Reso 718 30-TM-69
RESOLUTION N0. 718
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO
RECOMMENDING THE APPROVAL OF A TENTATIVE MAP
APPLICANT: Del Oro Development Company
ADDRESS: 50 George Street, San Jose, California
SUBMITTED: November 19, 1969
LOCATION: West side of Mary Avenue, approximately
1700 feet north of Stevens Creek Boulevard
ZONING: R3-2.2*rf AREA: 5.26 acres
------------------------------------------------------------------------------
CONDITIONS AND FURTHER FINDINGS:
1-12 Standard Conditions
13 The Tentative Map will be accompanied at all times by the approved
DeveZopment Plan, labeled Exhibit B.
14 Fire equipme:.t access shall be located where indicated on the
Tentative Map and shall be constructed in a manner satisfactory to
the Central Fire District.
15 In the event that the proposed Mary Avenue realignment is realized,
the applicant shall make the necessary right-of-way dedication as
may be required by the City Engineer.
---------------------------------------------------------------^_�_�����^_ -�-
PASSED AND ADOPTED this 8th day of December, 1969, at a regular meeting of the
Planning Commission of the City of Cupertino, State of California, by the
following roll call vote:
AYES: Commissioners Buthenuth, Frolich, Irwin, Puetz, Hirshon
NAYS: None
ABSENT: None
APPROVED:
ATTEST: J ck T. Hirshon, Chairman
- lanning Commission
, , " ,`� �* , ,
Z T
Jam�es H. Sisk
Planning Director
City of Cupertino
California
STANDARD CONDITIONS
l. Install ornamental street lights. All lighting shall be
designed to in no way interfere with adjacent residential
district.
2. Street trees will be planted in the public right-of-wa,y and
shall be of a type approved by the City in places d�,;ignated
by the City.
3. Traffic control signs will be placed at locations to be
specified by the City.
�. Fire hydrants shall be located as requested by the City.
5. A masonry wall will be built separating any commercial area
from any residential area; which wall shall be six feet high
above the highest adjoining f inished grade.
6. All parking area and driveways will be paved as shown on
the plot plan.
7. �urbs, gutters, sidewalks, and struc�ures shall be installed
to grades and to be constru�tPC� in accordance with standards
specified by the City Engine�r.
8. Drainage within and without the development shall be to the
satisfaction of the City Engineer.
9. ,�treet improvement abutting the applicant's property shall
be according to �ity standards and specification.
10. The applicant shall be responsible for completing site as
shown on approved plot plan, and shall be required to pay
for required engineering, checking and inspection fees prior
to issuance of building permit.
11. Landscaping shall be as approved and maintained as shown on
plot plan.
12. S�reet widening and dedications sha�l be in accordance with
street widths approved by the City Engineer.