Reso 4270 12-U-88
C I T Y O F C U P E R T I N O
10300 'Porre Avernie
Cupertino, California 95014
� RESOLiTI'ION No. 4270
OF 'I� PI,�NNING OONIl�SSION OF TI-iE CI'I'Y OF CUPF�TIIJU
APPR�TIl�IG AIKII�]�I' TO AN E�STING
RFS'rALIRArIrr BLTIIDIl�IG
SF7CTION I: FIlVDIl�TGS
1) Zl�e appsro�val action is based on Sheet A-1 dated 06/O1/90 of 12-U-88.
2) The modified architectural wir�dvw treat�ment adjoining the autdoor
clinir�g area enhanoes the appearanoe of the building, pravides
oontinuity of materials ar�d style, ar�d enharx�e.s utility of the area
for a loriger period of seasonal availability.
S�CTION II: OONDITIONS
1. N�DIFICATIONS
The devel�per shall ccm�lete the follvwir�g actions prior to final
inspectia�:
A) Re}�laoe the trellis structure as it existed piror to installation
of the wirydow wall.
B) Replaoe the trailing vines upon the trellis stnzc�re followirig
' its reinstallation.
C) Separate the trellis stnz�re from the wirydow wall by a mirunnrm
of sixd inches.
PASSID AND ADOFI� this ilh day of June, 1990, at a R�egular Nieeting of the
Planning C�oamission of the City of Glipertino, State of California, by the
follvwing roll call vote:
AYES: oCNY�IISSIONIIZS: Adams, M�nn, Fazekas, Chr. Claudy
NOFS : OCN�IISSIONIIZS : None
ABSrAIl�i: OCi�IISSIONERS: None
ABSIIJI' : C�SSI�S : Mackenz ie
ATl'EST: AP'PRpVID:
�s/ Robert C�o�ran �s/ John Claudy
R�bert C7owan Jahn Clawdy, Chairn�an
Director of Qamunity Development Cupertino Plannir�g Coirnnission
reports/rsl2uaPp�'