Loading...
Reso 4270 12-U-88 C I T Y O F C U P E R T I N O 10300 'Porre Avernie Cupertino, California 95014 � RESOLiTI'ION No. 4270 OF 'I� PI,�NNING OONIl�SSION OF TI-iE CI'I'Y OF CUPF�TIIJU APPR�TIl�IG AIKII�]�I' TO AN E�STING RFS'rALIRArIrr BLTIIDIl�IG SF7CTION I: FIlVDIl�TGS 1) Zl�e appsro�val action is based on Sheet A-1 dated 06/O1/90 of 12-U-88. 2) The modified architectural wir�dvw treat�ment adjoining the autdoor clinir�g area enhanoes the appearanoe of the building, pravides oontinuity of materials ar�d style, ar�d enharx�e.s utility of the area for a loriger period of seasonal availability. S�CTION II: OONDITIONS 1. N�DIFICATIONS The devel�per shall ccm�lete the follvwir�g actions prior to final inspectia�: A) Re}�laoe the trellis structure as it existed piror to installation of the wirydow wall. B) Replaoe the trailing vines upon the trellis stnzc�re followirig ' its reinstallation. C) Separate the trellis stnz�re from the wirydow wall by a mirunnrm of sixd inches. PASSID AND ADOFI� this ilh day of June, 1990, at a R�egular Nieeting of the Planning C�oamission of the City of Glipertino, State of California, by the follvwing roll call vote: AYES: oCNY�IISSIONIIZS: Adams, M�nn, Fazekas, Chr. Claudy NOFS : OCN�IISSIONIIZS : None ABSrAIl�i: OCi�IISSIONERS: None ABSIIJI' : C�SSI�S : Mackenz ie ATl'EST: AP'PRpVID: �s/ Robert C�o�ran �s/ John Claudy R�bert C7owan Jahn Clawdy, Chairn�an Director of Qamunity Development Cupertino Plannir�g Coirnnission reports/rsl2uaPp�'