Loading...
Reso 707 25-TM-69 80,000.6 RESOLUTION N0. 707 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING THE APPROVAL OF A TENTATIVE MAP APPLICANT: Clayton Barron ADDRESS: 22640 San Juan Road, Cupertino, California SUBMITTED: October 10, 1969 LOCATION: Northerly of San Juan Road, approximately 600 feet west of intersection of San Juan Road and Stevens Canyon Road ZONING: R1-10 AREA: 1.464 acres ------------------------------------------------------------------------------ CONDITIONS AND FURTHER FINDINGS: 1-12 Standard Conditions 13 The developer shall provide the necessary water pumping facilities to ensure an adequate water gressure for the proposed development. Said facilities shall provide domestic water service to the satisfaction of the County Health Department. ------------------------------------------------------------------------------ PASSED AND ADOPTED this 27th day of October, 1969, at a regular meeting of the Planning Commission of the City of Cupertino, State of California by the following roll call vote: AYES: Commissioners Buthenuth, Frolich, Irwin, Puetz, Hirshon NAYS: None � ABSENT: None APPROVED: �., �`-, .� �� ' o ..�.�� J k T. Hirshon, Chairman � anning Commission ATTEST: James H. Sisk Planning Director City of Cupertino California STANDARD CONDITIONS l. Install ornamental street lights. All lighting shall be designed to in no way interfere with adjacent residential district. 2. Street trees will be planted in the public right-of-wa,y and shall be of a type approved by the City in place� dE;ignated by the City. 3. Traffic control signs will be placed at locations to be specified by the City. �. Fire hydrants shall be located as requested by the City. 5. A masonry wall will be built separating any commercial area from any residential area; which wall shall be six feet high above the highest adjoining f inished grade. 6. All parking area and driveways will be paved as shown on the plot plan. '�. �urbs, gutters, sidewalks, and structures shall be installed to grades and to be constru�tP� in accordance with standards specified by the City Engine�r. 8. Drainage within and without the development shall be to the satisfaction of the City Engineer. 9. �treet improvement abutting the applicant's property shall be according to �ity standards and specification. 10. The applicant shall be responsible for completing site as shown on approved plot plan, and shall be required to pay for required engineering, checking and inspection fees prior to issuance of building permit. 11. Landscaping shall be as approved and maintained as shown on plot plan. 12. Street widening and dedications shall be in accordance with street widths approved by the City Engineer.