Loading...
PC Summary 06-14-2011 City of Cupertino , , 10300 Torre Avenue Cupertino, CA 95014 (408) 777-3251 C U P E RT I N O FAX (408) 777-3333 Community Development Department To: Mayor and City Council Members From: Aarti Shrivastava, Community Development Director Date: June 15, 2011 Subj: REPORT OF PLANNING COMMISSION DECISIONS MADE June 14, 2011 Chapter 19.32 of the Cupertino Municipal code provides for appeal of decisions made by the Planning Commission 1. A�plication U2011-06, Kenneth Frangadakis (De Anza Professional Center),10601 S De Anza Blvd Use Permit to allow 50% office uses where 25% is allowed at an existing commercial center located in a P(CG) zone. Action The Planning Commission approved the application on a 4-1 vote. Enclosures: Planning Commission Report June 14, 2011 Planning Commission Resolution (s) 6641 Approved Plan Set 2. Application U-2010-02, TR-2011-09, Tony Chen (O-Mei Academy),10070 Imperial Avenue Use Permit to allow a new daycare facility at an existing office building; Tree Removal Permit to allow the removal and replacement of three trees in conjunction with parking lot and landscaping improvements at a new daycare facility Action The Planning Commission approved the application on a 5-0 vote. Enclosures: Planning Commission Report June 14, 2011 Planning Commission Resolution (s) 6642, 6643 Approved Exhibits OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 C U P E RT I N O (408) 777-3308 • FAX (408) 777-3333 • plannulg@cupertino.org PLANNING COMMISSION STAFF REPORT Agenda Item No. 4 Agenda Date: Tune 14, 2011 Application: U-2011-06 Applicant/Owner: Kenneth Frangadakis Location: 10601 South De Anza Boulevard (APN 359-18-043 and 359-18-045) APPLICATION SUMMARY: Use Permit (U-2011-06) to allow up to 50 percent office uses where 25 percent is allowed at an existing commercial center in a P(CG) zone. RECOMMENDATION: Staff recommends that the Planning Coinmission: Approve the Use Permit (U-2011-06) in accordance with the draft resolution. PROJECT DATA: General Plan Designation Commercial/Residential Conceptual Plan South De Anza Boulevard Zoning Designation P CG)- Planned Develo ment with General Commercial uses Environmental Assessment Cate oricall Exem t Lot Size 71,874 s uare feet of combined arcels (1.65 acres) Existing Building Area 17,030 s uare feet Proposed Building Area None Existing Parking Stalls 88 Required Parking Stalls 71 (83 spaces if 50% medical office; 74 spaces if 50% rofessional office) BACKGROUND: Existing Site and Surrounding Uses The project site (De Anza Professional Center) is located on the west side of South De Anza Boulevard and north of Kirwin Lane. The site consists o�'two parcels connected through a shared parking easement. The larger parcel fronts De Anza (APN 359-18-043) and contains two buildings - a 12,730 square foot U- shaped building and a 4,300 square foot rectangular building. The smaller parcel fronts Kirwin (APN 359-18-045) and contains an overflow parking lot. The surrounding land uses to the north include the De Anza Plaza shopping center and single-family housing; to the south a commercial building; to the west single-family housing; and across the street to the east, the De Anza Center. 46 3. A�plication DP-2011-01, ASA-2011-08, TM-2011-02, Terry Brown (Robert Adzich),10216 & 10232 Orange Avenue Development Permit to allow the construction of two new, 2,697 square foot, two-story single family residences; Architectural and Site approval for two new, 2,697 square foot, two-story single family residences; Tentative Map to subdivide a 0.29 acre parcel into two parcels of 6,000 square feet each Action The Planning Commission approved the application on a 5-0 vote. Enclosures: Planning Commission Report June 14, 2011 Planning Commission Resolution (s) 6644, 6645, 6646 Approved Plan Set 2 U-2011-06 De Anza Professional Center Use Permit � A'� � �1 } � . �� � � . � I� . , �� �� �� �„' �. }°•�� � ., f � ! � `� � # � � q . '� � � �' De Anza Plaza ' ' ' - �. � �-�, � .3 '• � ,� � "`'� ; '�y' .� , �_: . Y . ,. q � �`��� - ��/_ . ) n • 1� .... �T� ~� •� ,� � - �� '__ . _.'. . �----^�-.. � �. 1 � � ,..�,�� � � ' �J i ! . ` � ]�", , � r ,��� � � i y -- �.,, � � «`� '� . , ►'�... ,,.y .. �,��— � � � � :'�° �^�''�`�� � , " ,� � "a � � �' � `� ' �.�: .� De Anza Center . ,� � � %� � .. ,: Project site ;�;, , � 4 � � ��..;:. . -� :-* � �.. �. ,'_. ..: - "' .. . . � t : ti.�\\\\�+:�+.\`,� ��+. . a�_ ; `..Li � -:��� �� �.4��.\\\�.,���.,ti���.,tititi.\\ti\\ 4�ti• ! r - • . 1 � • .. , � .� . \�.\3\�.'�,+:ti.\\\l\t�+.'�\�\�,ti.�t\'.'.. .�. a i�"� ......�i�.. � -.'+�\�.\��.\�\��ti�,\ti�ti.\\ti.\ti�.�±,'++,1., °J ��ti.tt��.���1ti�ti�`:�.t�.���1��.��� . ,�, -. . \\t\4.\\\\�.\\�.\t\�\\t`.'+.\�.\l� �� � � � 1il\\\\41��\\titi��ti\\\\5.�.\ti�.\�` " \. .Y •." , � �- ..� �-.� t.\\`..\1.\t.\.��.,\�.,�.�\\ti.\1.\�.,1.\\t ' ,'� � �.� � � � , � � .� �.\`��.\\^.\������\ti\ti���\ti\\\� ° �, �' _ � y ,. d� �! . �ti�\\'\�\\\\�\\\\\�\ \'+�\�\ti � " � �t1 � ��.\\�\\� .\�\ti'.���.,�1\'.'+.+.\�.\\\ .'� . � �t � � � \ �' ..i \ k ti�+.' i . � .� T . ' ' . . . . . � � f �.� . � - ` � . . � ��. ' w �` ` - �.� •� ,�ria.j � �;' "� - 3 .� :� .� .��►. �� _ , � „�, , :..r ` ;� ...._..:.. �; , ,,ta , ' � J1►' � ; -�� ` i rv' �„� � _ � � - � r � _ r . r ;,;.;+ � ,.�e►y � ��' .' 1 rv �� y r � - � _ ' .'L: � Li � ��� �9 �". p"' --. � . � w_.. �. �, � -� ' r "'� , "` '. �� �,,rZ� �,.. � � � � !'i� � - " .. General Conin�ercial Allozved Uses The buildings onsite were constructed during the 1960s and 1970s for general commercial/office uses. Prior to 1992, professional, general, and administ�ative offices were permitted in the CG (General Commercial) zone without any specific restrictions. In 1992, the General Commercial Ordinance was amended (Ordinance no. 1601) to restrict professional, general, and administrative offices to comprise not more than 10% of the tenant spaces in a shopping center. The ordinance was amended again in 1995 (Ordinance no. 1687) to limit office uses to not more than 25% of the space in a shopping center. The site has been used for office, commercial and tutoring/ specialized educational uses in accordance with the General Commercial Ordinance at the time of the original approval. The applicant would like to lease space to additional office tenants. The new request requires a Use Permit in order to allow office uses exceeding 25 % per the current General Commercial Ordinance. Staff would like to note that there were two previous use permit approvals-- 5-U-85, for a 6,600 square foot second floor addition; and 48-U-85, for a new 5,000 square foot office building on the site (see Attachments 2 and 3). However, the projects were never built and the permits expired. DISCUSSION: Office Use � The applicant is requesting for a Use Permit approval to allow for up to 50% of the spaces in the center to be office. Office uses would consist of administrative/executive, professional, and medical office uses defined in the City's zoning definitions. No physical building or site modifications are proposed. Prz��king A parking analysis has been conducted and confirms that currently there is a surplus of 14 stalls onsite (see Attachment 4). A condition has been added to require the applicant to work with staff to keep an active parking account for the center in order to ensure that the tenant mix is consistent with the City's parking requirements. A detailed parking analysis must be submitted for review and approval every time a new change of use business license permit is requested. 47 U-2011-06 De Anza Professional Center Use Permit STAFF RECOMMENDATION: The project was originally designed to house mostly professional offices consistent with the original General Commercial Ordinance. However, the spaces in the front could work as active commercial space. Therefore, recognizing the original situation as well as the intent of the current General Commercial ordinance, which supports retail, staff supports the applicant's request with the following condition: Commercial Uses along De Anza Frontage In keeping with Council's interest in focusing active commercial uses along the street, a condition has been added to require the three tenant spaces that front onto De Anza Boulevard (out of the 18 total tenant spaces in the center) be preserved as active commercial uses. There is currently a financial consulting business, tailoring shop, and a law office in these spaces. Out of these three, the law office doesri t meet the description of "active commercial use." However, the condition does not require any changes until the space is re-leased. When the space is re-leased, active commercial uses including banks, insurance/real estate agencies, travel agencies, etc. would be allowed. Staff believes that this provides a balance between the City's interests in maintaining active uses along the street with the applicant's interests in leasing his tenant spaces. INTERAGENCY AND ENVIRONMENTAL CONSIDERATIONS: Otlzer Departments' Reviezu The City's Public Works Department, Building Division, and the Santa Clara County Fire Department reviewed the project and have no objections. Environniental Assessment The project is categarically exempt from the California Environmental Quality Act (CEQA) per section 15301 (Existing facilities) of the CEQA Guidelines. Prepared by: George Schroeder, Assistant Planner Reviewed by: Approved by: / s/ Gary Chao / s/ Aarti Shrivastava Gary Chao Aarti Shrivastava City Planner Community Development Director ATTACHMENTS: 1. Draft Resolution 2. Use Permit 5-U-85 3. Use Permit 48-U-85 4. Current parking analysis 5. Plan Set 48 U-2011-06 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6641 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPROVING A USE PERMIT TO ALLOW THE MAJORITY OF THE CENTER TO BE USED FOR OFFICE USES EXCEPT FOR THE BUILDING FRONTAGE AT AN EXISTING COMMERCIAL CENTER IN A P(CG) ZONE LOCATED AT 10601 SOUTH DE ANZA BOULEVARD SECTION I: PROTECT DESCRIPTION Application No.: U-2011-06 Applicant/ property owner: Kenneth Frangadakis Location: 10601 South De Anza Boulevard (APN: 359-18-043 and 359-18-045) SECTION II: FINDINGS FOR USE PERMIT WHEREAS, the Planning Commission of the City of Cupertino received an application for a Use Permit as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held at least one public hearing in regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Planning Commission finds as follows with regard to this application: a) The proposed use, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; b) The proposed use will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan and the purpose of the City's zoning ordinances. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 2 thereof, the application for a Use Permit, Application no. U-2011-06 is hereby approved, and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Hearing record concerning Application no. U-2011-06 as set forth in the Minutes of Planning Commission Meeting of June 14, 2011, and are incorporated by reference as though fully set forth herein. Resolution No. 6641 U-2011-06 May 24, 2011 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS This approval is based on Exhibits titled, "De Anza Professional Center, 10601 De Anza Professional Center," prepared by Fazekas Architecture, dated 12-19-1985 consisting of page A1, except as may be amended by the Conditions contained in this Resolution. 2. USE APPROVAL Approval is hereby granted to allow office uses as described in the zoning definitions throughout the center (excluding the building frontage- see paragraph below), provided that the parking demand of the uses onsite (according to the City's ratios) do not exceed the parking supply. The Planning Commission allowed office uses to take up the majority of the center since the buildings onsite were originally constructed to facilitate professional office uses. The tenant spaces along the building frontage (suite #'s 107-108, 208, and 209) shall only consist of active commercial uses permitted in the General Commercial Ordinance, including, but not limited to retail businesses; restaurants; banks and financial institutions; insurance, travel, and real estate agencies; photography and similar studios which directly serve the public; laundry facilities; limited repair services; personal service establishments; specialty food stores; and pet shop and pet services. Any other uses not listed may be considered by the Director of Community Development at his or her discretion. 3. LOT LINE ADTUSTMENT Prior to business license issuance, the property owner shall obtain a lot line adjustment with the City to merge the southern parking lot parcel on Kirwin Lane (APN 359-18-045) with the main building parcel (APN 359-18-043). 4. SITE IMPROVEMENTS Prior to business license issuance, the property owner shall apply for the proper City permits for the following site improvements: a. Screen rooftop mechanical equipment from public view. b. Install street tree in the empty tree well in front of the building. c. Resurface and restripe the parking lot on parce1359-18-045. 5. PARKING ANALYSIS AND BUSINESS LICENSES The property owner and/or his representative shall keep an active parking account for the center in order to ensure that the tenant mix is consistent with the City's parking requirements. A detailed parking analysis must be submitted for review and approval every time a new change of use business license permit is requested. Said analysis must be kept up-to-date with the property manager and be made available to any tenants when applying for a business license with the City. All businesses onsite shall obtain City business licenses and licensing from the appropriate State licensing agencies. 6. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. ---� - -^--"-' - ------- ------------- Resolution No. 6641 U-2011-06 May 24, 2011 7. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constiiute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 14th day of June, 2011, Regular Meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: COMMISSIONERS: Vice Chair Miller, Brophy, Sun, Brownley NOES: COMMISSIONERS: Chair Lee ABSTAIN: COMMISSIONERS: none ABSENT: COMMISSIONERS: none ATTEST: APPROVED: /s/Gary Chao /s/Winnie Lee Gary Chao Winnie Lee, Chair City Planner Planning Comxnission :�., . .� ,� ,� ... -�.. �. .. ..� :fi .y � 4 , ..._.. y. s ::,%R ��:�� .�.�--'_ . �-.: :": ;"....:.. . _ . .. . - .. ,. .- ��a��... - e-.. . ..r2eme� � .. , _.. , c,. .,_ .,. � ... .. ... .. ..._.�... . ... : � . ;..-.. . . _. �'� � =���: ' .� a ;�:. .; . .. .ar ,_. .,v� , : x . . . . -. . . ...... r . � . . �� . �.�. .- ��.: ±v. - .a . 31g�': � ,. . :«,. �. { �..�.�` ;>;'x ;,. � , � c "+�, ' x ,. �,�:., __ _. . c.. ..,�. :.... ..:.. . .,: . ,::: . -� ._� -. � -,w .. ; . . . ,-.r.. ♦. 1'..,: .l.'r_...:;� . -. ....,-. .� .. ..'�.,-�� �� ._ .,.: . .._ � , . . ;� .�� . 'V.. yi ,�j;" .Y'� � " ... . ' . , ,. . _ ,��. ;. , .�.t._y..Fz'' ..�:.-. ':.�;r.�. ! - e . . - _ . . i , . . � . ..., , . - .,.. .�� h ` �. ��� :.. . �.. :: .....w� u .,.� . . ..�_.y.. . ,: .. ... .. .. .. . ... ,. _ . - . . �. . ~� �� ./` � . , ,s ,: ,., y ti : .. .. , _ : ... . : f f -� � �. ..,.. . _. ;.,� �. . _ _. _ . , �;.. _.. ,, �: . .,.�..«...� ,: � � - � * .�. , � -. - . � , _, . > ,. , � - , . . _: ���� --- - �. � w� . ; w,< �.»;� `:'�.:^.� . sw.. - ., . ` , a � .. � i. N ^6v , .� � . :' --: c:, � : trc. , 1 • , »�_ �y ., � .. � - • ? a,,, `..� .L.ai: . =:y� ".. - � . � . . � . _ F�... 4} ..�aM' �. ^ �+ . . . � . . . • � y . - � d , s � ,.. .. - '. �t� .&':� S. �py ' �+e,'�S� ro-v. f -�: , _ .. . . _ , . �; . •' ,�tA�, � . , . � � -.. �, f' v, 3 '� , � � . . . . � y, �� /�, ` u-.:K .,"t�y;j � R r �+ � - a b f �-` _ _ � _. . . . . _ . _ � : si l [/'_ . �4!�i'� . � « . SI. �. � � �" - , �. .. �, :� � .: . ,, . , - . . . . �. - t; a; .�� - �« r�. .a a � - �� y �, � n 4 7 � ! � � f �t� � ��{"(� + `i' .. � �� c r . n ... a. � -:. A F. � " e _ � .�+ . . . . . . . . .. � - - - - � . - .e ., e �r� y .«. ,: ; . , �.+ '.i .. . . . . . . - . s i (�� . . M. 'ri, ` };� ::y.nc..m :.. �.:. s,. :� '.tY� .�.. . . . _ '?�� .. . ' �. ���'"m;.. . �' r - n , .;;; _ ... t3„�°: 4 3� � �... rf _ . . _ . . . . . � . � . . � - � 1 � �V 1f�/ ( � � . ..E: . � 4e A , *: :i��''�� _ �'� �'� ,^� '�[S�C�'" _ � ;� � � � � ��� . � �.. . M .'�� � � r , '"� �,��'`�' N ' ���.Pr*„ t c � � - f- � . � . . . . . .. . '�� ,n,,.. �. , ,,: �s " ^- •� :ar� _.- 'SF J .�e+' ,� : t""'�� t - . - . . . . . ' - . _ . . _ - t � r .�� � = �'`. , x� � �^ � r� f � . � . . . . . . . , .. . �. xt�a;', rt ,�. � �s- .r;� � .. �'.7l ��! �� . �` '_,� ! � . . � � __-._.._�..� . � � . .. . . - . . . . . . , � � � �' � *e �'� ,�,�,.�, a�:. �„��.,� s r � < � � ��.� ���.,� _ � � f � � .� , . z - ,:. �x'�.'' � �t�, u,�+ � ����� ��' ,.�,��. �; � � �."�'"""" _ I• / ' ` : . � y � ; x / � .; � �'�xi',.,'., 3�"�� . ��v ' ��' c�s � .: � w._ � `� - �t ... �.�._ . -�( - 7 : ...+ - . . F� .� � ..t �� .� ,.�:�e n`�i ,", i � , v+',�K�` z- r ..� �..�,4 : � . { � rOiC� .� . � . , t �" w . � � . . � , r 2 - :.? �'. 3 � __ , _ , -�.. �~ �� � I � . . ., ,. �, �� � -� � ��.,� . � � p ° ,- °. - � � .� - _.-. { R �vRY �� -b, ` .. :. . - �: � � f . � .��. �� . . t y .. . 5� r _a ,�zv:.> � r # e _r �` ,.b e t E � �" � ( � • _ .. : . : +!��fi� �5 ' Y«L. ` � ' � .�� g .._ �.. , . . ��c 4. . ' '-,,' . . . . . ' _ " . . . . / . ; ~ t , �� �/ f . . .i... ♦" ii' •: . � .- .. .. ..,t •- . . I i . � � � � r �����' � '�..r - -`°2^ �e � f. 5� �.J'" - - % . - � . , . , y'. ...:, ,r� . � r C.' r. �� ,s,.; s ::�- g� . .�^} ,,: � �: � . ... - � ,. . . . - . , ` `� ��� � . . �{ � P('�� . j . N- 9 "XS"�.i,: ra? . "''Ct^ �.:.' r..3��' l'o� �'r,. .� �e -: .��;� ': . v. � � ... ,:y : i "� . . .. j l . ' " _ "� . . .. . .. . . �.' � � , / �, - ♦ t � . . .�. � . � G � .�x � , �v�. .� . ,._ ... , �6 .�.:� �-- .;.,. . . � � " ' .... . . _..�: ��� � . .: � ..'� .... . - p ,. �� J ` � ' ♦ N � F . � :. �.�'4' :i'�{'A`y�.#' N '^h � .,.-. 1;� ._,: :..., - .��. =. �'-{.. �.,� - �� . . �^"•1� ` . . /� � . . + �`-t �i.. p.'F.y.,� ..:.'-'s ..--� ��. .,:. �.. . � .,,.. �i� '��� i ��� . 4�- . � s4' . _ � ' ' 4r�� � � _ _ ' . �. ,.' .. �, 'F _�.;. ..v^f 'F'�� �"' " �tr .i �w . .. � �� - . . �. �, a 'v ._r+,a . a - °o .E _g _,... r,. � . - . >. , - _ � .,�a,. ; ; . , . - _.a . ,.». - , r - , . w te �r , ;_ �.- <z� ,. '. : ' . :' ::. , . . . _ �I` • . _ :: _.:�,:�.; ,.i�.. ..Ya�,Y.r, �,;._�' ,-.�,.,_., r�.,, .5... _,_n:=.� ,.' . , ..: r�:.. -�...; -r.._. / . . . . , �� vi��� � �^ � .:x .,. < � � ?-;._: ,�,,; .;... � - . > .:. � : ,��w1� ��' P � - : r �.,.i.;, �.- » �' ,�.-�-��i+!''y. - . � . ' ��`' i w..:,�4. ::_ � .1�C„ , ..,:i _ .;;?:iV'� .t L ::.._ �y .. . . . . /� . . :,. - t.r . . ,.. .t' .,...... .�.� . .o,--:.5: .�.,,-:.' - ,'� :... . .�,.._ . � .. . . ,.�, �.� . �r �f � . , ,. _.s . _�., � ���(�g,� �r��,� w _ ,� � _ . _... .. - - _.. , ...: .: , _ ; � ...., fi ., �. ..__. . _., � �' ; t�. _ ��`•� �. .,.�.;-� ..�b' . .....,.. �....... .,,....�.:- �. ....._,.. .:-.-...�,,. ..;. - _.� .: . f f , ..._ . � ,'--b^ -O ��� . �.�arl"'C/ ��+i�'"'� . . �:- . , s� �, ,,4� j.+P� � � ,�;., � � ., _ . �P (�b'� ` �� ,�.. . , + �' ..>.. . . . ...,.. „ . . ` - • :^�' . E, . y .... :;,_, , ..., r .� . - . . �}�� . . �. ' \ 1` � . ., �:.+� �. �, - � �+� . x ..vzw.a ',Y, � � , �,�'� . - . . - T . . . [�. . �._ -' . t � � � ' � ... :. . i . .. .r- . . � . ,. .. � , � �^� 37 ,5, � .:z�.�� p, r , ,� ., . *ti ,� �, 3 ` . � i � _ A {t, ...,r•;' .. : -,� _, f.� • ., ,,.. -� .. , . �' _ �- „ , . . . . , - . � << : �;� , .. . . w ,� , � �� � ,- . , . _ . ..: , . _� , . , p�„ , . ,; � , , .;. ,_ . , . , . �;� „ -.. � � ;, . . .. . .. , . _ . -.,, .. ,; � , ; � � �� � ���� :. �_.�., 5,. _ ._ :, - , ; _ _ ,;:a ,.> .y;� , ,.,., w •�, s�`� , � >_ . _. . _:._ '.: .. _ _ �,-. .._� .. _. . f �-�.. .. ,d, .. -,:_ .�.- ., ._ S�'r , .� , ..}�.: ' �:. � ,., _ ,:.. _..... . t.- - - :. �. ,.. , � .; . . .. . .. . . � _ :, _. �. � - , .. , �.,. . � � t :._.. . ___ .� __.. . �„_.: ;, ... _ •, _ . , : - _ ..�, � ,. . ,,��, J. < �„F,,. � ,.. _. � . . . - - : • i - _ � ,.. .:��,. - ...+`L w r�. � ...�.. . r. :. � 'S .:.:.,.. zu.% 3 ..,.. �._� .'i. . ... � ... � �� ' . � . . . { . . . . _ . ....„..,; .. � _. J ._,� r a- .: � .. �:,. � :. �.. .... � . _ . =,.-,. .; -:.:�.. . ��.. • - �. . _ - ._ - . . '.. . ._.�. . t ' ` � ' . , . . t� . . Qy�is�, � �, _ , . ' s..e-.,. �. _. _. . ;,,,e .. .. �� . i r � 1 r ��" � , =,:, {. _ � � _ ; ,� . _ . .�' �� - .., y ;T: .. ,'a�;.. .:�. F s ., y ,. ,., 'sFY" ' �u... . � :_ . . . ': .. _. _ . � � . . . I j � " . . . . . ' �� , .�_ .:..: - .. C.:v'.. � i:�+ . �..5:" C . ., .....,,. ... .'� . .,.djt �^� � ' � � . . . ! { . . - , s.s : �, . i .1�.. a ...,,...rt . ,. ..,� �,,._. ... ,..-� . -,_..�.: . ., ,::: , .. � . , � _ . . . � . . .I" � i I � . y f - . {� .. . . _ __.. , :. m.. , ._ .,.. r : . ,. , _ . . :. ,�s , � { _ ' . p j � , .�► � . _.._:, �' ,.�.w-_ ::.. . ... ;.._ � ...a;:,� . �„ ..,� „ ;. . , �� ,�. , � � � �'"- „.�� �.��'�-�,�,,;• . �.:;-� � �. �� -- --. _ , . < �- i f f �` h , �._ _ ,-.. ., � � - : � � . . _ . . . :> :.:: _ �-, ; E , y�� �, �; -� :Ma,�'x,_.. . � w 7=.,;.,:. _.� ;.� :�.y �,....;�.y _ ..,... � .'.:.,. �.. . . ?."G.'c ' . _ _ . _ . . . .. .. �.. , . . . . - � �.�i � i .:. e ::z.•;y �.... < ..�,.: ,: ,...._. .��.:W.._ �?5'n..;n.:.y � � �.e.,._ -... . �_:� .._ :,. � . . i� . . 1 . . - . �.�.r-.,.."`? `� � _ .�._. ._� . .. �,_ ,,,_ .. .���`,� _..-�..��'�'�,�` _.. . � �.. �rt� � � . � _ �. .4 .,. t .. . ,. __. ..,,..�� ,�. x. , .. � . . . . . .� y .. . F . �-�. . r,. . _ _ _ . ::_._ ._ ,.:: _, ,, ., . , _ � � ��� �..:`t ..� .:-.a. .,.... ._�. ��1E ..:.....1cM1�1'.' .:..'s� . ,.. �...: �. .: 7r -�-� • .,. '• " - • - , �:: ..'�`+^ :+'...... '_. ..e• • �...�.. . ....:.... .... >�`.�x. E..:..�.:, . .. �� .e .. � � .. �- . - "-. � {. . � . i . ..... � e : _ � . .eH.. x . �.. , � , .� .., _, � c ... ....,.: , . .� ..; .. . ..,.. J� � �:.. � .. .... . . . ✓ �- � . o�3w:r:., ., '�., . . .. �.. �, -- .�. ..,. _ .._ ,.- ,. , ,..... ... , ._ ,. ,. ., > : -�. - p'4� n _ �.., ..,.... �..... ._. , . �:.. ,. _ . _..: - �7 ' . : x�, • - . : -.. �.,,� ,. : ,�. .. -,':-� _ ._ -- . . _.. -: „_ . . . <. _ �, a . -. ,.s,^_ . ., �... �_ :� � , �, .. . _ -_: , F F E7 T� � � � �=� '� _ > r< .-_, '. , _ :;_ � f � '^ � _ . .. , _:.... ., ,�, �� , , . , d :.. . : ,;: .. - '- _ 1 ., . , � .. - _ .z., v .,- . , . .� � .. . . _ _.. .: .,. , � ,, e� _.:..::, _ ,. .. . . �i �.. •._,:,, -�,. , 1 N f� � y, _.: _,�.: � -:... :.:�.� �,. •. ._:. _ . : _ ;. _ � < -p�'' �, , > ,. . _ , � . �, �,.�. ,, , . . t : ,.�. �. ,.,-.r ,.� -,. . ;, :. ' �a---- -- ��� . . . y 1� _.� 1 � ; .:,�. -- :7r - L ,....��_ . .. � , ;: X #,<.: . .: � , ��"`�"�.�.....�. . . . . . . � / - . . . .���{} F'' '� 1 � . . ...� . m �x; _ . .. __.�� - . . . � -� _ j� ,.. .. . ..�.:�:_ - �.., ..� ti1"t. .:.,.,. Z1.�. ..:_.. ':� �<::.._-� :�-� . , .. .-_ � . . I'T� f� - �. ., . ,,r_. ,.�.. . . . , -._ .:_..:�+3+sy . . � �s � . . .u- ��. ..� . . . � . `^ " � I � �' �_ < .:. .�-a. ..� � . ..._-A " ..n_' � � . . . ,-. „• �� .:.--..-.. � ... . . .. - ..,.......:., .. ._ .. .,.. . .; �.:: �.. .-. ., .-. �. , " - � -.rr ... � .„ , .. �.., . ._-:.:.0 < <..:�. .. ',.!},'� ,..i - 4� - - .�.. �....-. ._ .. .. : .... . .. ........ : .. .. ti:r�.-�. � t _, - � �:;: ..� . . . :.. � ��_.,:, .-- : .�. . ` . . _ ,.. ... �..._ . , ,�,. .._� _... : ; .. � _ tM�n+ . . � "� � �_.., a� t'� w - ,. � _.: , _ ,. ,. . .;,. , ,. ,.�,. , ., _. . __ _ . � . . -,_ _ , , . .� .: _ , . � .�. �, . �. ;...,_.. ..._ ... _ .�._ : . �„ _.� . .. . _ -. � ., . ._ _- . . ,. - . � . . .. Y,. _ . . � . �*.��z'� ..v �, ,. � , _ . _ _ , ... �.dr, , - ` . : - , , .,,. ,� :._. -- , . „_ _..., . - - � _,�, _ ,, .�., .. , :: _ .. .. ._ : f , . , � . � /� _ �. _ _, t , . _ y. . � �' �. �' �- ' ,. _. �. __:. ,... r"'`�,, . :: . . _ ... . - . : , , x . ;.. .... - F .n.. :. � .��-. .., ... . _ . ; •: t, 'Z�L , . .: ..... .. .. r ..4 � '1.. �.._.. ..... � . h... .� _...a.-, ...�.�.:.�. .._ . ... .. � IiF{#�G_ . � , F ... �.ff`. . _. . �� .. ... � #�:: . `�l�.''. . .,, s",;. ,.. . ,.::.�'s :•�.. ..' .... . .. . ...... :�. ,, :.:: .... � ... C . .F . ' � c � ' : < :.. ..., . ��C_r. -_ . : ..s: . . - - - . . . :"- '. .;,� _a_: . . » 1r..``tla' . .,.......a,� . �:.; . '�� ... , a,...,.. . _ ::::-. _. .....�' . .�.:::. -- c... �-� ��: . . . . : � . .. ' . , }'�`!. .__.. _ . ..: � . ,,. 5 ��� . . � ' .. � . ' �="" . �� � F .4 1' ,'; �a+ .r.cF.... + ' . ....�..K .: . .; .. ,; �� vr .. ', : ' . _ . ' .. � ... . : . �_�� ..; .'. _ � i. .4 r� � ... , �. ...a:. � �. � . . .�.. .. ,: �... : . .-.��: .. • .�€ , , ,�.� .. ,. , '�"i' tM ,. . 7 ..� ,:. .. . , .. _..�:.� . . ..._ _ _ __ ::-,. , f _. v .. _ ti , r ..�- . ... . _.. _. . .- . . , . . : . .. _ : 1 ,: - - : .. �.: .� ...:,lY'. .. . ...., .. : , .a i� '�.-$k. .�t. � . .. ,...: ,..�.... .- ��. .. . � .- _. . , . . . ,. _: . .� - 'L' - , . , .. _ f? . _ � , *:� i :' x ....a k _ _ ...�._�,.- - . _.. , -�� �. � . ..,;�-�-_,. - ...::: ..._-� :. ..:.� ;.,� - . � . . �. . ._ . . :.�. � .-�.�� , . ��. � . a�� - y�. .:. . .�-� .> : . `.. � �....�c _:._ .: < . .: .- ,.., .... ...,. . .. . - . . t .. - . ..�^; . . � s�. .. . � .., ..,. �. . ..._..._. .,. . . �� : _. .. , -�.� . �. :.: �..:. .. ., � ...,, _,�d" . � . ...-.. �. .,. ', �� _ ..,r. �... . ., _. ...: . .�:.__ . _ ... .. - . .., . � ., ? .. .. , a. � �- � .�, �� 1 � .�. �� . . , . . . ;: � � : . ,.: �.._.. ��, fi� .. ,.: , ; � _ . ,,_..� �,;;. . ;..., ;:. , t . ,�+`•-� �.� .- . . _ , y. . . .� ; �" .- ,. . ,. _ �, - - ., .. - .� ,. .. :..� �:,�. - �.�: , _ :. ,:r s . ,,. ,_ n . ; : '#�,�, ., �- ��> � ,.,. r � _ r _ . ., . „ - . --- - ..,_. _� i- 4 +{�:. A� i { _. �..,., _ , � �., ,«, � _ �' ... . . . ., ,. , _ - _ � � ,: : - . ,; .�.}, � . . �a . : '� -r _ .. _ , . , r. r . �b r �. . :�, �'� .. .� ,�. , �,..„. . . ,; - � , � • , ` Af�1Q �'`� u , � s� ry�.,,w. � � ... i - ..E`„g 4.., 1:'�.. ..,. ��.. . . ., . . ,�� ... . � - . . _ . - � , - t . � �� . .,: , . ,. ._- � _.. � -s. . . ._. �. �. ,.. . � . . - . . . :�t ,,,, � . >., �� � �,; ._ _,� � . , .. _ . _ . , _ �- . . .._, �.t_ _ : _ x , .. . �, , ., _ , :: .� :• ..: -__ '� ..:w.. �-�� _. „ �, _. �,._. _ , _ .. _ . . . ., _ .. : - + . ,��,�' .x_.... ,, .,.� � �: ... ..r , - - . � � �' ,�._ ._. , � � . .,_ ,. , ..-. -- � � � • �. , � � _ :,, ._ _ ..��. R .. �. ,. ,.._�,_ .... , . . _ . . � ., �►�rtt � � , , . : ,� X�•.� : �:.�,�`.�.`- I -. . : , . �i',a v►��, , � � „ _. . �.,.. _ _ . . � _ . . . , . __ _ _ _ � ; r� .� ' �%: I � ,� .-. , ... „ . � ... _.. _ � � , � 4 'r': I C t t _.. r . . . ; , :. . ,.� .,: _. -: . _ ,, . - _ � � �11.G7tr� ' � _ � ..._-- .. -.. _ �. r , _ r . . . � <�,� �. , ,_ . ; . �. � � � � , - r . < -. �. . ,._ ,. :. ,: _ � . . �.� . _ . , . : __: �. ,: . _. t ` � . , ,+ � _ , ` �,� _ e�z��. �� ,:.. � x*4�.L�.,.t .: r ; k��?...'::., a.� � .. .�::. � .:'.. ,� � _ ... - � . :f/ . � . - -}� _ _ . � , . }_ .., .. r�fi,,,. ,,,� � , �. . _.: ,._. �.�_�_ ! -� � '_'.;- ._�- -�: . . .[�. .-. "-�: . .. {:.'' �� ��._. �:- . . --6' ,-. , ,�. -' � , �..,-.+ l � �.. �,..�' .. ��..k�.�.:.� . �� � . . y 1.... . M:' . � . . . . . . . � � '. .. . � - . Y .3.. -..�. ...n. .... . .. v . '!' .r !!. -_:...-- � . F. . - .. ' - . ..-. .. , r .. "5 � .T�x... ,li...1 �.. . . _ .,.', . "::.' . ..' ..:_ . - � _ � _. �-: '... ( . . � ' " . I � �r { � �y., � 414. . .r 3.. . , «. ,....._._.. ,. ..,,,.., f .._., ..�,. . : �. �., . . . .. . . . , , r �' . /� � j � - . : fi _.. � erv .s. �. .�.-.:: � .ua.. ... .. ._... M...,.:. . . . . . - , � . , P s2�� �! � : _. - . � � , ; ; . � .. ....g..� , ... „_., + r..,, . ,..,._.. .. "_�4 � :�::' � �,�.,�. ,, .�. 1""�� l� ° lY - . . �� . . .;�_. ..�' �::i �... � +M'. � � � ..�. -t, ;.�.... . ...? .. .,'�.-..... � - .... . � - ..,�s..� .:_ �, . . . . ._ E� . . � ���- . .. �j. ^ � � . . . .,.. a � -a" �, ,_.s� r � ....» . . .. ,<� . _ .,, , Gi : 4 ; � '�. -���: ,. _ ,� � < «�" s ..,,d x :;� _ : . _ _ , _ c�$ f' �__. . `4'�- ", ..� .�. , �, t .:.. . ., :,�,. y , > i f ���� •. : .' _. ,. ,K. . �,,: � ...,.. �x,, � ,-* �� t � . . „:. ..: .� ._d�. � , .. .. ..- . , „ ...:.... ,_ � ' . ` ' �:.•.._-` e`a_ ..: a -._a-__: �.�. ,� : _.� �1i� �..F j .:.. . . _ • ; � ' ' .{ �� ��._ . � '�? �' ': ' ;.'� -�: '-e . ...,:4�.t � w:�u, .... 3"' .. ,., ._` .. , .. . ..(. . . .,t � . . � - . ... . . .. . . - � "�"-�.r.`, �' � .. . .,P�T ' .�....,^ilR���.���+`, jk .. . .. �f •w: . . . .:.�-- v, i ' . .+4._ . . �_ . .' � . . . . . . � � - - �:.'�k.:'" . ' . � . ' .� �y. .:w .. 4.' �F' �;�'.�.. .. ". ;''. . . y ,.� .. � . �/` c . ":. � .. � _ - �l� . .-.� � . ' -� . . �;. t!� , . ,...: �,��._ . . � ; � �f�� _ ,y tSTt t�6 PL.�l13 F� ���F�EN�F �� ., � �� �. � . _. .. _�:.. . ... . , -. ..�. p �, �...,s� � ; :,. .- � - . _ �. . � ...._ . . . . : .. - - . �,.. _'."'.�" ^_-- '-- : . .�. . . . � . . , � -- �.�_, ... .._ _ . � . . a.n�� . . ,;,;..� �a,. t .. - . ..���. . � . ..� , � /\ a� � _ �, ... . - �. - . .... . , �.. . .:: ..� � • .v.: .. .. ,.. � ._.__ e , - .... _ . ., ,. .: .: . .'.�,,:. . . .. � � ` V �' � . . � . . /} ..� `� �fi• � � ' � 1 � M� y�� �. �' � �'+r Vl . � n . _„ r • , / , , , x� , ... .. .:.. . .�',.' .. . . � ��� _ .� . .__.:�. ,.. . . ,d��' . . , r. ,,._4tec ,,,.,-. .. , ....- ., �..... _. : . � V/ ' O � .'�§ „�'-i`.��". ..� . � , �., b. ._ �u��� �� � tl,��� � _. , _ . � . "'� ( {� ��1� S�`� '4 - ; , , � ; ��- ,: ,. � :�:� � .,r.._ . ,, _ , . -*� , , _ , � f� A�a�a�' I r ��-'w,d,o 1�;.-.f �. ,.�.. . .. 1 ���"� a��.� � �c�s e�e � ��� _ rs 1 � 'k,.n ;,-e, � .��. �; s�" ,.�`.� _ - . � � . . �r. . . (�-. � . . . � . . .� I ' �e .tl _ . �1 (' � � , .� ..r �- . � ,. ��, .,+,... , c.�.fiL�z .. wZtt,; ., _, .... �,,..;.��� ,. ' ,_� :: , .�. . . �� ,.,. . _ _ k . aK �x,�, a!, . : _.:. �t .P yy -� .- K ... , �:.-. � 4.. :p - •-. �;.. ' - . - � L „� i . 1 � . I' � . (�� . ' .., ' �i _:. . �, . �. �-a. ::�"".�' �-� . =n?•a ::-� :;..,_ �... ,_ ,.:-: .:_' ".,- :.,.. . ,: ._ ._ ; J .... } f �� . . _ ,x,�� . R-r ,Q � ; _ y �. : , . - ' �J �� �y , yr � •`* � - t � F t: t -,... .,, ,t r� i _; m ` . ,_;:: ' � :: } F r_r" _.--_ - '"*,,, •4 .•, -i. - v,. . a , _ . .. �� ' , • n' "* .. :�a. , ,v�� , �. ....... :: - ...:..� . ,:..:�,. �;+c.,- i. .,. c:: . -..�.-� ._.- .> ,.� �:.:- - . . . . . . . �. - ._ . .. i � `,ti ... � . f 1�}t � - ^ � S :..' ;,�, .� �,. :�". . _:: ... _....:�: � ���. . � . ' . ' � I n a - . . . . . a .. }� � i. �' +� A� �. „t� ; � � fK , + + / � , � • . .+�, s � � _...,� �:� '�,'x �, < . ...:...�. 2. ' � � „ ..� . � ��.. . . . � . . . i . , ��- i . � � . � � . _. . . . / a . � � �! - � � . a . � . �� � � . �:, . . .. .' .. , ��� _ .. .» � , _� , -.>- a:� ..'-� .�:`�.: �� ,.: ., _, , •.` �... ---.- � . . . .. ;� �� . cYtrstii �' 4 _ � . . iyq; p� , y � , . � . ,t� ,,. , . __ , _ _ ._ , j - _ � . . , ?�,. . ,..� ...:. - , . .�.,.,, . , „ . _ . ..,�.. a .. , , ...- -'.. :... ,: ..:.. ... r�- . �.- .r- , - ., .,. �. .^r�...:.. , ..-: �.: . � � -.:��.-.k� . ,: �-.. ...... . _ .... . _. .. � ��_... . � t . . ._ _..-- -�..� t� ��_ �C.., _ .g� . �..; :.. �, ,.. � . .. . u ..,...... �.:..,.._. ��..;:.:: . �.�.�:' .. .: �. _ .�� ::- . , . , � � , -:� _ . a.. _ �,.... ... .._ .. . ......r. . . � w � , , � .r �r.._r-,.. . . -_ i.. �. ..._. : .�,, _., ..,,, � _.... 1 , �,F'f0� i�i �-�. .. r .r,� �..,;.., :, t':L� . , � _ .t .. , . , . _ _. .::, ... . . _: ,.. . . r �, , �'i �..,., ..,. _. _ �.,._..� . .. . _, . _, :.. (�{"E� v C� � : aE ��t „ �« ��.r , . .. , , : ,. �. � . ' = , „_.. .<r�s�, -# ;-r ... •::,: ,.: _.. ,::: , _ �f t � t .. . .s.:� � - -- ._.F, .., ._,_.:: • . � , �#- , .� . . , - . �. ,., W _ ., . ,;.,: : : : � . �.. .. _ Gt� : . , ,� ._,... ,: ,; .. C�� __._._.. .. , Z � � n,- .. ,� ��i.• -a, T . _ . S� .f ,...::� - ...'heN. ..::� .. -_.-.- - .�_ '.�. . :: :�> �^" �� , i .:..` ti ! . �("''' j'� � � •D � � - . � _ C �. �� 5 'K j L ., a �,,.... .-., .. - ... _ _ .. ._.._ �-.�,. ., - . . i �,... h �. ,_ ; „ �._ , . .,.�.,� ,,� .�,, _ .;_ �. _ . ,:... _ � � ;:, __ - . _. 'k � . .. . y.. .;�,:.�. k�.s,x.. , .�_.� , .... ..,.,- ' •- `_ �H'' �F � : .T � _F� _ ' : . . .. �s .. ...-,�,. '.. :.� " ' �`L-. , . �y. .....�.•�±F . . W �'!.`.., � . . . , , �� . - . .�_�. ::;�.. �. ��.: '$:: � .. . ... ..., -�. ,.�.. s :_ r . . . � . . - ?y_ _.. . � . . . . .. . ... . .. . . .. .. ... ... ., .. .. . .. �, . _ . .. �:, r � = � - - - �. F � , . . 1 .. � � ' �� � .. ^[J ,,, ..L:F�f . i �., ..�.. ..� .., . � � �: �.. ., . �.:.,.. . ..,. . _ .._ : . ... ... . . � . ` ..� . � � � � � E _ � i .'.. - r i.w. +� a� . .s�, . . . . � _ ,. .�:: .,, �. s�: '�`„* . , �^"'��=.. ,„ ,.�, � : . . �-�,. f � ... ...... ��_: ,..r �`,. •. ,_ s�-.=,_ _.w. ���--- fi� ; � � � -,.' tr' f,a., =-1�`. ... :, ..-t '.�9. -.., 'FJ r...a�,+� ".Y+w�'m.«. 4 �3.. , �.'v: � . Y � � - I . -: . . _ s - .,,� w ,-._ ... .. .:., - 1 . � . _r-�.., --,... �,__..tv... c. .s. r . . .�>, _ . .:.. . ,.. r:__ _,.. . i �t. M tt , . :. � " , '� --�, : .�. _ a�c ,.....<._ . , :::'.a„ ..: , ^.r r..:. _..,..,,-_. .. <., :r ..,. . ti , ....,: -. - . �t F . _ " ,... . �:! .....�t.... '.�.:.- . ......._ I,:, ., _ .. -.a.. . �... .. . .. � * _ ,. .,.e,�c fi., x ....._.- . :i -:�„ ._,!__ _.. . . . . . . . , .._,. .>. .. .�..-...- ,v. �.�.. .,.:.,..., .. :;:,,, . '-"� _..,�.,� .. ._ .. .� . �_��� -::. .:r �. .. . � . .: .�, . .. -:, . .., . � � ,.,,. . , .... . � ..r. . . . w � ;_. - 1 - . �. .. � �. - . !N �, .: ,. 4-.... ,. . .._ ......... . � . , . . .. ...._ . . . . ._ -, .. ...:, .� ... ,.. ... .. . < -,. . ... .,: �. _ .,; �_... . + r�. � .� . � . .. � ,+ �.t� .. _. _ . .. " � , ._ � . _ _ .. . .... . w . , - - . .. _ , , , - .._;. . ....�.:4..-.a... ....... _.� .. �,....:.-...�...F. ..�...v._.:x.:.. . .. . -.. . .��t.��.. ._.-. ^ ' °'� � - r.. , , .,. . . . . , . .: : ., �r ._.. .. . . . _, . _ _.. _ � _ a .... , : _ _ I , '#-..-1i :_ ti r �_ . ...._ ._..- .. .. .. ........... , t _ .._ e.�F . ... .__� :.. � _�_� . :. ..,.... _.. . -- _. ..:: . _ aJ ��l.'.' - t�. - . '�, -� .....�� �"u�TM`a . . . - ' : r. R:.. �, r . _. . : , _ . . AM17 .. . .. �._. _�......,.. _ ..�::,. ... : ..,�.. -.' .. �'- . ww.: . _ • - - . x .....� ..... .... . ... . ... .. ..:. . :. F .. , ...y .. .. ,_ . . . . ". .. . . .'�..iF�,. '..:. '. � .. .. " .. . . � � `�H �' � . . � I X : . :: . .._, ....� ... ... . . ...... . Ya .,.,.. . ..n�-.. ...,.. . . Aa` . . t ,. ' . :- .. _ .. . ... _.... _ . �.. �*-...��...�.. . � F�`' � .{� . ._ .. , � _ . . . _ ,_ _,: _ ,. .,. ...., ... .. ... ..... � . .:..- . .�--�. , � . k. 1 � • li � I ;� . -..- .,r'2 ..._ .:-�. . � .e ���r.;. . ...� ... ..: .. . . -:........:. ._ � .��.�. ..._. �.. _.. ..:.. � ... . -... . .; � ��" _ : ,. ���� ..a,-. ,'. . �: _ 1, a`. . .r,.... .... �. . , , 'i . _ _ . .:. . __.-Y, ...,.� �� :: . ... ,. _ :. �. .� .;�. _. . _ � , , � . ,,� .�+ . �: c �. .... .r: �. . . ,. - f� � � . , , r . ,. � �:_ . , . _ : . .. . - .,-.. . . a ._ . ,..v ,r., ,. , -- ..,, . _.:..... _ ..,..: ;. _ , ��:_r..- .:w. �w, _ :z� �,, .. _. .. �. ,,.:_ .... - .�:. �- crli, � ��. � " r , � r � C `� Z� .. . .- i 7i • . .. .., .� � - - ' - . ,' �� � .. ... ..� .,. -,.�!...� , � .��.._.. . .:.. , : .�. ... ,. .-,*..- - �- . � . . . . . 'E�+� . . '�k:+be' �.r,W�°: - -. .. ..� .. . _. ..;:... � .,_.:� - ._.._ _.._ ... - ,«.r- . _ t. . <. , �� .�.. - .-- ...�_.�_:. ;.,��...�. ,.,.,,::.- :� . ,_., rt . � . �. , � �- � `� . . . . . . . .-` _ . - ` -s - ._ w . �..., ... .. . .:-, , �-�,.* . ...,___, ,... .;. . �:p, - ¢ ' . :. :...- -.- . ��� . -, ..'- . � _ ,. --.. ' ' � " _ .� t , _ �� � ' .:_ . :� �y . � .. . ... .... , c t �,x....., . .., , .... �. •. ` ..i�... . . . . ".:_.4; 4 _ � _ .�k-,+�f ; . ..�, d �� . . _ " " �;� ,. .,.. , ,,. .. .,;. d � .,..,� . . .. : .r:: ., .�. _ ;:'t�i,.. �' �c.� ,.�� ""' ,/ � / t , . . .... . �, : .�_ ; , - Fre - - .e . � � .5 • � , .�.. , ... _, ..-? ' . .._. . . �. . ' ,.:.: �.: . � . : .-� h t�...,.�.. .�.. .. Nvs } , - �-f E, d k ., � �{{ _ , , .. ,.. .., ( i _ : _:..._ ,�: -+b :. : s � : ,., .. , ., . .� ,.�... . rs_. a.. . �... e, , ,t .... .+.o...�,-....,,_ � � . �,.... i: /] �'� r . � _. ., } . . . � � .t - :.i � .... ... .. .. , t. �. .rc .'� �.. .i, ,,. . _� . '. . . r� i f : � � . ' .. . . : �' -, ' �� .�� - . � i I:r . f _ / � ._: .. ...J,�'R 7 � .... .�.. ..: .. . '. , ...a4 '.. �.+�.: ....t -. P �T:._.. .� . �:.. .. ..: � /� . - . . . ...e. .._ . . .,s, ,. , , �. . ..,.. � . .:, - �.,. _ _ .. , �1 ( . .. �v . rt4 . ...._ .:S+.n� ... ...: �.... .�[ :�.�tt�.. ,:,�... _. � , . � . � �: . . V f .I � f �.. � �r ... . . }�J..� �q " . . .' .. .,'.. " " � .. � ,R 1 7, � � .� +w ...,... �-a-... � , ,,,,,at ' �.e.:?fb� ._ ,. .,+.: .. r..�.. , t _..::' - � ... . . . . : �_ � .; . . . .. �� - - . v:�. a_' '�.���° �Sw�'�., 74 V � • �.- � . _; ' _r•, � •� . .9y,�F,...::- �' 'n,'r.`,ii..� .. �..� . -..:'... .: ��._.� � ..� � , ��, .� . . . � � � � � . . ��1 �6 �� � . . '- �� ' ..�;..,. � �.. h�{M�f'H?;:nt�tiFi. ^ :�y...,:.; ,. "':�M��- '.:..'.�u..,,. t.c��:. ��r� . . . . � r�.��� . �- .. . _ - ', � _ ° d'�, � � '� 3 �. � .. ,�. ..Z.v .ro..,� ...� . .,.. .�.. , � k - � - . � - . , .,.:. _ . ,.n . . � � f - - . . ,.. . '"€s . �. , s .__. ,. _ , . ,. . . _.. _ j . .. . , • . � ' . � �`' i:3 ..� _.�r.;4� . 5: a� w�,,.. ,,f . � .�.�,:.._. .....5; �� .: ..... ... ....:. .� . .., ..�. _� �N� . �� . � � . . w... � i . . �. ., _ . E.J - �. ' .�s' ���� ,,..�. . � ;,:- _r , :l7.. .., .. :. . , - � a .. .. � .. .., .., . . . 1 i I .. . = ��. . . , ' .:- .; =.r . .. . �-- :�. ...,,�... � _,. ,w _rta.t::, _''�....�.:�., - ,.,� ������< .-:F ,.. .,. .� .- . _ .-� � . . . . �`- .zv. ��� �.w�e.=s.._��.., _ • � �m,,..;w... . ...a,: -� �; . �- , :. . -_ -�. .ft_ � .i ;; -:� -: . .:# y L � � � , '`�;,. .�-- ,E°. ; M � : -�. +'� �' ; �. '�'L ; . _ �r- ., ,�""�i� .•.'�"t�� ! .; , _. _ t _ � .. ,.. s��.F�' ,,� C � . . .:,��_. ', ' . . '__'_'�., , . � �,. 5, j..,� .a.� 'a ...�,.:�� �.. - ..r.-�. : �...::�:..'...-� ._ �.. , ��. .. _ ._ . . . _ � :.� : . _.. _ .. �. _ �. � . �# _. r .t �,. ___ ._._ __ ��- .. 4� r _ ` � _ �, .# __, � . _ . . • �1�1 . . 1 � .:� . < ,� p,;, ����. ,,r,�. . . : • � �; , .,, , . - � . : .�•�,"� x � _:,.,__.,_...� � �_.. _ ..- _-_--_ �__ r � t .F` . .� _. . - ,4:..�• � '.fy� -:� �. ..�:�', - , . ..�-�-.,,�._ ' . . �w� :..... ..���..+wsro....s w.. �.:.._;_. ..-: ;�„ :'.:. �.. ! :'� � . �� � • . _ i � � � . �. . .. �. -.e... , . " ' :. �+'..T�- 1fF: `��' 'E y� � . . x.,�. �..� - '-... �: .. .-:.. . .. Z . T ,. �i . .��•w � � �,.'�."t 2 -:..�: Y ...'_._ ... �: .. � . .:. :.. _ :.: . . .. � � - .�. ±9i+ _.. �-.r. 4 ^T,w , #1^....,.: � ._:. � . .-. . �� •4v(-'e� -, . .. �. '-..�. . ... � Y. . _. . .. , , . � �� . _.. . ;y�i.� . . .� , .. . . .. ..n.. . . � .' . �.-ws�,w.�.. ` , . .: � �. ; : � . , _ , ,. .. �� ... .r.. ,� .cw..� .,� ,�.:�.,.. ,::. . �: ��. .. ... .._ . �..,: � . _ -;� _ . . . . i?�� - . �, . K'a a�7"` �.w� .. y i :_... '�?. .0 �. .. �. �.t-. _.. .,:,�_ r .., �. .: . �. . �.. �.: . ., . ..- � - - � ' - .. . . . , . . z : '- y . _. �,__r� �.��' � � „� . ... . ._ _�. .. . . _. , . - 4 'a� �. � �, . -..: . ?� - ..:_ t.,c. r- .�;: . :. :>n �-..., ..., ; _. < < ... <. ,._ LE �:. s � � � a ,.. . .. : � .. . .: . _ _ . : s i JrJoav - , , , . :�;- -,�; ..,. ,.. . _:_ .. _ . .,._, : __,,.: r �. � ,__ � .�} , . . . � '. . , . . . ;.. _' . _ � . r . : I�'!" +1�+`�'' . I � � �..�� � ..� � . - F . -,-��,: : s. . ;, : ,,, EawE K � - a/ ---er--- . � .. i. • . � . . . . , . .. .. .. . r,. . ,: � _ , : . � . . _ , - �.,..�� ,: :, , ' i- . ' _ . . . . - S wp - � ���w�,. '�f f� { t f' 2� &� ���- �- �. ,c:kw r.., �. ,.. . � . ,. _:G �r : ::. :. . . . � - : � � < ..,:.,.;_ �,,_,._ . . - ... . ' - � �._. _ ::: .,. - . . " . � � . � - � ,. ..:, t . �^c_,. . . ..� .....:.., _. , .. . �; ��.. ._ ; . _, . . �w..�...Mr . . . . -� N _ . . �i..�� � , ;�. :_�xa .-, , - � ��, �;• � I ,, .� :, � � ;. ...� - �,` ,� �,,--,,.. , < , �. . .-."Y'..,' .� ���.� ��,.` t -., ,..:,,L �.-��.�. c �(�' - _ . _ . .�� ..... � F � � _ . . . � �1' - :�i`. � , i � � --. . v�. , �..� '� ;_-; .�,:_ . : .. - . - . � .. y.• . . � �F• � . �,_. -sa" . ... _.:. _ . h �+n'p't�� � _- x .. ::,•k w�h�^"w.` .�� : � .�.:�� . .�:: . _ . _ � . . . �s _ � w . . w �� .._ . : - _.. .._ y� .�:. : : , . �� �� . ...:,. - ,� �� . . � .��Y . F . ,� ; ,. a�.:MC- ��s. -, .. �. :�._�....-:r.. . ��� ,:�u.::.�„ : ` . .. ��� , . . - . ... . _... . . ' :� � .�7....9` �r..,�...:�,,-_..... . .. :, �'. :� . ..,.. �1 ` '.� . " r R.. . . ���\ �'Z' T_ c . . . :�y� �.�'. `f�. ' I r .. . � �,.. �R, '�:. _::"'. ��. .; ..,..-�,• . . : .. ... . . ..:... .. � . � . ;. .....��.:'.. . _ .�� . t . � . _ ' -.�; - . . {-�.:-.,,. �, ,. �.1�,,..� ,... .a ..., ,...,, t. �. �. , ._ oA. . �' .. �� . _� .._ R [ .� _ : .z�x,�,..... •-:. ��"'� ,,,.. -...._ - ' \ . --. ..-..-. • • . ' • '"„wir.'- s`,;,. .� : . .�� .;�_ . _ _. ,. _ . .. . . \ �:, y � • �' _: \ . . '� ��....., a� .._ .ff�'_ � 3r ����'?..... � . . -: . .. . '. �-. .., . �`.- . .. _ � . � 7 �' . - - -�' 'l.�.. :,.4X ! ti . � � . ,.�,��� ' . . . � . ,-�, ,.. .,, .�:w, ,� ,...; :.._.. :.. .- . .�fi . 0�7� , ^ ; :y . ,. , � ... , •, � #:F: . .. �'!, : �� .,� ,>.:: .. .; :, . . . . , _. ,. ; � � '. t g ��� _ � k+ � �� � :.. i� :z�' .�.v ....._-�-�,.�....x,t. # _--- . . � , , , . , , 4..., �-.. . _ ,. .- ,-.. , _ ; _ , .. ._ � . ..., �_ _ . 1 � _..... �, � �' . � , _ . .,,. .a,. ., :�:z .. • . . . _ ,. ., r. ,. ! . . . .. • r - - ; � Q�'�..� , . , .. : l� y : 4. � �. , < - f � : � _ .� r s ; , � � s.•��; �.. . �r_ .,.:,_ � /.� _ . �.� �. _. _. .. �`�'. . -.. _;. �.. , _ .�_ :... , .. ,_ . : _ : _ � � ti � . .- ... �. � ._ . �. _. ; _ _ �. r _. _ _ � <.0 .� .._ .: . . . . ( i ,�'; - e .,. , _ , . _ � ,, __ � R _ s.. ,� . .. . .. __, _ . _, �. �; '.^ • _ �: . �,.� ,, � _ - .� ..,_, ._ . ; . . . , � ,. . _. : � � . . w -�G ty�� � say � c%� �y o...-e § �YS .. . .. .:.��.,. .�I 4 �'� � � . . '...� " ':. � 1 .. . . •y �: ' "^$'t � r».. r ? " s ty'.. .� Y + . � . . . . . . � �t+ ` "� fn . " . , • " . . . _ . . .'.,,�, � M� � 1 . � i�. �k i S -��e ... T1 Y _ ��.: . - . . ' . . . i. .'�".- ` �. . �,' "� r� ..�.:i : �.,,i, - . ��� . ..�'�:-�. .� . ...:.,. .��r . . . A � -� -, ." " �kd':��. ' �� � : e , . .''r� :.,-;... '-.k . . . N .. tt-� , . .- .. .`�.. . � � . r . - . . - � . � . ; ... ....:. �r�- . s..e:,:,.: . y�a;. �-c.� -;_� ,. �:�+ •,., . t .: .. �. . �-� _ . . 'F��: . . . � �,�..,..... :. ,,,< v ...� ��.. .. ��.... ... :,,. a4 ,.... {fs/' �. . . :. . . . : .-. .,�. -. � -.. . . �,y .s-Yw..- . �' � �a `<:� ; ,es' .2aF�. . �. _ .':,. .. ,.. ., �" . ;' .�r - � - � �: f �.. . �. � .� - . . <Y, i-a: -. , ..s:. .9t.. ,L .'. -,:-: ,.p -._ .:.. v-���.v.�,.. .. �� .. --- r. .a� • ....�. � „_.... . .. . . . ' . ♦ .. � ;� �'c � '� � .1..'ie.: .v � �-. ...VY,. .._.. ,... �........ 'S�.'c..?._..�...M�� �.. ! :,.. .. .,\. �..�. ....�...- 1. . �r �(e . . . . J . . ... .. .. _.. .. '. _.�.. � : F...,., � ... ... _.,..s_ _ , .:.�....✓.+', .x ,,...: �.� - . .. �'� . . . " . .' . �� � � . . . �� C. ,¢ ... . � ..�. ,.. , , .�.ir v ..,� �^l� � .. :_. ..r-: _ _�. .., . S' _ -. .. _ �. ' . . _ � I{ -�-. .. . 'C �. . - n . ,� . . . . � �.... .c�. ..`_:. . ... . ...: .< - ; , .....s_... . - ,. .... 1 ,: ._- ' _.�"� ..... . .�� . . . . - yw:.' ,d�. . .. t. ... . . . ... �. _ _ ... .... . _ ..� . � : 1 ; . - i � � _.�-...'1$0 . J' .':i��:... � ...... __:.._ . ..- �... _. � -_- . . . -.�. - . . , � � . �' � :� . , -: �,.. .: . �� � � � w . . ..:.. 'w; :-•. ,r -._. � : , .��' '. '.s' - . . _..z"`x .n.:: . : � ..:�" r..�__ . .. _ . �'.- . r t t . . . . . 7F `� s� ��iS �: ..;�.. ... x ._.... .... � ' . .'" . x.2' . . . . ' / ,. : .". -... . .., . . .,'�a-�....... ...wh, +w ..-..�..... . . ._...:�.: -.::. ,�.. . -..:. . .. ,. . . ... : -:. j .. .: - ' . ...: ' � . .; - ��� ' .� � � [ W .. �. �- / + �, .n -. ... ..� -. � ..:.. . ...�..�.� .:._.. ', g, "�'�' : ..1b�..�. �,`" r�.�. 6..-. �i.-. ., .. ...�u• A . _. . . � . . . � . . . ,.. , ,: ... pr. .. .R .c..d� e �..... `�.� _ . .�. :.. ... _ . _ - ... �_.� � i . . -.. .:.� ...- . . �.. . _ � . ^. :,.._ .nv..,r ._....._ .. k r , ,,. _ . �� ,�: '�3c..'�: �. �..�,_ ,_ ., ._.:, _ _ . �_. .. _ _ � . . _ : _ : a - .... _ _,. „ .,, _ . : _, :. _ . _ _____...� --. � : � , . . , , ; _ ,:_:;. � �. ., . , ,. ._. tu .., , _. _ ... , : _ _. . __ ; �r _ _ ,, . _: . . . ., . _ . . �_ �. �-...,. � _ _ .:.... . _ '�� . ��z � <... ..: - � . ,. �i"� . � � � . � . _. . _. _ �. .. �, _ �- ,s -.., .. . . . -� , .,_ _ . . - ( -r : - . . ;: _ .._ . .� � , �, ; , ., ... � . �„ . ._.. . ,. ..,,� ,_ . ... �'���� y� _.. � �. �,_, ,.x , �t ,..: ._.. .._t-_ � . ' � " . - �, . '.� 3... ..::. �,:_, '�, r_ ,,.:, , «. �,-k. ,,,. r .. ,_ ... <.- .._rc.. .'� -: .. �.:: � - .. . : ...ti. . - . :�.'' �''..- . . . . � .. -.. .�.�. �� ,.. - . . � . �. ..: �. �-:z� ��: ... iu . . . � �' Q , � : � - ��'.:� .. .,: �. . . ,.,,-. , ! A x ,��u , u,. � ,�. , . , . , � .. . - P . ! F ` . - r. � :. � k , .�?'{� �'m.. : , . ._ -. .. K.. ._;.,_ . �: . .. , . . . . �. .. " . - . : . .. ...,� . '�. .�n � .., " - _ ' _ '. ' +'* ' .. . �nr � �e .. �.. : . ". ,-� : vi'„�. . �:.: ' ,. :. _.. � - �:. �. :. ' ._'.;1. , �. .11 �,..5 � ff . _. `�. . _ w._.: . .. t.�,.. _; ,. � ..__._. � �! � � * ,.:��,. . . .Tr ,�. �v �. . �. ., . l..:.......�. _.. . 5.. . .-.�; , .. ..� .. �.. .. i ,. _&k.� .. .....:.. .. .. _ . -.:.: ... ...: . -. ....a '.��� � - � ' � .'...� . -�. -.. -.:. . _. '.:: � .f' t�)-. . ... ,... .. .. .�. ._:._�. ' •'.i. . .. Y�i� � �..�� ... ... .. ....'. ... .. �..�: �., � . . :_.. ._:. . _. :.. . . . .. '.. .. .._.. :'. ��� � .r.?4- ^.. ��-. ��_..,•.. .,..i. .� .-a4r. ,� .::':�. ,= _.�:-�, . . .., -. - . , ,. n . ,.... .. . . _ . _ ... ��...: � . . . . . . . `�" 7 . .e . _ . . _. � . . , _ ,, .; : ^w., ., a.__ rtr . �,,.,,�_ ,:�.. ,, . ;. . .,.... ,.., _ .. ,, - .�:.: -.� - �. ; n,,.. � . _'C . . , � , s�e . �...,,e . . .. ._ . . �, . .. , l . .Sr_ ... , ,__ .. .., . : ... - � � . � . . � . _ . . . . . . . -�'+- _ . . .. � t-., s :. - , c = . .. � . � . _ � . i , ,. _ . �1. .;... yn. •` ; g � "�-'� �, ,. u , � �. . .. , - . r � ,�:.�:,_ � ..,,� „_ . . � ... _,, _ ..;�.: ::�,> �; �, ,. ::e ; .► � - � ,'�c�', l ,. ... _.. .:., a�.n ,. _ , �. ,.:r: . _.. :. .. ` � � - -u . � 3 -.:. .. :..: , �... , _. .. _',�:�' ,::..-... . , . . ':.-' � ' � � . � •`!� ..._ . �� .� � . . '. <..�... . . . , � . . .. � .. . A v ,- � : " e . �...1:- .a '.:::�.. ...::. "- . --. -.'.. . �.:� �. . �, . . . �J� ...: . _ _ ���- . . - .,. .. � ' . �. .x �r.....3' _ �:._ >�. .� . _ _.. -�:..:. s.A� �. - _ . ..... :... �.: _ . ._: .� .. .� . _ , . � .:,�� �� .....a � . . _:+}..�....�: V.... v .. . � a e.:.. , .......-.. .... ♦� ..r.. -,t - � �. , .:.-_ ....r. ._ '�. .�Ix �. .�s. �.n• : .... . '�,-. .�. . . I . - _. tvs .:..,.._. .-..:. . .-;..... G,-'..,. � . . � .�.�:: .. _. .. .. � n. �:1 �s '.. ... �� (: ... � �w , �, .F._ � ._e , - � . - . .., _, . ,.... �. _ . ,_ . � �. . � .. _ .. . � . . _ . .. I . .. . .. . . .. .... "� .-:- . �+I�Y.�' .. . . .� ._.. ._.�_..� , .� _. .a. �� . . . . _ - � � � ti �., .. -.� ..� �• . . : . _�.._.�..._ .. . � � . 't--.. . _.� ... �:' [ : '- . . � }, ' � • • ' � F 1� t - ' ti ,. ., if , : .�;. .....,. _... . �.'. .. .:..,... �rl°„�.. �.. �. ,: � 1 . � . . .. _. . �. � .. � t ^: :. � � � � .'-� V _ ' �` i y <� _� �� �.,-. Ji . `A ._ ..: d ..:'� ..`- 2 ���,- .. a. .�4 .v.. � ' � { : i i , .,,..� r ...., -, . .a.... ,.... v t ,. - - . �._� �� ., -� � - . ..r � .. . �:�w - _ : . .� ...�,:._...� . :....�.. ,_ ...,� .. �:-, . ., . . , .. �Ldl�': ., ... .:... ..._.. . �. , � _� . . _ ... � .��-.._. -�, . �' . ,._... .. ._ . - .:� :._.:. .r r _.. �,, . ,.. . ��. .. ..r. - .v/�. t., . .. - .... , u . . _. .. ... . ., �..d _...� . . .'."� . .. .�. . . . . �. _ . ,- ...:: . .n 7�'_...... -. , ..: ..... ._..._ � .... �� . . _, , ,,. �.. .��. � .:.:.. .... . . .�._.:3, .'., _ ..�,..v ' �_ t � . 1..,. .. .. ............ ... :.... ...._ ..... .. ,. . 7�� . . s .. .a. . � �:._. . .�E. .. � .w• .: +�. .. , .. .. ., . .. � �� . t . : . . �: z� v . ,� . , ._. _ _ . _ .�. _ _ I � _ .., , ., . _... 4 s . . . . ?x. . . � .. .�. . �. :- _ _ � t �V .. _ : , . , . ,, � . .. .. ?�:'�; .. _ ...v �:.. . .F�- . . ._.,. ... :: � ... . .,... i_ . _ . . .. -. _. . . . _' � � � . r �:..�. . .,. ..n ..z ..., ::' . ... :'b. s ;. ,_��. , w.: .. � _�....__ ,,... .�. ., _ _ _ � � �r ,c*L/ �►�'"' f � ' ,_ _ .. . , � . .- ._ �� . , �+ , ._.. .. _ ., _: :. _. . - �. �� u. �. . ... _ _ . _ _ � _..�. �x �.. ., > ... . � . ...... .. _...... .:...� i. .. _ ».. . ..,..,,. ,.. .._. . _.� �. , . ._ _. _ r _ .. - - ! ,. < _ . , » . ,: .... , ,, .� �, . .,._ _ . , F. - ,_ ..__ ., ,. _ . , „ . ,., . . _ _.;..: _ . ...,. . .. ; . � . .. , > , �,v,_ _ . _. � .�.- ,,� , � , • � .s._ .. rm�;�r'• :. ..., ... ...:. . .. _ . . . :�. __�_�� . . . - . . , ,. . �. .� . �:. ^►�.�� . .:r � .<.e. ::�.:.. �_, �. ,. . :.._.. _..� . . . . � �_. .. . ..� �. .,�. ; -... '�; . _.,a...� �.:�� �._.... ........ x. :.:-.., ., ��_:. ..:, :. . �.. _--.:. �-� . � . � . I'l�a�. . . . . ...:�- -. _� +�`we� r� �. � - ...� < .. �� ::...._ �.,. _. �:... ,_ .........�. �-: . .. . � , r . . � � . . ,. rr, ._ �7si11�1'� . 1 ...,:. . _ .. .. ...,, .. ,. __ ,. . . . P ti.. � A . ,,..: �, . =_, _ d . .x. �, .... , . _. _ ��. � " . _ � �.< __ _ _ . ; , _ ; . _-. �� �. � . . .� . . ., - _ . : : .: ..,: < . ��. ,.. ,_, ,_ _ ,_. . _;.: � . .,.� , �; � �.� . _ _... : _ . � . . , .. , ... ,�� ,. � . _..�. ,, • , �.�4 . . ._ . � . _ _ p � _ ,. , � ... �=; ... .. ..x s . ,._ :. . , -_ _ r _ , . � . . . . �.?�. _ -..-� ��, �a. . .:. x.. ., . . .�.�. ,. .....__. . -. . ... E . . . . . - � . . . i.�.. � . �, � f - .__ . � ... . . .... �.. _ .,;.. , . ._ . � , � - ; _._., ., .� .:..- .�,-: '�! . --- -_.-�� .. �:� . .. , ...� f�4� C a <.,. ..,.. .�. ..._ , �i ..;.} ..,, ���� , �- f�.. �.... -..u3,.t., .,..: . : _,--. . . _ .,. .. . .....,.�,... �� . . . � V*� �. . . - - _ .� <. . ... , _ , , _ .,. . 6 : 5 . _ _. _ . ; . �� , . ? . � _ . �? ._:., _ �,,. . _ , _ _ .. <. __ . 1 . + �! . , «� ,, , , , r. , .., d . .� t , � . _�� -- ,.:.. _ _ - . �,..�__ . _ . __.�_ �` _ i ... _. . � � � -'� ; . �, ,j�F. ., 4.,.. -�� .:. . .,..- . ,.: -<-_ �,. . - _ 1 �.. „ t �� .,�., . „ _.z, _ . � Q 1 _ . ... _ . � , .. . . ... .. . . , ,; - • , . . F � � ���J.� . .: � .. � . � .. � � �• 5 . �..:.. ..'�' :e.�. . , '�. �:' . . . . . . . � .� . ' '1�" 'iI . - ;. !. :�. '�.�.: . :.:. .:'o.. 'F .: t� � ke � � �._ ...r :• � . " , % ,� ;Y S� R �� . , ,. -_ � ._.... .:...._.�� . . ��"_. � � . . ..-.. .. . . . i . , } . ._... � . .. _. .. . .,: D ,�e.. ... . . .4 .. x q,� � ' . ., :..- . xE..� R; . � -+. e�... �>. �... � .,. _.:�. ....�-��.... . � . . �� ., r+*i �� r ._ .� , . +� �.,:L �ca.,. ...,.. � ., .I' .^'� .. ��.. , . ._ .. . - ..�. .. . .... . . . - � � : .. ! ... ._� .t'� -. .. �L, .., . -� ,, r �-' ...4, .. ` _ , �. - � . .--. ,. � ... , � �. . _.,.. , .. .. .: . �. . . .-�M! �- � � : ...fi�. .. �+w � . .. �. : -. .,_ � ,., 3 � . .R;:� _ . r . e:�: �.,.-w. . ,�� . �!i , -y:�.ti . .. .:.., ,, ;,., � d ._'h.. .: - ,�� ....�-. .4.,.... .....':.,.:... _..._ .. :.... _ ..�:.... �. . �"T/ . . . �^C�. .. ,.-.. ... ...,, +�?�.. �.� ;. , u;:�,.:�. � 1i, � -� .,C._. :#� . .. .: . :: t. .� . ". '� �. �..� , �,- .;.. ' -� .,_: r� .,.:.. ,..-,.., �. . ....:,.� . i �. - ... � , :., , ,�. . �.�,:- _ , ..r :, . .� , . . . . �' { .� . , . > .�'� r-.� _ _ . . ..,n , 4 ._�_ , ,. _, i_� �. .. ,. . _ . . _ . .. � .�: � _ _. �-- , ,. �._ �:. , , : , . ,. �. , _ , . � _ . , , . _ � . --�--- ,� ._ , . �..... ,... -. . _ _ . c� � ,r� � � t , � . . , .. , �.. .. , a _ , _ . �.� ._ =x < - ,, . _ i .: � .. ; . ; _. z _ - � _ � , � ,. , . .� . � � ,,;,r , _ ,. . . � . r . ,,, �. , - • .yy . - . .�,: _.. - • _ �� . _ �' _ . � . : _ . ; . �. ��� k : , . , �� ..� � +a� � � - ._ �:,.� , _.�_. :. � . ,. ._ . �.' .:... .�-,.�-�.�:�. . . �- ' .. .. ` a .... ...,,,. �:. �. �:.�, � _.'- -P '� �-"� .k.'� . � _..:., �' „_. �;: r.. , v...,e�� . .. _. ._..:. _. .. _ , �:� . . �;,.. . . - k �. � � - . . ,. � �. . - -, . ,: . . . _. A -«<.M . ,,. -. _. � , . _ S � .. . . s�. �a*+' �sf , . . , .. :.. . t . . * . ` , � _;. �f � ., � i� � 2 . .�, � .,� .. .....,. . .,.... �.. ... � .�9;a+t,�4' . ....�:"-. '- :. .�.. . . . ._� . -..... �! .�G ..�F '.i� ais h �� , ..4wi.4.? .. � . f F . . � � . .. ' _ _ .. , � �.?T .! ... � . .. ........ .... . . ..... .�_...., . � . - . . � � �.. . . ,_' � _. a. .�' . � �,3.-��� ... .._ ... � .. ... .. � �_-.. ,.. _ --------^"-.'"`--�-- �• . � , . ... . .. :,. . . -. .. �. � ,r� :, �, � .a6 ..... -� . � - � . ��. ..,x. v: ... _�o-e -. -.-,� .....::.�-.. �-...:.:�.. _ . . . _.... � . � ! .i.. . a • .�� ...._ - ...� ,. . . �: .._ . -� .. t � t - . . . ..,. .���Sy .:., � - �_ .:r�,.. _ .,,. ... . .1.:�.,,.-.�..�, .�,., . �..,>_,.� �,. . ..: . . . _ �._ _ r , , s �.... � .._ w. , R N ; hE.�'( � � O�Ft .,,o . . ,. ,:���. .. , , . _ �, ;: � _ , .� 1� . _... _,, a _ �, � -� i _ - , .�... .. �.�� ,> . ._;,. . . : ,. .. ..,. :.: - _ . � ,. � --- . � _ ,�.s� . .,.,�..s-.F_ , . , , . � .: ......�... .�► ...;.�:_ � '� s - 4 �. � . �, � . � . . � .. y _ �,. ...,,,. . . _� ,. . . . . � . �_ .. �, � .: _ ,; _, _ . ,. . ..,._.,: _ �. �. . _ . _� . . ,. � _ , _ - �. : ,. � . .� . �... � ._ ... __.: _ _. . _..___ . .: . ... _ _ .�.. _.. _ ._ � t ._ � .,r _�. � � A � i + � 1 ��. `J`� I � � ��1 �` � 6. � �� � , � � �� � � � ��? � �� �� � .{� � �� � s. .. .... _ � �� , , ,, � _ �.. ( � I w � ,�. ! � ;� - � rr �y : � , ., . „ ' _,.'- ' � � ;�- g. _ , n,.. 2 � . .-.. - _...... x ,.��<..� a . � ._ � --.-: i . . . � ..'� . � �( �y �l 1 I � t . .�E' . .v. . <;.�..... r �:��_� .,,, _ _.. .�, . ..�- : - �: �.- . � �. - ,.. � :.c . � . , }.,fi..L.` ; • .. . .�.��. ..:.: u... �...: �.. �- " ar t _- ��_ . „^..��, . . . . �:. _ / .: �" � �_... :, . '�. k s� 'ir . . , f. r �..' z ., : .... .,. � � , .. .. _ . _ . � �ir-.I �rY��y� V y . y - '�. . . _ � k, t `�,y� ,_ ( � _ _ �.. , � _ ... ' ., i[ : ....,.. ' A ..;: a.:._: . :;:: �+ ���.. �. �� - , b'V _:"c,..G.F�T .- . . . . � . . . . . s jti. Iwi . /r . f � - Mk" ,. .., ,�;..� +A; � . . .: w-�. . . J . t f R� . 'ft� 1�C► , j : �.. �_�, .,_ �.iP_ � t . , �" E� .� ... .. -_ , M . . .. � 1 .° ' : R. ' :.:!„ �. . ., ._ . , . .. . ; . . " �P > �:�p'.A:K ... . .. ";,: .::� ': .�.- . . . . . . �.... . . � . ». . f ',. f _ . .... .. . .� .., ,.:. ... . . . .'.' � . _ .'-_ _. . ' � . . . . � . -�', . - r' �Sk'tl.- ...., .- , r.: . - I� �:.., . � �• . . .. - . �-� - �,T. : -.� °':._ '.:., '•�*� .. �SC,�rii�Y. , �.:��: , c,....� . . � . :}�f. . . . . . .: .. .. .. ,.. :..'. ._ .�� �" �..: .,,� � i 4 "': ,. � . . : . ' ..> .,. .�. .. �. ��. . a r-Ffiir#�.rf�� . . , ..�_F� :. ,., � . � _:.:., _ .. . . ':, . <'.: >: c- . � ��. . ... � . . - ' - �` _ � '� "': �:... ... :.,t :r �.. ..+a + � .,.�,.. . -,.. , . . . . , ,-i .x - . _. . � �..., .. .. . � . . . . . ,�. . . � '- -..___ . . i '� __ ..� . - �t .. i'..:.. � . . : ..:'- �. �..:. .: - . .. . -. ... _� � . _ . -.. ..:-.. . " �". . .s� ;.-; ,+4' . F . � � y � � � � - , ,,s++ , . "� ',: 'c^ �' , . , . , �. � ,�t.. , ... ..� _� : ,,. . . . , � ; t , . ., _, � .,� � �� , c� � � . , _ �_ , '� � A. . �.. . . , - . . - ;' , _ . : . ��� �. _ �,,.� . �`�' �: ; : , , � �;: .�ns i . - �"�` � � , � , ,.. : F,r.. : `" : .� y 4 , :_ . ` � _ . , } +„-, . , a ws > �.., ,.� ?: ----- _ .. _ :. . . , -;,��„- _ .� . � ..�..� . �r�;�� � t-----' - �c , � � � , .� � : -, - � � �' .' ° ;� �± � � . � . . y .. �. .: : ,'Fi-. .�J�. " � a ^ c s� �. t s !? � �p,i, �.9h�� _r . � � . . . .. . �� . - . � ". :� r . . - . .�:'�l' �+i, � �. ... � � w � � ; .S< .'�. - y � y - .. . T �� � $ � ' �� . " . _.. . . .. � � � � �I. . � ' !� . . . .� � t.-� � �� . � }�.�f . p ,.� �. ^ yyy , 1R' .� ; i+ a1i,.'. . � � f � .. _ 2�.. v�: - . .} ... . . . 1nr�Tw Rr , � : . . _ �. , �.. . . . . ,. �„- . 4 + = � E � •`7�e1F�tit-�►�. . . . y - � � .' �-�? _ � '��-� � , �> : .,�_.� �� .:., f . .. � e .,�. , . _ - y . ` � � / f � � � .� ; ,� � rf'� ':.i , _, . .�. 7 t..,. � � .. .,:.-� _ � .,:�:, �- . . . f � .. � +. � � S �. � .�i � ..H . �' „ � . .. � . .� ,. � � �t} ��f , . :e _ �. ��� . �r- .e - �� -.�.� �. .: , . _. - . r :/ . = ::. _. .. � � :.. � _..,..._ __ . _ _. . _'_ .-._�._ . ___. .. . . : z:,.� :,,� n-,- .. . . . . . � . . . ' . ,. �:. ; . . _ . . , Y ._ _ .. ,�... .:..: . . , �r . � . �""""' ._ , . � ... . ..": � ��w+^ � A �Y ...� �c.. �. � - ,,.. ; N . , , g ,. . .._. .:., . . . - 1�s.-aar,.. �. �./L' f...,.�,.....,..L, . � � �r - ,. . � ,:_ � , . . . . . ,�'� , - ' '� s; t r • f ;: ,: , ; ,. _ _ _ _ :_ �^. r . ` ' , . 3^'wrw� �.. � . . . `: , �;.,, , , ... . � � . , , � . :- � . , �. . - - . . .. � , . . . � + �,.s.�� w r; _ �. ,.r� � � .� -� ; �. .r ,: ,�..� . , � � .�. .., . . �� � . . . _ ,� .... , . . ,:_ ,...."' �.,: - . ..� �' . � . .. �.. �. .�. ... . . . , . ' �'.�z_ JK.r31"'� � �. � V � � k �i �� �. 1 � � . 1 � . i . . .` : J �Y.. ` -` .. ... ..::: .i � ' 'Z�..� ... �-: s -=�;�"' ^ " ''�i, :.. . � . .. . � ... _- . -..:.f '.:y. :i � �1 . . .. �.. .� . . . -. , . �.,:� . _ . . � .. ..: ,y`' ' �+'i"'i� .. � �::. r �. ,., � ._'. � Y � :;� < .'..:".. . . .. . `:: -. . . _: . , , '- - ..+�"'r-� �.iL t ' y � .L�. +W1.3 ' * .,. Y:.- :. ' 'a ya., -. � . . /.. . _ , ,-�. :. �..`�_ :-:. �. ..._.. . r. E- /��� v �"'' r = : ; w .. ,.. ��.. :, .:. ,..-:_ - �. � � .: ; ,_: .. „ r. � ,.. ., ,. S jrk� t �� ..n.. Y� ,.e _ .... - �..,. .�. � - . l � �Fnr � 6t�� •. ,.w .,�.�;: � :f.,''' ."F-'.M� iii°.. �.. -.�d t ` ..,�. ,' " ' � +� �` �*����'"� x ;s'4_�' ':" `•� � '� � � _.... � ���.' . � . - .. �. . . �4.� L+t r � _ . , �.o-' , � .? �a.. 'k` - � � ...� � {�.�'.x� sv-� ,-�' �,�-ak.�+":_ ' - _ � .:. .. . . S . . . .. . y , f.._ . .�!" .t. �ea+'. "E4 ': Y� •- � . . �: � ��`'.,.��ua.� . .� i' �,.�_�-;. �:.1,��i. �._. . X. _ . Y ��,� _ /^ . * . i " � ( �4 p , :'�, �` v . �`�� , ( t .. . r. - . . �:.:� ��7 -.: � �< ' r;�.., ":�r: - ,. ..: . . � :: ,- , .� � Yv �V �� ,.� -<�,. �t: ... ,. . . .._ .� �r; .: _ : � � .. .<::F. ;�. ,... . . . .. ,�.• ���:. . . . . : k y� i:. . � ; . = � ��. �•� .�^` <.i � . .,� . r x .::.. , � � . . . � ..._. . . �'� �.. � ,_�.. , .. ��;_ . _ .. .- .::.:. . r.... �..:.. `''�'& - �Kt " . .�'`.. _:,. yF .:.,_.. . .,,�,� "! :w.,+ �r.. � . .,. .. ; ... --�� ... . . . , .�, . ..: .. � ,. #��• i t � . �. P, �3:, . .-� :...r�, ..�: ,�. a..2�x -,�, . .;:.._. .: � . ..�,=.. . _..... .. . . ... : ! � . . , `: �,, .d, ,.. �, :: ..:. t .. ; ,, r.,,> ,� �,. .. . , ,. - � - . , �. , . � _ . , . ._ �;:�'� � .::,.., . t..�:�:,., '�,. M .. .. . . � . . . . . .:�c_. ,.a; �^��:�� .�a _ .. ... .. , �, .� ., ;.:.. �. �--..� r.. . . ._�. - - - � . . t - :{.; . � , � .. - ,, p� � ,G!..C� . . ,: �a �'y_.-. .,! � +PCf"_. . . . � ... , � . . . . . � ;};- � ' . ✓ ?� �, . . � , . . ... , �._ :.- .. _. � �� � ' � � .:.:� ��2 .: -�. . .. , . :-:�' .'.., . . .. � s.... . - , .. - . . "V '. . .�.t�:� �., aeM :'� . .. . . . . . .,..ry. _ . � �M�' a� I' x: aj' . � ...."�� ..�,.. . . .::.. ... ... ... . ...,.. __ ....=_ ',aG- y� �k` ' J,e = r ,:- . . .. . �. . . . . -. .._ .:.. � ,. .,. ... .�. ...... .. . .. . .. . . .. .n.. .., '.,,. .i • , .- "4 � V. . x '. }� } r;k. 1:. _ ., p � j . �, .' .. A.... �. . .♦ .� ♦ yy ....._. ��.. : � . . , . . .� .. . . . .... �_ . -. _.. .... ,,,...... _ . , � � ::.. ... .. ., ,. .�- `..d�'.� � +a, . . � �. ,r �. �, . ., � . __. ,_ _ >,: _ .r,.� . .,. ,. , _ - a.' �, . .� ,3.�.. . . .,. .. r.� a .� F ..�... .�.�SC,S.. ..._.. �: . ... . .. .... _�.,, .. ... .... ;. �... �._.���: . ... . .. .�... ' �j- �I�' - . y ': f ...,-...: ♦. _,� . � � rW..t , � .., tl..�: , . �.;. ... � .. _.- ..... ._,..... . :�- ... �-_ C��� V: °fL . 1...,. . :.,.. .. �.. .. _ .... .�... ...,_�..:-. ....... . r. n- _ �. �. ..� � .... ... . . ..,�s.� 'l.... �.. .{!.� ��� �� r�'d'.. ... . .. .. . ...-�. .. ., ... ... s..... ����.., .. +[t.::... �.. . r.. . . .:r. . ,.. :. :..::. ... . . ` ��K ' 'Q1 . �. v_ ... .. ._ �. .. . .,�a , �., .: .���. .::.. .. .�: .:- . , a. ...... ..a.., : �.;., '•�..2-. �...�.: '_. :�v I l*�� . r ... ....... ..... . „ ..l . ..�. �.:�_.,. .... . .. u.,..., �, �.:......1..:... . �.�:._ ... .. ... . I f.:s ".F1w. S� ; .. .. ...., ..,..'r.t .. . �..:r>� ..:. _... _� .. ,.- � �- _ .-,:-. �a. . , . ....�.,-•... . �a �:F/^'. �`r: � ,. ,. �... . ,. . : ,. . �,,.. �-. . . . . _ . , - - •�! ..-�� ..:. _.... :,_ ,. _. . ... . _._: �. ,.,. .�� �. _�.,c� _ ,- . . .... ..�. .... : �:. _. ���.Y...-. ".. .�.�: :_:, � `J. ... . . . �. .. � :.r.. ., ... 'M�:. .. . ., .... , - . - � . �� , . ., . :... t�.. ���{ "C,; . , � �.. 1 ._ .. �. �;i...�., :. �.. 1. �ntWr_.�.. �....:_... .':'� ..:� .. ..... ... . . .. ...: .� . ��..,. .. .. �.,..� . . ..... .. . .. .. .._- � ._, ..�.. '. .c.t.. " _.. .__: �....� .... ,.. ...... ..� ... .. �� y��.� �Y � . � � ` � �� a _ .E _ . �� �;. .... yt'.. ._..�. .-,.� .._.. ..::..., ..�. �...:- '% ..� .i� ..� .+-....�.... .a. -r .. . .. ,s... �'., . . '�IR . .. . _-.. .. .. . ......: .. . . . ... .:...: ... �. �..... ...... ..�,. . . ; . -:Xt . ..... .. . _ : � . . �.�. ; .. , . .:: . .. � . ., . � . ., , . ... . . , _. , . .. .,__ . . .. �.. .. . ... :-. . . .. ,� .. . � . � .. . , . .. s... ... r. � ,..�. , - .,.. �.; . . ,,, . „� ..: .... =..; ��.. �, �.. s ..: .. .. ._._ ....-.. �... . ..... ... .. ,.. ... ... .... .. ... ..,..,. . , .. . .... .. ..,.. . ...... i' _.� r , . � _ . . . . ._ . , i � -.� . _ � .. .. .. _ _ . .. . - ,-... �.�, . . . 4 : . . .. .. .:. . . . . . . YS., . . . . - , ., E . ._ .... �.. , . . .« .,,.._ ,...��.. ....,.. � - - �_ .. ��. .... .r„_., ,..... .. .,. �,. �... . � , ". _ .. . _ .. . . ... .... .�. . ..., �. _. : �_.. .. ... , . .. � „ , .. -o. ... � ., . . '.R a.. .:.w.s ...e_. . .... ._ � -.. . . : .. . .. ...- .,C!. .. , . ..-� .. ,.... _�...:.._ . ., .. -.�.. . . .,.. .,.:.. .,.:..t., .,. ,..'A.'a . .. . ,.. .. .. . ., . ., - ¢:- : ....,.. . :�. _. � .._,..... , �. .s .� ..: ��. .�.: ,. �: �,.... .. -::��• . .... ., .. ,... . . . , .,;.,.�. . , ... _��.�.,. , , .>�..,.,. ....,. �:.n , �,., . ,�-,;..,.: . .. ........ ._.._ . ., ... . .. ;. ,.. .aa�, . kw ,. S._ . .,. .x+A a. ,� .._ �...._i ..:. .,, �F..... .�,. . ,.. :.. _.,._ .-._.. . ,.. .. . ,.... �.. , . . ..: .,, . . ,. -,.�' ... i:. . .�. _ , t_. w,� .. � .-..-- -. ..r.. 'k�...:� . �. . . . , .,. . _ ,.,..» -, .. . .. .. . ...-. .� : .�3; . _.�s�.-.� ..M.r _ .. _ . ,� ,.. , '�,a�'°�c.. -�.. . . . . . _ .. _,_ �._ .. . .. � . _ _ _. .. .. .. _ __ _��' ., , .. a¢.� . .� '�"w. ti= � - �'�;�"!":. . �' ...� . _ . . . t . . . . . . . x _ . �..�.. �- � . , . . ,� .'�e"�'+,r,_.. ,v. . .>. . _..��,�::�-. .. ,,.: ,.�.- a'... ,,, : ..?�,.� ...�tE."� .�' : '�' �.: � - . ..,.., : , ., , , �..�.. . . _,.. . . _._. . . . . .. .. . . .. . ....... . . .-... ..,, :s�.... . . , _... . n , . , +� .. _ .- ..�. . _ . .:. . .. . . .. .� . .�. .. � ., wrt-'��.. ..r:w.. ..: ' - ,�:, : � � � �. .. � '� '�.i �- � . . ., ' : '+ . � . . . .�-� . .. 1 - . _.. . . . ., ::,:, . .. . � �., . �� . .;�y'Q-^ � � ` � . . OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 C U P E RT I N O (408) 777-3308 • FAX (408) 777-3333 • plaiuwlg@cupertino.or� PLANNING COMMISSION STAFF REPORT Agenda Item No: 5 Agenda Date: Tune 14, 2011 Applications: U-2010-02, TR-2011-09 Applicant/Owner: Tony Chen and Yunjian Zou (O-Mei Taichi Culture Academy)/Charles Chan Property Location: 10070 Imperial Avenue (APN 357-17-066) APPLICATION SUMMARY: 1. Use Permit (U-2010-02) to allow a day care center with an after-school learning program at an existing 5,600 square foot office building. 2. Tree Removal Permit (TR-2011-09) to allow the removal and replacement of three (3) trees. RECOMMENDATION: Staff recommends that the Plannulg Con�unission: Approve the Use Permit (U-2010-02) and Tree Removal Permit (TR-2011-09) in accordance with the draft resolutions. PROJECT DATA: General Plan Desi ation Nei hborhood Commercial/Residential Zoning Designation P(CN, ML, Res 4-12 DU/AC)- Planned Development with Neighborhood Commercial, Light Industrial, and Residential uses between 4 and 12 dwellin units er acre Environmental Assessment Cate oricall Exem t Lot Size 16,900 s uare feet .39 acres Existing Building Area 5,600 s uare feet Proposed Buildin Area None Existin Parkin Stalls 9 Required/Provided Parking 7 required,l3 provided Stalls Existin hei ht 14 feet 6 inches roposed number of children 40 `� Proposed number of staff 4 Proposed hours of operation 12 m to 6:30 m(re lar); 8:30am to 6:30 m Summer) BACKGROUND: The project site is located at 10070 Imperial Avenue at the eastern terminus of Granada Avenue. The previous use at the site included offices for Comcast. The building was designed as an office building and built under the jurisdiction of Santa Clara County and annexed into the City in 1980. There are general commercial uses to the north; the Astoria condominiums to the south; single-family housing and automotive repair uses to the west; and the Union Pacific railroad tracks to the east. See the vicinity aerial below: 63 U-2010-02, TR-2011-09 O-Mei Taichi Culture Academy June 14, 2011 ----�-�-- , � . � .� , a ' p ��.' + +w/1�1� �� � '� _ � �� �. � %''.- . �I � � � f /►� „ ` .. .�.� � �::. � ���. � / r !�`�� , �, � �, -4 � t ; �`� � � � � �;� � � �,. � �. ' � �� �- � : • : � :. .�'� '�'� � . � �.��.�. � z ���� � � �� . . �. �` � � . �w� � � �' . .� Commercial uses� •` � .� ��, � �, ." �► --- r �- " �` � : � �. ,:,_ ��UtO I`e�dll" �� � � � _ � "���'�#� _ '� . , ++ , � *�*� �� . ,� . . . , .__.:.'�� �,� a `'+ 5�:''tti�. ' �,'� . +'�� .t=. , � , .� ' • �n ��r� w. �'` c, �y , �`y:` S 1,�. k�� ���~ � �' � �� �rys � � ` ���-- '`��;. Project site �''�,,�' ` .._... `� -� �> � � I , � J � � ��,; ;� � »., ��',�� ` �t __ __ �,` ���=��,�:5:�;°�:�,'�' �`� �t• � �� .. � � � - �� . �" , •-�, s --- � �' � fA'� � A . „ ' .� '� " ��� `�'��!�l�� . , t �. �- ..: t �` �' ` ,,� � • � x �:. _`" `� � � .� �.�,.�., � �;:� ,;-� " t ����� � "� . - i ` � � � Astoria � �„ ,'- Single-family housing t� �; i � HOA '� �I � � � . Since 2009, the applicant has occupied the entire building with a martial arts academy and a dance studio. The applicant proposes to continue the existing uses and expand their operation to facilitate a day care/after-school program serving up to 40 children. The applicant has obtained approval through the State Department of Education to operate a heritage school. Heritage schools offer education or academic tutoring, or both, in a foreign language; offer education on the culture, traditions, or history of a country other than the United States; and offer culturally enriching activities based on the culture or customs of a country other than the United States. Per state law, heritage schools are not subject to State Department of Social Services Licensing Requirements, provided that no children are less than 4 years 9 months old. The State Department of Social Services confirmed that the day care is not subject to their licensing requirements. DISCUSSION: The child care provider, O-Mei Taichi Culture Academy, provides the following operational information about =�heir operations (Attachment 3): Day Cnre/After Sclzool Progranrs: Days of operation: Monday through Friday Hours of operation: 12pm to 6pm (8:30am to 6:30pm during Summer hours) Maximum Capacity: 40 children (ages - 4 years 9 months to 12 years) No. of classrooms: 4 Childcare Staff: 4(one staff per classroom; one staff for every 10 children) 64 U-2010-02, TR-2011-09 O-Mei Taichi Culture Academy June 14, 2011 Pick-Up, Drop-Off, arld Driz�ez��ay Widening The applicant has reserved and will provide �_ ' � � a ro riate si na e for five 5 onsite s aces for ick- ��'`' - ���~ pP p g g �) P p _ -:t w.,� . � w � up and drop-off . The spaces are perpendicular to a new -� "� �' � - four (4) foot wide walkway that will lead parents and ` � � _ �----- - - �� � . . __ children safel to the buildin entrance. Wheel sto s � �� ��� t �' Y g P _ �� _��` �i�� ,,: ..-, � are also proposed to limit vehicles from overhanging � 4'T �- � 4 � � the walkway. Drop-off times are scheduled from 12- �.- �=� � n-�- �,�. ���',� 12:20pm and pick-up times are scheduled from 6- '' _`�`" �..� :�: � 6:30pm. ,�� �� Currently, the site is accessed by one existing non- ������`�� �' �- , � . _ . ___ . _ ,�. � �. t% e:: F � � � �. � conforming 16-foot wide driveway entrance from t�.��'�x s.. ��� �; �� ,� T.,� Imperial Avenue. The project is required to widen this Existing 16 wide two-way driveway driveway to 22 feet, including the potential of having to relocate and/or modify any adjacent ancillary utility structures, in order to comply with the City's current standards and to ensure safe passage between vehicles enteriv.zg and exiting the parking lot. The existing driveway chain link fence is also proposed for removal to allow more vehicle turning radii. Directional signage will direct parents to the pick-up/drop-off area. The final site plan shall be submitted to the City for review and approval prior to issuance of building permits. Pr�rki�zg � The City's Parking Ordulance requires seven (� onsite parking spaces (1 space per 6.5 children) based on the proposed number of children at the facility. The applicant proposes to provide 13 onsite parking spaces to accommodate pick-up and drop-off and staff parking. AlI new onsite spaces meet City requirements. There are also eight (8) diagonal on-street parking spaces directly in front of the building near the main entrance. The site is located within an area identified by the General Plan where property owners can obtain credit for on-street parking spaces. Site I»iproz�ements As part of this application, the applicant is proposing to install the following site improvements on the existing paved area to the side and rear of the building: • Re-oriented parking lot with associated landscaping buffers and lighting • City-standard trash enclosure • 1,740 square foot uncovered, fenced-in play area (no play st�uctures proposed) • Play area walkway The site improvements are consistent with the City's Parking Ordinance and Trash Enclosure Guidelines_ Tree Re�riovals and Replace�lients One Evergreen Ash and two Flowering Pear trees are currently located in place of a new parking lot landscape buffer. The project arborist evaluated the trees with the proposed project and recommended removal since the construction would negatively impact the trees (see Attachment 4). The small diameter trees are proposed to be replaced with three new 24-inch box t� ees. In addition, several screening shrubs are proposed to be planted to provide additional screening along the property lines. Noise Co�isidercztions A noise study was conducted by professional acoustical engineer, Stan Shelly, to evaluate any potential noise impacts from the proposed indoor day care and outdoor play area (see Attachment 5). The site is 65 U-2010-02, TR-2011-09 O-Mei Taichi Culture Academy June 14, 2011 bordered to the east and west by a six (6) foot tall redwood fence on top of a two (2) foot high concrete masonry wall. The nearest sensitive receptors are the Astoria condominiums to the south (75 feet away) and several single family homes to the west (70 feet away). Potentially noisy activities associated with the project are in the outdoor play area behind the building. There are two play times scheduled a day from 4:30 to 5:05pm. There will be two groups of 20 children out at 15 minutes a time (see Attachment 6). The noise study concluded that given the existing ambient noise level and the presence of the existing eight (8) foot tall fence, the project is not anticipated to generate significant noise impacts and is within the allowable maximum allowed noise levels. In addition, potential noise impacts from indoors would be negligible due to the noise attenuation by the walls and windows of the building. Public Outreach The City sent notices to property owners within 500 feet of the project on June 3, 2011. The applicant personally delivered unofficial notices to property owners within 300 feet of the project site. Notices were mailed to those without physical addresses and to those living outside the City. As of the date of staff report production, no public comments have been received by the Planning Division. Interagency and Environmental Review Comments from Otlter Departments The City's Public Works Department, Building Division, and the Santa Clara County Fire Department reviewed the project and have no objections. Their comments have been included as conditions of approval. Environmental Assessment The project is categarically exempt from the California Environmental Quality Act (CEQA) per section 15301 (Existing facilities) of the CEQA Guidelines. Prepared by: George Schroeder, Assistant Planner Reviewed by: Approved by: /s/Gary Chao /s/Aarti Shrivastava Gary Chao Aarti Shrivastava City Planner Community Development Director „ ATTACHMENTS: 1. Draft Resolution for Use Permit 2. Draft Resolution for Tree Removal Permit 3. O-Mei Taichi Culture Academy Business Plan 4. Consulting Arborist Report by Deborah Ellis dated December 3, 2010 5. Noise Impact and Mitigation Study by Stan Shelly dated August 13, 2010 6. Outdoor Play Area Schedule 7. Plan Set G: � Planni�ig � PDREPORT � pc U reports � 20ll in•eyorts � U-2010-02, TR-2011-09.docx 66 U-2010-02 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6642 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPROVING A USE PERMIT TO ALLOW A DAY CARE CENTER AT AN EXISTING 5,600 SQUARE FOOT COMMERCIAL BUILING LOCATED AT 10070 IMPERIAL AVENUE SECTION I: PROTECT DESCRIPTION Application No.: U-2010-02 Applicant/property owner: Tony Chen and Yunjian Zou (O-Mei Taichi Culture Academy), Charles Chan Location: 10070 Imperial Avenue (APN: 35717 066) SECTION II: FINDINGS FOR USE PERMIT WHEREAS, the Planning Commission of the City of Cupertino received an application for a Use Permit as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held at least one public hearing in regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Planning Commission finds as follows with regard to this application: a) The proposed use, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; b) The proposed use will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan and the purpose of the City's zoning ordinances. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the initial study, maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 2 thereof,: 1. The application for a Use Permit, Application no. U-2010-02 is hereby approved, and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Hearing record concerning Application no U-2010-02 as set forth in the Minutes of Planning Commission Meeting of June 14, 2011, and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS This approval is based on Exhibits titled "Revised Business Plari' prepared by the applicant consisting of five pages; "OMei Learning Center Conditional Use Permit, 10070 Imperial Avenue, Resolution No. 6642 U-2010-02 June 14, 2011 Cupertino, CA 95014," prepared by Arun Shah and Associates dated July 8, 2010 with revision dates of March 9, 2011 and May 24, 2011 consisting of 8 pages; "OMei Learning Center Landscape Plan, 10070 Imperial Avenue, Cupertino, CA;' prepared by W. Jeffrey Heid dated January 26, 2011 and consisting of one page; and "Untitled Lighting Plan," prepared by Elite Energies, Inc. consisting of one page, except as may be amended by the Conditions contained in this Resolution. 2. DEVELOPMENT APPROVAL Approval is granted for a child care facility with 40 total enrolled children. Any changes in the operation parameters outside of this approval must be reviewed and approved by the City. Planning Staff has the ability to approve minor modifications to the business plan as long as the changes are consistent with any applicable Building and/ or Fire Codes (including but not limited to accessibility, fire safety, and building occupancy and other appropriate agencies). In the event that a pre-school is opened, when children younger than four (4) years nine (9) months are enrolled, and/ or if the business loses its Hertiage School Designation, the business owner shall obtain the proper licensing from the State of California Community Care Licensing Division and notify the City Planning Division. 3. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. TR-2011-09 shall be applicable to this approval. 4. DRIVEWAY WIDENING Prior to final occupancy of the day care, the applicant shall widen the driveway along Imperial Avenue to at least 22 feet, which includes, but not limited to removing power poles, the utility box, and/ or street light. 5. TOTAL AVAILABLE PARKING The site shall provide a minimum of 13 available parking stalls. The stalls perpendicular to the play area shall be reserved for pick up and drop off with appropriate signage. The applicant shall inform parents that off-site parking is not allowed. Parking in the on-street stalls in front of the building is permitted. 6. CHILD PICK-UP AND DROP-OFF PLAN In order to ensure the safety of children and vehicle movements during the pick-up and drop-off periods of the day care, the applicant shall submit a children pick-up and drop-off plan to the City for review and approval prior to the release of final occupancy. Such plan shall delineate general pedestrian/vehicular safety guidelines for parents, appropriate directional signs/parking lot striping (as needed) and parking lot safety measures to include a traffic safety conductor be present in the parking lot to monitor and direct all vehicular activities during pick up and drop off times. In the event that the pick-up and drop-off schedule changes, the applicant must submit a revised plan to the City for approval. 7. NOISE CONTROL The outdoor play area schedule shall be limited as indicated in the Business Plan. Noise levels shall not exceed those as listed in Chapter 10.48 of the Cupertino Municipal Code. 8. FINAL TRASH ENCLOSURE LOCATION The trash enclosure shall be relocated to the southeast corner of the building in order to be minimally visible from public view. Resolution No. 6642 U-2010-02 June 14, 2011 9. FINAL SITE LIGHTING PLAN All new lighting must conform to the standards in the General Commercial (CG) Ordinance, and the final lighting plan (including a detailed photometric plan) shall be reviewed and approved by the Community Development Director prior to building permit issuance. 10. FINAL LANDSCAPE PLAN Prior to issuance of building permits, the applicant shall submit a final landscaping plan in conformance with the City's Landscape Ordinance (Chapter 14.15). If the landscaping area (defined by section 14.15.030) is greater than 2,500 square feet, then a full landscape project submittal per section 14.15.040 is required prior to issuance of building permits. 11. FINAL FENCING DESIGN The final play area fencing design shall be subject to the approval of the Community Development Director prior to issuance of building permits. 12. BUSINESS LICENSE Prior to final occupancy, the business owner shall update the information provided on the City business license to include day care/after school uses. 13. EXPIRATION DATE If the use for which this conditional use permit is granted and utilized has ceased or has been suspended for one year or more, this permit shall be deemed expired and a new use permit application must be applied for and obtained. 14. RECYCLING OF DEMOLISHED BUILDING MATERIALS A condition will be added to require recycling of demolished building materials to the maximum extent possible. 15. CONSTRUCTION MANAGEMENT PLAN A construction management plan shall be prepared by the applicant and approved by staff prior to issuance of building permits. 16. REVOCATION OF USE PERMIT The Director may initiate proceedings for revocation of the Use Permit in any case where, in the judgment of the Director, substantial evidence indicates that the conditions of the conditional use permit have not been implemented, or where the permit is being conducted in a manner detrimental to the public health, safety, and welfare, in accord with the requirements of Chapter 19.124. 17. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Resolution No. 6642 U-2010-02 June 14, 2011 SECTION IV: CONDITIONS ADMINISTERED BY THE BUILDING DIVISION 1. ACCESSIBLE PATH OF TRAVEL An accessible primary path of travel shall be shown from each accessible parking stall to an accessible entrance into the building. 2. EXITING Two reasonably separated exits are required from the outdoor play area equipped with panic hardware. SECTION V: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 1. STREET WIDENING Public street widening and dedications shall be provided in accordance with City Standards and specifications and as required by the City Engineer. 2. CURB AND GUTTER IMPROVEMENTS Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades and standards as specified by the City Engineer. 3. STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjoining properties, and shall be no higher than the maximum height permitted by the zone in which the site is located. 4. GRADING Grading shall be as approved and required by the City Engineer in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. 5. DRAINAGE Drainage shall be provided to the satisfaction of the City Engineer. Hydrology and pre- and post- development hydraulic calculations must be provided to indicate whether additional storm water control measures are to be constructed or renovated. The storm drain system may include, but is not limited to, subsurface storage of peak stormwater flows (as needed), bioretention basins, vegetated swales, and hydrodynamic separators to reduce the amount of runoff from the site and improve water quality. The storm drain system shall be designed to detain water on-site (e.g., via buried pipes, retention systems or other approved systems and improvements) as necessary to avoid an increase of one percent flood water surface elevation of the culvert to the satisfaction of the City Engineer. 6. UNDERGROUND UTILITIES The developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. The developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the City Engineer. Resolution No. 6642 U-2010-02 June 14, 2011 7. BICYCLE PARKING The developer shall provide bicycle parking consistent with the City's requirements to the satisfaction of the City Engineer. 8. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement shall be executed prior to issuance of construction permits a. Fees: b. a. Checking & Inspection Fees: $ Per current fee schedule ($2,468.00 or 5%) c. b. Grading Permit: $ Per current fee schedule ($2,217.00 or 5%) d. c. Development Maintenance Deposit: $1,000.00 e. d. Storm Drainage Fee: $ TBD f. e. Power Cost: ** g. f. Map Checking Fees: $ Per current fee schedule (N/A) h. g. Park Fees: $ Per current fee schedule (N/A) i. h. Street Tree By Developer j. ** Based on the latest effective PG&E rate schedule approved by the PUC k. Bonds: 1. Faithful Performance Bond:100% of Off-site and On-site Improvements m. Labor & Material Bond:100% of Off-si#e and On-site Improvement n. On-site Grading Bond:100% of site improvements. o. -The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 9. TRANSFORMERS Electrical transformers, telephone vaults and similar above ground equipment enclosures shall be screened with fencing and landscaping or located underground such that said equipment is not visible from public street areas. The transformer shall not be located in the front or side building setback area. 10. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 11. NPDES CONSTRUCTION GENERAL PERMIT When and where it is required by the State Water Resources Control Board (SWRCB), the developer must obtain a Notice of Intent (NOI) from the SWRCB, which encompasses preparation of a Storm Water Pollution Prevention Plan (SWPPP), use of construction Best Management Practices (BMPs) to control storm water runoff quality, and BMP inspection and maintenance. 12. C.3 REQUIREMENTS C.3 regulated improvements are required for all projects creating and/or replacing 10,000 S.F. or more of impervious surface (collectively over the entire project site). The developer shall reserve a minimum of 4% of developable surface area for the placement of low impact development measures, Resolution No. 6642 U-2010-02 June 14, 2011 for storm water treatment, on the tentative map, unless an alternative storm water treatment plan, that satisfies C.3 requirements, is approved by the City Engineer. The developer must include the use and maintenance of site design, source control and storm water treatment Best Management Practices (BMPs), which must be designed per approved numeric sizing criteria. A Storm Water Management Plan, Storm Water Facilities Easement Agreement, Storm Water Facilities Operation and Maintenance Agreement, and certification of ongoing operation and maintenance of treatment BMPs are each required. All storm water management plans are required to obtain certification from a City approved third party reviewer. 13. EROSION CONTROL PLAN The developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. 14. WORK SCHEDULE Every 6 months, the developer shall submit a work schedule to the City to show the timetable for all grading/erosion control work in conjunction with this project. 15. OPERATIONS & MAINTENANCE AGREEMENT The developer shall enter into an Operations & Maintenance Agreement with the City prior to final occupancy. The Agreement shall include the operation and maintenance for non-standard appurtenances in the public road right-of-way that may include, but is not limited to, sidewalk, pavers, and street lights. 16. TRAFFIC SIGNS Traffic control signs shall be placed at locations specified by the City. 17. TRASH ENCLOSURES The trash enclosure plan must be designed to the satisfaction of the Environmental Programs Manager. Clearance by the Public Works Department is needed prior to obtaining a building permit. 18. REFUSE TRUCK ACCESS The developer must obtain clearance from the Environmental Programs Manager in regards to refuse truck access for the proposed development. 19. STREET TREES Street trees shall be planted within the Public Right of Way to the satisfaction of the City Engineer and shall be of a type approved by the City in accordance with Ordinance No.125. 20. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 21. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. 22. FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed. Resolution No. 6642 U-2010-02 June 14, 2011 23. SAN JOSE WATER COMPANY CLEARANCE Provide San Jose Water Company approval before issuance of a building permit approval. 24. DEDICATION OF WATERLINES The developer shall dedicate to the City all waterlines and appurtenances installed to City Standards and shall reach an agreement with San Jose Water Company for water service to the subject development. 25. SANITARY DISTRICT A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior to issuance of building permits. 26. UTILIT'Y EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E, PacBell, and California Water Company, and/ or equivalent agencies) will be required prior to issuance of building permits. SECTION VI: CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY FIRE DEPARTMENT 1. INTERIOR REMODEL A review by the County Fire Department of any such interior remodel construction is required. 2. INSPECTION The County Fire Department shall inspect the premises for compliance with applicable State requirements. SECTION VII: CONDITIONS ADMINISTERED BY THE CUPERTINO SANITARY DISTRICT 3. SANITARY SEWER SYSTEM Sanitary sewer is currently available for the subject parcel. 4. IMPROVEMENT PLANS Improvement plans shall be submitted to the District for review and comments. 5. FEES AND PERMITS Cupertino Sanitary District fees and permits will be required. PASSED AND ADOPTED this 14th day of June, 2011, Regular Meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSTAIN: COMMISSIONERS: ABSENT: COMMISSIONERS: ATTEST: APPROVED: /s/Gar,y Chao f s/Winnie Lee Gary Chao Winnie Lee, Chair City Planner Cupertino Planning Comxnission TR-2011-09 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6643 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPROVING THE REMOVAL AND REPLACEMENT OF 3 TREES IN CONJUNCTION WITH PARKING LOT AND LANDSCAPING IMPROVEMENTS AT A NEW DAY CARE CENTER LOCATED AT 10070 IMPERIAL AVENUE SECTION I: PROTECT DESCRIPTION Application No.: TR-2011-09 Applicant/property owner: Tony Chen and Yunjian Zou (O-Mei Taichi Culture Academy), Charles Chan Location: 10070 Imperial Avenue (APN 357-17-015) SECTION II: FINDINGS FOR TREE REMOVAL WHEREAS, the Planning Commission of the City of Cupertino received an application for tree removal, as described in Section I of this Resolution; and WHEREAS, the necessary public notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held at least one public hearing on this matter; and WHEREAS, the Planning Commission finds the following with regard to this application: 1. That the tree or trees are irreversibly diseased, are in danger of falling, can cause potential damage to existing or proposed essential struciures, or interferes with private on-site utility services and cannot be controlled or remedied through reasonable relocation or modification of the structure or utility services; 2. That the protected tree(s) are a detriment to the subject property and cannot be adequate�ly supported according to good urban forestry practices due to the overplanting or overcrowding of trees on the subject property. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony and other evidence submitted in this matter, subje ct to the conditions which are enumerated in this Resolution beginning on page 2 thereof,: The application for a Tree Removal Permit, Application no. TR-2011-09, is hereby approved, and that the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Hearing record concerning Application no. TR-2011-09 as set forth in the Minutes of Planning Commission Meeting of June 14, 2011, and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED REMOVALS The approval is based on the arborist report prepared by Deborah Ellis, Consulting Arborist and Horticulturist dated December 3, 2010, "10070 Imperial Avenue, Cupertino;' except as may be amended by conditions in this resolution. Resolution No. 6643 TR-2011-09 Apri112, 2011 2. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. U-2010-02 shall be applicable to this approval. 3. REQUIRED TREE REPLACEMENTS The applicant shall be required to plant a total of three (3) 24-inch box trees on the property in accordance with the City's Protected Trees Ordinance. The required replacement trees shall be planted prior to final occupancy of the project associated with file no. U-2010-02. 4. ADDITIONAL TREE REPLACEMENTS The Director of Community Development shall have the discretion to require additional tree replacements as deemed necessary. The final tree replacement plan shall be reviewed and approved prior to final building approval. 5. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has beg If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 14� day of June 2011, at a Regular Meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: COMMISSIONERS: Chair Lee, Vice Chair Miller, Brophy, Sun, Brownley NOES: COMMISSIONERS: none ABSTAIN: COMMISSIONERS: none ABSENT: COMMISSIONERS: none ATTEST: APPROVED: /s/Gary Chao Ls/Winnie Lee Gary Chao Wirulie Lee, Chair City Planner Plaruling Coinmission - ATTACHMENT 3 O-MET TAICHI CULTURE ACADEMY Revi Bu Plan ._ ............... - ------------_..._....__.._ ---.-........-- -_..__...... __._......_._ Use Permit to allow a new daycare facility; Tree Removal Permit to allow the removal and replacement of three trees in conjunction with parking lot and landscaping improvements at a new daycare facility. Submitted By: O-Mei Taichi Culture Academy May 27, 2011 ,, t ..... _�.. ,._._.:...___ ..�....._ .._...._....._...... _.._..�_ __....._....._:.�..- . . 1 � '"►2- �o� � - o �► y . �,(.'02 O� 0' �ci� � . __. . _ .. _._ _. � ; � � . 6-��-r► _ � .�. .. ; ; � � ; i , ._ __.__.......__.._..._, � ; �. _... . .. � � : � � � � _ .,tl,...�._�._,___.___.__._.�.._..�_...__�.�..�._....._. 76 Summary: Since its inception in 1997, O-Mei Academy has served the community by praviding excellent Chinese Cultural classes throughout the Bay Area: Oakfand, Fremont, San Leandro, and Milpitas. Our courses provided a need for students of various ethnic backgraunds whose interest and desire to learn Chinese Language, Calligraphy, Folk Dance, Martia! Arts and other many other forms of Chinese Arts and Culture. We have developed success#ul tutoring and after school programs, where students have won many awards in academic achievements, Martial Arts competitions, Chess Tournaments, Beauty Pageants, and mare. Aiumni of O-Mei Academy have gone on to top tier Universities such as Harvard, Stanford, UC Berkeley, UCLA, and West Point, just #o name a few. At �-Mei Academy, we strive to provide the best in every aspect of education that parents expect and children need to successfully compete in the growing globalization. There are approximately 40 students at O-Mei Academy with maximum of 10 students per fevel. Each fevel refers to an age range that corresponds to each grade level. Hours are operations are 12 noon to 6:30 pm. There are 4 ciassrooms with 4 teachers; 1 teacher per classroom of maximum of 10 students per classroom. O-Mei Academy is registered as a Heritage School with the State of California and is exempt from Community Care Licensing Requirements. Any decision to apply for Day Care/Pre-School is not in the immediately business plans. Future Plans and Growth strategy: Cupertino has a diverse population of about 55,000 with one of the most progressive and technologicalEy savvy residence in Northern California. Its residents comprised mostly o# engineers and other working professionals, and as a result, the families of Cupertino are also known to place a high vaiue on education, reflected in the city's award winning school system. (t is also home to one of the largest Asian popu�atians in the San Francisco Bay Area. The private sector is dominated by high-tech electronics and computer corporations, such as Apple and Symantec. ln short, quality schools and proxirnity to high-tech jobs make Cupertino a desirable Silicon Valley address for a high�y educated and culturaliy diverse population. Education, innovation, and collaboration are the ha([marks nourished by #he city government, the community, and local industry and commerce. Page 1 of 5 77 O-Mei Academy plans to secure, operate and expand into the City of Cupertino at 10070 Imperial Avenue with O-Mei Taichi Culture Academy. Its location is situated in a(California zone #ype) Neighborhood/Commercial zone. The subject building is strategically located near the core and is easily assessable by public transportation. Given that the majority of the area's commercial buildings are occupied by tech-firms, whose employees are mostly family orien#ed, after school programs such as those available at O-Mei Taichi Culture Academy are in demand. This also brings to Cupertino one of the largest, most dynamic and well respected Academy of its kind. Description of Operation Activities: Phase ! O-Mei Taichi Culture Academy proposes to use this location for an after school program. The facility can accommodate a maximum of 40 school age students. With 4 classrooms, each classroom can accommodate 10 children under the supervision of 1 adult teacher per 1 Ievel per classroom. Hours of operations are fr�m 12 noon to 6pm. Early hours of operations is limited only to summer programs and will operate from 8:30am to 6:3Qpm, Monday to Friday. If summer program is available, all levels of stucfents and number of students per classroom and teacher per classroom will be the same as during the regular semester. Courses of emphasis during the normal school semesters are: � Chinese Language: Training students to listen, speak, read and write simplified and traditional Chinese characters, and its romanization form of Hanyu or Pinyin. • Mathematics: Developing students' skills to apply mathematic principles and concepts to problem solving and logic reasoning. • Homework Tutorial: Assist and ensure that students complete their h�rnework assignment from their regular school. • Kung Fu: Teach eighteen sets of Kung Fu and self-defense methods. This is one of our most popular class that build students confidence, instill discipline, develop character and learn tha# hard work results in a positive � attitude to achieve success. • Dance: Teaching basic dance and performance skills, such as baffet and #olk dance. , Page 2 of 5 78 • Drawing: Teaching students basic drawing skills in sketching, watercolor, ink and other styfes. . • English reading and writing: Help students improve their writing skills and reading levels. • Abacus: Improve calculation skill and speed, develop human memory and logical inference and enhance children's training in concentration and patience. • College Prep courses such as SAT, AP and other academic exam prep workshops. �� Page 3 of 5 79 Schedule of Operations Activities: After School Program Schedule (Level 1-2}* �. .-� 12:00-1:30 Lunch / Free Play 1:3Q-2:30 Lunch Break 2:30-3:00 Story Poem Drawing Cartoon Reading 3:00-3:30 Homework: English, Math and Chinese 3:30-3:45 Snack Time 3:45-4:30 Chinese Kung Fu Chinese Chinese Abacus 4:30-4:45 Recess 4:45-5:30 Oil Painting Chinese Math Dance Craft 5:30-6:00 Kung Fu -- Chess --Games 6:00-6:30 Parents pick up time After School Program Schedule {Leve13-4)'� . �r� 3:00-3:45 Homework: English, Math and Chinese 3:45-4:00 Snack Time 4:00-4:50 Chinese Chinese Chinese Chinese Kungfu 4:50-5:05 Recess 5:05-5:50 4il Painting Math Dance English Craft 5:54-6:30 Kung Fu — Chess -- Games 6:00-6:30 „ Parents pick up time * School does not provide lunch to s#udents. Parents are advised to provide lunch for their children. * Students in Levels 1 comprise of children from K to G1 (4 3 /4 to 6 years). * Students in Levels 2 comprise of children from G2 to G3 (7 to 8 years). ** Students in Le�els 3 comprise of children from G4 to G5 (9 to 10�years). ** Students in Level 4 comprise of children fram G5 to G6 (11 years to 12 years). Page 4 of 5 80 Phase II O-Mei Taichi and Culture Academy hopes to offer Day Care within the next five years but is not in its immediate plans for at least three to four years. Due to the current state of the economy, offering pre-school at its current location would depend largely on the future conditions of the following: supply and demand, competition, the state of economy, growth and success of current program, cost for construction and the business direction of its business partners. Conclusion Much has been changed since initial pfans were proposed in 2010. The cost of construction has risen, the construction permit process has taken [onger than anticipated, a growing number of competition and a change of pattern in how famiiies are making choices in providing their students extracurricular activities. Nevertheless, the owners of O-Mei Academy have absofute confidence in its programs and believe that it will continue to grow. Page 5 of 5 81 LEGEND __ __ __ __ EXISTING CONSTRUCTION TO BE REIAOVED � NEW CONSTRUCTION PROPERTY LINE CENTER LINE �I i O \� �� � � � COLUMN L1NE DOOR MARK WINDOW A�ARK REVISION DATUM POINT SECTION DETAIL � I//// .� ���tH � � �.7f:�.it.L1''�`�y . � CONCRETE CONCRETE BLOCK EARTH GIASS GYPSUM BOARD INSULATION, BATT INSULATION, RIGID MEfAL MEfAL LATH PLASTER PLYWOOD ROCK FILL WOOD, fRAMING WOOD SHIM OR BLOCKING OME I LEARN I NG CENTER 10070 IMPERIAL AVENUE CU PERTI NO, CA 95014 ABBREVIATIONS q�. ALUMINUM APPROX. APPROXIMATE ARCH. ARCHITECTUR4L BD. BOARD BLDG. BUILDING BIKG. B�p�KING BOT. gp�70M CI. CAST IRON c�c. cEiuNc CLO. CLOSEf CLR. CLEAR C.O. CASED OPENING COL. COLUMN CONC. CONCREfE CONSTR. CONSTRUCTION CONT. CONTINUOUS DEPT, DEPARTMENT DEf. DETAIL DIA. DIAMETER DIA�. OIMENSION DN. pOWN DISP. DISPENSER D.S. DOWN SPOUT DWG. DRAWING EA. EACH EL ELEVATION ELEC. ELECTRICAL ELEV. EIEVATOR ENCL. ENCLOSURE EQ. EQUAL exisr. ExisnNc EXT. EXTERIOR F.D. F100R DRAIN F.E. FIRE EXTINGUISHER F.E.C. FIRE EXTINGUISHER CABINET F.H.C. FIRE HOSE CABINET fIN. FINISH FL. FLOOR FLOUR. F�UORESCENT F.O.C. FACE Of CONCRETE F.O.F. FACE OF FINISH F.O.S. FACE OF STUDS FT. F00T OR FEET FfG. FOOTING FURR. FURRWG GA. GAUGE GALV. GALVANIZED G.B. GRAB B,AR GL GLASS GYP. GYPSUM H.B. HOSE BIB H.C. HOLLOW CORE HDWD. HARDWOOD H.M. HOLLOW METAL HORIZ. HORIZONTAL HR. HOUR HT. HEIGHT I.D. INSIDE DIAMETER (DIM.) INSUL. INSUlATION INT. INTERIOR � JOINT KIT. KITCHEN LAV. LAVATORY LT. LIGHT MAX. MAXtMUM MECH. MECHANICAL MET. METAL MFR MANUFACTURER MIN. MINIMUM MISC. MISCELlANE0U5 MTD. MOUNTED N.I.C. NOT IN CONTRACT NO.OR� NUMBER N.T.S. NOT TO SCALE O.C. ON CENTER O.D. OUTSIDE DIAMETER(DIM.) OFF. OFFICE OPNG. OPENING OPP. OPPOSITE PRCST. PRECAST PL. PLATE P. lAbl. PLASTIC LAMINATE PLAS. PLASTER PLYWD. PLYWOOD PT. POINT P.T.D. - PAPER TOWEL DISPENSER P.T.D./R. COM8INATION PAPER TOWEL DISPENSER dc RECEPTACLE P.T.R. PAPER TOWEL RECEPTACLE RAD. RADIUS R.D. ROOF DRAIN REF. REFERENCE REFR. REFRIGERATOR RGTR. REGISTER REINf. REINFORCED REOD. REQUIRED RM. ROOM R.O. ROUGH OPENING RWD. REDWOOD R.W.L. RAIN WATER LEADER S.C. SOLID CORE S.C.D. SEAT COVER DISPENSER SCHED. SCHEDULE S.P. SOAP DISPENSER SECT. SECTION SH. SHELF SHR. SHOWER SHT. SHEET SIM. SIMIUR S.N.D. SlWRARY NAPKIN DISPENSER S.N.R. SANITARY NAPKIN RECEPTACLE SPEC. SPECIFICATION S�. SQUARE S.ST. STAINLESS STEEL S.SK. SERVICE SINK STD. STANDARD STL. STEEL STOR. STORAGE STRI. STRUCTURAL SUSP. SUSPENDED SYM. SYMMEfFtICAL S.S.D. SEE STRUCTURAL DRAWINGS T.B. TOWEL BAR T.C. TOP OF CURB TEL. TELEPHONE T. & G. TONGUE k GROOVE THK. THICK T.P.D. TOILEf PAPER DISPENSER T.V. TELEVISION T.W. TOP OF WALL nP. NPicu U.O.N. UNLESS OTHERWISE NOTED VERT. VERTICAL V.I.F. VERIFY IN FIELD W/ WITH W.C. WATER CLOSET wD. w00D W/0. WITHOUT WP. WATERPROOF Wi. WEIGHT GENERAL NOTES SCOPE OF WORK: AVENUE, FOR AFTER SCHOOL TUTORING CENTER AND DAYCARE FOR CHILDREN ABOVE 4 YEARS 9 MONTHS AGE. HOURS OF OPERATION WILL BE 12 PM TO 6:30 PM WEEKDAYS FOR CHILDREN FROM KINDER6ARTEN TO 6TH GRADE. A RAMP INSIDE THE BUILDING WILL BE CREATED TO MAKE THE ENTIRE BUILDING ACCESSIBLE. CODES: CITY OF CUPERTINO MUNICIPAL CODE CALIFORNIA BUILDING CODE 2010 EDITION CALIFORNIA FIRE CODE 2010 EDITION CALIFORNIA MECHANICAL CODE 2010 EDITION CALIFORNIA PLUIv81NG CODE 2010 EDITION CAUFORNIA ELECTRICAL CODE 2010 EDITION ALONG WITH ANY OTHER APPLICABLE LOCAL ORDINANCES AND STATE LAWS AND REGULATIONS. EXISTING CONDITIONS: INFORMATION ABOUT EXISTING CONSTRUCTION, SHOWN ON THE DRAWINGS WERE OBTAINED FROM LIMITED FIELD OBSERVATIONS AND DRAWINGS DATED JANUARY 11, 1979. ARUN SHAH & ASSOCIATES DOES NOT TAKE ANY RESPONSIBtLITY FOR THE ACCURACY OF EXISTING CONSTRUCTION. THE OWNER/CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND SHALL NOTIFY ARUN SHAH & ASSOCIATES OF ALL EXCEPTIONS BEFORE PROCEEDII WITH THE WORK. PROJECT DATA � �..r..__w__ .__._� ._.� ._.tl_. _ �.. .. � -, �o/ 1- 0� w � . � � Ti2 , ` � � � I%�"� ° " �� � ! . ) , . . 9 - � . .. .. .-. r... � + � y < < y ; .. a. � . .. - � . . .« : � . �. .�._ . � _y..b._.. ,�-`-� � r . , a �. � � :�. � , ; ,_ � r_���y __,.��____ . . j ; C'�s�:;��.�c�:.:;�.s � , } � � � � - PROJECT ADDRESS 10070 II�ERIAL AVENUE ORAWINGS AO ZONING: P(CN, ML, Res 4-12) A1.0 ASSESSORS PARCEL N0: 357-17-66 A2.1 A3.1 CONSTRUCTION TYPE: V-B (NO AFES) A3.2 A3.3 PREVIOUS OCCUPANCY: B/F-1 PROPOSED OCCUPANCY: A-3, B, E (E) BUILDING AREA: 5, 600 SQ. FT. APPROX. 6 000 S FT FOR A-3 OCCUPANCY INDEX OF DRAWINGS TITLE SHEET SITE PLAN FLOOR PLAN BUILDING ELEVATIONS BUILDING ELEVATIONS TRASH ENCLOSURE CONTACT INFORMATION BASIC ALLOWABIE AREA. , Q• • 1u�2. YUNJIAN ZOU 9, 000 S0. FT. FOR B OCCUPANCY 10070 IIuPERIAL AVENUE 9, 500 SQ. FT. FOR E OCCUPANCY CUPERTINO, CA 95014 NON-SEPARATEO USE, NO OCCUPANCY SEPARATION REQUIRED. LOT AREA: 130'x130' = 16, 900 SQ. FT. PHONE: 408.858.6208 email: yjzou111�yohoo.com PARKIN : ON SITE PARKING SPACES ; 30 STUDENTS/6.5+3 = 8 REQD 13 PROVIDED OFF SITE PARKING SPACES = 8(DIRECTLY IN FRONT OF BUILDING) LOCATION MAP � SCALE: 1" = 100'-0" � � ro � R x � >\N\:\\�a GR.1NADA -0 '�°,� _� x_ v I� ����- � r . # 3 0 �� D Z o0 AyEhUE m= w r? ���y��4r� �`o r, o � !a. 0. S. 469/ 5/ TNRU 59 � : STEVENS �CREEK -- -� _ — _ ---- _ B�VD. - Q - i � j � 1i �;,l.f� P/7LS l086J e'/6'9 �� �oJ.�• 116�6-a8 � i �^ ` ' '� J� 25 i ^.S , YS i 25 _ � ..�3C � - l y . �. ; � � n q � ��,, � I � -°, » v _ � � �: � `, 'v � � U �� � ; � � � � � � � r ( b - ; Iw ;Ib �` .``" O��o � � y \ .. �. „ v � f!' o � m t NI a � � — -�: A n m . c� . c� ' m � .n �N '6---� � ;' ��..•• � O ... ,as o, v D - `� � �+ � cn , ��� n� � i24.9B6 W� \\ \��'u .� Ib �- � S Yq N I# A r N ��SC , D �\:i 1� "'N�f.:� "��� m� O �. �, Z ° `" ' p "' Y � + N � 3 � ;\ -- - - �,, � V �vT2Q A � U Z �`� ... .. �Qi A ,' J 3� D�$ �z Iq �n '. -- -- - - � � m H (r e� � m � D � w:'� m _— 5 W � D ' N N ��s�-- `' � ;�_ �a g ., � �t � �a . J N � � � C ✓ I( N_ ' � '\ y $ � 1�9.96 � c � �w � �� J IO N y O "�' N �� I O ✓' Ip� ��. G� a � _ _ i-�' �� �o ,1 . ' I ro \`\ �a I � s $ s � � - I N — � , � — . o - • � o �,�� �� ..1�, ....J__ _._ _ � ____ ___ � ,� �-,.. . N - � �.� �:�1 $�`•:�v y (q �.I( y' r i." � o ? — o... � c a"�� ^ � x .\ N v�Y� N � V N L I� . ____"."__ \_' i ( N �6o� a �25�xs 2i ��I n� ��� U � � n 3o fo � �oUlq '' . J � 'IFPS 1/6B1 4 a-�s P M.582� M �3 - — GRANADA N o AVE �- ��)IG � T/t1C . �. t�61d , SO io[ ,�o .» 10997 50 � SC� j� � - . ��� �n 3 A �. � ,� � �; o p i � �; � !,� � ' o �u� ��a � � � i � " o i �'V �t"' , �r�5 0 # ��' � � o OD �-� b i � � _ a I +�T O� Q �„� 4� � D p :� J �N J � n V . � xs -__ _ _ .1u ,. .. ; D � . r ..._�e....�i.�• . .: ' o e I� b' )o — . \a .� . , 'r � ,� ,, a � ... ; .�c � m I � ° -___ la �zs � '^ rt* "' 3 � y � � �� �-i N ��N � n�', i 1 °� v . p _��' ��-+ Si: �� �v r- � .� . - : ' . �i ; 's ..- � -•. PROJECT SITE � T �� cc mm �C < < �N 00 Zz a o �� o� �Z OD � 0 � c < D N N m 0 .T1 _ D D D ARUN SHAH � ASSOCIATES 39795 PASEO PADRE PARKWAY, FREMONT, CA 94538 (510) 220-4264 (510) 657-4265 FAX � � �ti �c b = W wo. s+a+s � rc Eso yyLtiLlt a O O '�'� �RUCNa� �,s n. � �"�,. THIS DRAWING AND THE INFORMATION SET FORTH HEREON ARE THE PROPERTY OF ARUN SHAH a ASSOCIATES AND ARE TO BE HELD IN TRUST AND CONFIDENCE. PUBLICATION, DUPLICATION IN ANY FORM AND DISCLOSURE OR USE FOR ANY PURPOSE NOT EXPRESSLY AUTHORIZED IN WRITING BY ARUN SHAH & ASSOCIATES I..L W � Z� W � UW V � Z� Z� � J Q Z W p J � W � � O OU � W � / � Q � Q U W � I � G � _ � � W O a o V Sheet TITLE SHEET Date Issued For Drawn by ARUN Checked by ARUN Project no. I Sheet no. AO � 1. ADDI110NAL SN�1 0llY REWRED AT VAN ACCESS�LE SPACES. z v�r wTM � caanaNS. 3. VERFY 92E. CaLOR. MlORDN�IG Erc. w�n� m�c aa►�mnc uEa�nioar D ACCESSIBILITY SIGN w 8 � � � � i �2 - � , _a .. 2�-� RESERVED� `° FOR PICKUP � 8c DROPOFF SIGNAGE 1 n _ � r ._..,._.,._._..__w._�._�......_..�._�._-_._ OII,--OG� �-�- u �� � � , �. .. , i + � � . , � , � r = ._ 1.�, �°� ° ,o� � ` _ ... . # � t � b -� �-- � � � o ,�. � �i�, . ... , . . . ,.., . :: �....a.�....«�a..,..�ra<,,r.r:�rc r . .. `7 * � t i ; s � � ! . s. � .. .: � �� S �� ' ' � .,..w,_.�.o. ..�...�,�....,.»�.:.,..er.w.r ^v�woma�.t C j� '�w� �� , 1 `w �2�.- ., ` F !' � p � „ � s „�._.�_.<,.._...��...�a.,.� . 0 i 0 � ,30'-0° ARUN SHAH 8� (E) 6-FT. REDWOOD (N) LANDSCAPE (E) AREA DRAIN ASSOCIATES F NCE OVEf�2-FT. r� — r� — r� — r� — � — n� —� WALL — r� , �— r� . — -T � — r� � r —� — r� � I o �� '� I o - 1� _'_ I � o � ;:' � PO BOX 1805 � � � ` FREMONT, CA 94538 I SIGN, SEE DET. - J � L (E) PLANTER J 3 AT STALLS TO BE ^ ,� (510) 220-4264 � (E) STORAGE BLDG 2�6 MOUNTED :; MODIFlED (M LANDSCAPE I TO REMAIN ON FENCE n � STRIP W/ TREES J SIMILAR TO � `O � ao � EXISTING � UN-COVERED PLAY � � � I,:. ;:.: ,: AREA = 1, 740 SQ. : ' I ::: ;,:: . ,:: > � FT. APPROX. NO FIXED PLAY EQUIP. IN 18'-0" 24'-0" 16'-0" 5'-0" ��� THIS AREA � � .N9 ���N s� Fy ` S � � I: (N) LANDSCAPE � DEPRESS CURB & a�o. S4 �[�/ii a 22'-6}�° a PLANTER _ o PROVIDE WHEEL ��sfqucn�R��`P , VERIFY IN FIELD ' � I STOP �- �� I » (N) LIGHT POLE � � � r L (M FENCE ,� M PER CMC 19.100.050 I ; � =I THIS DRAWING AND THE INFORMATION OUTDOOR PLAY �` � ° SET FORTH HEREON ARE THE AREA � DEPRESS CURB & PROPERTY OF ARUN SHAH 8 � � PROVIDE WHEEL ASSOCIATES AND ARE TO BE HELD IN TRUST AND CONFIDENCE. PUBLICATION, TRUNCATED DOWES � N I STOP DUPLICATION IN ANY FORM AND �! I :: � BY ARMOR-TILE � DISCLOSURE OR USE FOR ANY PURPOSE NOT EXPRESSLY AUTHORIZED IN � Z WRITING BY ARUN SHAH 8 ASSOCIATES " (N) GATE W/ ;I IS PROHIBITED. � PANIC HARDWARE � � I-; (N) 6" WIDE CONC. CURB M ° � � � � E SIGN, SEE � 'a� � FENCE OVER I :� � DET. 2 ' � (N) TRASH ENCL, SEE SHEET A3.3 2-FT• CMU `' � I WALL I- `° ,r �� I OP NG <: � I— `D A � 3 ,_�,. � / � � I: � Z � � � W � � � � � C.�rwo�'�' ��J''' C� w � �. � a w o _ 1 Z W � rn I � � ��,{.��n _ j Q Q : ° - �G6�Z z J Q U , QZ �O �: F. � �v5� j�s� � W w z O 32'-4" � F— � � � — � � w w 0 o w � � '; _ . < � � p o � . ..:....... ... .. J i � � �` w I O U �- U - Sheet _ _.... . I (E) LANDSCAPED 9 SITE (E) LANDSCAPED AREA AREA (E) LANDSCAPED AREA 3'-8" � � (E) ENTRY GATE PLAN TO BE REMOVED �_ _ ld '1d ld � (E) SIDEWALK �(E) UTILITY POLES DE N, � EE (E) STREET LIGHT � Date Issued For 07.08.10 CUP APPLICATION _ � � � � 09.27.10 `. � �� ��'\`�`� 03.09.11 RESP TO CMNTS � l �Z 05.24.11 RESP TO MNTS (E) PLANTER p � �nI1/� �" (O ` G �S � r�5 f 1��� ...... ......... ... ......... .. ......... ......... ......... ......... ... ...._.. .... .... . .......... ........ . . ........ ..... ...� . . ..... (E) CURB & ON-SITE PARKING: GUTTER Drawn by ARUN STANDARD STALLS 12 @ 8'-6"x18'-0" HANDICAPPED 1� 9'-0"x18'-0 SITE P�r�►N z Checked by ARUN � �/8"=t'-o" Project no. Sheet no. A1.0 ,�._„ � ���r� ��{��I��� ,, ENLARGED WATER CLOSET PLAN � 3/$"= �-a� 32'-4" BUILDING AREA = 5, 593 SQ. FT. NOTE DIIrENSIONS AND AREA IS APPROXIMATE, BASED ON FlELD `D IvEASUREMENTS FOR GENERAL DESIGN � PURPOSES AND NOT AN ACCURATE SURVEY, NO WARRANTY OR GUARANTEE IS IA�PLIED OR PROVIDED � 15'-9" 31'-6�" 14'-0" o � � I in —� � O I O p i �., � � 32'-4" �, 33'-3 � 28'-0" I,� ��LOOR AREA J 1/16"=1'-0" �� FA � � � _ ! 'NC..Oc�Ft PLA'•' ASicA ^C%;:JPAN.^.Y' - A3 .4RFit = �,0i9 �J FT. ^(..-au � J REVERSE IDOOR SWING � � � Fn REVERSE DOOR SWING � ) HANDRAIL � � " WIDE MIN. s� ARUN SHAH & � _..�.._�__..._.,__�._._..�...._..._..___�ati._.�...�...,......._�.�..._�.. � ASSOCIATES rn- �o� �-o� . � � PO BOX 1805 ' ,, , ` ,' '- �/( �ap/�' �� � FREMONT, CA 94538 ,- _.. � � ! (510) 220-4264 '.. . � ,. lY,.il��ll ' � `: ,. ".:: � 1 ..... s.. . .... ..� ..�,...,.... ��'����� , 4 y 2 � �, No. 54345 m .. � E.p. on/�o/it a O O ' `�9�,'Q�CT� b �, Gl�' �qUF LEGEND: � (N) PARTITION Dc4 STUDS (� 16 W/ Yp" THK GYP BD E.S. � EXIT SIGN, CONNECT TO BLDG.ELEC.SYSTEM SHALL BE INTERNALLY OR EXTERNALLYILLUMINATED AND SHALL HAVE BATTERY BACKUP � PORTABLE FIRE EXTINGUISHER FA FiRE ALARM r .... . 7' 3Y " ' 7" RISER 1°J��Po9EP4 � � 11" TREAD � o��v ��,�er� � � . � i .�i.�a::; ..._. : � e � � : ' _ � \ -6 ; o � ���� � � , .. .. FA . ,. � ❑ f 0 ° � ' ; 1 -0 \ / \ � --1:12 SLOPE , i _ ;� i � : ..... .���...- /� � 5 � - Q� � � . U RECE�'TION �, 0 � � . ....:�. .�-��`� _...__: - .:��_ ___�° _� _���'- . s � x �:,��: ..,,•; k � � � vros�,�.cz: _ \ ct: a.ss � �� uoc�s x ^.:'tfPANCYF � ��. ��. �.RFA = ,R?, SC.. FT. . ; ; �3�.-=< � _; :.,,,. . ., .. . . _,. : � < C�P,S$ � _ __ ;: � RCtf3tel `s , , � O:;t::Vi'.NdCYE . .. Al2EA= ::g&::. �T . � FA o� � \ � 3�sAS5 : ;�LA58 j �j \ � ���., � NJOMt 4 '' '� . ;�v�P.d 1 '�� � :RE�t - 32�: 5:: i"i'. .. .. ... ..... .. ' '� .�::::._::.�::,::::: ::.::.:.:.:.::.::::::....:......:...............:.. ..:......... ..::...................:. .............. C.JPA1Jf,Y � ._.... =� iS . . A?2E 3- 3? f S4. F7. ^.E..' t:i / . . 1/2" MAX. �E) LANDSCAPING (E) CONC. LANDING & SIDEWALK � FLOOR PLAN z ' 3��6�=��—�� C�F>�10E ReiE1..' 7�*f'':�:. FY. O.i..:: : � � / c�F'>�4CE :.RF..�::::}q•;.^. > ot. =, � THIS DRAWING AND THE INFORMATION SET FORTH HEREON ARE THE PROPERTY OF ARUN SHAH d ASSOCIATES AND ARE TO 0E HELD IN TRUST AND CONFIDENCE. PUBLICATION, DUPLICATION IN ANY FORM AND DISCLOSURE OR USE FOR ANY PURPOSE NOT EXPRESSLY AUTHORIZED IN WRITING BY ARUN SHAH 8 ASSOCIATES IS PROHIBITED. 1..` w � Z� W � � Ua W � Z W � rn z � J Q � � � U W Z w Z � � — J � � �— �jJ � O W � p o o � O U r-- U Sheet FLOOR PLAN Date Issued For Drawn by ARUN Checked by ARUN Project no. Sheet no. A2.1 ARUN SHAH & ASSOCIATES 39795 PASEO PADRE PARKWAY, FREMONT, CA 94538 (510) 220-4264 (510) 657-4265 FAX � � p�,,� 4`S" r�� S �y � h Z W No. 54345 � � Evy. 06/ltl/11 A a o `�'� � �� F �. �� � � � � ` I.,, .\ � �` (E) BASEMENT ��RONT ELEVATION � WEST ELEVATION �/4"=i'-o" 2 REAR ELEVATION EAST ELEVATION �/4"=�'-o° l!_1 11VVV 11\Irvl lL/ J 1 Vlil�V I 11\IJI�1 ) MASONRY WALL � � . �...�.. �... �_�__........_. .--. w....�.:..._...�...w....._._:�.....,,.�- - Y �1 d T � �' 77�- 020// ' p .rt' e: .� � j T l + � . - � :. :� a ,...�.'��,.10 - Da fi ..�.:...�, }` _ G �i'_?a!t•` .:>!±a, : � .4�hS J:i l` R f a 1 � � � ` � ' . .� � M . , ... . %A 1 6 �� I� /! � � v�� .qU�/aY;y. � !: :�3 t : M t f 1 � � e �� � ; ` ----� .,.m__.,, ��_ �..........: _..,�,<>�, r � �' ;. �' � .� -w< _,.. :;;Ws � � ; "- THIS DRAWING AND THE INFORMATION SET FORTH HEREON ARE THE PROPERTY OF ARUN SHAH 9 ASSOCIATES AND ARE TO BE HELD IN TRUST AND CONFIDENCE. PUBLICATION, DUPLICATION IN ANV FORM AND DISCLOSURE OR USE FOR ANY PURPOSE NOT EXPRESSLY AUTHORIZED IN WRITING BY ARUN SHAH & ASSOCIATES IS PROHIBITED � W H � w � w UW z� C� a- w o Z � Q rn z � -' Q � Q � U Q Z W O J � a F- � � � w Z o w �p o� O U � U Sheet BUILDING ELEVATIONS Issued For Drawn by ARUN Checked by ARUN Projeci no. I Sheet no. A3.1 I I � �I � ., -` r- - , � (E) BASEMENT � �,� LEFT ELEVATION � NORTH ELEVATION �/4"=�'—o" � RIGHT ELEVATION SOUTH ELEVATION �/a°=i'—o° (E) MASONRY WALL ON PROPERTY LINE �� I � � ARUN SHAH � ASSOCIATES 39795 PASEO PADRE PARKWAY, FREMONT, CA 94538 (510) 220-4264 (510) 657-4265 FAX � � �f `�N+ S� F ti c y t �, No. 54343 � rc E.�C� OE/70/11 p o a �'� Sl R�CNR� �'\ F � ���FO THIS DRAWING AND THE INFORMATION SET FORTH HEREON ARE THE PROPERTY OF ARUN SHAH 8 ASSOCIATES AND ARE TO BE HELD IN TRUST AND CONFIDENCE. PUBLICATION, DUPLICATION IN ANY FORM AND DISCLOSURE OR USE FOR ANY PURPOSE NOT EXPRESSLY AUTHORIZED IN WRITING BY ARUN SHAH & ASSOCIATES IS PROHIBITED. � W H H w � w Uw z� C� � w � Z� Qrn Z � �Q � QU (E) MASONRY WALL Q � W z W Z J � � F— � � � w Z o w a O � °� Sheet BUILDING ELEVATIONS ,� - _._.._.�,._�_.�.,_��_ �,.. �._._.__ _�.�.__. __ _ �....... . .. � ; _ ,. _ �� 0 �0/l--(�9 a � � - . �. -�� _o.. -�._o a � ; � . , ... . � ; ; , . : . . .� -�� �ii � � C � �. �;��- i• ... j � .... _ _. � .e.�..,..w.�.� a �.w»TYru�..i7'tt.z��.���...r....<„ � Issued For Drawn by ARUN Checked by ARUN Project no. Sheet no. A3.2 Ou'(�,7�— � �C " "_'!-► � � � DA � (I `�^�v� I h -��- �cLo�r�% . , �� � � . . � �y,,� � � 6 ps 6�t5 �vcl � �,�6�� L � o�✓ki� , e �� o I� �I �° ?.,� PLANT LEGEND AND NOTES � Erigeron karvinskiansus/Santa Bazbara Daisy @ 5' oc 1 gallon low water `�l I I) Nepeta fassinii/Cazmint @ 36" oc 1 gallon low water — u✓ A Cupressus sempervirens/Italian Cypress @ 5' oc 15 gallon low water B Prunus caroliana Compacta/Cazolina Laurel @ 5' oc 15 gallon low water T-I Lagestrcemia Tuscorora std./Crepe Myrtle 24" box low water T-2 Ginko biloba (male form) 24" box med water (Proposed Street Tree from City of Cupertino list) 1) Verify placement of new planu around proposed liglrting. 2) New plant material to be automaticaliy irrigated with a high efficient (bubbler and/or drip type applica6on). This shall include a multi-progammable controller, and automatic control valves. Verify water line access to all planter Iceations new and proposed. 3) Install three inch layer of wood chip mulch at a1l planting beds. 4) Verify all underground utilities before digging or trenching operations begin. Notify azchitect if location of proposed trees needs to be adjusted based on potential utility locations. 5) Verify all drainage methods of site. See Architectural or Civil plan. LANDSCAPE AREA Existing Area (along front and side of building) 430 sf. Proposed Area (perimeter parking area and parking island planters) 710 sf Total Landscape Area: ] 140 sf GENERAL NOTES 1) Play area to have no fixed play equipment 2) Proposed plant spacing based on city screening ordinance at�d anticipated plant maturity. 3) No drinking fountain is proposed within the outdoor play area, there is an existing one within the building. 4) No pervious paving is currendy proposed for this site. � ' �"12—oZol/ � - , = l� —�dl D � 0� . . ..r , . . : _ _ .� . . . ,. � � . _� ! ; _ . . _ . ..�.�.. �.--� . . x_ _........ �_..... _.�. � t� ;:: .,��, ....r ; � ,.i�.� � . w���i. I � � ' c ��_.,_..�.»-,�...,..�...�,,.,_,.._._.� — - - � 3 _ � 0 � N � � � � ; � � " , "'�` "�� �� �'/l`�� i �� n ,�� �m � � � � .��� � �■� � o� WI I' > W � � W 3 0 �s � o : i � � o "S _ 6S8Y >: a.; s:: -^• �a: os's� =a� ; _��; �< < :�u'r'w �+ s � Q T � � W d H � Z � W � Z � � Z � � W � J _ � � o � � 0 8 IMPE� A�i�1LE LANDSCAPE PLAN ! ��,i�� BLACK WROUGHT IRON FENCE ELEVATION ��� � ��� Propose to: O-Mei Academy 10070 Imperial Avenue Cupertino, CA 95014 ��W:: .�..:.. : w� :. ,, � 3 ,.... ,,..v g , � � � ., � ► � �, � � � _------ �.,�— "��,.'� — 4 _.-�-°" �� �,,'' � �, � � � c� �. � � _ �} ; <,�, y �' :: : � s�.. r .. z �,:� � # k � : .� .�. ..„... S ., � .. . . > By: Elite Energies, Inc. 2576 Alvarado Street, #E San Leandro, Ca 94577 Tel: 510 351-9800; Fax 510 351-9808 � � ''�' � � � '"�t � ��f y ��l �� 1 �a► � �,�. #� C � Az / ti0 5��� � � s �D � P�., ��-s � . �. ':4 " ...+� c.-._.._'i:: -.._uaw..m ....;.�,,�.,.�r�-�r...,. � ; _ .. . ..... _.._... � .. _ ._. _ �����o�� ' �� � . . . . .. � ��0� h � ai ,' . ' . , . . ."�. `' � y , ,� .._ � ���� .�!,,,,.:L-.�.:'�*o t� . . � t:s:C 1 �} 1 � . .. � �,..�s....�,r,......��... � I � •�• =;��:;;��a c.. �: . L . . OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 C U P E RT 1 N O (408) 777-3308 • FAX (408) 777-3333 • plannulg@cupertino.or� PLANNING COMMISSION STAFF REPORT Agenda Item No: 6 Agenda Date: June 14, 2011 Application: DP-2011-01, ASA-2011-08, TM-2011-02 Applicant (s): Terry Brown (Robert Adzich) Property Location: 10216 & 10232 Orange Avenue Application Summary: 1. DEVELOPMENT PERMIT application for two new, 2,697 square foot, two-story single family residences. 2. ARCHITECTURAL AND SITE APPROVAL application for two new, 2,697 square foot, two-story single family residences. 3. TENTATIVE PARCEL MAP application to subdivide a 0.28 acre parcel into two parcels of 6,000 square foot each. RECOMMENDATION: Staff recommends that the Planning Coinmission approve the following applications per the draft resolutions (Attachments 1, 2 and 3): 1. Development Permit application, DP-2011-01 2. Architectural and Site Approval application, ASA-2011-08, and 3. Tentative Map application, TM-2011-02. Project Data: General Plan Designation: Residential (4.4 - 7.'� Zoning Designation: P (Res) Net Lot Area (after dedication): 12,000 square feet Acreage (Net): .28 acres Subdivision Proposed: Two (2) - 6,000 square foot parcels Building SF: �� Two Two-story Buildings: 2,697 square feet �� FAR: 45 % Building Height: 25 feet 7 inches Total Parking Proposed: 4 spaces Total Parking Required: 4 spaces Project Consistency with: General Plan: Yes Zoning: Yes Environmental Assessment: Categorically Exempt per Sections 15303, Class 3(New Construction or Conversion of Small Structures), and 15315, Minor Land Divisions, of CEQA 101 DP-2011-01, ASA-2011-08 10216 & 10232 Orange Avenue june 14 , 2011 TM-2011-02 BACKGROUND: Site Location The project site is currently developed with two residential units. The site is located on the east side of Orange Avenue, north of Olive Avenue, and is surrounded by other apartments/ duplexes on the north, south and the east and by single-family residences to the west. � ` _� ����� •� ��� � � � ' ��' . . y � � ._._. _ � � x.. _ „ , ` � � f ` ° R,��tc t„� ' � . �- .�... ,.� . *_ � — �� ,,�� �'�:'�"'��°° :, , . � � ��� �_ w.wo � . , °�, ;-, ..� ' � � . �� ,��� � �« , . � , � 4 : . _ . . _�� ,�' � , ' �t^ -�i�t: ' �� _� ` �. .,.:�' � /' �� ��{_ � -- , ,� �'� ���;-��.::_s - �_:� i � ���i�" i 1� ..� •�'°` � y � �,1 � / � � +� � � �' � ''�� � 1 �:. 3 , , � g•�� �:�d F # . , �� � �. „P, ....- .�. -.., ` . r ��� �.., , � , - � x t � .�. [ ' _ �.. - L -. � �.:. � i --=� , � pp �: �, �J� r .: ° t , e . �:.le"°....-._ �......� , • ,. r �- � ,- .i __..:i.... s : . M � ` 4 "`: .. ��•�� . �"ci. - !�--����......�... � . �; a-�' .. . r ' - � � � _ .a �Cli4 _ _ � " � 1 ( r� . � �'L � . �+ �it .3.; ( �'^_ , : t � �:.�-�• ; w ! � ,�; �`�� � �! r � -'� ; � � �� , �. .. 9 � x,r��. � . ��. . F .arr�� � h � . � { � .. .....,F. � --- .. � � � ¢ i ' ' � ,� � , f ,_ .,. , , i0�' , � E e , �'r. �-- -.--. _ � . ;� „ t �, .!s7�.,+. � #`. i ,��� � j�w � � � "`' � _ " ,;,;,e , � .. �,�:r' " �f J � �?' �i _� �! 1 �. . � � 4,. 4 _�- � . . �..._.�.._.___ ... . �� a^' : �Cs. p �A ' ._, � � 'P:' � C_ - '. ___ � ` t, .�.�,,." r , rr�y i ��� _' 7 ,��y� y w ��""`�� �- �� �_'_.�� . j��� � ,M ' � 1 � � .r .. .. ' = � r , . I 4 , _ _ _ „ � � 1 ., ...q ,• ..+.: MM�. � .-. .\. +���` . y ' ' ��r � � }!.; _ * + . , '.� . ." , ' , . ., . . ; � _i^ � : � . e.��Y' � . � . � . . .� ,.. '� -t } . . + " I L • . . �' � ^ �„da�. :� . ,.. , . �.��_ ' ., ... ! , � , �� { 5a.. x` .� � �� � � .. . . 6')*�s+� _ . ._. .., � � L� c . � .. �.. ' _ � _. .. , !� , < <,,� ? z` .+�� � .... �. , Nr� �1 Y � L i� F � 1 V �� �• . .�'' — , � � � 4 � ,�,��= � � "�.,. � t � � � — _ - �.� . ��� � - �..�.� ._.. �� . � _ __�,� 5�..�_..__ ` 1� -, � �+�--..► —� � . - _ r � .---- �J � � A� � � 9 , . � :�p�, la.:_�, �i� r .. . �. 7 '� � � �"" ,l'-' f �� � � ��, °"� � � ,j �"�r � � �.( � � �� _ +4 �- �'1 F` . a 1� ;i, � . � ' � . � i '�__.,, '�'' � �� �t i � , �� � �� �� � � � ��� � �� kk""'' i . . �, ,, r � .I�, • �' ., i � � . ' � ( � � i . -^�° � � �'�" '. � '! ..� .i � �a . �.� � . " ""=� ' �. ���.� Es�_ ,� � �r�i�y�t -": r °� ' ;; ..�, _ i # .>. ..;..sr � ��.. �c« .. . aa- � > ,. .. . ;�,. , - , ��r' , t.„. . . r. '� �t_ _ � � . � � 'e �'S" _ � � �° ��� ..� A!' ��' �I.��' N'� r . r _< ��'�"' r.].. . • � ..' .._.._ �.�. ° � r na � � , �_�-� t ___��' ��� I 'i � � r i � ��� . ' . .. . � *, � �� .1 ,�" � � _ r ��i �r k ,� � W � � � '" � +I � � Fi . . ' e k. �. r �.A i,i � � ,. . R �:' � .. �. .. . •�� �'ar.r .. . ... C _ � F Z � ' • '� � � ' � � b . . ._..,,�,�'%- {. /A f ?� � �` � �.�Ii���: �, . .: . _ � ._.: .� �� � _ �t - .�;, ,� '� ` -- -- _ , _ DISCUSSION: P��oject Description The key highlights of the project are summarized as follows: • Demolition of existing residential units and any accessory structures onsite • Subdivision of the site into two side-by-side street fronting parcels, each approximately 6,000 s.f. • Construction of two new 2,697 s.f. two story single family homes • Parking is provided consistent with the Parkulg Ordinance - two (2) garage spaces and two (2) driveway spaces Ge�ieral Plan Confor��ia�ice The project proposes to replace the existing two residential units with two new single family homes. The project is consistent with the General Plan density, which allows a(maximum of four (4) dwelling units on the site based on gross acreage). Neiglihorliood Subdiz�ision Pattern The applicant is proposing to subdivide the project parcel into two side-by-side lots. Although the width of the new lots is narrow, there is a similar lot pattern in the project neighborhood and in the general Monta Vista residential area. 102 DP-2011-01, ASA-2011-08 10216 & 10232 Orange Avenue June 14, 2011 TM-2011-02 Architecfiural £� Site Design The design of the two homes reflects the architectural variety and interest in the neighborhood. One of the proposed homes is a Craftsman style with a substantial porch fronting the street, siding material, hip roofs, wide eave overhangs, carriage style doors and grouped single hung windows. The other home is a Spanish Mediterranean style with gable roofs, exposed rafter rails at the gable ends, casement windows with grids and arches. The garages of both homes have been setback further from the street than the living area in order to help emphasize the entry and living areas. Landscape Considerations No trees are being removed as part of this application. The existing Oak Tree located along the north property line has been reviewed by the City's Consulting Arborist and deemed to be healthy. As a condition of the project, the Oak tree shall be retained on site and protected from any construction activities. Environmental Assessment This project is categorically exempt from Environmental Review pursuant to Sections 15303, Class 3 ((New Construction or Conversion of Small Structures), and 15315, Minor Land Divisions, of CEQA. Noticing and Public Input The project has been noticed consistent with the requirements of the Municipal Code. Notices were mailed to property owners within 300 foot of the project site and a legal advertisement was posted in the Cupertino Courier. In addition, site signage with a color perspective of the proposed project has been installed at the site. Staff has not been contacted by any member of the public with regard to this project. CONCLUSION: Staff supports the project because it is consistent with the General Plan density and the zoning. The proposed subdivision pattern, and the residential use of the property, is compatible with surrounding neighborhood. Additionally, the homes are well designed and will complement the neighborhood. Prepared by: Piu Ghosh, Associate Planner Reviewed by: Approved by: Ls/Gary Chao /s/Aarti Shrivastava Gary Chao Aarti Shrivastava City Planner Community Development Director v� ATTACHMENTS: 1. Draft Resolution DP-2011-01 2. Draft Resolution ASA-2011-08 3. Draft Resolution TM-2011-02 4. Plan Set G: � Planning � PDREPORT � pc U reports � 2011 i�reports � U-2011-04.docx 103 DP-2011-01 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6644 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPROVING A DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF TWO NEW 2,697 SQUARE FEET SINGLE FAMILY RESIDENCES LOCATED AT 10216 ORANGE AVE SECTION I: PROTECT DESCRIPTION Application No.: DP-2011-01 Applicant: Terry Brown Property Owner: Robert or Kathleen Adzich Location: 10216 Orange Avenue (APN: 357-18-031) SECTION II: FINDINGS FOR DEVELOPMENT PERMIT: WHEREAS, the Planning Commission of the City of Cupertino received an application for a Development Permit as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held at least one public hearing in regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Planning �ommission finds as follows with regard to this application: a) The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; b) The proposed development will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan and the purpose of the City's zoning ordinances. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 2 thereof,: The application for a Development Permit, Application no. DP-2011-01 is hereby approved and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Hearing record concerning Application no. DP-2011-01 as set forth in the Minutes of Planning Commission Meeting of June 14, 2011, and are incorporated by reference as though fully set forth herein. Resolution No. 6644 DP-2011-01 June 14, 2011 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 2. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. ASA-2011-08 and TM-2011-02 shall be applicable to this approval. 3. DEVELOPMENT APPROVAL Development approval to construct two new two-story 2,697 square foot residences is granted. No allocation from the Monta Vista Area is required or granted since this replaces two existing units on the site. 4. BELOW MARKET RATE HOUSING PROGRAM The applicant shall participate in the City's Below Market Rate (BMR) Housing Program by paying the housing mitigation fees as per the Housing Mitigation Manual. The estimated mitigation fee for this project is $7,941 based on the 2010-2011 fiscal year rate (If building permits are submitted after June 30, 2011, then the estimated mitigation fee for this project is $8,179 based on the 2011-2012 fiscal year rate, subject to additional Council approved adjustments or changes). 5. FRONT YARD TREE The applicant shall plant a 24" tree in the front setback area. 6. TREE PROTECTION The development plans shall be reviewed and approved by the City's consulting arborist to determine that the improvements proposed shall not damage the health of the tree. If the improvements cannot be designed in a manner that shall not damage the health of the tree, the applicant shall obtain appropriate permits and plant appropriate replacements. As part of the demolition or building permit drawings, a tree protection plan shall be prepared by a certified arborist for the oak tree to be retained along the north property line. In addition, the following measures shall be added to the protection plan: • For trees to be retained, chain link fencing and other root protection shall be installed around the dripline of the tree prior to any project site work. • No parking or vehicle traffic shall be allowed under root zones, unless using buffers approved by the Project Arborist. • No trenching within the critical root zone area is allowed. If trenching is needed in the vicinity of trees to be retained, the City's consulting arborist shall be consulted before any trenching or root cutting beneath the dripline of the tree. • Wood chip mulch shall be evenly spread inside the tree projection fence to a four-inch depth. • Tree protection conditions shall be posted on the tree protection barriers. • Retained trees shall be watered to maintain them in good health. • A covenant on the property shall be recorded that identifies all the protected trees, prior to final occupancy. The tree protection measures shall be inspected and approved by the certified arborist prior to issuance of building permits. The City's consulting arborist shall inspect the trees to be retained and shall provide reviews prior to issuance of demolition, grading or building permits. A report Resolution No. 6644 DP-2011-01 June 14, 2011 ascertaining the good health of the trees mentioned above shall be provided prior to issuance of final occupancy. 7. LANDSCAPE PROTECT SUBMITTAL Prior to issuance of building perxnits, the applicant shall submit a full landscape project submittal per section 14.15.040 of the Landscaping Ordinance. The Water-Efficient Design Checklist (Appendix A of Chapter 14.15), Landscape and Irrigation Design Plans, and Water Budget Calculations shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits. S. LANDSCAPE INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. The landscape installation report shall include the following statement: "The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit." 9. LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a) Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b) Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de-thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. c) Failed plants shall be replaced with the same or functionally equivalent plants that may be size-adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments in water, nutrients, pest control or other factors as recommended by a landscaping professional. 10. CONSTRUCTION MANAGEMENT PLAN A construction management plan shall be prepared by the applicant and approved by staff prior to issuance of building permits. Staging of construction equipment shall not occur within 15 feet of any adjacent residential property. 11. CONSTRUCTION HOURS Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays. The developer shall be responsible for educating all contractors and subcontractors of said construction restrictions. Rules and regulation pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of a developer appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. Resolution No. 6644 DP-2011-01 June 14, 2011 12. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to issuance of final demolition permits. 13. PROTECT AMENDMENTS The Planning Commission shall review amendments to the project considered major by the Director of Community Development. 14. NOTICE OF FEES DEDICATIONS RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 1. STREET WIDENING Public street widening and dedications shall be provided in accordance with City Standards and specifications and as required by the City Engineer. 2. CURB AND GUTTER IMPROVEMENTS Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades and standards as specified by the City Engineer. 3. STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjouling properties, and shall be no higher than the maximum height permitted by the zone in which the site is located. 4. GRADING Grading shall be as approved and required by the City Engineer in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. 5. DRAINAGE Drainage shall be provided to the satisfaction of the City Engineer. Hydrology and pre- and post- development hydraulic calculations must be provided to indicate whether additional storm water control measures are to be constructed or renovated. The storm drain system may include, but is not limited to, subsurface storage of peak stormwater flows (as needed), bioretention basins, vegetated swales, and hydrodynamic separators to reduce the amount of runoff from the site and improve water quality. The storm drain system shall be designed to detain water on-site (e.g., via buried pipes, retention systems or other approved systems and improvements) as necessary to avoid an increase of one percent flood water surface elevation to the satisfaction of the City Engineer. Any storm water overflows or surface sheeting should be directed away from neighboring private properties and to the public right of way as much as reasonably possible. Resolution No. 6644 DP-2011-01 June 14, 2011 6. UNDERGROUND UTILITIES The developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. The developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the City Engineer. 7. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement shall be executed prior to issuance of construction permits Fees: a. Checking & Inspection Fees: $ Per current fee schedule ($2,468.00 or 5%) b. Grading Permit: $ Per current fee schedule ($2,217.00 or 5%) c. Development Maintenance Deposit: $ 3,000.00 d. Storm Drainage Fee: $ TBD e. Power Cost: ** f. Map Checking Fees: $ Per current fee schedule ($3,765.00) g. Park Fees: $ Per current fee schedule ($2,250.00) h. Street Tree By Developer ** Based on the latest effective PG&E rate schedule approved by the PUC Bonds: Faithful Performance Bond:100% of Off-site and On-site Improvements Labor & Material Bond:100% of Off-site and On-site Improvement On-site Grading Bond:100% of site improvements. -The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 8. TRANSFORMERS Electrical transformers, telephone vaults and similar above ground equipment enclosures shall be screened with fencing and landscaping or located underground such that said equipment is not visible from public street areas. The transformer shall not be located in the front or side building setback area. 9. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 10. NPDES CONSTRUCTION GENERAL PERMIT When and where it is required by the State Water Resources Control Board (SWRCB), the developer must obtain a Notice of Intent (NOI) from the SWRCB, which encompasses preparation of a Storm Water Pollution Prevention Plan (SWPPP), use of construction Best Management Practices (BMPs) to control storm water runoff quality, and BMP inspection and maintenance. Resolution No. 6644 DP-2011-01 June 14, 2011 11. C.3 REQUIREMENTS C.3 regulated improvements are required for all projects creating and/or replacing 10,000 S.F. or more of impervious surface (collectively over the entire project site). The developer shall reserve a minimum of 4% of developable surface area for the placement of low impact development measures, for storm water treatment, on the tentative map, unless an alternative storm water treatment plan, that satisfies C.3 requirements, is approved by the City Engineer. The developer must include the use and maintenance of site design, source control and storm water treatment Best Management Practices (BMPs), which must be designed per approved numeric sizing criteria. A Storm Water Management Plan, Storm Water Facilities Easement Agreement, Storm Water Facilities Operation and Maintenance Agreement, and certification of ongoing operation and maintenance of treatment BMPs are each required. All storm water management plans are required to obtain certification from a City approved third party reviewer. 12. EROSION CONTROL PLAN The developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. 13. WORK SCHEDULE Every 6 months, the developer shall submit a work schedule to the City to show the timetable for all grading/erosion control work in conjunction with this project. 14. OPERATIONS & MAINTENANCE AGREEMENT The developer shall enter into an Operations & Maintenance Agreement with the City prior to final occupancy. The Agreement shall include the operation and maintenance for non-standard appurtenances in the public road right-of-way that may include, but is not limited to, sidewalk, pavers, and street lights. 15. TRAFFIC CONTROL PLAN The developer must submit a traffic control plan by a Registered Traffic Engineer to be approved by the City. The plan shall include a temporary traffic control plan for work in the right of way as well as a routing plan for all vehicles used during construction. All traffic control signs must be reviewed and approved by the City prior to commencement of work. The City has adopted Manual on Uniform Traffic Control Devices (MUTCD) standards for all signage and striping work throughout the City. 16. TRAFFIC SIGNS Traffic control signs shall be placed at locations specified by the City. 17. TRASH ENCLOSURES The trash enclosure plan must be designed to the satisfaction of the Environmental Programs Manager. Clearance by the Public Works Department is needed prior to obtaining a building permit. 18. REFUSE TRUCK ACCESS The developer must obtain clearance from the Environmental Programs Manager in regards to refuse truck access for the proposed development. Resolution No. 6644 DP-2011-01 June 14, 2011 19. STREET TREES Street trees shall be planted within the Public Right of Way to the satisfaction of the City Engineer and shall be of a type approved by the City in accordance with Ordinance No.125. 20. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 21. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. 22. FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed. 23. SAN TOSE WATER COMPANY CLEARANCE Provide San Jose Water Company approval before issuance of a building permit approval. 24. DEDICATION OF WATERLINES The developer shall dedicate to the City all waterlines and appurtenances installed to City Standards and shall reach an agreement with San Jose Water Company for water service to the subject development. 25. SANITARY DISTRICT A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior to issuance of building permits. 26. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E, PacBell, and California Water Company, and/or equivalent agencies) will be required prior to issuance of building permits. PASSED AND ADOPTED this 14th day of June, 2011, Regular Meeting of the Plannulg Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSTAIN: COMMISSIONERS: ABSENT: COMMISSIONERS: ATTEST: APPROVED: /s/Gary Chao /s/Winnie Lee Gary Chao Winnie Lee, Chair City Planner Planning Commission G: � Planning � PDREPORT � RES � 2011 � DP-2011-01 res.doc ASA-2011-08 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6645 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL FOR TO ALLOW THE CONSTRUCTION OF TWO NEW 2,697 SQUARE FEET SINGLE FAMILY RESIDENCES LOCATED AT 10216 ORANGE AVE SECTION I: PROTECT DESCRIPTION Application No.: ASA-2011-08 Applicant: Terry Brown Property Owner: Robert or Kathleen Adzich Location: 10216 Orange Ave (APN: 357-18-031) SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL WHEREAS, the Planning Commission of the City of Cupertino received an application for an Architeciural and Site Approval as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held at least one public hearing in regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Planning Commission finds as follows with regard to this application: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; 2. The proposal is consistent with the purposes of Chapter 19.134, Architectural and Site Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Design harmony between new and existing buildings have been preserved and the materials, textures and colors of new buildings harmonize with adjacent development with design and color schemes, and with the future character of the neighborhood and purposes of the zone in which it is situated. The location, height and materials of hedges and screen planting harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots have been concealed. Ground cover or various types of pavements have been used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees have been avoided. Resolution No. 6645 ASA-2011-08 June 14, 2011 NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 2 thereof, the application for an Architectural and Site Approval, Application no. ASA-2011-04 is hereby approved, and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Hearing record concerning Application no.(s) ASA-2011-04 as set forth in the Minutes of Planning Commission Meeting of May 24, 2011, and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS This approval is based on Exhibits titled "New Single Family Residence, 10216 Orange Avenue, Cupertino, CA 95014" consisting of pages A-1 - A-6 and "New Single Family Residence, 10232 Orange Avenue, Cupertino, CA 95014" consisting of pages A-7 - A-12 prepared by Bruno Marcelic, Architect A.I.A. dated 5-26-2011 and "Landscaping Planting Plari' labeled L1.0, dated 3- 28-2010, except as may be amended by the Conditions contained in this Resolution. 2. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. DP-2011-01 and TM-2011-02 shall be applicable to this approval. 4. DEVELOPMENT APPROVAL Architectural and Site Approval is granted to for fa�ade, landscaping, parking lot and sidewalk enhancements, including a new trash enclosure to service an on-site cafe inside a new health club facility located inside the Sears store. The Planning Commission shall review amendments to the project considered major by the Director of Community Development. 5. TREE PROTECTION The development plans shall be reviewed and approved by the City's consulting arborist to determine that the improvements proposed shall not damage the health of the tree. If the improvements cannot be designed in a manner that shall not damage the health of the tree, the applicant shall obtain appropriate permits and plant appropriate replacements. As part of the demolition or building permit drawings, a tree protection plan shall be prepared by a certified arborist for the oak tree to be retained along the north property line. In addition, the following measures shall be added to the protection plan: • For trees to be retained, chain link fencing and other root protection shall be installed around the dripline of the tree prior to any project site work. • No parking or vehicle traffic shall be allowed under root zones, unless using buffers approved by the Project Arborist. Resolution No. 6645 ASA-2011-08 June 14, 2011 • No trenching within the critical root zone area is allowed. If trenching is needed in the vicinity of trees to be retained, the City's consulting arborist shall be consulted before any trenching or root cutting beneath the dripline of the tree. • Wood chip mulch shall be evenly spread inside the tree projection fence to a four-inch depth. • Tree protection conditions shall be posted on the tree protection barriers. • Retained trees shall be watered to maintain them in good health. • A covenant on the property shall be recorded that identifies all the protected trees, prior to final occupancy. The tree protection measures shall be inspected and approved by the certified arborist prior to issuance of building permits. The City's consulting arborist shall inspect the trees to be retained and shall provide reviews prior to issuance of demolition, grading or building permits. A report ascertaining the good health of the trees mentioned above shall be provided prior to issuance of final occupancy. 6. LANDSCAPE PROTECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full landscape project submittal per section 14.15.040 of the Landscaping Ordinance. The Water-Efficient Design Checklist (Appendix A of Chapter 14.15), Landscape and Irrigation Design Plans, and Water Budget Calculations shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits. 7. LANDSCAPE INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. The landscape installation report shall include the following statement: "The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit." 8. LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/ her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a) Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b) Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de-thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. c) Failed plants shall be replaced with the same or functionally equivalent plants that may be size-adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments in water, nutrients, pest control or other factors as recommended by a landscaping professional. Resolution No. 6645 ASA-2011-08 June 14, 2011 9. CONSTRUCTION MANAGEMENT PLAN A construction management plan shall be prepared by the applicant and approved by staff prior to issuance of building permits. Staging of construction equipment shall not occur within 15 feet of an� residential property. 10. CONSTRUCTION HOURS Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays. The developer shall be responsible for educating all contractors and subcontractors of said construction restrictions. Rules and regulation pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of a developer appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. 11. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to issuance of final demolition permits. 12. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a) Water all active construction areas at least twice daily and more often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b) Cover all trucks hauling soil, sand, and other loose materials or require all trucks to maintain at least 2 feet of freeboard; c) Pave, apply water at least three times daily, or apply (non-toxic) soil stabilizers on all unpaved access roads, parking areas and staging areas at construction sites. d) Sweep streets daily, or more often if necessary (preferably with water sweepers) if visible soil material is carried onto adjacent public streets. e) The applicant shall incorporate the City's construction best management practices into the building permit plan set. 13. EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments and/ or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble the details shown on the original approved plans. Any exterior changes determined to be substantial by the Director of Community Development shall require a modification approval with neighborhood input. 14. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 15. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of Resolution No. 6645 ASA-2011-08 june 14, 2011 such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 1. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. DP-2011-01 and TM-2011-02 shall be applicable to this approval. PASSED AND ADOPTED this 14th day of June, 2011, Regular Meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSTAIN: COMMISSIONERS: ABSENT: COMMISSIONERS: ATTEST: APPROVED: /s/Gary Chao /s/Winnie Lee Gary Chao Winnie Lee, Chair City Planner Planning Commission G: � Planning � PDREPORT \ RES � 2011 � ASA-2011-OS res.doc � a � � co . � O O N �O N � ABBRE�„�TIONS & AND L ANGLE Q AT CL CENTER LINE O DIAMETER # POUND OR NUMBER AA.P. ATTIC ACCESS PANEL A.B. ANCHOR BOLT A.C. ASPHALTIC CONCRETE A/C AIR CONDITIONING ADJ. ADJUSTABLE A.F.S. AUTOMATIC FIRE SPRINKLER ALUM. ALUMINUM APPROX. APPROXIMATE ARCH. ARCHITECTURAL ANOD. ANODIZED ASPH. ASPHALT AWG AWNING WINDOW B/ BACK OF OR BOTTOM OF BD. BOARD B.H.A.C.B. BETTER HEATING AND AIRCONDITIONING BUREAU BLDG. BUILDING BLKG. BLOCKING BM. BEAM B.O.J. BOTTOM OF JOISTS BOTf. BOTfOM B.U. BUILT-UP C. CARPET CABT. CABINET C.B. CATCH BASIN CEM. CEMENT CNT. CENTER C.T. CERAMIC TILE C.I. CAST IRON C.J. CONSTRUCTION JOINT CLO. CLOSET CLR. CLEAR CLG. CEILING C.M.U. CONCRETE MASONRY UNIT C.O. CLEANOUT COL. COLUMN COMP. COMPOSITION CONC. CONCRETE CONN. CONNECTION CONST. CONSTRUCTION CANT. CONTINUOUS CONTR. CONTRACTOR CSK. COUNTERSUNK CSMT. CASEMENT WINDOW C.W. COLD WATER D. DRYER DB. DOUBLE D.B. DROPPED BEAM DET. DETAIL D.F. DOUGLAS FIR DH DOUBLE HUNG WINDOW DIM. DIMENSION DR. DOOR D.S. DOWNSPOUT D.W. DISH WASHER DWG. DRAWING DWR. DRAWER EA. EACH E.J. EXPANSION JOINT ELEC. ELECTRICAL ELEV. ELEVATION ENCL. ENCLOSURE E.P.B. ELECTRIC PANEL BOARD EQ. EQUAL EXH. EXHAUST EXP. EXPANSION EXIST. a (E) EXISTING EXT. EXTERIOR FBRGL. FIBERGLASS F.D. FLOOR DRAIN FDN. FOUNDATION F.E. FIRE EXTINGUISHER F.E.C. FIRE EXTINGU�SHER CABINET F.H. FIRE HYDRANT OR FLAT HEAD F.H.C. FIRE HOSE CABINET F.F. FINISH FLOOR F.G. FINISH GRADE FIN. FL. FINISH FLOOR FLUOR. FLUORESCENT FLSG. FIASHING F.O. FINISHED OPENING F.O.C. FACE OF CONCRETE F.O.F. FACE OF FINISH F.O.M. FACE OF MASONRY F.O.S. FACE OF STUD FR. DR. FRENCH DOOR FT. FOOT OR FEET FfG. FOOTING FRP FIBERGLASS REINFORCED PLASTIC FURR. FURRING FXD. FIXED GA. GAUGE G.D. GARBAGE DISPOSAL GALV. GALVANIZE(D) G.I. GALVANIZED IRON GFI. GROUND FAULT INTERRUPTER GL. GLASS GRD. GROUND OR GRADE G.S.F. GROSS SQUARE FEET G.S.M. GALVANIZED SHEET METAL GYP. BD. GYPSUM BOARD H.C. HOLLOW CORE H.D. HOLD DOWN HDR HEADER HDWD. HARDWOOD HDWR. HARDWARE H.M. HOLLOW METAL HORIZ. HORIZONTAL H.P. HIGH POINT HR. HOUR H.B. HOSE BIBB HT. HEIGHT HC. HANDICAP HTG. HEATING HVAC HEATING VENTILATING AND AIR CONDITIONING H.W. HOT WATER H.W.D. HOT WATER DISPENSER I.D. INSIDE DIAMETER INV. INVERT INSUL. INSULATION INT. INTERIOR J.B. JUNCTION BOX JST. JOIST JT. JOINT KIT. KITCHEN K.O. KNOCKOUT K.P. KICKPLATE LAVS. LAVATORIES LAM. LAMINATED LIN. LINEN L.P. LOW POINT LT. LIGHT MAT. MATERIAL MAX. MAXIMUM M.B. MACHINE BOLT MECH. MECHANICAL M.C. MEDICINE CABINET MET. METAL MFR. MANUFACTURER M.H. MANHOLE MIN. MINIMUM MISC. MISCELLANEOUS MTD. MOUNTED MULL. MULLION (N) NEW N.I.C. NOT IN CONTRACT NO./# NUMBER N.S.F. NET S�UARE FEET N.T.S. NOT TO SCALE O/ OVER O.C. ON CENTER O.F.S. OUTSIDE FACE OF STUD OH. OVERHEAD OPNG. OPENING OPP. OPPOSITE O.D. OVERFLOW DRAIN ar OUTSIDE DIAMETER PA. PUBLIC ADDRESS P.B. PANIC BAR P.C. PRE-CAST P.D.F. POWDER DRIVEN FASTENER PL PLATE P/L PROPERTY LINE PLAS. PLASTER PLAS. LAM. PLASTIC LAMINATE PLY. PLYWOOD PNL. PANEL POL. POLISHED PORC. ENAM. PORCELAIN ENAMEL PT POINT P.V.C. POLY VINYL CHLORIDE PR. PAIR R. RISERS R.A. RETURN AIR RAD. RADIUS R.C.P. REINFORCED CONCRETE PIPE RD. ROUND R.D. ROOF DRAIN REC. RECESSED REF. REfRIGERATOR REINF. REINFORCED/ING RES. RESILIENT R.H. ROUND HEAD RM. ROOM R.O. ROUGH OPENING REQ. REQUIRED RNV RIGHT OF WAY RWD. REDWOOD R.W.L RAIN WATER LEADER S$P SHELF AND POLE SCHED. SCHEDULE S.C. SOLID CORE S.D. STORM DRAIN SECT. SECTION S.F. SQUARE FOOT/FEET SGD. SLIDING GLASS DOOR SGW. SLIDING GLASS WINDOW S.H. SINGLE HUNG WINDOW SHT. SHEET SHTHG. SHEATHING SHWR. SHOWER 5HVS. SHEIVES SIM. SIMILAR SK. SINK OR SKETCH SL. DRS. SLIDING DOORS S.M. SHEET METAL S.M.S. SHEET METAL SCREW SPECS. SPECIFICATIONS SQ. S�UARE STD. STANDARD STL. STEEL STOR. STORAGE STRUCT. STRUCTURAL ST. STL. STAINLESS STEEL SUSP. SUSPENDED SYM. SYMMETRICAL T. TILE T.B. TOWEL BAR T.C. TOP OF CURB TEL. TELEPHONE TEMP. TEMPERED THRESH. THRESHOLD T 8 G TONGUE AND GROOVE T.O.F. TOP OF FOOTING T.O. TOP OF T.O.P. TOP OF PLATE T.O.S. TOP OF SLAB TOSF TOP OF SUB FLOOR T.P. TOILET PAPER TR. TREAD T.W. TOP OF WALL TYP. TYPICAL U.N.O. UNLESS NOTED OTHERWISE U.O.N. UNLESS OTHERWISE NOTED UR. URINAL V. VINYL V.C.P. VITREOUS CLAY PIPE VERT. VERTiCAL V.G.D.F. VERTICAL GRAIN DOUGLAS FIR W. WINDOW OR WASHER wi wm WAINS. WAINSCOT W.C. WATER CLOSET WD. WOOD WDW. WINDOW W!O WITHOUT W.P. WORK POINT or WATERPROOF W.R. WATER RESISTANT or WASTE RECEPTACLE W.S. WEATHER STRIPPING or WOOD SCREW W.W.F. WELDED WIRE FABRIC XO SLIDING WINDOW WITH'X' BEING OPENABLE AND 'O' BEING FIXED WHEN LOOKING FROM THE OUTSIDE XOX SLIDING WINDOW WtTH "X" BEING OPENABLE AND 'O" BEING FIXED WHEN LOOKING FROM THE OUTSIDE, DNIDED ROUGLY 1/4, 1/2, 1/4, RESPECTNELY - ... �" ,-a . NEW SINGLE FAMILY RESIDENCE x DETAIL NUMBER X.X SHEET WHERE DETAIL IS DRAWN. SAME DISCIPUNE U.N.O 10216 ORANGE AVENUE CUPERTINO, CA 95014 SYMBOLS x SECTION NUMBER x INTERIOR ELEVATION NUMBER X.X SHEET WHERE SECTION IS DRAWN. X�X SHEET WHERE ELEVATION IS DRAWN. SAME DISCIPLINE U.N.O SAME DISCIPLINE U.N.O WINDOW MARK O DOOR MARK Q REVISION NUMBER x (SEE WINDOW SCHEDULE) � (SEE DOOR SCHEDULE) x (SEE DESCRIPTION BLOCK ON SAME SHEET FOR DATE & DESCRIPTION) PERSPECTIVE � ELEVATION ABOVE DATUM POINT NORTH ARROW (THIN LINE INDICATES TRUE NORTH) a �.•._.....__.-...-- ' � i ^e ��.....,.�.-�.•....,....,..�....,.,.,....:.�:,.M.-..��..�.-�+..��.,:._....�.a+....,..._.>....._:�� . . y D� --�/I-D► " � �45�- �/ ►.-� r�, s .. . . . . .... . � . �. .. ._.,. , � r �� +/ � .. . ;.iw.. ... ..�al.' a�.�<..-L'�4 � . �.._�...,...w�..�, 3: a' � �- � � . ' . �'Y tif �,LayJ�.c�.' . ....�..r .� .� � ax� f� • t�.; ;;cY VICINITY MAP PROJECT SITE ,.. i „ � . :.,... . ; : , . �� ... , i' �. - DRAWING INDEX ARCHITECTURAL SHEETS A-1 TITLE SHEET A-2 SITE 8 AREA PLANS A� BASEMENT & FIRST FLOOR PLANS A� SECOND FLOOR & ROOF PLANS A-5 ELEVATIONS A� SECTIONS 8 DETAILS A-7 TITLE SHEET A� SfTE 8 AREA PLANS A-9 BASEMENT & FIRST FLOOR PLANS A-10 SECOND FLOOR 8 ROOF PLANS A-11 ELEVATIONS A-12 SECTIONS S DETAILS CIVIL SHEETS TENTATIVE MAP 1 COVER, DETAILS, 8 SECTIONS 2 PROPOSEDIMPROVEMENTS 3 EXISTING IMPROVEMENTS PRELIMINARY GRADING 1 GRADING & DRAINAGE PLAN 2 SECTIONS 8 DETAILS LANDSCAPE SHEETS L1.0 LANDSCAPE IRRIGATION PIAN L1.1 HOUSE-1 LANDSCAPE HYDR0.ZONE PLAN L12 HOUSE-2 LANDSCAPE HYDRO-ZONE PLAN LZ.O LANDSCAPE PLANTING PLAN L3.0 LANDSCAPE CONSTRUCTION DETAILS L3.1 LANDSCAPE CONSTRUCTION DETAILS L4.0 LANDSCAPE SPECIFICATIONS PROJECT DATA FLOOR AREA RATIO: RATIO OF 2ND FLOOR TO 1 ST FLOOR: NUMBER OF STORIES: HEIGHT: BUILDING PAD ELEVATION: CURB ELEVATION: PARKING: EXISTING USE: PROPOSED USE: ZONING: GENERAL PLAN DESIGNATION: PAVING AREA: LANDSCAPING AREA: NUMBER OF DWELLING UNITS: RECREATION AREA: 2,697/6,000 = .449 1006 S.F. / 1,691 S.F. _ .59 2 25'_7" SEE CNIL DRAWINGS SEE CNIL DRAWINGS IN GARAGE -2 ON DRIVEWAY - 2 TOTAL-4 SINGLE FAMILV RESIDENCE SINGLE FAMILY RESIDENCE P(RES) 4.4 - 7.7 DU/GR AC 1,220 S.F. (20%) 3,089 S.F. (51%) (1) 4-BEDROOM UNIT 1.824 S.F. (30 % ) RESIDENTIAL PROJECT COVER SHEET ASSESOR'D PARCEL NUMBER: 357-18-031 NAME OF OWNER: Robert Adzich PROJECT ADDRESS: 10216 Orange Ave, Cupertlno, CA 95014 CONTACT PERSON: Rabert Adzich PHONE 408-234-4835 FAX: NET S�UARE FOOTAGE OF LOT 6,000 S.F. (.138 AC.) S�UARE FOOTAGE MAIN HOUSE: EXISTING: PROPOSED: FIRST FLOOR: B10 S.F. 1,267 S.F. SECOND FLOOR: 1,006 S.F. GARAGE: 400 S.F. 424 S.F. BASEMENT: 1,691 S.F. TOTAL: 1,210 S.F. 4,388 S.F. Me there at least two 10 foot by 20 foot clear spaces inside tlie garage: Y Is privacy protection planting required for the project'? Y Build it Green Total Pdnts: N/A On what floa is work being done? ALL Brief description of work: DEMOLITIN OF A SINGLE FAMILY RESIDENCE AND DETACHED GARAGE. CREATION OF A NEW LOT BY SUBDNIDING WITH A NEW SINGLE FAMILY RESIDENCE AND ATfACHED GARAGE Code Editions: 2010 CBC, 2010 CRC, 2010 CPC, 2010 CMC, 2010 CEC, - - __ __ � � � � ■ � � � � � � � � � . _ � � , � u�' � ARCHITECT A.I.A. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 408/ 379-6500 Fax 408/ 379-6110 Project Name: NEW SINGLE FAM I LY RESIDENCE 10216 ORANGE AVENUE CUPERTINO, CA 95014 Sheet Name: TITLE SHEET Project Number 1103 Date 05l26/11 Drawn By �Rg Checked By BM A-1 sca�e 12" = 1'-0" � VIEW FROM STREET . i' a o� N _ 'n a 0 0 N �O N � FIRST FLOOR AREA � A- 11'-4" x 4'-0" = 45 sf � B- 29'-0" x 21'-0" = 609 sf � C- 33'-0" x 28'-0" = 924 sf D- 20'-8" x 2'-0" = 41 sf E- 14'-6" x 5'-0" = 72 sf TOTAL: 1,691 sf D �° --ad� r - o � � . . . .. - t �,1 '�° / 1 " �$ e . b , . �..`� �`.$. ..._ 1 �•v;._..,aa;<�:�es� ...�,«.'c.nY � '/_ ; �g �a p p i � V r l ` I �, �i W I I � a�..k>.�1• ay M X i1110�6il.7.� ��d _ ____ , 43aIf � .�3�o��aiii�C _ -- ' ._.._....._....— - _ ''..°"" - Cuac t1�i �s��;ct' 3 FIRST FLOOR AREA DIAGRAM 1/4" = 1'-0" SECOND FLOOR AREA F- 23'-0" x 16'-9" = 386 sf G- 1'-9" x 3'-5" = 6 sf '� H- 18'-6" x 6'-9" = 125 sf �- 2'-0" x 6'-0" = 12 sf K- 25'-0" x 15'-3" = 382 sf L- 10'-0" x 5'-6" = 55 sf M- 10'-0" x 4'-0" = 40 sf i, r TOTAL: 1,006 sf G 0 0 � � � w 0 M � � � � � `v fV M � � � •(N) PLANTER Sl 48.00' ' - srnNOnHUS, i rr. _ _ ORANGE AVENUE SITE NOTES: 1. SEE CfVIL DRAWINGS FOR PROPERTY LINE DIMENSIONS AND DIMENSIONS OF THE HOUSES FROM PROPERTY LINES. 2. ALL UTILITY SERVICES, INCLUDING TELEPHONE, ELECTRIC POWER, AND ALL COMMUNICATIONS LINES SHALL BE PLACED UNDERGROUND. UNDERGROUND CONDUIT SHALL BE PROVIDED FOR CABLE TELEVISION SERVICE. 2 SECOND FLOOR AREA DIAGRAM � SI� 1/4" = 1'- 1/8 - 1'-0" NEW GAS METER NEW 250A MAIN ELECTRICAL PANEL WITH UNDERGROUND SERVICE Z 0 � a U 0 w ❑ �, ,, N 00°00'00" W 48.00' �— 6 FOOT TALL REDWOOD FENCE ALONG PROPERTY LINES, TVP. 0 0 � � � � 0 co (� � � � Z � % BRUNO MARCELIC ARCHITECT A.I.A. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 408/ 379-6500 Fax 408/ 379-6110 Project Name: NEW SINGLE FAM I LY RESIDENCE 10216 ORANGE AVENUE Cl1PFRTINO. CA Sheet Name: SITE & AREA PLANS Project Number 1103 Date 05/26/11 Drawn BY JRB Checked By BM A-2 scaie As indicated ���s• 4'-0" s�-o �r. CLR. '7 � 11'-4' 5'-8" 5'�" A5 2 2 A� 37'-0' 1 T-8' 17'-8' � � N � PORCH o � � 4'-0" 3'-0 t/2" CLR. .....--� _..,�...�..._ _......,.^.._._... ..�..._..,�_.._....�...__a..._.�...... ,. �.. � pP�aOII-DI � �-' . - +- .f� "aoll -o , ,. . . . � � ' `.' . s Sr� .� �r���I Q ... r . _ c o' t,c.:s � � � O 2 i:t4� ¢ � . CELIC .�����I��C��� ..,,,,. -_.. • ARC ITECT i.i' � Cwsc: !4$:��a Lrr I.A. 4 - v 365 E. C mpbell Ave. Cam bell, CA 950 8-2013 DINING TEMP. Phone � 408/ 379-6500 W � Fax DN 408/ 379-6110 Z COUNTER WITH � KNEE SPACE � Q v � _ � 0 0 N t0 � � i BASEMENT FLOOR PLAN 1/4" = 1'-0" � UNDERNEATH � Z o 0 n H T------------ o FAMILY ° � ' �, ROOM = � o ` � �,W� � -� �3m 6'�" �q a a � o w o F 0 3 0 i A� KITCHEN � � � N o � o � a -, � � � ' � i � 4 LL ' i A� N � � � UP i a i � � 3 i � w = J O I � O H� 4 � W � � I m p ;� 4 W J I I � J3m ' � R� M � T-T i i i i i� � N z'-0• PANTRY � ; ;�' ; i DN 16R ;; � � i i DN � � � A-5 3 — � VEN ____�� j i t i i T=10.5"MIN. � 4 q� J � �� I I I _L_ o� O r� L. Q � -Z � � � � � BATH � � fV WALLMOUNTED TANKLESS 4'-3' 4'-T WATER HEATER � EXPANSION `° GARAGE �OINTS ^ � Q � o BEDROOM N �------------------- ------------------- / OFFICE o � � � � � � � a�-0• � i i � i � � , W � i a i i i i � i i � i � N I I � I � 4 i � 'v i � i i i � � � i � � ; CL. � ENTRY -- � -- N � � � r-s• g is�-0• s• r-s i CL. � v i a <V � fOVE GRADE I � = PuMP. PORCH � � � � � I N � in o � BASEMENT AND � � DUCTS �..OR FRAMING, THROUGH DROPPED CEILINGS AND SOFFITS. DO NOT PENETRATE FLOOR JOISTS AND BEAMS. 2'-0' 10'�' 2'-0" z�-o• zo�-s• . �<'-s" FIRST FLOOR PLAN 1 /4" = 1'-0" ��-0• � A-6 Project Name: NEW SINGLE FAM I LY RESIDENCE 10216 ORANGE AVENUE Sheet Name: BASEMENT & FIRST FLOOR PLANS Project Number 1103 Date 05/26/11 Drawn BY JRB Checked By BM A-3 sca�e 1 /4" = 1'-0" � � � � � 0 0 N � N N \ ROOF PLAN 1/4" = 1'-0" 'CMI' MODEI RVGL50 ROOF VENTILATOR, TVPICAL A-5 Z 31'-10" i -------------- i ❑ � I 23�-0• h 1' I 2 � 0 � I �2�$• s�-�o• 1 I °� � -- ------ -- --------- m I � � I a � I 6 , $ . 6 ��• 6 ��• � I � I � I I � I SHOWER I � � � O o I � i ---------- ---� I � � i I I N i i � o i i � ° � s�-z• MASTER � � I � BATH ;MASTER � I � O BEDROOM � � I ; , z�-�o• I i 9'-10' CLG. i I o � 3�" i � 3-0" � N � TOILET i 4 � � rrP. I � � �' ; ; � , � ' �---------- ---� I I � y I I i i W NLK "' s�-o CLG. I q � I; CLOSET � � � � i� n� , I � w ' �------------------- � ------- r � I I L_—J DN18R � p� 3 M � � � DN T=10.5' MIN. � � o m� � — �_ � 4 � � BATH �q i --- � � I i.i � AA.P. � I _____J . I z'�' LAUNDRY - — - — - iv � ------- -------- � --- SINK? -W- Q� - � � i v i LIN. 4 I i r+ � r-- - � � i i i i i � i � i i i T-�" � 2'-0' 3'-8' i 3-2• i i � I i i i v i i I i i � I� � � � i 4 i i � � ! i � li � i � '° ° � 5'-r BEDROOM � � � � BEDROOM � �� ��,$. 2 ��. � �#2 � � � � SLOPE i SLOPE i ��'�� i 4'-10" � f — i � i 3:�y i 3:�2 SLOPE i SLOPE � � o ~� ~ 4 i a 3:12 � 3:12 � I � t I '� i _ .... .... .. _ .... ... i i �q I � I � 5'-0" 5'-0" � 5'-0' S�-0� �-- --------- ----- 10'-0" 5'-0" 1 D'-0" 25'-0" 4 ''� �" � � r I I I I L � �—J � _ �-.- --- ---- - -- - -_ p �,. �,ol I —o I . . � : ` f }� ��o/I -og � � . . . . . �'�`�'��. :�:.:� B � UNO F . CELIC �, �;: a:�. ,Y u -�.�-- � AR � HITECT C:a��: �t�u �.��;��� .I.A. 365 E. � ampbell Ave. Ca pbell, CA 9 08-2013 Phone 408/ 379-6500 Fvc 408/ 379-6110 � � � � � � 0 � �4 � ° `_v io � 4 A5 fV 0 in fV 4 ih 4 � � � � 4 fn 1 A-5 � SECOND FLOOR PLAN 1/4" = 1'-0" Project Name: NEW SINGLE FAM I LY RESIDENCE 10216 ORANGE AVENUE ri io�RTitin rn Sheet Name: SECOND FLOOR & ROOF PLANS Project Number 1103 Date 05/26/11 Drawn BY JRB Checked By gM A-4 Scale 1 /4" = 1'-0" � . ; �' � -^' T - A' � � y . .. . < . < ,.. �~�+ � . .. . --. , ,.. _ --_a,c;;:. � � .�. r . .<-< .. e �'m' ; ' . . __ ; Y,,, ` �: , � � � I; . - ; ,, . .. .. .. .... . I �',, . __. , �< � ;: � � . �., . , ............ . . . . .. . . . . >�..,.... . . ..,.., , . .......... . . ,.,... ,.,.. Roof n 20' -�I p LIGHTWEIGHT CONCRETE TILE ROOFING A � BY EAGLE STVLE: CAPISTRANO-SUNRISEBLEND �..*''``�� ; - "��^�. FIN SH CBENJAMIN MOORE SILHOUETTE � y'� '� � � t � "^ � , �'" _ � — f — �. =� — — — — Roof � �� � _ 20'-0 ANDERSEN 100 SERIES WINDOWS � FINISH: DARK BRONZE �i I I '`� �� WINDOW TRIM BY VERISTONE � G�u y; --; FINISH: VERIFY WITH OYVNER , - � -- --- . xrrs. � � ' 3 � . .. �_.____-_) � �� �: � .. . . . .. ry i n �..�_::��:.�.u��,.. �;�,�«�,..�:..�<� .� i � ,. -� , ` �=�� S— Second Floor $ , �� ��� ,. �' N 11 ' 0 " i'"� _ ��,,,�°' �,.�� ' � �� `, � � -� .,� � ' � �,...- �,,. � � � ; STUCCO WALL FINISH � , .;, - � � � ry � : � a � t FINISH. BENJAMIN MOORE RATTAN � �: � � 1 �__ � ; � � , . , �,. -��:�_�� �,���� , � � _ ,, WOOD ENTRY DOOR � ��'��� : j € � ; FINISH: BEHRWOODCHIPSTAIN � •� ; � � �� �£ � : � � , � .) � , 1 t3 . 2 S ' .� � � .� k....d.� �.�...� �� � � r ✓ i 1 ` , � WOOD ROLL-UP GARAGE DOOR I � � F ': ` FINISH: BEHR WOODCHIP STAIN � 1 � �� t: s (;`� t x �_, j i i �,s ! � � �� i E Firs_t �Floo�r ,� � � � ���� �� � — - — — — , — 0 " � I •. .... .., t i � �'. f S `k. ... ' 5 A� FRONT ELI 1/4" = 1'-0" - �, �econd Flc � 11' - ........ - ;:: �... _,:. , :�.... � _ „ ; , �: , �-.-....w•..- , , � - i: � i � � r. � � t, i: � } (::' � � , i; : , ,, .._.. ... • ......._: ;: ; � : : E i....... ���, ., . . . ...._...�......_ _ �i _ ,� _ __ _ _ , -, T _.�.. �_� � ,___� ...: �� � ,. .. s ,� � ; ; ; a � f �� 3 ; � � t ( I � E , l � ' E � � . �, ��.0..�.£ 3 __... ..__... � i � � . � ; � . . z � ! 1 — , � : .,; z � i " � � i T — .—. _ _ � - � — — _ _ _ _...... ... _ _— i — First Floor _ � -..<--.- � . _ ? ,�_ � : � 0 _ _ ., � �. 3 LEFT SIDE ELEVATION 1/4" = 1'-0" r.�-m--.- �.� _ �. � .. .' F � ��.� �: '� ' � :: �-�� ::: �' � *s.r��s. ', f,� ��� � . ,. , ; .;� , . Ro�of � 20' - 0" � ��� s �"�"�T: ' {T { x� �� . i _ � Y . , ,. , .. ... ... � al � ' � . . :: i ,.; : _ „ , : � ,,. � ,:: ..,. _.,- .._ .,., ,,. .�.. ._ �; , . <. . : : � � �=" ------- � : � � � � � , . ^-�„ � : .. ��� , ..�. �._ ,: _ . . „��.. - — .: � _ ,... .._.___.. , � : - � ; " � � i; : ; ; �: � : � , . � : . r +v� . ; ', , , �! . . � ; � � . q : . : . . ' ...,: • � 33 a� i. f �' ..... �_ �.:; �. � i i JJ 3 —_ 7, ;: � . .... . . . � �- : � F . ¢ ' --- £ ---- _._.._ __ � ----- ' ; : ;� N ........... ....... .... ........... . ...,_„__m:;..�_ ,...,..,.;� -... ! � 3 . . . �' � _ - � 1 --- , — a : ` . � ..; a ..; "f '��� ..... . ... . � � � � _ !. � � s �, �: �3 .# � ��� e . � �� . 1 0� i � � . 8 �.�. ..���. — — — — . — - : � — — — — — — — , a � � -- . — , o , _ _ , _ _ ,. N . . . , . ... . . ..... . � � .. ..... ... . �: .. . ... . . ... ......... ..... . �. .. : . t0 .. .. .. ....... ..... , .. ... . . .... . .. .: �. . . � ��. . �. . . ..., .. �. . �. . � �. N� . . . ..... . _ . . � ........ . . .. . .. . . . ..... . . ... .. . . . � COMBUSTION AIR 2'-0" COMBUSTION AIR 3 EXHAUST VENT INTAKE VENT A-6 � RIC�HT Slf]F FI FVATION __ # :i $ €� . '� ��.�� �f _ Roof 20� - o° ' N Second Floor °� 11' - 0" r-ti• -Q o First Floo�� 8COf1 � ....-�.. -- .�..._ _..._ .�,....�...,.W._..�...,.....< . .._. _ ..,� .,...�........�.....m.�_.�..,.au,<J...�,+...c.�..u:r �� ti 11' - 0" u n REAR ELEVATION � _ n __ � First Floor � �1 - �.ol 1-0 ` �� i � .. `. ' o " ; .�..� '�.�Q v i �' . . . , e_ .,. i � f � z ., .. ,.. . . .. ,... . .-�,.'�• ��'��.....�.�. � � 1 r� :, � � �-- • f � � .� tz�i' � �' a .: ,.. .r,�....�... _.._..r...c �•,.�...r �,:z.�:° �„R eu�;cr i BRUNO MARCELIC ARCHITECT A.I.A. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 408/ 379-6500 Fax 408/379-6110 Project Name: NEW SINGLE FAM I LY RESIDENCE 10216 ORANGE AVENUE CUPERTINO, CA 95014 Sheet Name: ELEVATIONS Project Number 1103 Date 05/26/11 ��� BY JRB/BM Checked By gM A-5 Scale 1 /4" = 1'-0" -- 1/2' CDX PLWD. --�-- �� FASTEN ROOFING MATERIAL PER MFR'S INSUL. BAFFLE RECOMMENDATION ROOFING FELT — 7�c SOLID BLKG. w/RAFTER VENTS PER ROOF PLAN � � � GUTTER COUNTER- FLASHING � ST�os c� i 16" O.C., U.N.O � ROOF GALV. METAL FRAMING, GUTTER PLYWOOD SEE STRUCT. SHEATHING F ' 1x6 V�ROOVE FINISH INSULATION, SEE ROOF PLAN BOARDS ON UNDERSIDE� SEE SECTIONS I OF EAVE { S GYPSUM I 7/8" STUCCO OVER METAL BOARD LATH AND 2-LAYERS � BUILDING PAPER r 6 TYPICAL EAVE 1 1/2" = 1'-0" � i � ROOFING, SEE PLYWOOD SHEATHING ELEVATIONS & ROOF FRAMING, SEE STRUCTURAL PLANS ROOFING UNDERLAYMENT V-GROOVE SIDING GALV. METAL RAKE FLASHING 4 I Dc R/S RAKE, SEE � ELEVATIONS � ( Dc4 OUTRIGGERS SEE PLANS f� 48" O.C. 7/8' STUCCO OVER METAL LATH 8 2-LAYERS � BUILDING PAPER PLYWOOD SHEATHING � 2x STUDS � 16" O.C. � TYPICAL RAKE 1 1/2" = 1'-0" SECTION 1 1/4" = 1'-0" � a � a O 0 N � � 7/8' STUC( LATH AND BLDG.PAF P�vw000 2x STUDS (t7� 16" O.C. INSULATION IJULH I 1 V IY 1M BOARD iTUD IER STUD. SEE ;TURAL �_FIfSt FIOOf v WINDOW FLASHING HEADER (SEE • ' " STRUCTURAL) SEALANT GYP. BOARD WINDOW CORNER BEAD PLYWOOD SHEATHING L-CASING BEAD WINDOW FLASHING g�ement WINDOW � �� — � CAULKING 7/8" STUCCO OVER METAL LATH AND 2-LAYERS BUILDING PAPER 8 TYPICAL WINDOW HEAD 4 TYPICAL WINDOW JAMB 3 SECTION 3 3" = 1 ,- 0 . 3�� _ ���• 1/4" = 1'-0" NOTCH EACH RAFfER 1' x 3' AT TOP FOR CROSS VENTIUITION — 4 'v CAULKING STUCCOF OVER FOF WINDOW,SEE ELEVATIONS WOODSTOOL WOOD TRIM WINDOW FLASHING OVER BUILDING PAPER PLYWOOD . -� GYPSUM BOARD SHEATHING _ `{ INSULATION, SEE � �� - � SECTIONS ST���o - . i.. ,. . I. I I 9 TYPICAL WINDOW SILL 3" = 1'-0" Floo_ r � 0"�� r� ��� III. I I I I Basement - � — -�o�-o� .I -� �� I I I I I I-I I I,=1 I I=1 I I=1 I 1=1 I I-I I I-I I I-I I I-I I- I I,-1 I I-I I I� I I I��� � I �-� � �-� � �- � i 1=1 I I-1 I 1=1 I 1= � � � =� i 1=1 I I- � i �- 5 SECTION 4 1/4" = 1'-0" rioN z = 1'-0" _ Second Floor 11'-0" First Floor ' 0" Basement I� 10� ' _ Roof 2�� - �" �cond Floor 11'-0" First Floor I 0" Basement I -� �� - �" ROOF TRUSSES NOT SHOWN IN DETAIL, SEE STRUCTURAL AND TRUSS MANUFACTURER'S DRAWINGS FOR FURTHER INFORMATION INSULATION USED TO SATISFY "COOL ROOF' 2008 ENERGY REQUIREMENT � _ _ �Roof � 20'-0" � % BRUNO MARCELIC ARCHITECT A.I.A. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 408/ 379-6500 Fa�c 408/379-6110 Project Name: NEW SINGLE FAM I LY RESIDENCE 10216 ORANGE AVENUE C:IIPFRTW(� C:A Sheet Name: SECTIONS & DETAILS Project Number 1103 oate 05/26/11 Drawn BY JRB/BM Checked By BM A-6 scaie As indicated ABBREV �HTIONS & AND L ANGLE � AT CL CENTER LINE O DWMETER # POUND OR NUMBER AA.P. ATTIC ACCESS PANEL A.B. ANCHOR BOLT A.C. ASPHALTIC CONCRETE A/C AIR CONDITIONING ADJ. ADJUSTABLE A.F.S. AUTOMATIC FIRE SPRINKLER ALUM. ALUMINUM APPROX. APPROXIMATE ARCH. ARCHITECTURAL ANOD. ANODIZED ASPH. ASPHALT AWG AWNING WINDOW B! BACK OF OR BOTTOM OF BD. BOARD B.H.A.C.B. BETTER HEATING AND AIRCONDITIONING BUREAU BLDG. BUILDING BLKG. BLOCKING BM. BEAM B.O.J. BOTTOM OF JOISTS BOTf. BOTfOM B.U. BUILT-UP C. CARPET CABT. CA8INET C.B. CATCH BASIN CEM. CEMENT CNT. CENTER C.T. CERAMICTILE C.I. CAST �RON C.J. CONSTRUCTION JOINT CLO. CLOSET CLR. CLEAR CLG. CEILiNG C.M.U. CONCRETE MASONRY UNIT C.O. CLEANOUT COL. COLUMN COMP. COMPOSITION CONC. CONCRETE CONN. CONNECTION CONST. CONSTRUCTION CONT. CONTINUOUS CONTR. CONTRACTOR CSK. COUNTERSUNK CSMT. CASEMENT WINDOW C.W. COLD WATER D. DRYER D8. DOUBLE D.B. DROPPED BEAM DET. DETAIL D.F. DOUGLAS FIR DH DOUBLE HUNG WINDOW DIM. DIMENSION DR. DOOR D.S. DOWNSPOUT D.W. DISH WASHER DWG. DRAWING DWR. DR�WER EA. :n:- E.J. �'�VSIONJOINT ELEC. "41CAL ELEV. . �• "ION ENCL. � '-'SURE E.P.B. +iC PANEL BOARD EQ. , EXH. �����_:- EXP. +- � EXIST.or�E) � +i� �i^.-� EXT. i �'� �+i"�R FBRGL. Fi= �:.. �SS F.D. F _� �>_ _ FDN. F; . •. . � "ION F.E. Fi��: � � "iNGUISHER F.E.C. Fi�t � iNGUISHERCABINET F.H. F I? �-�_�� ZANT OR FLAT HEAD F.H.C. FI�� -� . �-= CABINET F.F. Fi�i .- :. _�OR F.G. Flr.i ��- _,�4DE FIN. FL Flhi�-� � . - �OR FLUOR. F�._ ::�-t: > ;ENT FLSG. FL�S��i'�: F.O. FINi`�-�= _ )PENING F.O.C. FA:.: :>� �.ONCRETE F.O.F. FAC: :`�� � INISH F.O.M. FAC: '?� +nASONRY F.O.S. FAG ;`� ;TUD FR.DR. FREN_- �OOR FT. FOO' ��a FEET FfG. FOOT�v; FRP FIBERC,_ASS REINFORCED PLASTIC FURR. FURRING FXD. FIXED GA. GAUGE G.D. GARBAGE DISPOSAL GALV. GALVANIZE(0) G.I. GALVANIZED IRON GFI. GROUNDFAULTINTERRUPTER GL. GLASS GRD. GROUND OR GRADE G.S.F. GROSS SQUARE FEET G.S.M. GALVANIZED SHEET METAL GYP.BD. GYPSUM BOARD H.C. HOLLOW CORE H.D. HOLD DOWN HDR HEADER HDWD. HARDWOOD HDWR. HARDWARE H.M. HOLLOW METAL HORIZ. HOR¢ONTAL H.P. HIGH PO�NT HR. HOUR H.B. HOSE BIBB HT. HEIGHT HC. HANDICAP HTG. HEATING HVAC HEATING VENTILATING AND AIR CONDITIONING H.W. HOT WATER H.W.D. HOT WATER DISPENSER I.D. INSIDE DWMETER INV. INVERT INSUL. INSULATION INT. INTERIOR J.B. JUNCTION BOX JST. JOIST JT. JOINT � Q N M N � 0 O N � N � KIT. KITCHEN K.O. KNOCKOUT K.P. KICKPLATE LAVS. LAVATORIES LAM. LAMINATED LIN. LINEN L.P. LOW POINT LT. LIGHT MAT. MATERIAL MAX. MAXIMUM M.B. MACHINE BOLT MECH. MECHANICAL M.C. MEDICINE CABINET MET. METAL MFR. MANUFACTURER M.H. MANHOLE MIN. MINIMUM MISC. MISCELLANEOUS MTD. MOUNTED MULL. MULLION (N) NEW N.I.C. NOT IN CONTRACT NO./# NUMBER N.S.F. NET SQUARE FEET N.T.S. NOT TO SCALE O/ OVER O.C. ON CENTER O.F.S. OUTSIDE FACE OF STUD OH. OVERHEAD OPNG. OPENING OPP. OPPOSITE O.D. OVERFLOW DRAIN or OUTSIDE DIAMETER PA. PUBLIC ADDRESS P.B. PANIC BAR P.C. PRE-CAST P.D.F. POWDER DRIVEN FASTENER PL PLATE P/L PROPERTY LINE PLAS. PLASTER PLAS. LAM. PLASTIC IAMINATE PLY. PLYWOOD PNL. PANEL POL. POLISHED PORC. ENAM. PORCELAIN ENAMEL PT POINT P.V.C. POLY VINYL CHLORIDE PR. PAIR R. RISERS R.A. RETURN AIR RAD. RADIUS R.C.P. REINFORCED CONCRETE PIPE RD. ROUND R.D. ROOF DRAIN REC. RECESSED REF. REFRIGERATOR REINF. REINFORCED/ING RES. RESILIENT R.H. ROUND HEAD RM. ROOM R.O. ROUGH OPENING REQ. RE�UIRED R/W RIGHT OF WAY RWD. REDWOOD R.W.L. RAIN WATER LEADER 5&P SHELF AND POLE SCHED. SCHEDULE S.C. SOLID CORE S.D. STORM DRNN SECT. SECTION S.F. S�UARE FOOT/FEET SGD. SLIDING GLASS DOOR SGW. SLIDING GLASS WINDOW S.H. SINGLE HUNG WINDOW SHT. SHEET SHTHG. SHEATHING SHWR. SHOWER SHVS. SHELVES SIM. SIMILAR SK. SINK OR SKETCH SL. DRS. SLIDING DOORS S.M. SHEET METAL S.M.S. SHEET METAL SCREW SPECS. SPECIFICATIONS SQ. SQUARE STD. STANDARD STL. STEEL STOR. STORAGE STRUCT. STRUCTURAL ST. STL. STAINLESS STEEL SUSP. SUSPENDED SYM. SYMMETRICAL T. TILE T.B. TOWEL BAR T.C. TOP OF CURB TEL. TELEPHONE TEMP. TEMPERED THRESH. THRESHOLD T& G TONGUE AND GROOVE T.O.F. TOP OF FOOTING T.O. TOP OF T.O.P. TOP OF PLATE T.O.S. TOP OF SLAB TOSF TOP OF SUB FLOOR T.P. TOILET PAPER TR. TREAD T.W. TOP OF WALL TYP. TYPICAL U.N.O. UNLESS NOTED OTHERWISE U.O.N. UNLESS OTHERWISE NOTED UR. URINAL V. VINYL V.C.P. VITREOU5 CLAY PIPE VERT. VERTICAL V.G.D.F. VERTICAL GRAIN DOUGLAS FIR W. WINDOW OR WASHER W/ WITH WAINS. WAINSCOT W.C. WATER CLOSET WD. WOOD WDW. WINDOW W/O WITHOUT W.P. WORK POINT or WATERPROOF W.R. WATER RESISTANT or WASTE RECEPTACLE W.S. WEATHER STRIPPING ar WOOD SCREW W.W.F. WELDED WIRE FABRIC XO SL�DING WINDOW WITH'X' BEING OPENABLE AND "O' BEING FIXED WHEN LOOKING FROM THE OUTSIDE XOX SLIDING WINDOW WITH'X" BEING OPENABLE AND 'O" BEING FIXED WHEN LOOKING FROM THE OUTSIDE, DNIDED ROUGLY 1/4, 1/2, 1/4, RESPECTNELY NEW SINGLE FAMILY RESIDENCE 10232 ORANGE AVENUE CUPERTINO, CA 95014 SYMBOLS X DETAIL NUMBER X.X SHEET WHERE DETAIL IS DRAWN. SAME DISCIPLINE U.N.O X WINDOW MARK (SEE WINDOW SCHEDULE) � ECTION NUMBER X.X SHEET WHERE SECTION IS DRAWN. SAME DISCIPLINE U.N.O DOOR MARK O (SEE DOOR SCHEDULE) VICINITY MAP � ELEVATION A80VE DATUM POINT NORTHARROW (THIN LINE INDICATES TRUE NORTH) PERSPECTIVE � VIEW FROM STREET ? F • ��'/ OI � ' . i ' , . .. . n . . , . _ -. .. . ... , . .: : � � , . , . . . _�..�..'� �f- / I � `ei+;if 3 r. t � . i � � .... ......... ,...�...,�...� .�n6"�� � �,.wlw�+fs% Y. 's ....:�� ` >, f f , sst�Pa` [ ArnnMlt�+�U�:••<-.>Y�%G5i'w'�K:+H¢-.'"»-Wi9�'iM9�'S . . . . '._ . ' *"�NT.OMab%:��.�WYW.�M DRAWING INDEX ARCHITECTURALSHEETS A-1 TITLE SHEET A-2 SITE $ AREA PLANS A-3 BASEMENT 8 FIRST FLOOR PLANS A-4 SECOND FLOOR & ROOF PLANS A-5 ELEVATIONS A-6 SECTIONS 6 DETAILS A-7 TfTLE SHEET A-8 SITE & AREA PLANS A-9 BASEMENT & FIRST FLOOR PLANS A-10 SECOND FLOOR & ROOF PLANS A-11 ELEVATIONS A-12 SECTIONS 8 DETAILS CIVIL SHEETS TENTATIVE MAP 1 COVER, DETAILS, SSECTIONS 2 PROPOSEDIMPROVEMENTS 3 EXISTING IMPROVEMENTS PRELIMINARY GRADING 1 GRADING & DRAINAGE PLAN 2 SECTIONS 6 DETAILS LANDSCAPE SHEETS L1.0 LANDSCAPE IRRIGATION PLAN L1.1 HOUSE-1 LANDSCAPE HYDRo-ZONE PLAN L1.2 HOUSE-2 LANDSCAPE HYDRaZONE PLAN L2.0 LANDSCAPE PLANTING PLAN L3.0 LANDSCAPE CONSTRUCTION DETAILS L3.1 LANDSCAPE CONSTRUCTION DETAILS L4.0 LANDSCAPE SPECIFICATIONS PROJECT DATA FLOOR AREA RATIO: RATIO OF 2ND FLOOR TO 1 ST FLOOR: NUMBER OF STORIES: HEIGHT: BUILDING PAD ELEVATION: CURB ELEVATION: PARKING: EXISTING USE: PROPOSED USE: 20NING: GENERAL PLAN DESIGNATION: PAVING AREA: LANDSCAPING AREA: NUMBER OF DWELLING UNITS: RECREATION AREA: 2.697/6.000 = .449 1006 S.F. / 1,691 S.F. _ .59 2 24'-8' SEE CIVIL DRAWINGS SEE CIVIL DRAWINGS IN GARAGE - 2 ON ORNEWAY-2 TOTAL-4 SINGLE FAMILY RESIDENCE SINGLE FAMILY RESIDENCE P (RES) 4.4 - 7.7 DU/GR AC 1,220 S.F. (20%) 3,089 S.F. (51%) (1) 4BEDROOM UNIT 1,824 S.F. (30%) RESIDENTIAL PROJECT COVER SHEET ASSESOR'D PARCEL NUMBER: 357-1&031 NAME OF OWNER: Roberl Adzich PROJECT ADDRESS 10232 Orange Ave, Cupertino, CA 95014 CONTACT PERSON: Robert Adzich PHONE 408-234�4835 FAX: NET SQUARE FOOTAGE OF LOT 6,000 S.F. (.138 AC.) SQUARE FOOTAGE MAIN HOUSE: EXISTING: PROPOSED: FIRST FLOOR: B10 S.F. 1,267 S.F. SECOND FLOOR: 1,006 S.F. GARAGE: 400 S.F. 424 S.F. BASEMENT: 1,691 S.F. TOTAL: 1,210 S.F. 4,388 S.F. Are there at least hvo 10 foot by 20 foot clear spaces inside the garage: Y Is privacy protection planting required for the projed? Y Build it Green Total Pdnts: N/A On what floa is work being done? ALL Bnef descnption of work: DEMOLITIN OF A SINGLE FAMILY RESIDENCE AND DETACHED GARAGE. CREATION OF A NEW LOT BY SUBDNIDING WITH A NEW SINGLE FAMILY RESIDENCE AND ATTACHED GARAGE Code Editions: 2010 CBC, 2010 CRC, 2010 CPC, 2010 CMC, 2010 CEC, _ - � - :__ � � . � � � � � � � � � . _ � � � � � � • � ♦ � ARCHITECT A.I.A. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 408/ 379-6500 Fax 408/ 379-6110 Project Name: NEW SINGLE FAM I LY RESIDENCE 10232 ORANGE AVENUE CUPERTINO, CA 95014 Sheet Name: TITLE SHEET Project Number 1103 Date 05/26/11 Drawn BY JRB Checked By BM A-7 Sca�e 12" = 1'-0" X INTERIOR ELEVATION NUMBER X.X SHEET WHERE ELEVATION IS DRAWN. SAME DISCIPLINE U.N.O Q REVI510N NUMBER X (SEE DESCRIPTION BLOCK ON SAME SHEET FOR DATE & DESCRIPTION) PROJECT SITE `; � � . .......:. ....... . . . . .. ,....... :F :'.�. � .. . .. .. � R.,A ., .,,,,.,.,.uc. � ,. , .... ,... . y ;t,. ,.,.... a 0 c� O O N (O � AF f REA J 12 SF .a_ �«w_....�_.�.�.. �- - -..�+a..+�..�r � ���o�l !!�� SECOND FLOOR AREA C � /` /� ■ _//�/� / � ( �`� y s� _�. �.. ,.. .�./�:]Yl..J�...\..'rf,=..-x�:.� l r V V _ .�� � ;:,;; . _.. . ,� �_�� F- 23'-0" x 16'-9" = 386 sf ; G- 1'-9" x 3'-5" = 6 sf � � ��! H- 18'-6"x6'-9"=125sf � �;-.. . �, �.;-_s�a>'���.��'���«�d � � J- 2'-0" x 6'-0" = 12 sf jYiilY K- 25'-0" x 15'-3" = 382 sf + S L- 10'-0" x 5'-6" = 55 sf M- 10'-0" x 4'-0" = 40 sf � � �.l�t. — TOTAL: 1,006 sf � Cua+z Atutru�,�c�' � �OND FLOOR AREA DIAGRAM 2 Fla RST F�� . _ �,- 1/4" - 1'-0" FIRST FLOOR AREA A- 11'-4" x 4'-0" = 45 sf B- 29'-0" x 21'-0" = 609 sf C- 33'-0" x 28'-0" = 924 sf D- 20'-8" x 2'-0" = 41 sf E- 14'-6" x 5'-0" = 72 sf TOTAL: 1,691 sf 6 FOOT TALL REDWOOD FENCE ALONG PROPERTY LINES. TYP. ---+ O O � M � � 0 ch ip � � � Z b a 4 N 0 N Q ih M NEW GAS METER NEW 250A MAIN ELECTRICAL � N 00°00'00" W 48.00' LANDSCAPING zs�-0• � r-a• » ��• PORCH � NEW HOUSE � x C7 J 11 I I 1 �J 2-CAR GARAGE O O � M � w 0 M Z� � 0 rn w � DN a � 3 N � 3'-0" J J F � � 2 � J T-11" Y N PANEL WITH ��� ' UNDERGROUND � � I SERVICE 4 I PORCH � � � � ❑ � DRIVEWAY LANDS. I WALKWAY ' — — — — — — — o �---- � � N ' 14'�" � 20'-6" � I I I m 35'-0' � I � � 1 I I � � MATERL4L I I ' � S pR I � LANDSCAPING � � � � � � � � � �� � � � � � Z � L-----------JI o ------------- ---------- ----- 4 a ° o (N) SIDEWALK w 0 � (N) PLANTER STRIP' � � � � � � � � S 00°00'00" W 48.00' CURB, GUTTER, DRIVEWAY, AND SIDEWALK PER CITY STANDARDS, TYP. ORANGE AVENUE SITENOTES: ------- 1. SEE CIVIL DRAWINGS FOR PROPERTY LINE DIMENSIONS AND DIMENSIONS OF THE HOUSES FROM PROPERTY LINES. 2. ALL UTILITY SERVICES, INCLUDING TELEPHONE, ELECTRIC POWER, AND ALL COMMUNICATIONS LINES SHALL BE PLACED UNDERGROUND. UNDERGROUND CONDUIT SHALL BE PROVIDED FOR CABLE N TELEVISION SERVICE. / / BRUNO MARCELIC ARCHITECT A.I.A. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 408/ 379-6500 Fax 408/ 379-6110 Project Name: NEW SINGLE FAM i LY RESIDENCE 10232 ORANGE AVENUE Sheet Name: SITE & AREA PLANS Project Number 1103 �ate 05/26/11 Drawn BY JRB Checked By BM A-8 scaie As indicated � N C7 O 0 N tD �1 3r-0• 4�-0• , T�• ,,,�. 4�_p. � . ..� ' � . � • . . 2 . � . . . �' Y. 4 A , -------------- ----- � � a � � ' WINE 3�-Z� TASTING c�R. '" AREA a .' • i 4 m � 4 � 4 m � r v � 4 i0 � 3�_2• � � CLR. 0 0 ' •• ------ , .._ .. ...,.... . . � � STEPPED '� �d WALL 4 ' 1 � � N ______ " W f N� � BASEMENT � � � � -�� � 1 � `� 9'-0" CLG. � o STORM DRAIN i CATCH BASIN & .v,�. uicTwi i cm• �' _ SUMP PUMP, SEE DETAIL ; B!A-7.0 $ CIVIL ;� DRAWINGS � DN 1R 7.5' MAX. •� � � � I 1 UP 16R i t � � � T=10.5' MIN. i i i i i i i i i i i i i i i i i i i � i i i i i i � i i i i i i � i i i i i i i i i i i i i � i i i i 4'�' N .1 � -0• SMONER � . BATH 3'-6• 6'-8 �n ^ $ � � io N UP a a 4 w a� r' � � � � � F STORM DRAIN CATCH BASIN, Q 8'-0' CLG. CONNECT TO CATCH BASIN 8 a SUMP PUMP AT OTHER LIGHT �pN � W �u�i 4'�" WELL, SEE CNIL DRAWINGS 7.5" MAX. 3 1 � x � LINE OF SOFFIT ABOVE TEMP. J LL �� . .. ;� GAME ROOM ; 8 �'�� O� fD 8'�' CLG. ' CLG. w i i � ?�LL IO DRAIN WITH SUMP PUMP . MECHANICAL / � STORAGE � 8'-0" CLG. LISTED 2QAAINUTE FIRE RATED, SELF-CLOSING, DOOR ASSEMBLY WITH AIR-TIGHT GASKETING SANITARY SEWAGE PUMP, SEE DETAIL 6/A-7.0 AIRINTAKE a FROM ABOVE , � GRADE � - FURNACE SERVES BASEMENT AND FIRST FLOOR, RUN DUCTS UNDERNEATH FLOOR FRAMING THROUGH �� - c 4 v - Q �W DROPPED CEILINGS AND SOFFITS. DO NOT PENETRATE q LL � FLOOR JOISTS AND BEAMS. 1 O 0 N � .. • � .. .,. ,.w.,Rw. ,, ,. - . «� ..... .....,.�..xsr' " _� _,�,..d.�.._._..._.�.4..�_. ,- �� � �, � �0 � EXHAUST FROM 14'-s' 'y �" � 2'-0"� ABOVE GRADE 37'-0" � �� ��� � , � ' E . . . , , . . - - Ra . ._.,. . . . ,.. � �� � �i�� � . � , �, . . � 6 .�.! �..F� �.. � _ . ,. sta�a � t � � �. � _,_ ... '��Cw9w �dCkaF�,;;�f .. ,....,.,,.�. � # ; � 2 BASEMENT FLOOR PLAN 1/4" = 1'-0" a i •...A.�,.-,.�.- FIRST FLOOR PLAN 1/4" = 1'-0" A-11 A-11 i BRUNO MARCELIC ARCHITECT A.I.A. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 408/379-6500 Fax 408/379-6110 Project Name: NEW SINGLE FAM I LY RESIDENCE 10232 ORANGE AVENUE CUPERTINO, CA Sheet Name: BASEMENT & FIRST FLOOR PLANS Project Number 1103 Date 05/26/11 o� Bv JRB cnecked sy gM A-9 Scale 1/4" = 1'-0" A-11 � � � � � � r � � � i � � � � � � � � � � ' • � � ARCHITECT A.I.A. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 408/ 379-6500 Fax 408/379-6110 Project Name: NEW SINGLE FAM I LY RESIDENCE 10232 ORANGE AVENUE CUPERTINO, CA 95014 � a � � � 0 b N � � PLAN �W 4 . . ,....� .�-�..�. .Wo-N.r�a+Iy✓� � �p-�,o��-o� �C�;� -.o�.4,L l - D� ? _b -� `�"" � � � � ' . ' > �' { h .e J - i9:1 ,'. ,. • . ._ �. �1sli < �- �i 1r � rv � � J �4�C3,�,� �Cus� Rba 'GL.cr 1/4" = 1'-0" u � SECOND FLOOR PLAN 1/4" = 1'-0" Sheet Name: SECOND FLOOR & ROOF PLANS Project Number 1103 �ate 05/26/11 Drawn BY JRB Checked By gM A-10 sca�e 1 /4" = 1'-0" _ _ , � 50 YEAR PRESIDENTWL TL COMPOSITION . � � _ .. r.:..-•,....� SHINGLE ROOFING BY CERTAINTEED STVLE: WEATHERED WOOD - �.--''"` �� � ANDERSEN 100 SERIES VINYL WINDOWS � � -�� FINISH: WHITE "� � ��•- ' '---.., � �' Roof � �_ — _ 20 � _�I ::-- . . :;� ::; .. ... . m ....:� ...:.. . . : . �- 4' HORIZ. FIBRE-CEMENT SIDING . .. ^T �---� " ---� FINISH: BENJAMIN MOORE WEIMERANER E I� _, �, ,, ., --- �� r- �� , � : � � � ; �j �- � �� � FIBRECEMENT WINDOW TRIM � �: = : � -.. FINISH: BENJAMIN MOORE MASCARPONE , _r � ..,:.,.. � .. ; .. - .. . � . � � ; � 5��,�0 ; } , } � - ' :... � � �'� Y � - -' `.. WOOD ROLN-UP GARAGE DOOR : . ,,. .., � �� �rw;� � .:.: ... ����� ' ^ '� FINISH. BEHR CHATHAM FOG STAIN � � , :. , .. � -. � '-' � . N �, _ - _ _ S econd Floor —,.�..,,.,.- ,.�;_ '� � 8 = •' . ,_ , l ` ; 11' - p,� . � _ ; -•c., .,,. ...... „ , , ,,; ,,, . ,,,,,,; ,,, , ,,;, ,,,,,,,, , ' _ - ' -�-. ' , ' , �..., .,.,,. .,_,.,..., ' , , 8 , . .. . ... ._. .. ,_... �'.. . : , .-: ..._... .: .........:._......,. ''. :: ..: v , �' .. . .......................... ...,,,�.. : �. . ,. . � ......... .......... .. .. ...... ......... .......... ......... _.... ; ' ,,,_ .. __..._ _.. .._......_.._...._._.__...._ ........__.. ; ' 8' HORIZONTAL FIBRE- : ��� � � # ��� � �� F N SHNT EIDI �IN MOORE i " �-- WEIMERANER ; _ ( . -� �W�� � � ���� 3 , � � : o '. : : _ r .: : � . _ : �'"'' - - - � ....... ... ...: _i`" �- i """` , " i STONE VENEER :. ! .�� - ; - � { MFR � EL DORADO � � _ ; 5� 2 �/2� � � . a ; . �-����- �� � ; � f ' STYLE: SANTA FE STACKED � ": >„ :: � :_ • � . _ i i � s i _; . .... . _ .:;:.,......., 1: - ; � - � ; ,,� ; :' ::: ; s : -. . E � - . - � � � : First Floor � . . � -, ,. , . . :. . a v ; ..._, . i : L ___ ` 0" � _ �— ' WOOD ENTRY DOOR FINISH: BEHR CHATHAM FOG STAIN � FRONT ELEVATION � 1/4" = 1'-0" _ _ Second Flo_ or � 11'-0" `1 _ ,� First Floor � _ �� Roof 20' -� / i BRUNO MARCELIC ARCHITECT A.I.A. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 408/379-6500 Fax 408/379-6110 Project Name: NEW SINGLE FAM I LY RESIDENCE 10232 ORANGE AVENUE CUPERTINO, CA o��,� Q N N N O 0 N � N � T 0 . �' s . s. . f . �- Second Fl�oor� / °"� 11'-0" u L . ... .... . , _ 4 . : "":. . ' ', - _ 1 i �. r : . . _ _ ' ,,^ .. � .- _ _ - < � t ., .. -.. . ' � : . -: � a... ..... ... .. ... ... ... ' ... .4. � .. ... O n RIGHT SIDE ELEVATION s� TALL REDWOOD FENCE 1/4" = 1'-0" Second Flo�or � 11' - 0" �1 � � __� � � � .::: g '� g : ; �� �� 5 �'�� � .,�aW....: � � � .� .. I ... � g 5 � .. I .... .. , : 4 ':( : � : ...... � ..... Q ,. � i . : ....... � ... �. � 4 � � ' ..1...� . ��� �_ ........ � �, � �: . �_ �� First Floo� [ — � — �. : ._�.....,..�:; ' �. .,. p�-ao1 � -v1 : � �� �020,�.� '0.'� .. ...!�� ' . ,,,; .F�.... ,-.t //�//' =� a: i a'•.� •'e s�' a i . w.�,a..�� �b2�R . ���C&u�.�E€'�." �.._... J`\ . . ____'_�rr � Sheet Name: ELEVATIONS Project Number 1103 Date 05/26/11 Drawn By JRB Checked By BM A-11 sca�e 1/4" = 1'-0" � O �n O 0 N <O � 16' O.C., U.N.O PLYWOOD — SHEATHING INSULATION, - SEE SECTIONS GYPSUM — BOARD _ rYPic,a� �,vE � v2° _ � �-o° ROOF FRAMING, SIDING O\ BUILDING (SEE ELE\ 1/4' RED1M1 STARTER 24 GA. GA METAL FL PLYWOOC SHEATHIN Dc6 TRIM SEALANT WINDOW TYPICAL WINDOW HEAD 3" = 1'-0" Baseme n -10'-0" LAP BUILDING ROOF TRUSSES NOT SHONM IN PAPER OVER GYPSUM BOARD DETAIL, SEE STRUCTURAL AND TRUSS METAL FLASHING KING STUD (SEE STRUCTURAL) First Floor MANUFACTURER'S DRAWIN �c 5TUD5 Q 16" O.C. _ FURTHER INFORMATION � ATTIC TRIMMER STUD p" v INSULATION (SEE STRUCTURAL) ROO_ f n ,. =I — — — 20 _�1 � WINDOW i i i '. HEADER(SEE srRUCruwu� GYP.BOARD CORNER BEAD L-CASING BEAD CAULIONG WINDOW WOOD STOOL CAULKING � - 2x3 TRiM, SLOPED ��� WOOD TRIM Dc6 TRIM, BEVEL TOP ' WINDOW I FLASHING OVER ' PLYWOOD SHEATHING BUILDING PAPER � GYPSUM BOARD CAULKING R-13 INSULATION I SIDING OVER ��. BUILDING PAPER (SEE ELEVATIONS) n TYPICAL WINDOW SILL ` PLYWOOD SHEATHING � � � I • • 3'-0 1/2" �"�'�'"" I I I CLR. CAULI4NG _ B8S8�Y1@�lt � r ��''� -�0� W�NDOW FLASHING I I I �' �, �''• SIDING OVER BUILDING I I — — — I I PAPER (SEE ELEVATIONS) 4 TYPICAL WINDOW JAMB n SECTION 3 3" = 1'-0" i � 1/4" = 1'-0" SECTION 4 WALK-IN-CLOSET KITCHEN STUDY/LOUNGE AREA 0 G� 8'-11" — — STAIRWAY — — Seco Floor 11'-0" 4 o � MUD � � ROOM HALL STAI RWAY =irst Floor _ _ 0 " ? I I I I I I I, . — III � STAIRWAY I I I I I I I I.: MULTI-PURPOSE ��I I I I I I I I �� 4 III I '� 3asement _� O, _ O I I I I I • _ - • ` . _ _ « -. . . .ti ' � _. - - + t + •'''. : = � - - •� � " �' � � — I I- I I I I �=� � �— � � �—� � �—� � �—� � �—� � �—� � �—� � �—� � �—� � �—� � �—� � �—� � � �—� � �—� � �—� � �—� � � I -I I I � � I I I I I I I I I I I I I I I I I � � I I I � � i I I I— I I I—� � �—� � � —� � �—� I �—I I I—I I I i i i I I I I I I I I I I I � I I I—I I I—� � � n SECTION 2 - � � .,.. .,... _� First Floor /1 � �7 isement ' � O� ' On % BRUNO MARCELIC ARCHITECT A.I.A. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 408/ 379-6500 Fax 408/ 379-6110 Project Name: NEW SINGLE FAM I LY RESIDENCE 10232 ORANGE AVENUE !'`I IDCOTIAI!'1 f`A Sheet Name: SECTIONS & DETAILS Project Number 1103 Date 05/26/11 Drawn BY JRB Checked By BM A-12 scaie As indicated - FASTEN ROOFING MATERIAL PER MFR'S RECOMMENDATION � A-12 INSULATION USED TO SATISFY'COOL ROOFING FELT ROOF' 2008 ENERGY REQUIREMENTS 2x SOLID BLKG. w/RAFTER VENTS PER ROOF PLAN ATT�C � 1xTRIM — — — � GUTTER COUNTER- FLASHING GALV. METAL HALL GUTfER BED ROOM STAI RWAY MASTE R 1�c6 V-GROOVE FINISH #2 BEDROOM BOARDSONUNDERSID�,,.,,,. �,,,__,,,,. „__ ..,�,,,,_,,,,. --... ..... .._... ..... , , ....._� .... ... s-... ... ... �.. ,+..,m ,...,�..+.a....u....z....,�t:f"'�'►�s- OF EAVE @ HORIZONTALSIDINGo/ � � ^ Q�,O// � O I 2-LAYERS BLDG. PAPER SEE ELEVATIONS � . .�4s� -ao1 �,.o� - , ... . � ,r`_ro; f � : 1 � �� �` ,� .;,.,� �,.� r� 7 —�, i":' `°' h.� s$ ���. � b q:fj:�a � STAIRWAY FAMILY � ���ti� F� NT ENTRY HALL ROOM ROOFING, SEE � P RCH ELEVATIONS � � ' 30 LB. FELT i r E +:���,t�1t�.;.f�5p - --- - V-GROOVESIDING i -- ' g �.iD�C Kr �[iR�,�l� - .•�,t: ' GALV. METAL RAKE � • + e• , F�SHING -I I I—I I I—I I I I I I—I I I •' I—I I I—I_I I—I I—I I 1=1 I�:� � w5 �,KE, SEE I I I I I I—I I I I I I—I I I. ELEVATIONS I=I I I =I II—I I=I I I I�;! MECHANICAL HALL M CL H STAIRWAY BASEMENT � 2x40UTRIGGERS - — — . STORAGE � 48" O.C. I—I I I—I I—I I I I I I I I I I I I I I` " e < HORIZONTAL SIDING o/ - I I I I I I I I I I I I I I l 2-LAYERS BLDG. PAPER, SEE ELEVATIONS I—I I I—I I I—I I I—I I I PL,��D SH�,,�ING -I I I—I I I—I I I—I I I—I I ' • ''� � � �� °� � � ; � ' -" � _ � � �STUDS�16"O.C. I III III III III .'.:� .:, "': ,. . ••...,., . ...:�.'-- ::� :.'. . ..' :. . �.�:' . _ �,.'.•..:: .,:. y .•. .,, .., '. •:: . ..::. -� —i i i—i i i—i i i—i i i—i i i—i i i—i i i=i i i=i i i=iTi—i i i=i i i—iTi=i i i=i i i=i i i=i i i—i i i—i i i=i i i i i i=i i i=i i i=i i i—i i i—i i i—i i i—i i i—i i i=i i i=i i►_ 2 SECTION 1 1/4" = 1'-0" z R-13 INSULATION A-12 _ Ro� 20� - �" Second Floor 11' -� REAR PORCH First Floor � 0" TYPICAL RAKE 1 1/2" = 1'-0" �� REED ASSOCIATES LANDSCAPE ARCHffECTURE �n sourH r� sr�T su+wwu� c�wAOro+u► woae so�.�e�•�atai�o�.���.�ett r�x .�e: r.w�ur � .�k pry�Y�ir ORANGE AVE. HOME srom ORANGE AVE. Cupertino, CA ISSUE p�7E � 1210.09 ORANGE AVENUE N�IG o.C. rLI�V\ 1 �� L TFaE COMTRACTOR SNALL V62FY pLM(i (X1qMTTEg FRq,� 7{.E pLqNTiJG p�yy IXJAMTTES SNOWN N Tl-E IFC�B�D ARE FOR COM/B�BJC'.E O�IT. 2 NOTFY Tl-E LAPD�'.�CAPE ARCHTECT NN�EDIA'TRY N Tl-E EVErfi OF ANY DISC.R�ANCES BETW�1 ACTUAL SITE COrDIT10NS ArD Tl-E PLANTNG PLAN. 3. PLANT GROU�DC',OVB2 N SI-RUB AREAS AS NOTID, USE TRIANGI.IAR SPAChK'. 4. S� DEf,4d. AND SPECFICATION SI-�TS FOR ADDfT10NAL rFORMATION. 5. Tf-�RE Wtll BE NO MA'T'H21ALS IX2 PLAM MAT62V>LS SIbSTiMIONS WfTF1pUT APPROVAL OF TI-E OWPB2 OR TF�E LArIDSCAPE AR(�ITECT. 6. ALL SLOPES PLANT� WfT�I LAWN NOT TO DCC� A 3�i SLOPE ALL SLOPES PI-ANTED WRI-I GROUND COV62 NDT TO IXC� A 2d SLOPE 7. PROVDE POSfi1VE DRANAGE AWAY FROM All BUI7NCS (2E MrU 8. N TI-� EVENT OF ANl' DISCR�ANCES BEfW�J TF�S PLAN APD AC1iJAL SITE CONDfT101`1S, T1-E LArDSGAPE ARCHIECT IS TO BE NOTP� Yrk�IATH.Y. 9. B�(TRE SITE I$ TO BE ROUC'�I-I GRAD� BY 71-E GRADI�K" COMRACTOR TO WfTF#J J(o FOOT OF FNSH GRADE LArDSCAPE COMRACTOR IS TO R�E GRADE ALL LAt�'aCAPE AREAS. 10. ALL SRE UTLIT�S ARE TO BE PROTECT� DIR�J� CONSTI2UCTI0�L N TI-E EVENT OF COhFLICT BE7W�N TI-IE PLANS A�D UTLITES TI-E CANTRACTOR SNALL NOTFY Ti-E LArA�'aCAPE ARCV�ITECT. ANY DAMAGE TO UTUTES, STRIJCTIRES. OR OTF$2 FEATlf2ES TO R5u4AN. A�D CAUSED BT TI-E LMDSCAPE CONTRACTOR SNALL BE R�LACED OR R�AR� BY Ti-IE CONTRACTOR AT NO EKPBJ�'aE TO TFE OWPH2. a THE WORK IN Tl-ESE DRAWNC'S ArD SPECRCATION�' MY RUJ CONCl.�2BJTLY WtT1-I WORK BY OTI-825. TI-E LA�DSCAPE CONTRACTOR SHALL CppRpNATE T►.E yypRK WITH OTI-H2 CONTRACTORS. 12. R�H2 TO CNL BJGt�2'S PLANS FOR OVH2All SRE GRADNC' APD DRANAGE p. SOD LAWN SHALL BE DWARF FESCI� BLE�D. 14. PRIOR TO ANY DIGGNG OR l'RB�CL#JG, CAIl lJ[� -,D � i r-�r - �eoo.n�.26o0 PLAIVT SYM�OLS INDICATES PLlWT KtY TS - __._ ___- . __ _.. . . .. , -. ��INDIC�'f'CIOGi'C�JTIT1° . . . ��-ao<<-�i 14'.� . —o2t�31 /—p $ � .. . t� _ 6 ��� - f� _w � � ._ _�. . r>zPw r �` .�,': e.' t, : t 4� � _,.. ` � .-.,.. ,,.,,,4.�.�_._._ ::s�e� � ��Q`dL �� � :�� .�� E�F���^�E�Y � > �'Or ^� _ 1 �< ��" �� '-�:, � ���� � � � � � ��� � �, � A�� � ':s � ������ �� ��� m � � PAUL JAY REED � P�D.1002 y * EJ�.9/�JWI * 6}. �P �r F � �` OWNERSMP AND USE OF DOCUMENfS M ha�'nqa, Sp�X'iwtiwp and eopY� 1M�ol IwnhhsE by n«a �oo�.. �an��. �e�,n a. aa a�m � ifs WuVer1Y. Thry aa 1e 6e wsd aMy �Rh rapset lo Mb Projset md on not lo M w�d on o/ry otMr proj�et. suemh.wn o. dh4Wutim to m..t omda� nyulowly �— qufnmerk� or lor purpo� in eonrrctlon wNh SM P�1 i� nd b M oondrwd o puEioetqn n dnoqo6an of �lwocble� � Md�lettve. Comnnn len oopyrlpM �PP�d Pl� Drown DS Revfered pjr Project No. 11.12 x� 1�8"=1'-0" hsua Data 3.28.10 LANDSCAPE PLANTING PLAN L1.0 �, of PLAWT L.IST� TM-2011-02 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6646 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPROVING A TENTATIVE MAP TO SUBDIVIDE A 0.28 ACRE PARCEL INTO TWO PARCELS OF 6,000 SQUARE FEET EACH LOCATED AT 10216 ORANGE AVENUE SECTION I: PROTECT DESCRIPTION Application No.: TM-2011-02 Applicant: Terry Brown Property Owner: Robert or Kathleen Adzich Location: 10216 Orange Avenue (APN: 357-18-031) SECTION II: FINDINGS FOR TENTATIVE MAP WHEREAS, the Planning Commission of the City of Cupertino received an application for a Tentative Subdivision Map as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Subdivision and Procedural Ordinances of the City of Cupertino, and the Planning Commission has held at least one public hearing in regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; WHEREAS, the Planning Commission finds as follows with regard to this application: a) That the proposed subdivision map is consistent with the City of Cupertino General Plan. b) That the design and improvements of the proposed subdivision are consistent with the General Plan. c) That the site is physically suitable for the type and intensity of development contemplated under the approved subdivision. d) That the design of the subdivision or the proposed improvements are not likely to cause substantial environmental damage nor substantially and avoidable injure fish and wildlife or their habitat. e) That the design of the subdivision or the type of improvements associated therewith are not likely to cause serious public health problems. � That the design of the subdivision and its associated improvements will not conflict with easements acquired by the public at large for access through or use of property within the proposed subdivision. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 2_thereof, the application for a Tentative Map, Application no. TM-2011-02 is hereby approved, and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Hearing record concerning Application no. TM-2011-02 as set forth in the Minutes of Planning Commission Meeting of June 14, 2011, and are incorporated by reference as though fully set forth herein. Resolution No. 6646 TM-2011-02 june 14, 2011 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on Exhibits titled: " Two Lot Subdivision for 10216 Orange Avenue, Cupertino, CA 95014 " dated April, 2010 and consisting of 5 sheets labeled Sheet 1of 3- 3 of 3 and 1 of 2 and 2 of 2, prepared by Nordic Engineering, Inc. dated April 2011, except as may be amended by the conditions contained in this resolution. 2. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. DP-2011-01 and ASA-2011-08 shall be applicable to this approval. 3. DEMOLITION OF STRUCTURES Prior to recordation of the final map, the applicant shall demolish and remove all structures on the property. 4. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 1. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. DP-2011-01 and ASA-2011-08 shall be applicable to this approval. CITY ENGINEER'S CERTIFICATE OF ACCEPTANCE OF ENGINEERING/SURVEYING CONDITIONS (Section 66474.18 California Government Code) I hereby certify that the engineering and surveying conditions specified in Section IV. of this Resolution conform to generally accepted engineering practices. /s/Timm Borden Timm Borden, Director of Pulic Works City Engineer CA License 45512 Resolution No. 6646 TM-2011-02 June 14, 2011 PASSED AND ADOPTED this 14th day of June, 2011� Regular Meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSTAIN: COMMISSIONERS: ABSENT: COMMISSIONERS: ATTEST: APPROVED: /s/Gary Chao /s/Winnie Lee Gary Chao Winnie Lee, Chair City Planner Cupertino Planning Commission G: � Planning \ PDREPORT � RES � 2011 � TM-2011-02 res.doc z z a � GRANADA GRANA A HERMOSA LOMITA LOMITA > ALMADEN LI a SITE a Z w w V . O Z a ¢ N � a o a STEVENS 11 CREEK I BLVD. 0 � J m Q N Z Q W 0 Ui N VICINITY MAP NOT TO SCALE PROJECT INFORMATION: PROPERTY ADDRESS: 10216 & 10232 Orange Ave. Cupertino, CA 95014 APN: 357-18-031 PROPERTY OWNER: Four Point Holdinqs, LLC 10164 Carmen Rd. Cupertino, CA 95014 Robert Adzich Managing Member PROJECT ENGINEER: MARIUS E. NELSEN, R.C.E. 20597, EXP. 9/11 NORDIC ENGINEERING 21801 STEVENS CREEK BOULEVARD, STE. 8 CUPERTINO, CALIFORNIA, 95014 TEL. (408) 257-6452 FAX: (408) 257-6821 nordicengineersOyyahoo.com EXISTING LAND USE: SINGLE FAMILY RESIDENCE PROPOSED LAND USE: SINGLE FAMILY RESIDENCE PROPOSED NUMBER OF LOTS: 2 PROJECT AREA: 12,000 S.F., 0.28 AC. UTILITIES: ELECTRIC AND GAS, P.G. & E. WATER: SAN JOSE WATER COMPANY TELEPHONE: ATT SEWER: CUPERTINO SANITARY DISTRICT Y J 3 w � W N W p � H � Z O � w J d' U' � � Z 3 � � '�' 'n a -- �....,..�„�.a_ �.,...._.. z...y..,..a... »... ., �.: ., w .... � _ ._...-, . ......... .....�.,.,�....,..u , ti .. � � s . :; . , ..�� — �ol l— Da � � . •- _ f,. . ,_ e ; , ,1 ,^ �/ ��'' � NAR ¢�,q � � ;�R � � � ^}-�C �/ , !�c w�.? i.��.1 a r{ :�.,'�.v r � 4� a�! s:i; ds n a _ �.. 1 ~ � ��r�t � 1 , � � � o� - ,...,+....,.._�..c " .. . �:WS� ��ousay;er 6 � , x' � CHRISTY U21 WITH LIGHT DUTY CAST IRON GRATE 79� MIN._ 1% MIN , � -: z � N � 3/4" DRAIN ROCK 15 L.F. 24" H.D.P.E. PIPE OVERFLOW TO FUTURE STORM DRAIN IN ORANGE AVE. Y' 6" SCHEDULE 40 _ _-^ ` PVC PERFORATED PIPE PERCULATION PIT DETAIL NOT TO SCALE w � � O _ � a F.F.=344.40' � DRIVEWAY GARAGE a � a SLAB _ _ . _. __ ... .. ............. ................. _..._... _........_ _ ___ _,......._.. ,. _... _ EXISTING GRADE' __ I 5=0.01 _ _._ _._ _ ! 344 _ � 344 _ � _. �- 1 , 340 � ; 340 FINISH GRADE BASEMENT ' F.F.=334.40' ' 336: ' ;, '. ; 336 _ __ _ _ ; � _ _ �' _ � � � � � � � o' �, �, � � � N. N� N N� N N N N: N N�. �: �� � �� � : a- d�� d d: � ��. d �- � ��. �: �: d d: � � M: M���. M�. r'')� M' M��� M M: 17 M� M: M: 17. M_ � � 0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 SECTION A—A, LOT 1 � SCALE: HORIZONTAL: 1"=10' 3 VERTICAL: 1"=4' � w 0 � � Z w w � � �� � J � } Q � � w 3 �- x � z � � � �n a F.F.=344.65' a p a � DRIVEWAY GARAGE J � a SLAB _ _ _ l ' EXISTING GRADE _ I S=o.o, 344, _ _ _ '344 I ', I ', , ' ' ' 340 _ _..__ _.. _ _ _ ! 340 FINISH GRADE , BASEMENT , ', I F.Fi=334.65 _. _ _.__ _ 336 336 __ . _. _ _ _ _ M:.. . . ...... M . ....... . ''"'. ...... ... � ......... I�: . .. ..... O ......... .. Of . ..... .. ....�. ...... . �.. ..... ........ a . ... . ... M ......... . ....� ..... .... ��.�. . ..... . �... . .. M. M: N��.. M.. cV'�. ry-. M�. (V� N� N: N N� N: N�. N N. d: ����. � ���. a: a��. a�� ����. d d��� d: a��. ���. ���. d: .. M-. M.. M� ���.. r7 r7���. 17�. M��_ M: M���. M M��� M��. M���. M . 0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 SECTION B—B, LOT 2 SCALE: HORIZONTAL: t"=10' VERTICAL: 1 "=4' � Wz JO � �� �� �� 0 �� MO G, � z a � � � � � � � , � V�727 . REVISIONS � 3 o - �U � c � � = m U n � - > � �v�� 7 � s� u c: C N cj� ° � � • r C °a X 't� �4,� �u mJ � �'-� �� � �,� �m t � � y w. C • c -: W � N '� T � n �i z v � � � 'OWU m � � O m Z '> ,� � . (U � :_ � O � � � � z, ¢ - W. �� � — Z� 0, z ^ w V I � Q �..l.J � � �..I..� �._I._� 2 (n W / � O z U w � � O � Q L.L J � �..1..� Q Q C' U �z w � O > O Z � ~ �/ Q � LL � � �.J..� Z N � w Q � F— � U Dote: APRIL 2011 Scale: 1"= 10' Drawn: CAD Sheet 1 � of � Sheets 1 � � � { � I ■ .,..ms � f . ( ■ 3as.ia ( I a �ma.2c � N ■ s+a.aa � ; r 342.00 � LIMITS OF NEW CURB, GUTTER � � & DETACHqD SIDEWALK � PER STa DET. 1-19 sas.:s;� i 15.00' • ` W , � , � ; � � �z.sc W ' E. WATER I _ , METER � ( 'l `J . k2.as ■ s+a.?z Z : FL=342.12 � �nzss � � ' ROADWA � DEDICATION O ?a IN 2� �� � �� 2� �� � TC= SCALE: 1"=10' 3i� � _, olZ va. sae as - o ojw II 1 C TEMPORARY N�O� BENCHMARK 3O MAG. NAIL=342.95' � N = 3Q �m ■� �.�� � B TWIN LIVE OAK 25"... � 2� I1 � ..4 �.,� rs 20.00' BUILDING SETBACK DRIVEWAY � 5=0.03 ■ v:.3s � . HIGH POINT FG=343.4 GARAGE FF=343.73' (AT REAR) S=0.01 � .x iU i� `O : a � R 3a2.3? - 24.00' : FG=343.4 FL 343.3 BEGIN SWALE INT FL= 343.55 �� `� BEGIN SWALE r � �. FG=343.65 - 20.0 M 382.5u BUILDI ; SETBA K � _ .�� , : � ,�.:.��zi. "� , �<s.,� � 92 � SIDEWALK BLD. T � . SETBACK SURFACE ; FG=341.39 BIO-SWALE , N89_56'30"W 135.0�0' � _ � � '• EG=341.39 �,ss- - _� , ---:.a:.�.srV+-7 ¶ ... ■ sa� rz"�V�SKrq� ■ sa�.e� � .r.. _ .- _ -... - ____� - ' � 2 FG= 343.4 � � :HTWELL � 1 ■ }di 5.. ■ 34`..5a NEW RESIDENCE LOT 1 I � PTRCULATION FF= 344.40' ( o BASEMENT NET AREA: GRATE=341.2 0 FF=3� 440' 0.1�4 AC. �/ O �� ■ 361 91 a 3A:.85 �( I r s+z.?s ■ 3�9.95 � ( � 2�.Q�� � BUILDING LIGHTWELL � /�p SETBACK ■ sa.s, 2 FG=343.4 0 I "�: �s 1 - ^ � r 34�.$7 � O M 3i2.00 p � � � 810.-SWALE,.. � ' ��� BLD. SETBACK � FG=342.0 r a+r,+< �G=342.0 � a°'' < � - 3 ...._.. . - °--... ._._. - ■�r_-� a - - �_. , FG=343.65 @/a�� � r =a:.�o - � w A�E ° O 5.08' BLD. SETBACK ■ ssa.ar sai.ia 125. ABBREVIATION: � �a. o ,�y,<� r aaa.az E. EXISTING � E. WATER METER ■ u.ss 1'0 EG EXISTING GRADE � � �� Q FG FINISH GRADE � 3 � o DRIVEWAY ': GARAGE TC TOP OF CURB z �� ; FL=342.63 I � o • FF=344.07' o � � S=�02 (AT REAR) FL FLOW LINE "'`'� r sa3 sc ■ i43.0i 3 S=O.O� 5=0.01 SLOPE=0.01 � ; � z' S `` R ' � TYP. TYPICAL BEGIN NEW CURB, GUTTER & DETACHE�D SIDEWALK FG=343.65 FF FINISHED FLOOR PER STD'. DET. 1-19 `�"'"' ° � zs.00' � .��.�� ll � r vg - r SFS.. � � � 562.05 � 742.6t . EG=343.36 FL=343.0 � TC=343.36 � BEGIN SWALE HIGH POINT 15.00' 30 0' -� � . JOINT � UTIUTY .95 3"''�'JOINT POLE � ■ �a.�s.+z UTILITY POLE sea.�s ■s �F6 ' PG&E � PGdcE VAULT p� � GV PG&E / � �a�ag.� SERVICE J B�X ' � 4 LIGHTWELL� �2 .�2� - M 392.3; NEW RESIDENCE FF=344.65' r �+:.ss BASEMENT fF=334.65' � LIGHTWELL F = 4 . � � _ - .. 125.00' S89'56'30"E 135.00� ��� SIDEWALK BLDG. TYP. SETBACK 25 ' O � LOT 2 � 'Z NET AREA: � � pERCULATION I 6,000 S.F. PIT 0.14 AC. � GRATE=341.3 ° / A I o �� ■ 3i2.i9 r 342.5,0 ■ :SEi.3U ' � / � 20.00' � BUILDING� / �� ( SETBACK 0 ,0 � - � � � -- 4 A � _- '_-�' _� - _- FG=342.45 EG=342.45 LEGEND: M J�92.Bi � PROPERTY LINE SPOT ELEVATION E. GRADE DRAINAGE, DIRECTION OF FLOW APN: 357-18-031 (LOTS 1 & 2) GROSS AREA: 12,960 S.F. 0.30 AC. NET AREA: 12, 000 S. F. 0.28 AC. NOTES 1Q SEE DRYWELL DETAIL, STORM WATER OVERFLOW TO DRAIN INTO FUTURE STORM DRAIN IN ORANGE AVE. Q2 LIGHTWELL DRAINS TO DRAIN TO PUMP SYSTEM, SEE GRADING PLAN. SEE GRADING PLAN FOR UTILITY CONNEC110NS, BASEMENT WALL DETAILS, ETC. - y..�...,.,....._...._ ..,.....�.-_..r,..._..._..�_........ _...,.. „ , � � i's � e . . .:. , - `. .-- J--�'�CL// � O p� � ;.:' .f/K i ,. . # � t F ; � �- , � . � ;.�:� 6-/�-�� � R • r.. -..� r��iCd FMi.. . . i 'l�a�a � E � 6` . � � 4. t �:'.i • � N r./ V�a�i�l�P , �. a.�� �r+ �`:��s� �e� .���e�' � REVISIONS m m � o � �U � C � ..: S y� ' U `r. � � � � � c o � � c x: � C N � � . . C � X � i 41 � o :.c . � m � u.. � - C • m • � rn � �� �% � '� t � :u w C. C , : :. W � cn " °: �^ � �� v � ro N y � rn �c - � W U c o i O � Z '_> r y �� � � J c � t� u� x ¢ - W� �� � - i� �, z �� W � L.L.J � � O � � � N o Q � _ O Z � W � � � O I � � � �..I..� Q Q C' U � Z w � O � O Z � � Q � �..L.� � Z N � w O � I- � U Dote: APRIL 2011 Scole: 1"= 10' Drawn: CAD Sheet � of � Sheets i N 20 ,o o ,o zo SCALE: 1"=10' TEMPORARY � BENCHMARK � MAG. NAIL=342.95' JOINT UTILITY POLE � EDGE OF I � • PAVEMENT TYP. ( ' � ` � TWIN LIVE OAK 4.5' WIRE FENCE �5.00' � 25 12 I '•. ... _ ; ; . , N89'56'30"W 135.00' rt � _ � _.� ., - - � .. .,.� .:.v�,�. � � .. �....� <�.�., � � � _ ; • 125.00 W E. GAS METER � ; ' ' ' . _._�_...._.._.�......_.. FENCE �� 6' WOOD � I � ' \' � l ' � � �` '' I � ;� ; E. GARAGE � ` I E. HOUSE E. WATER � �' � METER I. � I..... 1 � �. � � i; 1 , : � � _ _ ._. . . f�' ` �10.00' ROADWAY ' �� � DEDICATION CONCRETE ASPHALT � 4' CHAIN � O � 1 � LINK FENCE DRIVEWAY � N � -'�....... _ _. i � ....... � I � ... -------.__—.�,�.._.... __._._... � � ..______ ..._% ' 3 � o �--�� --___. ` � o 3 � a ASPHALT �� o + o oz � � DRIVEWAY � % ��.o o� � . A.P.N. 357-18-031 � ,, � rn�o a � .�. � �.� � w 1 3 �,�. � �� ° o m _-------- ...^.. ...__. .._.....__ --�-----�--- • ...�.-_..... _ _ _. , _ z o __ _ � � :—..... ..�.�T__.......... . . ...._.._- ------....._ ....._._... ____._. ..._-�-� --.__.. ...__.... � o \`�` �--�--- ----�-�- � .._..-�-�--�-• N o �� N ° ASPHALT . m ' � � DRIVEWAY ` I � ` �- �-__.. .......... ���� ._:........... ......_.. _.._.... �1��, ._ ..._._._...��� ASPHALT ` I � I �.��1 DRIVEWAY f � f I BRICK I I ; PAVING CONC. ' CURB & � E. WATER ' t , �,. --r--.. GUTTER METER ' � �\ 15.00' PG&E � ;� '�G VAULT p� ; GV PG&E / �5 ' SERVICE J BOX � � E. HOUSE � ; � I� ...._..._._._...____.- -. ' j I I I I I � 1 I J � 1 ��` �� E. GARAGE t 1 �: 4' CHAIN 6' WOOD ' ' LINK FENCE FENCE E. GAS _._._ ..__...—..: ' ...� METER 125.00' - - �. :... . � � � _�.. �. ��__� �._� - � � � �..�� �...�. -...- _ - - _ - S89'56'30"E 135.00' : T� WOOD FENCE � 6' WOOD � FENCE 30.�0' � E� JOINT � �-UTILITY POLE LEGEND: - - PROPERTY LINE _. . _.. _........_ FENCE LINE --�-------��-�- � -"-� EDGE OF ASPHALT �� - -- _ _. - CONTOUR LINE � JOINT UTILITY POLE APN: 357-18-031 GROSS AREA: 12,960 S.F. 0.30 AC. NET AREA: 12, 000 S. F. 0.28 AC. NOTE: SANITARY SEWER CLEANOUTS WERE NOT FOUND DURING THE TOPOGRAPHIC SURVEY. ,Ra�.�. . ..�A�� _a . ..� �'M-��oii �.oa �l `,e; ,`;:1F �.:rt".r �'., °.,, .. �� 9 �r ' � 4 ; ` �� 6 �I ��� I � ,ri: r .� ..4� �te< �.���� , t �1a�a � . � �• �, � � - ae � ' �'� ,� � 2,.�r� •:..�,.,... s.:. ` �l��:: �'� i".;3�'l`�' C t ...,,�,..,..�......._...,_...�..o..... -- - -- -- __... REVISIONS � c � o � �U x c � u� L� U n c c m `'�i � ` � 3 c i� N L N� `� J � �� c � y r y d�d ��� � � ro . u� .,;, •� 01 � "� u`; � �n � i;: C L N y ` . W d cn cn'r. v c � ,n a`�� � '� �U " o � �W � O_ � _ � Z•� � ", iU � V= �� > m � v z, � �� � - i�f 0, z � � � Z M wo ' � I W o0 r O I � � � � � � V Z Z Q V ! Q /\ I Z �--�--� W � � O � � W Q Q (� U � Z � �..I..� � � � O Z � ~ Q (� � � � �.1..� Z N � w Q � � � U Date: APRIL 2011 Scale: 1"= 10' Drawn: CAD Sheet Z J of � Sheets ,� 20 ,o o ,0 20 SCALE: 1'=10' TEMPORARY BENCNIAARK MAG. NAIL=34295' ABBREVIATION: E. DOS?iNG EG DQSTING GRADE TC TOP OF CURB FL FLOW LJNE Sa0.01 SLOPE=0.01 „�. ���� �rn FF FlNISHED FLOOR ; I � . �w.�s i I y � a 3Ws I JIZ00 u oF NEVr , cu � 6c DETAqi SID ALK � y PER DET. -19 ' S.00� • W y > Q�A E. WATER y � METER R .M�L�i Z Q FL�34212 � �70.00' ROADWA y DEDICAl10N y � s s N �� a 3 c� I z o' _ a N W r �p N < vi- a a a a � E. WATER �� y � y FL=34263 s EGIN NEW R8, GUTTER d� DETACH�D SIDEWALK PER STd DET. 1-19 N G a y 25.00' 4 I I y 15.00 � JOINT � UP�� H H PGdtE � ' VAULT ,� PG�E ��� BOX y I y I y N I I N N I � y y 11 v�aa��� .an�L HIGH POINT - -- -�- -- 20.00' --r�a�' BUlLDING — — SE7HACK � a DRIVEWAY I I � GARAGE S=0.03 I FF=343.73' � � /I (AT REAR) � � � I �� i s�o.o� � ~ , a pm � � I � M .M2i1 ;= 428 � � FL=�.� — — - ' BEGIN SWALE HIGH POINT I 7.92' � � I B �• SURFACE SETBACK BIO-SWALE ° N89_56'30'W 135.00' � _ EGs341.39 - 12 OOT_ __�--- __ -- _, �.��� r st�.n � � __ __ ___ , A F 343.4 I 1 � ~ GFII'VYELL I I r �tw NEW RESIDENCE �( PERCULATION F'F=344.40' � I / ' PI o BpSEMpdT GRATEm341.2 0 FFm334.40' sn.n m �� ' LOT 1 � .�r ��'r n��n: `�` :• I 6,000 S.F. I / ""� 0.14 AC. 20.00' I y j` BUILDING UGHTWELL � SETBACK sam 5.08� I ■ sa.ee I BLD. SETBApC — — — — — — —� r aa.a t b : 3�2T7� a@.ta a dSSOs O --- r6 . . . ... ... v' 589�E —� r.08' BLD. SEiBACK � '" 20.00� � �- - ---- N BUILDI SETBA a x ts 1 ■ ti sua/ sa.� P I r 3�3tt » .� . rg ( '� 3 � g � DPoVEWAY I � �,�,07 o m Sa0.02 � I (AT REAR) ~ I ; S=0.01 1 z IY'�° I I � t � a a � �t —ir� C � j 1 ■ �no� - - �k � '�` xus FL=343.0 T��.36 BEGIN SWALE HIGH POINT 30 --� � I m I aay I �JOINT TiUTY POLE I � I Y �+s�o I I � —xs¢�e — ucH�u� � � � x xsa ( • ■ �a.a NEW RESIDENCE �a�.ss• ,�,� ensa�or� � FF=334.65' LOT 2 NET AREA: 6,000 S.F. 0.14 AC. I ua�n��u � _ _ ___L .. ...�_...125. .. ... ... S89'58'30'E 135.00' 7.92' � SIDEVMALK BLDG. - 1'YP. SEIBACK NOTES: 1Q SEE PERCULA710N PIT DETAIL, STORM WATER OVERFLOW TO DRAIN INTO FU'NRE STORM DRAIN IN ORANGE AVE. � 11GH1WELL DRAINS TO DRAIN TO PUMP SYSTEM. � OYER WITFI DUPLE UMPS 07ES, SHEET 2 PROVIDE HIGH WAlER ALARM MOUN7ED IN BASEMENT WI7H SWITCN SET AT EL=89.8'. SET ON ANO OFF SWITCHES AT EL=89.2' AND 88.2 REPECTIVELY. Q4 2' SCF1L �0 PVC PRESSI)RE PIPE WITH CHEqC VALVE TO BUBBLE UP. � MSTALL BUBBLE UP. SEE DETAIL, SHEET 2. GRATE ELEV. = 342't Q DOWN SPOUTS SHALL RELEASE TO GROUND SURFACE, DRAtNAGE SHWLD BE DIRECTED AWAY FROM 6llIlDING FWNDAl10N AND TO LANDSCAP£D AREAS. � INSTALL PERIMETER DRAIN AT OUT5IDE BASE OF BASEMENT/ RETAININ� WALL GRAVITY DRAIN TO SUMP HOLE. MIN. SLOPE�I7C, SEE NOTES AND DETAII, SHEET 2 � CONNECT PERIMETER DRAIN TO SUMP. � VE. CONNECT 1ST FLOOR AND B�ASEMENS AIJITARY DRAIN UNES TO THIS PUMP. SEE PLUMBING PLANS. � INSTALL 2' SCHL 40 PVC PRESSl1RE PIPE SEWER LJNE NA'iH CHECK VALVE. 11 SANITARY SEWER SERVICE ESTiMA7ED LOCATION OF IXISTING LA7ERAL, EXACT LOCATION TO BE DETERMINED PRIOR TO CONSTRUCTION. MOVE SANITARY SEWER CIEANOUT TO 9EHIND PROPERTY UNE �E CLEANOUT DETAIL, SHEET 2 r sv.0 - x �'a=342.U( ��b}/�.,,,,, � • � PERCULAl10N o - °��' PIT o ATE=341.3 p ^ m � g {..,1 I �z LJ 3 I 0 � �� R 3{tN • �.C� � . .� / � Z�.�� Q' BUIIDING `y SE78ACK �'°� � ' — — — �--� i 1 - - r xsn - - FG�34245 EG=342 NOTES (cont.): � UNDERGRWND ALL EbSTING OVERHEAD U11Ul1ES TO NEW HOUSE. (ELEC., PHONE, AND OR CABLE SERVICE IN JOINT ?RENCH). � WATER SERVICE, MOVE EXISIING WATER METER TO aa+��o PROP�xn uNE ALL EAR7HWORK, INCLUDING FOO�ING AND BASEMENT EXCAVA110N. PREPARA710N OF OF SIAB-ON GRADE UNDERLAI'61ENT. PLACEMENT OF RETAINING WALL DRAINAGE, PLACEMENT AND COMPAC710N OF FlLL AND SURFACE DRAINAGE tMPROVEMENTS SHWID BE PERFORMED IN ACCORDANCE NATH THE GEOTE(�iNICAL REPORT PREPARED �Y DATED 2011. SHOULD BE ALLOWED AT LEAST 48 HWRS ADVANCE N071FlCAT10N OF ANY EAR1HWORK OPERA'iIONS AND SFiOUID BE PRESENT TO 06SERVE AND/OR TEST AS NECESSARY THE fARTHWORK AND FOUNDA710N INSTALLATION PHASES OF THE PROJECT. LEGEND: — — �oP�rr uNE ■ xs�e SPOT ELEVATION E. GRADE .� DRAINAGE, DIREC710N OF ROW rr ,rr JOINT U71UTY TRENCH, POWER, GAS. N, CABLE. COMMI. SS SANITARY SEWER MAIN a � SANITARY SEWER LATERAL W WATER MAIN � GAS MAIN � APN: 357-18-031 (LOTS 1 & 2) GROSS AREA: 12,960 S.F. 0.30 AC. NET AREA: 12,000 S.F. 0.28 AC. ,�oa ' ��� � � . �..d...�...�...._. _. ,.....�. _....>..._... _._... . �_- -- --� �' ---_ ,,;.i,..'�'�lt/'T � v a � .. $ � � � .�{�: : � � �� �� _. ..Tl!'�_-ao�/-„o� � . ' i h �.���'� , ..."1" -�.. .' , i e . '' �r a '� r �'/�! '/� � 5 � �r. '` � � �:;s f c�'��� i : . .... t . " - lt��e � 6 1 � v o • V =v �; � (� r_ C V y E � �� �g � � g,� � '�9� ;;�y ` 8 LL � a C • m • °a �,�� �mw � :yC c .� W � N � � ? � c „�{z o�� °n3 o� � � �; ���� � � z - u� �� ' i� s �� Z � � Q V Z Z W � � � O Q � � � �..L.� Q � C' U �a � Q �o Z � � L � � J r � W W N � � � Q � � V Date: APRIL 2011 Scala 1'= 10' Drawn: CAD �,�t � of � Sheeta Y J d K W O r � Z J W W � � � Z _ � � � � � � a � a 344 I � 340 ( 336 �o �n n r 0+00 344 �o ♦ N lV fV n n 0+20 � 2' W O W �- � Z a' � W J 0 � z � � c a i � 'n � � �� a � I � F.F.�344.40' — DRIVEWAY GARAGE SLAB � EXISTING GRADE � . . . . Sa�.O�. .. .. . .. . .. . . . . . . . .. . � S � 2 � FINISH GRADE BASEMENT F.f.=334.40' M v � � (o 0 0� a ap n M. �� M. M M�. h� M� M M�� h� 0+40 0+60 0+80 i+00 1+20 SECTION A-A, LOT 1 SCALE: HORIZONTAL: i"si0' veRncn�: i'=a' DRIVEWAY W N � � GARAGE F•f.a344.65' S�AB SaO.Oi EXISTIkG GRADE 3� MIN. 344 FINISH FLOOR 340 1'2' 2X M�N. 336 r CONC. SLAB � BASEMENT fL00R �o T � T "� PAD ELEVATiON 1+40 TYPICAL BUILDING SECTION NOT TO SCAIE X• � CHRISTY U21 HOI.E WITH LIGHT DUTY CAST IRON GRATE 1z MIN, 1�6 MIIN k ,, � : z 344 � � � � �' "'"� lV . �� � t�'[� � — i � � 3/4" DRAIN ROCK 340 I . . 340 15 L.f. 24" H.D.P.E. PIPE �' !. BASEMENT FINISH'CRAOE OVERFLON TO FUTURE STORM �. � F.F:=334.65 DRAIN IN ORANCE AVE. �; F Y , ' � � � �i 336 , : 3 � , r . : 6" SCHEDULE 40 � �. � PVC PERfORATED PiPE k .. � .... . ... . . . . . . .. . . . . . .. . . . . .. ... . . . . . .: . . .. . . .. . . . . . . . . J i +7 M M1 O� t�� O. A U) Y.. Y� r7� N �� ♦ M � M- M�� �1� N� tV� M N� fV N. N�� fV��� N: N� N� fV� - a v � v a v r a v � v a � n �i n M n n n n n �i; M M n �i rn � � §__�` �; 0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 .� SECTION B-B, LQT 2 °� SCALE: HORI20NTAL• �'=to' I OISTANCE FROM PROPERTY PERCULATION PIT DETAIL � � UNE Tp 8E AS CLpSE AS NOT TO SCALE VERTICAL: 1"=4' �� pq�TIGV, ANp NOT TO � ExCEED F'ivE (5) fEET. n` � STMIDARD CLEANOUT PUBUC RICHT OF WAY '�'-- RENOVABLE CLFr1P10UT PIUG ' FlNISH CRADE r �cc�ss eox sH�u eE c�srr es . � ����a�tr "�. --�4----0 � ` �r��e� A� �u�;,cf � k � m _ ..�_.^ .r .w�......�....y...�..._.,._.. _�...�_....y.�,_._.....�y.:.:.: x � I � ra��c vN.ve arnc �o-a/e' �.o. x�2' v�n� ,.,�.. -. ................,. � cx uu u�ea.EO 's�` WYE fOR RiSER � � CL£ANOUT RISER PWE .. _: a . _ o � � oa , ,,a- �o Y �� t � . �� . . � - /. __ REDIH:ER Fi7TINC . ' .?`:.. e c . ., , .. . . � AOAPTOR COUPINiG ( SIZE ? �P1 C OR HO ER`�� SPEdFICAilONS � � � PRESSURE fIOW fROY PUAIP / '� _ r � � -"— 2X Mh � �--2X Nin � � 4 .T �."j k. p: a . v . �!�•�( �� � n �.,.♦ �� � '�..�'�.nSr�''g.aX.e+,ai�iNJ'r _...�..�-..✓..++�" C � c � � �1�lIR r STREET IATERAL SEWER � HOUSE IAYERAL SEWE , f i � ( � _r � I . � NOTES: 1. ALL ON-SITE PlUM81NG, IN ACCORDANCE NATH LOCAL JURISOICTION BUII.OING DEPARTMENT REQUtREMENTS. 2. LATERAI SEWER CLEANOUT TO 8E SAME SIZE AS STREET IATERAL SE1A�R. 3. 6-INCH MINIMUM CLEARANCE BETWEEN REMOVABLE CLEANOUT PLUC ANO �NSIDE Of BOX REOU�RED. �. REfER TO PUMP MANUFACTURER'S RECOMMENDA110NS FdR ANY ADpITIONAL EOUIPMENT REQUIREO FOR THE PRESSURE i.INE ANO CONNEC710N TO GRAV�TY SEWER• 6' ' 1 � N , � � NATIVE SOIL COMPACTED TO 90X 3/4 ' ORAIN ROp( - WATER PROOFING �— MARAFI 140 FILTER fABRIC _ RETAINING WAIL FOR BASEMENT — VAPOR BARRIER PER SOILS REPORT f BASEMENT FLOOR �—CAPILLARY BREAK MATERIAL 12 , PER SOILS REPORT 4" SCHEDULE 40 PVC PERfORATED PIPE pRA1N TO SUMP AT 1% MIN. BASEMENT RETAINING WALL ORAINAGE NOT TO SCALE NOTES 1. PROVIDE DRAIN ROCK, FILTER fABRiC ANO 4' SCHI.. 40 PVC PERFORATED PIPE PER OETAtI A, ON THE OUTER PERIMETER OF THE RETAINING WALL FOR THE BASE►AENT. DRAlN AT MINIMUM SLOPE OF 17L TO CONCRETE SUMP NATH AN INVERT OF _�. PROVIDE DUPIEX PUMP SYSTEM ORAINAGE SYSTEM WITM A TEEL /2P355 SUBMERSIBLE EfFLUENT PUMP CONTROLLED W17H A /2P544 BOX AND N2P055 FLOAT SWITCH. USE 2' SCH�. 40 PVC PIPE FOR CONNECTION TO THE DRAINAGE SYSTEM. PUMP REQUIRES A 230 VOIT 20 AMP CIRCUIT, ALL NARING AND PLUMBING TO BE PER THE NATiONAL ELECTRIC COOE ANO THE UNIfORM PLUMBING CODE. 2. EXTERIOR SURFACE OF RETAINING WALL FOR THE BASEMENT TO BE TREATED FOR WATER PROOfING. 3. FLOOR Of BASEMENT TO BE PLACEO ON VAPOR BARRIER AND CAPILLARY BREAK MATERIAL PER 501LS REPORT. 6� DIA. GRATE IN CONC. BOX iK MIN. t� Mi � Z :� � 3�4" QiA. DRAiN ROCK • 1' ;-'�-`r " ____�_ z i �- � � � �� Y SCHED. 40 PVC I �� ���� PERFORATED PIPE � f_ 1 � 6 i t BUBBLE UP DETAIL NOT TO SCALE REVISIONS � `c U N c � ��,o ` G � N c�J � 7 N o q r� M 4� a� �� x�- '' �M w m �. � J � LL '� . G ��. .� . m'o, G C � N y V � ab � W � N 'U 3 � W V � � 3 � _ � v 7 U� a � O � � � :' a � — W� ' z� + �I _ �r V J Z � � U V ► V I � Q Ll.� � Z J � � V Z Z W � 0 / O Q � � �wa C� U �Q � Q � � Z O � ` � � � r �'6') � � O � � r— U Oote: APRtL 2011 Scolr. t'- to' Orown: CAO Job: Sheet � of � Sheets