Reso 708 26-TM-69
80,000.6
RESOLUTION N0. 708
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO
RECOMMENDING THE APPROVAL OF A TENTATIVE MAP
APPLICANT: Franchise Realty Interstate Corporation
ADDRESS: 6922 Hollywood Boulevard, Hollywood, California
SUBMITTED: October 9, 1969
LOCATION: Southwesterly corner of Stevens Creek Boulevard
and Portal Avenue
ZONING: General Commercial (CG)
AREA: 4.8 acres
------------------------------------------------------------------------------
CONDITIONS AND FURTHER FINDINGS:
1-12 Standard Conditions
13 The easement shown on the Tentative Map labeled Exhibit A shall be
improved to the appropriate standards of the City of Cupertino, sub-
ject to the approval of the City Engineer.
------------------------------------------------------------------------------
PASSED AND ADOPTED this 27th day of October, 1969, at a regular meeting of
the Planning Commission of the City of Cupertino, State of California, by the
following roll call vote:
AYES: Commissioners Buthenuth, Frolich, Irwin, Puetz, Hirshon
NAYS: None
ABSENT: None
APPROVED:
1 � . )
� _._..=
' J ck T. Hirshon, Chairman
� lanning Commission
ATTEST:
James H. Sisk
Planning Director
City of Cupertino
California
STANDARD CONDITIONS
l. Install ornamental street lights. All lighting shall be
designed to in no way interfere with adjacent residential
district.
2. Street trees will be planted in the public right-of-waV and
shall be of a type approved by the City in places d�;,ignated
by the City.
3. Traffic control signs will be p7_aced at locations to be
specified by the City.
�. Fire hydrants shall be located as requested by the City.
5. A masonry wall will be built separating any commercial area
from any residential area; which wall shall be six feet high
above the highest adjoining finished grade.
6. All parking area and driveways will be paved as shown on
the plot plan.
'�. Curbs, gutters, sidewalks, and structures shall be installed
to grades and to be constru�t°c� in accordance with standards
specified by the City Engine�r.
8. Drainage within and without the development shall be to the
satisfaction of the City Engineer.
9. ,�treet improvement abutting the applicant's property shall
be according to �ity standards and specification.
10. The applicant shall be responsible for completing site as
shown on approved plot plan, and shall be required to pay
for required engineering, checking and inspection fees prior
to issuance of building permit.
11. Landscaping shall be as approved and maintained as shown on
plot plan.
12. Street widening and dedications shall be in accorciance with
street widths approved by the City Engineer.