Reso 707 25-TM-69
80,000.6
RESOLUTION N0. 707
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO
RECOMMENDING THE APPROVAL OF A TENTATIVE MAP
APPLICANT: Clayton Barron
ADDRESS: 22640 San Juan Road, Cupertino, California
SUBMITTED: October 10, 1969
LOCATION: Northerly of San Juan Road, approximately 600 feet west of
intersection of San Juan Road and Stevens Canyon Road
ZONING: R1-10 AREA: 1.464 acres
------------------------------------------------------------------------------
CONDITIONS AND FURTHER FINDINGS:
1-12 Standard Conditions
13 The developer shall provide the necessary water pumping facilities to
ensure an adequate water gressure for the proposed development. Said
facilities shall provide domestic water service to the satisfaction
of the County Health Department.
------------------------------------------------------------------------------
PASSED AND ADOPTED this 27th day of October, 1969, at a regular meeting of the
Planning Commission of the City of Cupertino, State of California by the
following roll call vote:
AYES: Commissioners Buthenuth, Frolich, Irwin, Puetz, Hirshon
NAYS: None �
ABSENT: None
APPROVED:
�., �`-, .�
�� '
o ..�.��
J k T. Hirshon, Chairman
� anning Commission
ATTEST:
James H. Sisk
Planning Director
City of Cupertino
California
STANDARD CONDITIONS
l. Install ornamental street lights. All lighting shall be
designed to in no way interfere with adjacent residential
district.
2. Street trees will be planted in the public right-of-wa,y and
shall be of a type approved by the City in place� dE;ignated
by the City.
3. Traffic control signs will be placed at locations to be
specified by the City.
�. Fire hydrants shall be located as requested by the City.
5. A masonry wall will be built separating any commercial area
from any residential area; which wall shall be six feet high
above the highest adjoining f inished grade.
6. All parking area and driveways will be paved as shown on
the plot plan.
'�. �urbs, gutters, sidewalks, and structures shall be installed
to grades and to be constru�tP� in accordance with standards
specified by the City Engine�r.
8. Drainage within and without the development shall be to the
satisfaction of the City Engineer.
9. �treet improvement abutting the applicant's property shall
be according to �ity standards and specification.
10. The applicant shall be responsible for completing site as
shown on approved plot plan, and shall be required to pay
for required engineering, checking and inspection fees prior
to issuance of building permit.
11. Landscaping shall be as approved and maintained as shown on
plot plan.
12. Street widening and dedications shall be in accordance with
street widths approved by the City Engineer.