Reso 4647 6-TM-95
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO. 4647
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING
APPROVAL OF A TENTATIVE MAP TO SUBDIVIDE 5 ACRE PARCEL INTO 16 LOTS
SECTION I: FINDINGS
WHEREAS, the Planning Commission of the City of Cupertino received an application for a Tentative
Subdivision Map as described on Page 2 of this Resolution; and
WHEREAS, the necessary public notices have been given as required by the subdivision and
procedural ordinances of the City of Cupertino, and the Planning Commission has held at least one
Public Hearing in regard to the application; and
WHEREAS, the Planning Commission finds that the application meets the following requirements:
a) That the proposed subdivision map is consistent with the City of Cupertino General Plan.
b) That the design and improvements of the proposed subdivision are consistent with the General
Plan.
c) That the site is physically suitable for the type and intensity of development contemplated
under the approved subdivision.
d) That the design of the subdivision or the proposed improvements are not likely to cause
substantial environmental damage nor substantial and avoidable injury to fish and wildlife or
their habitat.
e) That the design of the subdivision or the type of improvements associated therewith are not
detrimental to the health, safety, peace, morals and general welfare of persons residing or
working in the vicinity of the subdivision.
� That the design of the subdivision and its associated improvements will not conflict with
easements acquired by the public at large for access through or use of property within the
proposed subdivision.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, e�ibits, testimony and other evidence submitted in this
matter, the application for a Tentative Map is hereby recommended for approval, subject to the
conditions which are enumerated in this Resolution beginning on Page 2 thereof, and
That the subconclusions upon which the findings and conditions specified in this Resolution are based
and contained in the Public Hearing record concerning Application 6-TM-95 as set forth in the Minutes
of Planning Commission Meeting of October 9, 1995, and are incorporated by reference as though
fully set forth herein.
Resolution No. 4647 6-TM-95 October 9, 1995
Page -2-
SECTION II: PROJECT DESCRIPTION
Application No.: 6-TM-95
Applicant: Citation Homes Central
Property Owner: Citation Homes Central
Location: Southeast corner of DeAnza Boulevard and Homestead Road
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
The recommendation of approval is based on Exhibits Tentative Map dated revised September
30, 1995, from MacKay & Somps, except as may be amended by the Conditions contained in this
Resolution.
2. BELOW MARKET RATE UNITS
The applicant shall comply with the requirements of the Housing Mitigation Manual and
Condition No. 3 of City Council Action Letter of October 5, 1994 of 8-U-94.
3. COMMON AREA
The development rights to the Common Area, including the pool, spa, recreation building,
volleyball court, barbecue area and roof garden, shall be dedicated to the City of Cupertino in
advance of recordation of the final subdivision map to ensure that open space is available to the
entire 18 acre development as provided in Condition No. 15 of City Council Action letter dated
August 17, 1989 & subsequent City Council Action letter dated September 7, 1995 of
Application 8-U-94(Mod.). Access to common areas shall be approved as an Architectural Site
and Approval agenda item.
4. CONFORMANCE WITH ORDINANCES, REGULATIONS AND LAND USE CONDITIONS
The Declarant warrants that this Declaration of Covenants, Conditions and Restrictions is in
conformance with all ordinances, regulations, and land use conditions imposed by the City of
Cupertino or any other government agency with respect to this Development. In any case where
this Declaration of Covenants, Conditions and Restrictions is found to be in conflict with any
ordinance, regulation or land use condition imposed on the development by the City of Cupertino
or any other governmental agency, then said ordinance, regulation or land use condition shall
prevail over this declaration.
5. GRADING STANDARDS
The grading concept and building location for each lot shall substantially reflect the approved
Exhibits upon which the subject application is based. The Director of Community Development
shall review and approve subsequent building permit applications based upon the RHS zoning
and Grading Ordinance regulations.
Resolution No. 4647 6-TM-95 October 9, 1995
Page -3-
6. HOMEOWNERS ASSOCIATION DOCUMENTS
The Homeowners Association documents, enabling declaration and condominium plan shall be
approved by the Department of Community Development and by the City Attorney prior to
recordation and should substantially reflect all conditions of this approval and plans.
7. INGRESS/EGRESS EASEMENTS
The applicant shall record an appropriate deed restriction and covenant running with the land,
subject to approval of the City Attorney, for all parcels which share a common private drive,
parking or private roadway with one or more other parcels. Said deed restriction shall provide for
necessary reciprocal ingress and egress easements to and from the affected parcels. Said
8. PARKING
A reciprocal parking agreement is required. A draft shall be provided for City Attorney review.
Following acceptance a recorded copy shall be provided to staff.
SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT
9. STREET WIDENING
Street widening, improvements and dedications shall be provided in accordance with City
Standards and specifications and as required by the City Engineer.
10. CURB AND GUTTER IMPROVEMENTS
Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades
and standards as specified by the City Engineer.
1 l. STREET LIGHTING INSTALLATION
Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures
shall be positioned so as to preclude glare and other forms of visual interference to adjoining
properties, and shall be no higher than the maximum height permitted by the zone in which the
site is located.
12. FIRE HYDRANT
Fire hydrants shall be located as required by the City.
13. TRAFFIC SIGNS
Traffic control signs shall be placed at locations specified by the City.
14. STREET TREES
Street trees shall be planted within the Public Right of Way and shall be of a type approved by
the City in accordance with Ordinance No. 125.
15. GRADING
Grading shall be as approved and required by the City Engineer in accordance with Chapter 16.08
of the Cupertino Municipal Code.
Resolution No. 4647 6-TM-95 October 9, 1995
Page -4-
16. DRAINAGE
Drainage shall be provided to the satisfaction of the City Engineer. Surface flow across public
sidewalks may be allowed in the R-1, R-2 and R-3 zones unless storm drain facilities are deemed
necessary by the City Engineer. Development in all other zoning districts shall be served by on
site storm drainage facilities connected to the City storm drainage system. If City storm drains
are not available, drainage facilities shall be installed to the satisfaction of the City Engineer.
17. UNDERGROUND UTILITIES
The developer shall comply with the requirements of the Underground Utilities Ordinance No.
331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate
with affected utility providers for installation of underground utility devices. The developer shall
submit detailed plans showing utility underground provisions. Said plans shall be subject to prior
approval of the affected Utility provider and the City Engineer.
18. IMPROVEMENT AGREEMENT
The project developer shall enter into a development agreement with the City of Cupertino
providing for payment of fees, including but not limited to checking and inspection fees, storm
drain fees, park dedication fees and fees for undergrounding of utilities. Said agreement shall be
executed prior to issuance of construction permits.
a. Checking & Inspection Fees: $ 5% of Improvement Cost or $1,744.00 minimum
b. Development Maintenance Deposit: $3,000.00
c. Storm Drainage Fee: $14,689.28
d. Power Cost: $75.00 per street light
e. Map Checking Fees: $1,469.00
f. Park Fees: $4,239.00/unit
-The fees described above are imposed based upon the current fee schedule adopted by the City
Council. However, the fees imposed herein may be modified at the time of recordation of a final
map or issuance of a building permit in the event of said change or changes, the fees changed at
that time will reflect the then current fee schedule.
19. TRANSFORMERS
Electrical transformers, telephone vaults and similar above ground equipment enclosures shall be
screened with fencing and landscaping or located underground such that said equipment is not
visible from public street areas.
20. DEDICATION OF WATERLINE
The developer shall execute a quitclaim deed for underground water rights to California Water
Company and shall reach an agreement with California Water Company for water service to the �
subject development.
Resolution No. 4647 6-TM-95 October 9, 1995
Page -5-
CITY ENGINEER'S CERTIFICATE OF
ACCEPTANCE OF ENGINEERING/SURVEYING CONDITIONS
(Section 66474.18 California Government Code)
I hereby certify that the engineering and surveying c ditions specified in ection III of this Resolution
conform to generally accepted engineering pract' .
B Visko ich City Engineer
PASSED AND ADOPTED this 9th day of October, 1995, at a regular meeting of the Planning
Commission of the City of Cupertino, State of California, by the following roll call vote:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ATTEST: APPROVED:
�
Robert S. Cowan David Doyle, airman
Director of Community Development Cupertino Planning Commission
g:/pdrepocdrso6tm95