Loading...
Reso 625 80,000.6 3-TM-69 RESOLUTION No. 625 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECO�NDING THE APPROVAL OF A TENTATIVE MAP. ---------------------------------------------------------------------------- APPLICANT: Claude T. Lindsay ADDRESS: 587 N. Mathilda Avenue, Sunnyvale, California SUBMITTED: February 28, 1969 LOCATION: West side of Bubb Road, between Regnart Road and Conradia Court ZONE: A1-43 (R1-7.5 AREA: 1.97 acres recommended by PC) ---------------------------------------------------------------------------- CONDITIONS AND FURTHER FINDINGS: 1-12 Standard Conditions (as listed on Page 1) ---------------------------------------------------------------------------- PASSED AND ADOPTED this 24th day of March, 1969, at a regular meeting of the Planning Cammission of the City of Cupertino, State of California, by the following roll call vote: AYES: Commissioners Buthenuth, Hirshon, Irwin, Puetz, Frolich NAYS: None APPROVED: ��-,,�.�.��� � Donald A. Frolich, Chairman ATTEST• Planning Commission � � � Adde Laurin Senior Planner -2- C I T Y 0 F C U P E R T I N 0 Telephone; (408) 252 City Hall, 10300 Torre Av�nue, Guper�tino, California 95014 STANDARD CONDITI�NS 1. Install ornamental street lights. All lighting shall be designed to in no way interfere with adjacent resi- dential district� 2. Street trees will be planted in the public right-of-way and shall be of a type approved by the City in places designated by the City. 3. Traffic control signs will be placed at locations to be specified by the City. 4. Fire hydrants shall be located as requested by the City. 5, A masonry wall will be built separating any commercial area from any �esidential area; which wall shall be six feet high above the highest adjoining finished grade. 6. All parking areas and driveways will be paved as shown on the plot plan. 7, Curbs, gutters, sidewalks, and st�uctures shall be in- stalled to grades and be const�ucted in accordance with standards specified by the City Engineer. 8. Drainage within and without the development shall be to the satisfaction of the City Engineer. g. Street impr�vements abutting the applicant's property shall be according to City standards and specifications. 10, The applicant shall be responsible for completing site as shown on approved plot plan, and shall be required �o pay for_required engineering, checking, and inspec- tion fees prior to issuance of building permit� 11. Landscaping shall be as app�oved and maintained as shown on plot plan. 12. Street widening and dedications shall be in accordance with street widths app�oved by City Engineer.