------------- TOTAL RECEIPT 390'. 50 , - VOICE ID DESCRIPTION VOICE ID DESCRIPTION -------- ---------------------------- -------- ---------------------------- 601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL 604 ROOF IN-PROGRESS 605 FINAL REROOF • / CITY OF CUPERTINO REROOF OF •CUPERTINO PERMIT APPLICATION APN # 3 5 , 0 6 0 22 . D D Date: D 5/0 ? /Dg- Building D8'Building Address: 2Zo23 13Ax Lsy GOVT-T CUPE-r--r it,10 C& 95;011-- Owner's Name: Phone #: 34& A SATHYA 4-08-- 34-3 — 1299 Contractor: 0169Phone #: Fax #: Cupertino Business License #: Contractor License #: Type of Roof Covering: Existing: Proposed: ❑ Built-Up Roof ❑ Built-Up roof ❑ Asphalt Shingles ❑ Asphalt Shingles �k Wood Shakes ❑ Wood Shakes II ❑ Wood Shingles ❑ Wood Shingles ❑ Other (Specify) ❑ Other (Specify) T 1 L E Number of existing coverings ❑ Provide I.C.B.O. Report # ❑ To be Removed ❑ Provide Mfgr. Installation Specs. Job Description: IC E P D o p _,a7 c_ Residential Commercial Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the there are any restrictions: ❑ application or if applicable, include in plan set & the sheet index. Valuation: • I Have Read, Understand and Will Comply with Cupertino's Tear-Off Policy: Signature CITY OF CUPERTINO - � REROOF CITY•CUPEI,TINO FEE SCHEDULE Number of Fee ID Fee Description Fee Permit Type Squares Group 1 REROOFCOM Re-roof Commercial B 1COMMLROOF 1BSEISMICO Seismic Commercial B d 1REROOFRES Re-roof Residential B 1SFDWLROOF 1BSEISMICRE Seismic Residential B 1RER00FMRES Re-roof Multi-Family B 1MFDWLROOF 1BSEISMICRE Seismic Residential B 1BUSLIC Business License B • Community Development Department Building Division City of Cupertino 10300 Torre Avenue • Telephone: (408)777-3228 Fax: (408)777-3333 Building Department Subject: Re-roofing policy for the City of Cupertino 1. Prior to permit issuance,you must agree to comply with 1997 UBC Standards and manufacturers specifications on re-roofing. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re-roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City, the following steps are required: 1) Pre-inspection and/or tear off approval. 2) In-progress inspection approval. 3) Final inspection approval. a) Spark arrester installation. 5. If plywood is installed, a plywood nail inspection is required. • 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re-inspection fee of$176.18. The re-inspection fee must be paid before another inspection can be scheduled. IMPORTANT: 1. Flat roofs must have a minimum of 1/4" per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be on the job site at the time on inspection. I understand and will comply with the above stated policy on re-roofing. Homeowner's Name: g A AT H IA- job Site Address: 'L2o L 3 l3A-2c L_c `/ Cz>y 2T Roofing Company Name: Applicants Signature: `Y Date: o > o 7/0 Q� • Greg Casteel Building Official Revised 11/2/04 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below a . 72points B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 11. Permeable Pavin Note L-1 C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 5. Use Truss with heels, (detail) S-2 6. B. OSB Sheathin detail S-2 E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Enerqy Star Refrigerator, (No te/Spec. A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point TOTAL POINTS 40 points FM Plan Review Process Work Book Page-12-Revised 3/25/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types,assigning a'total points'value to a project to be considered environmentally friendly is .. not feasible.However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for'greening'your project. Site 1.Recycle Job Site Construction&Demolition Waste 65%=1 point;75%= 2 points;80%=4 points f up to 4 Resource pts 0 2.Salvage Reusable Building Materials _ _ 1 4 Resource pts y--yes 0 3.Remodel for Mixed Use,Adaptive Reuse,and Historic Preservation 4 Resource pts y=yes 0 4.Protect Native Soil 2 Resource pts y--yes 0 5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0 6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0 7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0 design Resource-Efficient Landscapes and Gardens_—} 4 Resource pts y=yes 0 9.Reuse Materials/Uss Recycled Content Materials for Landscape Areas 2 Resource pts y=yes , 0 10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes D 11.Provide for On-Site Water Catchment!Retention 2 Resource pts y=yes 0 1 1 1 B.Foundation 1.Incorporate Recycled Flyash in Concrete • 25%Recycled Flyash=2 points;Add 1 point for every 10% increase of flyash,up to 5 points up to 5 Resource pts0 2.Use Recycled Content Aggregate 2 Resource pts y=yes 0 3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes 0 1 1 1 C.Structural Frame 1.Substitute Solid Sawn Lumber with Engineered Lumber _� 3 Resource pts y=yes p 2.Use FSC Certified Wood for framing (For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0 3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y--yes 0 4.Use Web Floor Trusses 2 Resource pts y=yes 0 5.Design Energy Heels on Trusses 6°or more 2 Energy pts y=yes 0 B.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0 7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0 B.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0 9.Use Structural Insulated Panels(SIPS) a.Floors 3 Energy pts y=yes p b.Wall 3 Energy pts y=yes 0 c.Roof 3 Energy pts y--yes 0 10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0 11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0 r12.Use O9B -- --�^_'— - -- a.Subfloors 1 Resource pt y=yes 0 • b.Sheathing 1 Resource — � Pl Y=Yes 0 04 1 0 INPUT resources Fnergy IAO[Health .Extenor Finish 1.Use Sustainable Decking Materials a.Recycled content 3 Resource pts y=yes D • I b.FSC Certified Wood ( 3 Resource pts y--yes 0 2.Use Treated Wood That Does Not Contain Chromium/Arsenio i 1 IAQ/H"th pt y--yes 0 3.Install House Wrap under Siding ! 1 IAQ/Health pt y=yes 0 4.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0 1 ! 1 E.Plumbing �1`Install Water Heater _^� _ 1 Energy pt Y--yes 0 2.Insulate Hot and Cold Water Pipes 2 Energy pts Y--yes 0 3.Retrofit all Faucets and Showerheads with Flow Reducers a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. D b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. D 4,Replace Toilest with Ultra-Low Flush Toilets (1 point each,up to 3 points) Up to 3 Resource pts. 0 5.Install Chlorine Filter on Showerhead 1 IAQ/Health pt y=yes 0 6.Convert Gas to Tankless Water Heater 4 Energy pts Y_-Yes 0 7.Install Water Filtration Units at Faucets (2 points each,up to 4 points) Up to 4 IAQ/Health pts. 0 B.Install On-Demand Hot Water Circulation Pump 4 Resource pts y-- r. D 1 1 1 r.tiecvicar f1.Install Compact Fluorescent Light Bulbs(CFCs) 16 bulbs-2 points,10 bulbs=3 points,12 bulbs=4 points) _ f U to 4 Ener -- �_ p0_.__. �_. _.� P � J P 9Y Pts. D 2.Install IC-AT Recessed Fixtures with CFLs(1 point each,'up to • 5 points) Up to 5 Energy pts. 0 3,Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0 4.Install High Efficiency Ceiling Fans with CFLs (1 point each,up to 4 points) Up to 4 Energy pts. 0 1 1 1 G.Appliances 1.Install Energy Star Dishwasher's 1 Energy pt y=yes 0 2.Install Washing Machine with Water and Energy Conservation Features 1 Energy pt Y--yes D 3.lnstall Energy Star Refrigerator 1 Energy pt y=yes 0 4.Install Built-In Recycling Center ! 3 Resource pts y=yes 0 H.Insulation 1.Upgrade Insulation to Exceed Title 24 Requirements a.Walls 2 Energy pts y=yes 0 b.Ceilings 2 Energy pts y=yes 0 2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes D 3.Instal(Recycled-Contant,Fiberglass Insulation w th No Added Formaldehyde _ _ _ ) 3 IAQ/Health pts y=yes 0 4.Use Advanced Infiltration_Reduction Practices 2 Energy pts y=yes 0 5.Use Cellulose Insulation a.Walls 4 Resource pts y=yes 0 b.Ceilings 4 Resource pts y--yes D . 6.Alternative Insulation Products(Cotton,spray-foam) a.Walls 4 Resource pts y=yes 0 U.cewngs 4 Resource pts y=yes 0 TNTindDWS 1.Install Energy-Efficient Windows - • a.Double-Paned 1 Energy pt y--yes 0 b.Low-Emissivity(Low-E) 2 Energy pts Y--yes 0 c.Low.Conductivity Frames _ _ ___ 2 Energy pts y=yes 0 2.Install Low Heat Transmission Glazing 1 Energy pt y=yes 0 1 1 1 J.Heating Ventilation and Air Conditioning 1.Use DuctMastic on All Ducl Joints 2 Energy pts y=yes D 2.Install Ductwork within Conditioned Space _ 3 Energy pts y=yes 0 3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes D 4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes D 5.Install Solar Attic Fan 2 Energy pts y=yes 0 6.Install Attic Ventilation Systems 1 Energy pt y=yes 0 7.Install Whole House Fan 4 Energy pts y=yes 0 8.Install Sealed Combustion Units a.Furnaces 3 IAQ/Health pts y=yes 0 b.Water Heaters 3 IAQ/Health pts y=yes D 9.Replace Wall-Mounted Electric and Gas Heaters with Through-the-Wall Heat Pumps 3 Energy pts y=yes D 10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0 11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0 12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0 13.Retrofit Wood Burning Fireplaces • a.Install EPA certified 'wood stovesrinserts 1 IAQ/Health pt y--yes 0 b. Install/Replace Dampers 1 Energy pt Y--yes 0 c.Install Airtight Doors 1 Energy pt Y--yes 0 14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0 15.Install High Efficiency Filter 41AQ/Health pts y=yes 0 16.Install Heal Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes D 17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes D 1 1 1 K.Renewable Energy and Roofing 1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0 2. Install Solar Water Heating System 10 Energy pts y=yes 0 3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes D 4.Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) _ Up to 18 Energy pts D i6.Select Safe snd Durable Roofing Materials 1 Resource pt y--yes D 7 Install Radlanl f3arner' - - - 3 Energy pts yryes p 1 1 1 L.Natural Heating and Cooling 1.Incorporate Passive Solar Heating 5 Energy pts y=yes D 2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts . y=yes D 3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes p 1 1 1 • INPUT ResDurces Energy IADNealth .Indoor Air Qua ity and Finis es • • - it.Use{ow/No-VOC Paint 1 IAO/Health pts y=yes 0 2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes 0 • 3:Use Low/No VOC Adhesives- v 3 IAQ/Health pts y=yes 0 4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 61AQ/Health pts y=yes 0 6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0 7 Seal all Exposed Particleboard or MDF 4 IAQ/Health.pts y=yes 01 8.Use FSC Certified Materials for Interior Finish 4 Resource pts y--yes 0 9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y--yes D 10.Install Whole House Vacuum System 3 IAQ/Health pts y--yes 0 1 1 1 N.Flooring 1.Select FSC Certified Wood Flooring a Resource pts y=yes 0 [2.Use Rapidly,Rdneweble Rooring Mate als _ __ _` 4 Resource pts y=yes 0 3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0 4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0 B.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 1 1 1 Total Points Available: 1 1401 130 57 Total Points Project Received: 1 01 0 0 • G:daiarprooslgreenbuildingguidelineslremodelerslgreenpointsf ne12.12.04pmleoied.xls • n Community Development � 10300 Torre Avenue Cupertino CA 95014 Telephone(408) 777-3228 CITY OF Fax(408)777-3333 *UPEf�TINO Building De artment JOB ADDRESS: PERMIT # 22o2-3 gAxL� CoVa?T �PERTIN� .� 005 Doi OWNER'S NAME: S q PHONE # GENERAL CONTRACTOR: p 1„ifVE-2 L FAX # I am not using any subcontractors: 05 b p Signature Date Please check applicable subcontractors and complete the following information: SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets &Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum/ Wood • Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting/ Wallpaper Paving Plastering Plumbing Roofing p o / n/L--R— Septic Tank Sheet Metal Sheet Rock Tile 05 Owner/Centraete�Signature Date