PLANNING COMl�tISSION STAFF REPORT
Agenda Item No. �- Agenda Date: October 26, 2010
Application: M-2010-07
Applicant: Dipesh Gupta
Location: 10165 North De Anza Boule��ard
APPLICATION SUMMARY
Modifications to a previously approved L; se Permit (U-2008-02) to reduce the number of
parking spaces, reduce the conference are � from about 4,194 square feet to 1,000 square
feet, reduce the restaurant/bar area and s�:ope from public-serving to hotel patron-
serving, and eliminate the green building requirement for an approved 138-room hotel at
10165 North De Anza Boulevard.
RECOMMENDATION �
Staff recommends that the Commission cc►nsider the requested modification per the
model resolution (Attachment 1).
BACKGROUND
OriQinal Project Data Summary
Hotel Rooms: 138 rooms
Conference Room & Prefunction Area: 4,194 square feet (proposed reduction to
1000 square feet)
Restaurant & Kitchen Area: 4,076 square feet
Bar & Lounge Area: 1,453 square feet
Approved Parking: 201 spaces (with capacity of up to 240
spaces with valet service) (proposed
reduction to 72 spaces)
On January 20, 2009, the City Council approved a Use Permit, Architectural and Site
Approval and a Tree Removal request to �illow the development of a 138-room hotel with
associated underground parking structur�� and tree removals and the demolition of the
existing gasoline station/car wash. The project was proposed as a luxury hotel with a
full-service restaurant, bar, lounge, conference meeting rooms, swimming pool, high
1-1
M-2010-07 Permit Modificatior. for an Approved Hotel October 26, 2010
Page 2
quality architecture and building material:� and the requirement to apply for Leadership
in Energy and Environmental Design (LEF;D) Silver building certification (Attachments 2
& 5).
The approvals were set to expire on Janua:�y 20, 2011 and the applicant received a one-
year extension of the approval to January :?0, 2012.
DISCUSSION
Pro�osed Modification
Due to the current difficult construction financing environment, the applicant is
requesting the following reductions in the project scope and conditions to make the project
financially feasible:
• Reduce the parking requirement of t�ie hotel to 0.52 spaces/room by modifying the
hotel service from a full-service hotel tc� a select service business hotel;
• Reduce the conference rooms from 4,1�►4 square feet to 1,000 square feet;
• Reduce scope of restaurant/bar from �ublic to hotel-patron only;
• Eliminate requirement for lift parking if justified by parking study;
• Eliminate the requirement to apply for LEED Silver certification;
• Eliminate the below-ground swimmin�; pool; and
• Grant flexibility to construct the original full-service hotel if construction financing
conditions improve over the next year (Attachment 3).
The applicant has indicated that even �vith above outlined modifications, no exterior
changes are being proposed to the abc�ve ground hotel structure (e.g., the building
footprint, envelope, architecture and building materials), just a reorganization of the
interior spaces and functions and the elim.nation of one level of underground parking.
Parkin� Consideration
According to the City Parking Ordina�ice Section 19.100.060, the City Council may
approve a parking ratio different from the standard hotel parking requirements prescribed
in Table 19.100.040A (one space per roorn plus one space for each employee on a shift)
provided that the project is owned by a svigle entity and that the proposed parking ratio is
based on a parking study prepared by a p:�ofessional traffic/parking consultant.
In order to ensure that sufficient parking : s provided for the proposed select service hotel,
Hexagon Transportation Consultants (the same consultant that analyzed the original hotel
project) was retained by the City to cond ict a parking analysis. Hexagon surveyed two
business-service hotels: Cupertino Inn and Hilton Garden Inn and one full-service hotel:
Cypress Hotel (Attachment 4). The surv ey was conducted on three days: Wednesday,
Thursday and Saturday (October 13, 14 �L 16) between 7 p.m. and 12 midnight to gauge
parking demand on the weekdays and weekend during expected peak occupancy hours.
According to the consultant, the Cuper Inn and Hilton Garden Inn are business-
service hotels with limited amenities sinular to the proposed select service hotel. The
�� _2
M-2010-07 Permit Modificatio�i for an Approved Hotel October 26, 2010
Page 3
Cupertino Inn has a small bar area anc� approximately 1,720 square feet of ancillary
meeting rooms. Hilton Garden Inn ha:; a small bar/restaurant area and three small
meeting rooms totaling 1,650 square feet . At both hotels the food service and meeting
rooms are set up to serve hotel guests a:1d are too small to accommodate most outside
activities. In contrast, the full-service Cy��ress Hotel has a restaurant and bar open to the
general public, and several large meeting :�ooms totaling approximately 5,000 square feet.
The hotel parking data is summarized in t he table below:
Parkin Surve
���� ��. �,�e�,�
��.� f _���� ���� ,�����,� ��, � �Q���'
..� � . �.
,
����°��°�� � 124 164 224
� ������ � � ���
�}�� �������� u � ���
� �C����< � � , k��� � ��� ���� �;
�'�'�`��,�?� � �� � ��� ¢`� R �� � ` ° 113 152 157*
��
� � �� � � '�` � �' 0.91 0.93 0.70
-. � ,
y s
�.�.,� �nr� .: � - � �.�
n,, ,�.... . ..� .,. �w: , . :�� �� ��.
�� ,�.� �`:vK�.r � -: � � ,� � �� �, ���: �
���?��� .'�����a�, �a� �r� �'��.,. ��.� �'��':
��� ����i��' a ��� � ���������� 124 164 206
��? ��� �;s c��x� �� sr�-� .�� :e.� r;
�,�� x��� ����'f�`�����" 85 121 153
��� ±�������� �: ��� y�a��°� ` ��� ��� .e ��� � 114 159 224
��� �;'. ....: � � �� .�6 � ��e� ��1"���, ��.= 71 109 149
� , ���� x±��.�. .�.�. �
������ �� � � � �� ��� � �� � ���,; 91 146 202
�c� ����a��� _� �������: �.8.���:,,_
�� `��.���s����� ��.. �����`���� ��; 74 106 147
�
��� �v,��,� � � �� �,,�� & �<, s� � ���' �-i
:��ka:�s� a�.,;���F ��H e '_ � ��..�, . �- �
�� .� � �.r� � � ���s�� >��g =�ff � � � � ����;; 0.69 0.74 0.74
�� ��� , �� ,'���� �� � � ������:�:
�� �, � ����".
�� S �.:. � �,� � �� � ������ � ��n 0.62 0.69 0.67
� ���� � �� �� �.���� ������:
� �� � � ���� ���
. . �...£.; ax,. :.,�.��:. .�.. . �» ..w������' ��s:�:��. . r.r,.� °
a �� " �aT�s,. ����.: �ft �,'k� z»�».y�."� �`Y�' er ,d'3 ��,�^tx t�k� .e : � ' � 'x�' a xz �a � � �� �' � C �z - �r `F � s �::
3 � - �- � .a �. -��� ��.�.� �� � �s .� � � xs� � ,��'� . L � -. �� �, � `� � � s� xi�' s � r� `�
�,�� 4 :��£�.�.. ���.,�`���� ., �Ma���y.,�'� ,�' �...: �tr�.,. �aa�� z� , .�u,. ��. .. � :. �a�� �: N �:: �
.a�� �` �� ' � � � � �,�� � 0.69
� �
��� � � �� �� .
�
's� ���� _ �� t `� ��, �k�.
�a��� �'� ��
s �� `� �`� g Y' D �
� N ���`����° � � ��������. � � ���
(* Cypress Hotel has rights to share 315 spaces of c dditional structure parking with office building.)
The Saturday parking counts confirmed �:hat weekday occupancy is the peak occupancy
for all three sample hotels. The survey also confirmed that during weekday with full
occupancies, sufficient parking was avai lable to all hotels: Cupertino Inn and Hilton
Garden Inn on Wednesday, and Cypress Hotel on Thursday. In all cases, parking
occupancy was less than room occupanc:y. It should be noted that the Cypress Hotel
parking figures may not capture all of its parking demands. The consultant points out
that there may be additional parking de�nands not captured from various guests of the
hotel, restaurant, bar and conference facilities parking in numerous other locations in the
City Center mixed use complex.
The weekday average ratio of occupied parking spaces to occupied rooms for the two
Cupertino business-service hotels is 0.6�'. This ratio is comparable to the nationwide
�I-3
M-2010-07 Permit Modificatior. for an Approved Hotel October 26, 2010
Page 4
parking survey data for business-service hotels published by the Institute of
Transportation Engineers (85�' percentilE parking ratio of 0.71). Based on the survey
results, the consultant recommends the us�� of a parking ratio of 0.70 spaces per hotel room
for a select service business hotel in Cupertino.
Necessary Project Adjustments
Based on the parking ratio (0.70 parking s��ace per hotel room) recommended by Hexagon,
the number of parking spaces required v�ould be 97 parking spaces (138 rooms x 0.70).
This number is higher than the applicant's request of 72 spaces (a deficit of 25 spaces).
If the Commission finds merit in the proposed modification, staff recommends the
following condition:
1) Parking shall be provided at a ratio o�� 0.70 parking space/guest room for each of the
138 guest rooms allowed by the use pe:-mit.
2) Retain the previously approved special parking arrangements for tandem and lift
parking and not allow the option of va:.et parking.
Staff believes the applicant will need the f exibility of tandem and lift parking arrangements to
meet the parking ratio of 0.70 spaces/roon� if he maintains the full 138 hotel rooms. However,
staff does not believe the vale parking option is realistic since it is more characteristic of full-
serr�ice hotels and not a typical feature of a select service business hotel.
Green Building Req,uirement
The applicant is requesting the elimin.ition of the condition requiring LEED Silver
certification. The original condition only ��equired the applicant to apply for a LEED Silver
designation at the building permit stage. The intent was to have the applicant strive to
achieve Silver designation but not to witlthold the building occupancy based on a third-
party building certification process.
The draft Green Building Ordinance, cur rently being reviewed by the city, applies to all
building permits after the effective date o:= the ordinance, regardless of whether they were
approved before the Green Building Or�iinance was adopted. The applicant has been
informed of this requirement. Therefore, if the request to waive the LEED requirement is
approved for this project, it would only bE� applicable as long as the applicant applied for a
building permit prior to the Green Buildir g Ordinance becoming effective.
Staff would also point out that the new CALGreen State Building Codes go into effect
January 1, 2011. These new codes inclt�de a number of green building measures that
would also apply to the hotel constructior .
Restoration of the Original Hotel Use Perr:ut
The applicant would like the flexibility to construct the original full-service hotel if
construction financing conditions impro� e over the next year. The following condition
has been added to the model resolution to address this possibility:
�I —4 -
M-2010-07 Permit Modificatio�i for an Approved Hotel October 26, 2010
Page 5
Condition No. 8: If the applicant determ ines, he may file an application for a Director's
Minor Modification to revoke the Use Permit and Architectural & Site Approval
Modification (file no. M-2010-0� and re:�tore the original permits, U-2008-02 and ASA-
2008-07, in their entirety, provided the original U-2008-02 and ASA-2008-07, have not
expired. Upon the original U-2008-02 ar�d ASA-2008-07 being restored, all rights to the
modification, M-2010-07, shall be deemed extinguished.
Prepared by: Colin Jung AICP, Senior Pl��nner
Reviewed by: Approved by:
�21� ��� _ �
Gary Chao Aarti Shrivastava
City Planner Community Development Director
ATTACHMENTS
Attachment 1 Model Resolution
Attachment 2 City Council Actio�i Letter (Amended) dated January 23, 2009
Attachment 3 Applicant's Reque� t Letter dated October 21, 2010
Attachment 4 Parking Survey prE�pared by Hexagon Transportation Consultants,
Inc., Dated Octobe�� 17, 2010
Attachment 5 Approved Plan Set
G:planning/pdreport/pcMreports/2010/M-2010-07
�I-5
Attachment 1
M-2010-07
CITY OF CUPERTINO
10300 Tc�rre Avenue
Cupertino, <:alifornia 95014
RESOLI JT'ION NO.
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO
RECOMMENDING APPROVAL OF .� USE PERMIT AND ARCHITECTURAL
& SITE APPROVAL MODIFICATIOTf TO ALLOW THE REDUCTION OF THE
REQUIRED PARKING, RESTAURATIT SPACE, CONFERENCE ROOMS AND
OTHER HOTEL AMENITIES FOR .�N APPROVED HOTEL LOCATED AT
10165 NORTH DE ANZA BLVD.
SECTION I: FINDINGS
WHEREAS, the Planning Commission of the City of Cupertino received an application
for a Use Permit Modification, as describe�i in Section II. of this Resolution; and
WHEREAS, the necessary public notices have been given in accordance with the
Procedural Ordinance of the City of CupE rtino, and the Planning Commission has held
one or more public hearings on this matte=�; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and has satisfied the followin;; requirements:
1) The proposed use, at the proposed lo�:ation, will not be detrimental or injurious to
property or improvements in the viciz►ity, and will not be detrimental to the public
health, safety, general welfare, or conv �nience;
2) The proposed use will be located an�� conducted in a manner in accord with the
Cupertino Comprehensive General Plan, and the purpose of this title.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, the application for Use Permit Modification is hereby
recommended for approval, subject to :he conditions which are enumerated in this
Resolution beginning on Page 2 thereof; a�id
That the subconclusions upon which tY�e findings and conditions specified in this
resolution are based and contained in the public hearing record concerning Application
�I —6
Resolution No. M-?010-07 October 26, 2010
Page 2
No. M-2010-07 as set forth in the Minu of the Planning Commission Meeting of
October 26, 2010 and are incorporated by i eference as though fully set forth herein.
SECTION II: PROTECT DESCRIPTION
Application No.: M-2010-07
Applicant: Dipesh Gupta
Property Owner: Abe Kaabipour
Location: 10165 North De Anza Boulevard
SECTION III: CONDITIONS ADMINIST�:RED BY THE COMMUNITY
DEVELOPMENT DEPT.
REVISIONS TO USE PERMIT FILE NO. U-2008-02 & ASA-2008-07
The following Conditions of Use Permit, iile no. U-2008-02, are revised in their entirety
as followed (new text is underlined; d��leted text is struck through). Use permit
conditions that are repeated in the Archit�ctural and Site Approval (file no. ASA-2008-
0� are identically modified. All the othE�r use permit (U-2008-02) and architectural &
site approval (ASA-2008-0� conditions, nc�t otherwise modified, remain in effect:
2. DEVELOPMENT APPROVAL
Approval is granted to construct a 5-:;tory, up to a 138-room hotel that includes a
restaurant, bar, lounge and confe�•ence rooms built over a one �e-level
underground parking � ag ra�e. Conference rooms shall be reduced to 1,000
square feet and restaurant and bar areas shall be reduced and reoriented to serve
just the hotel patrons.
5. SPECIAL PARKING ARRANGEMENTS
Parkin�shall be provided at a ratio c�f 0.70 parkin� space/�uest room, up to 138
�uest rooms. �e Tandem and lift parking arrangements a�
a���M;�^a ;r ��^ �rrr^= „'�-� �^� ma;� be allowed to meet the parking requirement
subject to the approval of the Director of Community Developrnent at the building
permit sta�e.
n � �t�„ t..,,;i a;,, �. ,., ,..,,;+ ��., �-„ +�.,,, ., �;,,
- � YY`�`
� � {�� 4� n� � ..r�� ��r���i�n �� .. �;TCV'VVS�`. �.c+��c. c.��ns� t���4�at �ia �...�a
v va ... �� v� v
i ��
Resolution No. M-2010-07 October 26, 2010
Page 3
8. RESTORATION OF ORIGINAL HOTF;L USE PERMIT & ARCHITECTURAL AND
SITE APPROVAL
If the a�plicant determines, he may file an a�plication for a Director's Minor
Modification to revoke the use pe:-mit and architectural and site approval
modification (file no. M-2010-0 , and restore the ori i� nal permits, U-2008-02 & ASA-
2008-07, in their entiret� provided the original, U-2008-02 and ASA-2008-07, have
not ex�ired. Upon the ori�nal, U-�,008-02 and ASA-2008-07 bein� restored, all
ri�hts to the modification, M-2010-07, �hall be deemed extin igtz shed•
PASSED AND ADOPTED this 26th day �f October 2010, at a Regular Meeting of the
Planning Commission of the City of Cupe:�tino by the following roll call vote:
AYES: COMMISSIONERS:
NOES: . COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ATTEST: APPROVED:
Aarti Shrivastava Paul Brophy, Chair
Community Development Director Planning Commission
g/planning/pdreport,/res/LO10/M-2010-07 res.doc
�—$
-- Attachm�x�t 2
�� OFFICE OF TH1= CITY CLERK •
,�� -
CITY HALL �
- - -1-0300 TORRE f�VENUE 950 -- --
C U P E RT I N O TELEPHONE: ( 777-3223 • FAX: (408) 777-3366
January 23, 2009 AMEP�TDED �
R.a.j eev Chopra � �
Shashi Corp �
10050� Wolfe Rd Suite #SW1-276 �
Cuperti.no, CA 95014 �
Ebrahim Kaabipour �
� 12600 Saratoga Ave
- Saratoga, CA 95070 �
� Re: Consider Application Nos. U-2008-(i2, ASA-2008-07, TR-2008-09 (EA-2008-08), Rajeev
Chopra (Ebrahim Kaabipour), a 5-st��rv hotel on 10165 N De Anza Blvd. (Conti.nued from
� Dec.2): �
a) Negative declaration -
b) Use Fermit and Architectvr��l and Site approval to demolish an existing gasoline
. station/car wash an.d constn: ct a 5-story, 13 8 room hotel of appro�rimately 82,000
square feet, which will inclu je a restaurant, bar, lounge and conference rooms built
over a two-level undergrounc parking podium that contai.ns tandem parki.ng -
�� c) Tree Remova� request to rem �ve 6 trees and replace with a comprehensive landscape
, plan .
Dear Mr. Chopra and Mr. Kaabipour: . �
At its Jan. 20, 2009 meeting, the Cupertinc� City Council approved the project with the following
additional conditions:
• Adopted a Negative Declaration �
• Approved Allocation Option 2(which i.nvolves usi.ng the uncommitted hotel allocation from
the Vallco plan.ning axea and using c�mmercial allocation from the North De Anza planning
area that has been discounted based on peak hour trip equivalency) with the condition that
when the Cupertino Square Mall de�relopment agreement ends, the hotel allocations will be
transferred to the approved hotel prc jects and the commercial allocation will be returned to
" the available pools of development
�I —�
U-2008-02 � � � January 23, 2009
• Approved Architectural Design Optior. No. 2. If there is a parking problem or concern, the
matter shall be brought back before the City
• The Construction� Management Plan shall provide for posti_ng of a 24-hour telephone
number-for-eompl-aint�and additional-f encing - - --- -- -
• The applicant shall provide 201 spaces (with capacity of up to 240 with valet service); an
adequate number of spaces for self-par:sing shall be worked out with staff
• The applicant shall plant more trees/shrubs on the eastern side of De Anza Blvd. on City
property to fill in gaps where there tsay be a view of the hotel in consultation with the
� neighbors and City staff. �
• The irrigation system shall be evaluat�;d and the applicant shall be responSible for the one-
time cost to update the infrastructure
• The applicant shall offer shrubs to the :ieighbors for privacy screening
• The applicant shall plant larger trees (� 8-inch box) on the west side of the street �
The Use Permit conditions are as follows unless amended above:
� SECTION III: CONDITIONS ADNIINIS'I�'sRED BY THE CO1��Il�IUNITY DEVELOPMENT .
DEPT. � .
1. APPROVED EXFIIBITS �
The approval is based on Exhibit � titled: Cupertino Hotel by Shashi Corporation,
"consisting of 22 pages labeled C1, C2, Al-A16, L1, L2, CP1 and CP2, except as may be
� a.mended by the conditions contai.ned is this resolution.
� 2: DEVELOPMENT APPROVAL � �
� Approval is granted to construct a 5-�tory, 138-room hotel that includes a restaurant, bar,
lounge and conference rooms built over a two-level underground parking podium.
3. DEVELOPMENT ALLOCATION
The applicant shall receive the unc ommitted hotel allocation from the South Vallco
Plannulg Area, the remaining comme rcial allocation from the North De Anza Boulevard
Plan.ning Area and any needed remairing commercial allocation from the Heart of the City —
Plannulg Area. There will be no disccunting of the commercial square footage for hotel use
based on peak hour 1rafFic equivalency.
Any com.mercial allocation granted to he hotel will be readjusted at the time additional
hotel allocation becomes available in fie General Pla.n.
2
1-1Q
U=2008-02 . . January 23, 2009
4. LENGTH OF HOTEL STAYS
Hotel stays shall be limited to a maxi�num of 30 days per reservation.
5. SPECIAL PARHING ARRANGEI��NTS
Approval is granteci for the tandem, li� and also valet parking arrangements as described in
- the approved plan set. ,
6. BICYCLE PARHING� �
The applicant shall provide bicyclf; parking facilities . for the proposed development in
� accordance with the City's Parking Regulations under Cha.pter 19.100 of the Cuperti.no
�Municipal Code.
7. LANDSCAPE PLAN � �
. The applicant shall submit detailecl landscape and irrigation plans to be reviewed and
approved by the Director of Commuuty Development prior to issuance of building permits.
The landscape plan shall include: �
� 1) water conservatior. and pesticide reduction measures in conformance with
Chapter 14.15, Xe��iscape Landscaping,
2) pesticide control measures referenced in Chapter 9.18, Stormwater
Pollution Prevention a.nd Watershed Protection, of the Cupertino
Municipal Code, azd
S. GREEN BUILDING
Af the building permit stage, the ap�licant shall apply for a LEED Silver designation for the
building and consider a power purc:iase agreement. The applicant shall also evaluate the
costs and benefits of a photovoltaic versus a solar water heating systein (or a combination)
, � as part of its green buildi.ng measure.,. -
9. DEMOLITION REQUIREMENT S -
All demolished building and site materials shall be recycled to the maximum extent feasible
subject to the Building Official. Thf; applicant shall provide evidence that materials will be
recycled prior to issuance of final de�nolition permits.
� ' 10. NOTICE OF FEES, DEDICATIO vS. RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Appro��al set forth herein may include certain fees,
� dedication requirements, reservatio� requirements, and other exactions. Pursuant to
� Governnient Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of su�;h fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90-day
approval period in which you may protest these fees, dedications, reservations, and _
other exactions, pursuant to Goverrment Code Section 66020(a), has begun. If you �
fail to file a protest within this 90-d3y period complying with all of the requirements
of Section 66020, you will be legally barred from later challengi.ng such exactions. .
� 11. PUBLIC ART
The applicant sha11 provide public ar: in accordance with General Plan policy 2-
66. Public art selection will be revie:wed by the Fine Arts Commission.
3 r
� 1 -1 1
� U-2008-02 � January 23, 2009 �
, 12. CLOSURE OF ABANDONED WEI�LS
Prior to grading and demolition permit issuance, the applicant shall provide the City with a �
well closure letter from the Santa C13ra Valley Water District as that agency may deem
necessary. � -
13. GE4TECA1vICAL REV�W
Prior to building permit issuance, the applicant sha11 provide a geotechnical report for the
hotel and basement for review and ap�roval by the City a.nd City Geologist.
14. AGREEMENT TO JOIN AN OPErf SPACE MAINTENANCE DISTRICT
Prior to building permit issu.ance, th: applicant shall record a covenant on the properiy
agreeing to join an open space mai.ntE:nance district for the purpose of maintai.n.ing the De
Anza Blvd. landscaping if and when :�uch a district has been formed. Until such ti.me, the
applicant shall be responsible for ma.i�itain.i.ng� their landscaped area in a manner acceptable
to the City.
15. TRASH ENCLOSURE ODOR COrTTROL
All food refuse shall be double baggf;d (or placed in contai.ners) and be sealed to prevent .
leakage. No refUSe or recycli.ng prod�icts shall be stored or placed in a manner that would
� cause odor and/or vector problems. In the event that there is evidence that there are
� problems with vectors and/or odors, tt.e Planning Commission may hold a public hearing to ,
review, modify or revoke the use perait.
16. LANDSCAPING SCREENIl�tG OF HOTEL
The applicant shall supply a.nd plant (if requested) evergreen trees on the easterly side'of the
North De Anza Boulevard right of w�y to fill in the gaps of the la.ndscape screen between
the proposed hotel and Parlett Place ��esidences, The tree planting shall be reviewed and
. approved by City staff. � �
17. CONSTRUCTION MANAGEMENT PLAN
Prior to building pemut approval, th�; applicant shall provide a construction management
" plan for the project, including anc name and contact i.nformation of the complaint
. . coord.inator.
SECTION N: CONDITIONS ADMIl�TISTER�D BY THE PUBLIC WORKS DEPT.
� 18. STREET WID�l�TING
Street widening and dedications shall l�e provided in accordance with City Standards and
specifications and as required by the CitS Engineer. _.
19. CURB AND GUTTER IIVIPROVEMENTS , �
Curbs and gutters, sidewalks and related structures shall be installed in accordance with
grades and standards as specified by the ��ity Engi.neer. �
20. STREET LIGHTING INSTALLATIC�N
4
1-12 �
J
_ U-2008-02 _ _ . �January 23, 2009 _
Street lighting shall be i.nstalled and sha11 be as approved by. the City Engi_neer. Lighting
fixtures shall be positioned so as to �reclude �glare and other forms of visual interference to
adjoining properties, a.nd shall be no h.gher than the znaximum height permitted by the zone i.n
� which the site is located.
21. - FIRE HYDRANT
Fire hydrants shall be located as requu ed by the City and Santa Clara County Fire Department
as needed.
22. GR.ADING
E'rradi.ng shall be as approved and req iired by the City Engineer in accordance with Chapter
� 16.08 of the Cuperti.no Mun.icipal Cocie. 401 Certifications and 404 permits maybe required.
Please conta.ct Army Corp of Engine:ers and/or Regional Water Quality Control Board as
appropriate. '
23. DRAINAGE . .
Drainage sha11 be provided to the satis:�action of the City Enguieer. Pre- and post-
development calculations must be pro��ided to indicate whether additional storm water control
measures are to be installed.
24.. UNDERGROUND UTILITIES
The developer sha11 comply with the re:quirements of the Underground Utilities Ordinance No. �
331 and other related Ordinances and regulations of the City of Cupertino, and shall
coordinate with a,ffected utility provid�rs for i.nstallation of underground utility devices. The
developer shall submit detailed plans showing utility underground provisions. Said plans
- � shall be subject to prior approval of the; affected Utility provider a.nd the City Engineer:
25. IMPROVEMENT AGREEMENT
The project developer shall enter i.nto a development agreement with the City of Cupertino
providing for payment of fees, i.ncluciing but not limited to checking and inspection fees,
� storm drain fees, park dedication fees �nd fees for under grounding of utilities. Said agreement
. shall be executed prior to issuance of c�nstruction permits.
Fees:
a. Checking & Inspection Fees: $ 6% of Off-Site Improvement Cost or
$3,847.00 minimum
b. Gradi.ng Permit: $ 6% of Site Improvement Cost or $2,239.00
� minimui�k
c. Development Maintenance Deposi�:: $ 2,000.00 . �
d. Storm Drainage Fee: N/A _
e. Power Cost: * *
f. Map Checking Fees: � N/A
� g. Park Fees: . � N/A
h. Street Tree .. By Developer
. ** Based on the latest effective PG&E rate schedule approved by the PUC .
� 5
. 1-13
U-2008-02 � January 23, 2009
Bonds: � �
a. Faithful Performance Bond: 100% of Off-site and On-site Improvements
b. Labor & Material Bond: lOC% of Off-site and On-site Improvement �
c. On-site Gradi.ng Bond: 100°�0 of site improvements. �
-The fees described_above_are,imposed._based upon_the_�u�xent fee_schedule_adopted_b-y—the - - _
City Coiincil. However, the fees impos :d herein may be modified at,the time of recordation
. of a final map or issuance of a buildi.n; permit in the event of said change or changes, the
fees changed at that time will reflect the; then current fee schedule.
26. TRANSFORMERS .
. Electrical transformers, telephone vaults �ind similar above ground equipment enclosures shall
be screened with fencing and landscapin�; or located underground such that said equipment is
not visible from public street areas. � The transformer shall not be located in the front or side
building setback area. � �
� 27. BEST MANAGEMENT PRACTICES �
Utilize Best Management Practices (BNIF's), as required by the State Water Resources Control
Board, for construction activity, which di�turbs soil. BMP plans shall be included in grading
and street i.mprovement plans. � �
28. DEDICATION OF WATERLINES �
Tlie applicant shall dedicate to the City all waterlines and appurtances i.nstalled to City
Sta.ndards and shall reach an agreement vcith San Jose Water for water service to the subject
development. .
29. NATIONAL POLLUTANT DISCFLARGE ELIlVIINATION SYSTEM (NPDE5) _
CONSTRUCTION GENERAL PERM
The applicant must obtain a Notice of Int�;nt (NO� from the State Water Resources Control
Board, which encompasses preparation oi' a Storm Water Pollution Prevention Plan (SWPPP),
use of construction Best Management Prz ctices (BMPs) to control storm water runoff quality,
a.nd BMP inspection and maintenance. �
� 30. AMENDED DEVELOPMENT BF,ST MANAGEMENT PRACTICES BMPZ
REQUIREMENTS
The applicant must include the use and �naintenance of site design, source control and storm
� water tre.atment BMP's, which must be designed per approved numeric sizing criteria. A
. Storm Water Management Plan, Storm V�ater Facilities Easement Agreement, Storm Water
Facilities Operation and Mai.ntena.nce A��eement, and certification of ongoing operation and �
, mai.ntenance of lreatment BMP's are reqiured. —
31. EROSION COI�TTROL PLAN
The developer must provide an approved erosion control plan by a Registered Civil Engineer.
This plan should include all erosion control measures used to retain materials on site. Erosion
contr�l notes shall be stated on the plans.
. - 6 . .
1-14
U-2008-02 . _ . Jan.uary 23, 2009
32. TR.ASH ENCLOSURES � � �
The trash enclosure plan shall be desi�ned to the satisfaction of the Environmental Programs
Manager.
33. REFUSE TRUCK ACCESS �
- - - —T-h�de-veloper-must obtain Glearanee-f -o -m- -th�-Envir-onmental-P-r-ogr-ams-Manager—in--r-egar-ds- - - - -- -
to refuse truck access for the proposed ievelopment. :
The Architectural and Site Approval condit.ons aze as follows unless amended above:
SECTION III: CONDITIONS ADMIlVISr'ERED BY THE COMMUNITY DEVELOPMENT
DEPT. � �
1. APPROVED E��ITS
The approval is based on Exhibits titled: Cupertino Hotel by Shashi Corporation,
"consisting of 22 pages labeled C1, C2, A1-A16, Ll, L2, CP1 and CP2, except as may be
amended by the conditions contained in this resolution.
2. DEVELOPMENT APPROVAL .
. Approval is granted to construct a:i-story 138-room hotel that includes a restaurant, bar,
lounge and conference rooms built o�rer a two-level underground parking podium.. �
3. DEVELOPMENT ALLOCATIOr
. The applicant shall receive the ulcommitted hotel allocation from the South � Vallco
Planning Area, the reniaining comsiercial allocation from the North De Anza Boulevard
Planning Area and any needed remaini.ng com.mercial allocation from the Heart of the City
Planning Area. There will be no dis�;ounting of the commercial square footage for hotel use
. � based on peak hour traffic equivalenc;y.
Any commercia.l allocation granted t�� the hotel will be readjusted at the time ad�itional
hotel allocation becomes available in the General Plan.
� ' 4. LENGTH OF HOTEL STAYS
Hotel stays shall be limited to a maximum of 30 days per reservation.
- 5. SPECIAL PARKING ARRANGEIIZENTS
� Approval is granted for the tandem, li� and also valet parking arrangements as described in
the approved pla.n set.
6. BICYCLE PARI�N� . -
. The applicant shall provide bicyclf; pazki.ng facilities for the proposed development in
accordance with the City's Parking Regulations under Chapter 19.100 of the Cupertino
' Municipal Code. - �
1-15� �
U-2008-02 � � January 23, 2009 �
7. LANDSCAPE PLAN
The applicant shall submit detailed landscape and irrigation plans to be reviewed and
approved by the Director of Communi'.y Development prior to issuance of buildi.ng permits.
The landscape plan shall include: . .
3) � water conservation aad pesticide reduction measures in conformance with
. Chapter_L4_a�,_Xeriscap_�Landscaping,
4) pesticide control nieasures referenced in Chapter �9.18, Stormwater
Pollution Preventioa and Watershed Protection, of the Cupertino
Municipal Code, anc . .
S. GREEN BUII.,DING
� At the building permit stage, the applic;ant shall apply for a LEED Silver designation for the
building �nd consider a power purcha�e agreement. The applicant shall also evaluate the
costs and benefits of a photovoltaic vE:rsus a solar water heati.ng system (or a combination)
as part of its green building measures.
9. DEMOLITION REQUIREMENTS
All demolished building and site mate�ials shall be recycled to the maximum extent feasible
subject to the Building Official. The �pplicant shall provide evidence that materials will be
recycled prior to issuance of final demc�lition perm.its.
10. NOTICE OF FEES, DEDICATION:�, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation r:quirements, and other exactions. Pursuant to
Government Code Section 66020(d} (:.), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. Y��u are hereby further notified that the 90-day
approval period in which you may protest these fees, ded.ications, reservations, and
� � other exactions, pursuant to Govemment Code Section 66020(a), has begun. If you
fail to file a protest within this 90-day period complying with all of the requirements
.� of Secti�on 66020, you will be legally b;irred from later challenging such exactions.
' 11. PUBLIC ART � �
� The applicant shall provide public art ii accordance with General Plan policy 2-
� 66. Public art selection will be review�d by the Fine Arts Commission. .
12. CLOSURE OF ASANDONED WE �
Prior to grading and demolition permit issuance, the applicant shall provide the City with a
well closure letter from the Sa.nta Cl3ra Valley Water District as that agency may deem
. necessary. � � � —
. 13.. GEOTECH1vICAL REVIEW
Prior to. buildin.g permit issuance, the applicant sha11 provide a geotechnical report for the
. hotel and basement for review and approval by the City and City Geologist.
8
1-16
U-2008-02 . . � _ January 23, 2009
14. AGREEMENT TO JOIN AN OP:EN SPACE MAINTENANCE DISTRICT
Prior to building permit issuance, the applicant sha11 record a covenant on the property
agreeing to join an open space maintenance district for the purpose of maintaining the De
Anza Blvd. landscaping if and whea such a district has been formed. Until such time, the
applicant shall be responsible for ir.ai.ntain.i.ng their.landscaped area in a manner accepta.ble
. to-th�-Gi�r.
15. TRASH ENCLOSURE. ODOR C��NTROL
� All food refuse shall be double ba;;ged (or placed in containers) and be sealed to prevent
leakage. No refuse or recycling pr��ducts shall be stored or placed in a manner that would
. cause odor and/or vector problems. In the event that there is evidence that there are
problems with vectors and/or odors the Planning Commission may hold a public hearing to
review, modify or revoke the use permit.
16. � ZANDSCAPING 5CREENING UF HO'PEL
The applicant shall supply and plan�: (if requested) evergreen trees on the easterly side of the
North De Anza Boulevard right of way to fill in the gaps of the landscape screen between
the proposed hotel and Parlett Place residences. The tree planting shall be reviewed and
� approved by City staff.
� 17. CONSTRUCTION MANAGElYI�;NT PLAN �
Prior to buildi.ng perm.it. approval, the applicant shall provide a construction management
plan for the project, including �nd name a.nd conta.ct information of the complaint
coordi.nator. �
SECTION N: CONDITIONS ADMIl�IIS'TF;RED BY THE PUBLIC WORKS DEPT.
18. STREET WIDEPLING � �
Street Widening and dedications shall be provided in accordance with City Standards and
� spec�cations and as required by the City Engineer. �
19. CURB AND GUTTER IMPROVEl��NTS
r � Curbs and gutters, sidewalks and related structures shall be installed in accorda.nce with
grades and standards as specified by t� e City Engi.neer.
. 20. STREET LIGHTING INSTALLATION �
Street lighf.ing shall be installed and shall be as approved by the City Engineer. Lighti.ng
� fixtures shall be positioned so as to � reclude glare and other forms of visual interference to
adjoining properties, and shall be no h.gher than the maximum height permitted by the zone in
which the site is located. _
�
21. FIl2E HYDRANT � �
_ Fire hydrants shall be located as requued by the City a.nd Santa Clara County Fire Department
- as needed. .
9
1-17
U-2008-02 January 23, 2009 �
22. GRADING .
Grading shall be as approved and requir:d by the City Engineer i.n accordance with Chapter
16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required.
Please contact Army Corp of Engineer:�� and/or Regional Water Quality Control Board as
. appropriate. � .
23.— D�RAI�T�,.GE .
� Drai.nage shall be provided to the satisfaction of the City Engineer. Pre- and post-
development calculations must be provid:d to indicate whether additional storm water control
measures aze to be installed.
24. UNDERGROUND UTLLITIES
� The developer sliall comply with the reqtirements of the Underground Utilities Ordinance No.
331 and other related Ordinances and regulations of the City of Cuperti.no, and shall
. coordinate with affected utility provider: for installation of underground utility devices. The
developer shall submit detailed plans s'sowi.ng�utility underground provisions. Said plans
shall be subject to prior approval of the afected Utility provider and the City Engineer.
• 25. IlVIPROVEMENT AGREEMENT
The project developer shall enter into a development agreement with the City of Cupertino
providing for payment of fees, includir.g but not limited to checking and inspection fees,
storm drain fees, park dedication fees ancL fees for under grounding of utilities. Said agreement
� shall be executed prior to issuance of construction permits.
Fees: �
� a. Checking & Inspection Fees: $ 6% of Off-Site Improvement Cost or
. $3,847.00 minimum
b. Gradi.ng Permit: �� $ 6% of Site Improvement Cost or $2,239.00
minimLUri � .
c. Development Maintenance Deposit: $ 2,000.00
� .d. Storm Drainage Fee: N/A .
e. Power Cost: *�`
f. Map Checki.ng Fees: N/A
' g. Park Fees: N/A
h. Street Tree By Developer
** Based on the latest effective PG&E rate schedule approved by the PUC
� Bonds: �
d. Faithful Performance Bond: 100% of Off-site and On-site Improvements
� e. Labor & Material Bond: 10(►% of Off-site and On-site Improvement _
f. On-site Grading Bond: 100° o of site improvements. �
-The fees described above are imposec based upon the current fee schedule adopted by the
City Coun.cil. However, the fees imgos �d herein may be modified at the time of recordation
of a fmal map or issuance of a building permit in the event of said change or changes, the
fees changed at fhat ti.me will reflect thE: then current fee schedule.
� l0
1-18
u-zoas-o2 . J�,� 23, Zao9
26. TRANSFORMERS
Electrical transformers, telephone vaults and similar above ground equipment enclosures shall
be screened with fencing and landsca� i.ng or located underground such that said equipment is
not visible from public street areas. 711e transformer shall not be located. in the front or side
buildi_ng setback area. ,
27. BEST MANAGEMENT PRACTIC �
Utilize Best Mana.gement Practices (B:vIPs), as required by the State Water Resources Control
. Board, for construction activity, which disturbs soil. BMP plans shall be included in grading
and street i.mprovement plans.
28. DEDICATION OF WATERLINES
The applicant shall dedicate to the Cii�� a11 waterlines and appurtances i_nstalled to City �
Standards and shall reach an agreement with San Jose Water for water service to the subject
developmerit. .
29. NATIONAL POLLUTANT DIS��HARGE ELIlVIINATION SYSTEM (NPDESI
CONSTRUCTION GENERAI� PEPMIT
The applicant must obtain a Notice of :iltent (N0� from the State Water Resources Control
� Board, which encompasses preparatior. of a Storm Water Pollution Prevention Plan (SWPPP),
� use of construction Best Management :?ractices (BMPs) to control storm water runoff quality, �
and BMP inspection and mai.ntenance.
� 30. AIVIENDED DEVELOPMENT BEST MANAGEMENT PRA,CTICES BMP)
REQUIREMENTS - �
� The applicant must include the use and maintenance of site design, source control and storn
. water treatrnent BMP's, which must be designed per approved numeric sizing criteria. A
Storm Water Management Plan, Stonn Water Facilities Easement Agreement, Storm Water
Facili�ies Operation and Mai.ntenance Agreement, and certification of ongoing operation and
maintenance of treatment BMP's are rE;quired. .
31. EROSION CONTROL PLAN
f The developer must provide an approv�d erosion control plan by a Registered Civil Engineer.
This plan should include all erosion co strol measures used to retain materials on site. Erosion
control notes shall be stated on the plar.s. �
32. TRASH ENCLOSURES �
The trash enclosure plan shall be designed to the satisfaction of the Environmental Programs �
Manager. � ,
33. REFUSE TRUCK ACCESS •
The developer must obtain cleara.nce fi om the Environmental Progra.ms Manager in regards
� to refuse truck access for the proposed c�evelopment.
11 �
. 1-19
U-2008-OZ � � January 23, 2009
The Tree Removal conditions are as follows unless amended above:
SECTION III: CONDITIONS ADNIINISTERED BY TI� COl��Ty DEVELOPMENT
DEPT.
� . '�REE12ElY.LO�AT.
The applicant is authorized to remove six protected trees consisting of two Coast Redwoods,
two Deodar Cedars and two Canary Island :?ines identified as Nos.. l-6 i.n a report prepared by �
. Arbor Resources. The approval is based or. the Exhibit entitled: "A Review of the Proposed
Removal and Replacements of Six Trees L��cated at 10165 North De Anza Boulevard,
Cupertino, California APN 326-34-057," a�id dated August 18, 2008, except as may be amended�
by the conditions contained in this resolutic�n. �
� 2. TREE REPLACEMENT � �
To mitigate the ioss of the subject trees, the applicant shall implement the landscape plans
titled: "Cupertino Hotel Concepfual Landsc ape PYan, Shashi Corporation, Cuperti.no, CA" and
"Cupertino Hotel Landscape Cross-Section� and Notes, Shashi Corporation, Cupertino, CA,"
. consisting of two sheets labeled L1 and L2 3ated 1/06/09 by KLA Landscape Architecture
Planning. � . . . �
3. NOTICE �F FEES, DEDICATIONS, R];SERVATIONS OR OTHER EXACTIONS
. The Conditions of Project Approval set fo:-th herein may include certain fees, dedication
requirements, reservation requirements, aiid other exactions. Pursuant to Government �
Code Section 66020(d) (1), these Conditic�ns constitute written notice of a statement of
the amount of such fees, and a descriptic�n of the dedications, reservations, and other
exactions. You aze hereby further notified that the 90-day approval period in which you
may protest these fees, dedications, � res �rvations, and other exactions, pursuant to
Government Code Section 66020(a), has be:gun. If you fail to file a protest wittv.n this 90- �
day period complyi.ng with all of the requirements of Section 66020, you will be legally
barred from later challenging such exaction.�.
•. Please review conditions carefully. If you have any questions regarding the conditions of
approval, please contact the Department of Community Development at 408-777-3308 for
clarification. Failure to incorporate conditi�ns into your plan set will result in delays at the
plan checking stage. If development conditions require tree preservations, do not clear the
site until required tree protection devices are installed. .
The conditions of project approval set forth herein may include cerfain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government Code
Section 66020(d) (1), these conditions constit� te written notice of a statement of the amount of �
such fees, and a description of tlze dedicati��ns, reservations, and other exactions. You are
Izereby further notified tlzat the 90-day appr��val period in wl:ich you may protest these fees,
dedications, and other exactions, pursuant to �Jovernment Code Section 66020(a); has begun. If
you fail to file a protest within this 90-day ��eriod complying with alt of the requirements of
Section 66020, you wilt be legally barred from later challenging suclz exactions.
12
1-20
U-2008-02 . . . January 23, 2009 .
Any interested person, including the ap��lican� prior to seeking judicial �eview of the city
council's decision in this matfer, must first file a petition for reconsideration with the city cterk
within ten days after the council's decisian. Any petitivn so filed must comply witli municipal
ordinance code �2.08.096.
S.in�e.r�l�: .
. �
Grace Schmidt � '
Deputy City Clerk
cc: . Community Development
,� .
1-2� . -
Attachment 3
SHASHI COC[�PORATI�N
20=�8R Stevens Creek Boule��� rd, t#331, Cupertino, CA 9�014
Phone: =308 (i21 30ti=� P��.Y: =108 99(i 2729
1�/21/2�10
Ms. Aarti Shrivastava
Director of Community Development
City of Cupertino
10300 Torre Avenue
Cup.ertino, CA 95014-3255
Re: 138-Room Hotel Project at 10165 N Df. Anza Boulevazd, Cupertino
Dear Ma' am,
As you know this project was approved in January 2009 as a world-class, full-service,
hotel and ever since the market conditior, s have been extremely challenging and the
financial markets highly restrictive, estim �ted to be the worst construction financing
conditions in over 30 years. In order to create financial feasibility for the project,
necessary to close the construction finar.cing gap created by the prevalent market
conditions, we are requesting the City to a] low us to develop it as a world-class, select-
service hotel.
Specifically, we are requesting the City to provide us with an Option to develop this hotel
with following changes in order to create f.nancial feasibility necessary for construction
financing and successful completion of the ��roject:
1. Allow the Developer to reduce overall project scope for the project to make it a
world-class, select service hotel by f:liminating the approximately 4,000 SQ FT
public restaurant and bar space and rec ucing the meeting space from approx. 4,000
SQ FT to 1,000 SQ FT.
2. Based on the reduced scope of the p�•oject as a world-class, select service hotel,
reduce the overall parking requirem�;nt for the 138-room hotel to 0.52 parking
spaces per guest room. The third � arty parking study conducted by Hexagon
Transportation Consultants in October 2010, on behalf of City of Cupertino, estimates
that the select service hotel will requir� 0.70 parking spaces per guest room. This
study is based on parking analysis per.:ormed for Cupertino Inn and Hilton Garden
Inn during peak business hours. However, unlike Hilton Garden Inn and Cupertino
Inn, the proposed hotel is located wittun walking distance to Apple Headquarters,
Seagate, Cupertino Office Towers, ancl other leading businesses as well as world-
1-22
class restaurants and cafe's such as Fontana's, Mandarin, Bombay Oven, BJ's,
Starbucks, Peet's, Panera Bread, Le F4oulanger, and Whole Foods. According to
Urban Land Institute (ULI) publicatio�i, Shared Parking, 2005, referred to, in the
original Hexagon Parking Study, many guests in a business hotel, such as proposed
herein, would walk, carpool, take a sh�ittle, or be dropped off at the hotel. Guests
staying at hotels located in pedestrian c�riented districts, which allow hotel guests to
walk to businesses and restaurants, usu�.11y have a lower propensity to rent their own
car. The 0.70 pazking ratio based on H ilton Garden Inn and Cupertino Inn does not
make any necessary adjustments to pa�king requirement based on proposed hotel's
close proximity to businesses and restau -ants.
Based on the reduced project scope, the updated parking study performed by
Hexagon, and the adjustments based on hotel's extremely close proximity to
businesses and restaurants, we believe that the hotel will not require more than 0.52
parking spaces per guest room. If any shortfall is experienced in parking spaces, the
Developer is committed to provide the iollowing services to ensure adequate parking
space is available for the hotel:
a. Provide valet parking to Y�otel guests, which based on the analysis
performed by Hexagon, typi �ally increases the parking capacity by 20%,
andlor
b. Provide complimentary shub.le service to hotel guests to local businesses
and nearby airport, thereby :urther reducing the need for hotel guests to
rent their own car
Additionally, the original design had approximately 26% standard stalls, and 74% of
the parking spaces were designed with mechanical lifts andlor in tandem. The need
for mechanical lifts will be completely e liminated.
We hereby request the City to reduce the overall parking requirement to 0.52
parking spaces per guest room, leadi�ig to a requirement of 72 parking spaces for
the 138-room select-service hotel.
3. Waive the requirement for Silver I�EED Certification for the Project. The
Project would still be developed as an,nvironment friendly, energy efficient, green
hotel. This waiver will be valid only if tJie developer breaks ground for the Project on
or before December 31, 2011.
4. The Developer will make all efforts nec�;ssary to maintain the integrity of the original
design and architecture. If any signific:ant changes to original design are deemed
necessary to reduce the project scopf; to make it financially feasible, then we
understand that any such changes may rf quire approval from Planning Commission.
1•-23
Please note, that we must receive forma] approval from the City for on or before
November 1 St , 2010, in order to secure , :he construction financing and successfully
complete the project. We look forward to �vorking with you in effectively bringing this
world-class hotel to our community.
Regards,
-------------------------------------------
Dipesh Gupta, CEO, Shashi Corporation (A;�plicant)
1 -24
„ Attachment 4
`� �IEXAGON TRANSPORTATION CONSUITANTS, INC.
October 17, 2010
Gary Chao
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
Re: Results of Business Hotel Parking Sur✓ey in Cupertino
Dear Mr. Chao:
Hexagon Transportation Consultants, Inc., ha� completed parking counts at three hotels in Cupertino. The
purpose of the counts was to determine an aFpropriate parking ratio for business hotels. Business hotels
are characterized by limited services, as oppcsed to full-service hotels, which have on-site restaurants and
meetings rooms. Hexagon counted two busin��ss hotels: Cupertino Inn and Hilton Garden Inn. The
Cupertino Inn has 124 guest rooms, a small bar area, and some small meeting rooms. The Hilton Garden
Inn has 164 guest rooms, a small bar and res�:aurant area, and three small meeting rooms. At both hotels
the food service and meeting areas are set uF to serve hotel guests and are too small to accommodate
most outside activities. As a contrast, Hexagon also counted the Cypress Hotel, which is a full-service
hotel. The Cypress Hotel has 224 guest room�, a restaurant open to the general public, and several large
meeting rooms, some of which were in use d� ring the survey. The Cypress Hotel has only 157 parking
spaces for 224 rooms. There is other parking around the hotel in the Cupertino City Center that could be
shared. However, the surrounding parking is riot very convenient for hotel use. We do not know whether
any of the surrounding parking was in use for the hotel.
The counts were conducted on Wednesday October 13, Thursday October 14, and Saturday October 16
from 7 PM to midnight. Those are the hours when we would expect to see hotel parking at its highest level.
The Saturday counts wete done to confirm thE; thought that weekdays would be higher than weekends.
That proved to be the case.
The attached table shows that the Cupertino I �n had a maximum parking demand of 0.69 spaces per
room, and the Hilton Garden Inn had a maximum demand of 0.74 spaces per room. The average for these
two business hotels was 0.69 spaces per roorn. This number almost matches the 85 percentile parking
ratio of 0.71 spaces per room that is publisheci in the Institute of Transportation Engineers (ITE) Parking
Generation Manual. Curiously, the Cypress H�tel had a parking ratio that was quite comparable to the finro
business hotels. It appears that what is happening is that the restaurant and meeting rooms peak earfier in
the evening, and then they are closed when tt�e guest rooms finally fill up for the night.
In conclusion, Hexagon recommends the use of a parking ratio of 0.70 spaces per room for a business
hotel in Cupertino, based on the survey result�.
We appreciate the opportunity to provide this �arking survey data for your review. Please do not hesitate to
contact us if additional information is needed.
Sincerely,
HEXAGON TRANSPORTATION CONSULTE►NTS, INC.
�
Gary Black, President
111 W. St. John Street, Suite 850 • San 1ose, Califo �nia 95113
phone 408.971.6100 • fax 408.971.6102 • www.hextrans.com
1 -25
�
I
N
�
City of Cupertino
Hotel Parking Survey Data
Time Wed Thurs Sat Wed Thurs
7:00 PM ` 42 33 36 57 , 37
7:30 47 35 52 60 39
8:00 51 `' 43 ' 53 67 ' 40
8:30 , 54 , 44 53 70 48
9:00 61 45 57 78 55
9:30 64 47 60 90 65
10:00 ' 75 < 51 - 64 101 ' 87
10:30 82 56 63 105 99
' 11:00 85 61 62 109 99
11:30 81 68 72 119 105
12:Q0 ' 79 ' 71 74 121 109
113
0.91
� .•
Cupertino Inn and Hilton Garden
ITE 85th Percentile
� .]
152
0.93
0.74 0.69
0.69 spaces per room
0.71 spaces per room
Sat
53
55
56
55
68
68
76
87
`97
103
106
Wed Thurs Sat
119 128 115
117 132 117
" 119 141" 118 ;
135 131 115
138 128 122
128 131 127
134 134 130
131 133 139
146 138 138
152 144 145
153 149` 147
157
0.70
0.74 0.67
Attachment 5
C(,IP�RTIND hOT�.L �Y St1A5h1 CORPORATION
PROJ�.CT D1RE.CTORY
owr��
ARCHITECT
LANDSCAPE ARCHITECT
CIVIL ENGINEER
SHASHI CORPORATION
10050 WOLFE ROAD
SUITE SW7-276
CUPERTINO, CA 95104
(408)996-2750
RYS ARCHITFCTS- INC-
10 MONTEREY BOULEVARD
SHN FRANCISCO, CA 94131
(41� 841-9090
K1.A, INC.
151 NORTH NORLIN STREET
SONORA, CA 9537D
�zos� saz-2ees
HMH ENGINEERS
1204 E STREET
MARYSVILLE, CA 95901
(408) 487 - Z200
� � � �� � O � ��O�v � �D �
� , e....� � r
w
�:��'ati��o r ��, D �
0._,,,,,,,d,_
�_�.; �.:;»�'.�;�;-.
�����,�,�:� ������������:rs��7 r'► 3—oq
�„�,.. r, �,,,,,,,,, �. . _ —. _ ., � a
G �c�
� �E�s e���������.' �o � o Q
' P'-xiP
�t�;t�3�Lf� \
�'.tISC � iSLCi'
PROJ�.CT DATA
AP.N.: 32B�4-057
ADDRES5: 10165 N. DE ANZA BLVD;
CUPERTINO, CA
IXISTING ZONING : COMMERCIAL
FXISTIN[; IIRF• (`.AMMFRCIAL
TYPE OF OCCUPANCY: R-9 / 8/ A-2 ! S-2
PROPOSED USE: LUXURY HOTEL
ROOM COUNT�
FIRST FLOOR:
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR:
FIFTH FLOOR:
l TOTAL ROOM COUNT:
NONE
35 UNITS
35 UNITS •
35 UNITS
33 UNITS
138 UNITS
SIT� ARE.4 t3a,saas.F.
ARF�1: S. F. PERCENTAGE
BUILDING AREA: t 17,114 49%
DRIVEWAY: t 2,980 996
UWDSCAPE: t 14,572 42%
TOTAL SITE AREA t 34,646 10056
bUILDING AREA�
FIRST FLOOR
SECOND FLOOR:
THIRD FLOOR
FOURTH FLOOR:
FIFTH FLOOR
- TOTAL BUILDING AREA:
17,114 S: F.
17,153 S. F.
17,153 S. F.
16,858 S. F.
16,132 5. F.
84,410 S.F.
� � .. 0 4� �-.- 7,ot o
i
�� ��� � � EXr- �v -- ob
' � 6 � � � v V � b � �.�
► - �' - :•'�a'�_s:_,` - ,
. ��.�.:._�_.:. . .r.T
r", � ^w �..r
d 4o`'�.L5Yt+1.',Lx`':� �Ya.�i::�£��i;r����v:��.���.���...�,..,,�.,,.,,.......�_
:r E ��,^
Y.�1•
: j'� ,� .�� $ ~ 3 ~/ V
��7��'I L�B,�Eaf:.J��
SL'J:3
`
.
� j �;'��� l.�5��
�.dSS +� )�l�i:t'
DRAWING 1ND�.X
C� COVL'R
(� fROJL' CT INf'ORMATION
q� 51TL' f'LAN- f'lItST f'LOOR FLAN
��
L2
A2
A3
A4
A5
AB
A7
A8
A9
A70
A11
Al2
A13
A14
A15
A16
CP1
CP2
LANDSCA�L' CRO55-SL`CTION
SL'TbACK ANALY515
5L'COND i'LOOR fLAN
Tt11RD f'LOOR PLAN
POUKTH ('LOOR �LAN
1'If'TH I'LOOR FLAN
ROOi' FLAN
I'IRST LL'VL'L GARAGL' FLAN
SL'COND LL'VLL GARAGL' PLAN
SL'CTIONS
L'A5T ` SOUTFi L'LL'VATIONS
WL'ST � NORTH L'LL'VATIONS
MASSING DIAGRAMS
MASSING DIAGRAMS
STORYBOARD � DL'TAILS
STORY60ARD i DL'TAILS
GONTL'XTUAL fLAN VIL'W
�D CONTL'XTUAL VIL'W
�• C t1 0TEL SF1�ET NO- C�
. PLANNING PACKAGC o�/3o/oe
S t1A51 I CO RPO RATI O N CUPERTINO CA RL'VISL'D ot/o6/o9
a,� �,a �crs
MR11CL• 0�110
V1CINITY MAP
PROJECT SUMMARY
SITE AREA:
ACRES:
BUILDING AREA:
NUMBER OF STORIES:
BUILDING HEIGHT:
BUILDING PAD ELEVATION:
CURB ELEVATION:
NUM9ER OF EMPLOYEES PROJECTED:
NUMER OF SEATS:
PARKING PROVIDED:
FIRST LEVEL•
ACCESSIBLE
STANDARD
SECOND LEVEL:
STANDARD
STANDARD WITH LIFTS (62)
TANDEM STALLS (2)
TANDEM STALLS WITH
CAR LI FTS (24)
TOTAL CAR PARK(NG
TOTAL BICYCLE
HOURS OF OPERATION:
EXISTING USE:
PROPOSED USE:
ZONING DESIGNATION:
PAVING AREA:
LANDSCAPE AREA:
t 34,646 S.F
0.7995
t 82,059 S.F.
5
45' - 0'
232' - 0'
235'-0'
60
BB
6
38
11
122
4
48
201
8
24 HOURS
COMMERICIAL
LUXURY HOTEL
COMMERICAL P (CG.0)
t 2,980 S.F 9%
t 14,952 S.F 4396
CUPERTINO Trash Storage Calculations
�� o - oy; EX�'-ao� o -os �
� ���1��1'��D ,:� e� ��.r��O��e- 0 � �
a � p�3i �+r'A6i {!
''�: : '-.. . ,..._. : � E
�T L� � q , �
�f • �;jrp^ :.J��..�,.:y.{
6�C•:.fJ�96w.x� ��L:.:+c✓aS.:.;.'•. ,�....,r..:�..� - -
. l+i::; _
, � � �j ^ 3-1 c�
,�+ ...,���.-�
C. r'�1 �✓' �J E�r e s.• i �...�._._.. -- - ---.r�e-
��$f
n �
�I�;�a�f�E� -++.
C:�tse �� s �;���
�' '� � ° 0 �� �IQ -' e200�j — 0 �
� �E ;� �? (���f � I' � ��Q�'_„ �„
•I�Y 2 Y�Li/ • T 7d
k�'"��:�.� �.�:�.:;Y
�Z ����F€.��� � / — /3 - 09
�
�a�� �E3Enca�rd� ��� � 1
�E�;�2��0�: �JI/l..r�
C��r A
CUPERTINO t10TEL . Sh��.T NO- (;2 �
PLANNING PACKAGC. O J�3�/O B
SI CORPORATION CuP�.RT�NO CA RCVISCD oi/od/o9
— nttcru�crs
DAT� OB2710! .����
PROJ. NO: Oe110 � �� � ��
TOTAL TRASH AREA PROVIDED = TRASH ENCLOSURE + CARDBOARD STORAGE
304 S.F. + 109 S.F. = 413 S.F.
LADDER
STAGING
AREA
Al2
�
i
I
: I
� I
I
I
I
146 SF
71'-3'
Al2
NORTHI
- — — — — — — — — — — — — — — — — — — — — — —
o � � Io REMEDIATION
;, ° � I� AREA �
�T �s.s
;, 5 SERVICE _ _ _
b b L� N �
I
B'-3' 4•1' �
e o e • I
KITCHEN
�-�' � GRE4SE
1121 SF INTERCEPTO�
. . . . o �
3 _�. ° � CK REQUIRED 50.00 FT
�� CK PROVIDED 6�.22 FTI
- �? r i � I
CANFERENCE - � i i �; �
2868 SF ..,._ :, j � � i m CANOPY ABOVE
._
---------------------------- IADDER � I � I
._� STAGING � f �
I AREA �,�"� �
- �='� `' � I NANq i i I
� .... �.....�. � � w�- i i ENTRY CANOPY I
i ' ABOVE
CONFERENCE NANA j VERANDA � RESTAURANT � � I
PREFUNCTION I WALL I 609 SF � 2g55 5F i i `� �
1326 SF x .-�•<�: Ft;� I i �
I I
� �
� . . � . � � : � �
�q ' � `" � A71 �
v P I � � CANOPY ABOVE
� RESTROOMS ' ' m
�E 853 5F ; ; I
� ELEV LOBBY �
� � NANA I
WALL 212 SF N
� BAR m
�
�
� ----- 412 SF � i �� �
�----------------------°---
I
J I
OPEN STAIR I
TO GARAGE I
. OFFIC LOBBY
107 SF 1987 SF �
LOUNGE �
DEUVERY RECE N 1041 SF �
706 SF 187 ^
I SHO � ENTRY CANOPY �
�`� A80VE
OVERHEAD 102 SF
DOOR � �
�
.
Q � :
---------- '"
�=
---------- ------- ------�--- --------------------------�--"'-'�-
� DRIVE AISLE
.� s_,,,2 r�.,• e_r s�_,• ,a.6,rz�� 3r.,• 1
. � � ��. I I
; � / � f �-------------- -�------------------------------- ----,
b < � PORTE COCHERE '
i � y SETBACK REQUIRED 25.00 FT �
� � SETBACK PROVIDED 5200 FT ABOVE /
� � %
� o � �
i .:
� �� " / �.
, �-- ----- ------- -- ----------- ----- — ,
� �, _ a , `� A71 � . p� — — — � �
FIRE STAGING AREA .
, ROLLED CURB ALVES DRIVE "
Z
0
a
�
I
I �-�
I
i
I ROOFED\
� TRASH
� ENCLOSURE
e'-0" CLR. INT
I HEIGHT
S1TE.PLAN - �1}ZST �L�OR PLAN �
SCAL�.�3/�r- i�-0� "
o � + . ��
�� E'�l-o�ot o- 0� r'�-`l'-�al o-0� ..:
m �
� nc. B � ��>��O _O� �
��o'E 3:.� �u. � �
Z .•,�, ..... _ ...;r:.. .<a' �
Q
� j � ? ,�, .i ^.. ,. - ° f7
A if���' �+ ......�.., •n
Z :: � s. ; � ts• oa � u i : : �1 . .��.r.�......��1_.�,
!%.ii Y �
e /1
�'s�;t &'. ��, �:�:�� ~ _' � �'-�..�.::�.
Ysia�;
�3�,�3�r�it� � -
�:IEi� ���iLt �
�
,�-a«�s-o�, - ��-an°�-�9
' �-��00� '�
��� � � ���a��e
:er; �r...::.s P'r:as:;��
� �,�, - � „y�•* � ��r ? 00 p: � /� �
«�3rFG� 4 � � ✓ � .
e:�:s
� p � ' �� �0�
�s•s`�yf �J�n��'{�Y - -- -
4:e�c
!
(•" c'� �'°�"a r
a's��ya�..�:tn v �
�'K�C aEelt7;;�
C U PE RTINO 110TEL Sh�. ND- A�
PLANNING PACKAGC o�/3o/oe
5 t�1A5 t1 I CO R PO RATI O N CUPERTINO ca RL:VISL`D o�/06/09
_
�,� �,� ,�x�cT's
�,.,d �„� -
.s��•
CUPERTINO hOT�.L
I . . . . . " �■
, , �
� ■ ■
�w
, ' � ��
�ms I � "� "esr,,urw+r
� m� �ug
, ' I
■ ■
��
�� euvio..r
t�e ss
I
�--:--:-- � C
■ ■
..,� �`�:
ALVES DRNE
SETBACK ANALYSIS: ALVES DRIVE
AREA: 10,390 SQ FT.
LENGTH: 210 FT '
AREA/LENTGH:
10,390/210 = 49.00 FT.
MINIMIJM SETBACK REQUIRED: 15.00 FT
AVERAGE SETBACK REQUIRED; 25.00 FT
SETBACK PROVIDED: 49.00 FT
0
�
m
N
Z
Q
W
0
Z
S�.T�ACK ANALY515
shashi coRPORAT�oN
214 00'
CUPERTINO� CA
4fiL2�
z�a.oa�
. . . . . ��,e, ■
1 ' �
� ■ ■
1 ' � ��u
1 i
��ruwcnow vg�""o� �sr�uiurrt
ia�sr � � msr
1 ' j m..�
� ■ ■
J�
w�ww�u e�v�o�er
ro �
I
L-------- �
■ ■ �\
� . .
lWry
ALVES DRIVE
SETBACK ANALYSIS: N. DE ANZA BLVD.
AREA: 9,294 SQ FT
LENGTH: 165.57 FT
AREA/LENGTH:
9,294/165.57 = 56.00 F1'
MINIMUM SETBACK REQIJIRED: 35.00 FT
AVERAGE SETBACK REQUIRED: 50.00 FT
SETBACK PROVIDED: 56.00 FT
.��-
�'"- o �Zo1 D- 0�, ��C'Tr'�v� �-- DS
AP��?t���a �' �°�°_. �� b
k� ;a`�a :.°:-r.: Becx:�e�.�
e �i.../�
F�S�����'�I�n� �.�1JEd'�C�Y�:� i�4GJJ�
�SiI!{C
�14�� � r
�. �17!7
�re
C�SC �.
�
�
m
N
Z
Q
W
O
Z
�a�pg—p7 � ��
�� ._ ' r � ��D �0�
'��'d'?�����. �� o� - —
h�.:��:� ts:,��
�r���aa:ea�� ��sFarc��:��r;�� l �� 3 " 6
E:ose
�E 1�'w1l����'�i � _ �O '� !
�! '� ETuBv
,
�:��:����'� �
e.��sc c�� � ��;�r
St�1�.�T NO� . A2
PLANNING PACKAGC O J/ 30/O 8 �
RevlseD oi/oa/o9
� nRCtuz�c�rs
o�� osrrrroe �••,.�
PRa. No.: oe� �o � �_�
�
� A11
BUILDING AREA :
FIRST FLOOR :
SECAND FLOOR :
THIRD FLOOR
FOURTH FLOOR
FIFTH FLOOR:
TOTAL BUILDING AREA:
17,114 S.F.
17,153 S.F.
17,153 S.F.
16,858 S.F.
18,132 S.F.
84,410 S.F.
�xT'.ZO! 0 -01�� EX�T 0� D,S
A���t�;�� �. � -�o� o -oG
�� ��Zi.'.a'i•J �{1L1:!`GQ�
�i,Y��tlii�7C,�,� �i �
i�si�
!':r.. C'".�.,.,..s� Q �2_ � w
_ . � .. �. ,..,. v �.�� � � v
�
��tt
�d5 i�i$'�� �.�„',
�s� �►iwtr P
�}S�1 �ao8 -0 �, TIP- �o$-Dg
�� ���LF�g��oo8 -D�
:o;;;''Sn:c. i� :e:'s2t
Al2
NORTHI
wuuin
M1
S�COND �LOOR PLAN �
SCALE�3�z�-��-0• „
o � � . ��
�S��raai�a�� ��':i���t�e. r� / � �Q /
i?a�=
E�..aF� �6ie,�av�� l�� �D /
E*�ia
�
�:�y��e�.:��'
d'usr �Ea i �c�
C t10 � ShF� NO• A3
PLANNING PACI:AGC o7/3o/oe
5 t t l CO RPO RAT1 O N CUP�.RTlNO cA RL_VISL'D ot/o6/o9
o�te o�nw ��
rioaw: m�o
I :
�
� A11
��-�,.� �T-ao�o'o5
�i ��t ���....��° �
1 �,..� :��s"a tfi!Qklc3�:
�4 a R`
C � �n • � ' �
E ���d�6:�3E �.a�=�ii�:r����ri: ,...�,..�..r•-n,�..
lliji
[`1�,�� �'�oa:��st�° � '3'�d
�::�
S����as�re ``
[:usc A :.�;�r
M2
NOKTHI
�r_,�• .a .. �.� .. ...� s
�o�
A-1
ThIRD FLOOR PLAN �
scA�e=3�Z�-��-0� „
a � , . ,�
� S�-aan 8 - 0'1, T�-�aa
��� ���c���;�. u-aoo� -oa
a�n;�:a.� ;�5:��_�c:
8� 3�s:9lJi5� ���3�1��$iS�d+.';'y'�a' ( - I � D�
�:L•':S
• � -x� �—ao o �
y I'� 'J
,Q .�� ~` � + x�
�9_ GSrb �. �r.z '
_ „e �`•c. _
i .:: �
1
i
���r'7'��Ji'.r+A �
r .iY: tMt+/i �
u �7....Swi� :CZdZri19
CUP�.RT1N0 t10TEL 5���.,- No. A4
PLANNING PACI:AGC p��3a�a8
Sl CORPQRATION CUPERTINO ca RL'VISL'D oi/o6/o9
� ,�„� ,.�, nx��crs
.�.�: �,e
A1T
NORTHI
�
7f�_��• .a_.•
� ��c 0'04, FKT—�c�o"o5 .
, "„ . ° 010 - o '
� ����� ��� ��..��T-a --�--- b �:
/1 �,�'.l��\:.�::Y �
r.� i "' '
/!� p • � p C 5 �.4 ..��,�r �- �
��Y\i P1:a�a ��!?rL�[LFd�..iu�:� e. �
�
�`.�
v. .<� ,
-�-�D
�°s��� �'��� —�-�--
tP::
/1 ,�1 /�'�
�
�.
�1�r�;�4�
Cnsr Ce@ tc {;s�
/�-�-�GaD� - ��� �ie�� � - � �
ti�����11 r18. V� ��p���
��s�!✓a Cit�cvw�t�
��• _ � �,.. :
��
A11
��URTh �LOOR PLAN �
SCAL�,3n2�-��� �
o � , . ��
�e��'ar3a:a�S� �i39D���g��=i�: �—/ � • �g
���
c��,� ^�������� I - a� -og
+e�dt� _
�i�Jb4d7�6i��i&r /`-� -
0..:.��. .�� �ySir
CUPERTINO hOTEL 5h��.,- No. A5
PLANNING PACI:AGC a�/3o/oa
5t�1A51�11 CORPORATION . cuP�.RT�►vo. ca RL'VISL'D a��o6�
�,� o.�..-,�.�...:�.,..:
�� �„e _
Al2
NORTIi1
�r _ � r .a� _ . .,.. . _.. ._
�1 �Tl �LOOR PLAN �
sca�e=j.�Z•- �.-0• "
a 3 , . i�
�g u� •-•,—�,.-,_, ' '. ,
� A11 ,�„����..- --�-`�""`'"._ �.._.. .
i
r �y� ��-�o�o �✓
�� _ aolo�a�O �
����� �� °
� � o u ,,.a..•,.....r..--� .F. _ _ . ..:. .. _..�...- �
di� •,'::'[�••:: :, ti:r•.::;'•.d �
9
p e qt ..�TJ"Q.•��t..�c'•I �� b �
�il�e�lf���9� P�SJ£ y.��� :i,- �
`' }�:.:4
a —��/D �
.Y'�4r'.i r'��i.7?2�.`p•� �
b `=�7 — _ ' i
eetl:a
I
� '
�����:��Y`� �
�C:�s� �Fa:: �
�-S�9 -a.�.�a8 - 0 7, 7"�?-�a8 -Oq
�a������h�. I� -aoos-o�
w��ia'4:I.lY �N6:�e'Y4
���s�v�sSE$� �G3s8E?5�,�:;�3�E��ai � ^ � 3 � � %
@3��e
�'3�,�� �'�t!$;�d�rA� ..._ � �oc�d � Q "/
�s�:
�9��i��1Fss� T
i_ ' i' 'i9�'C�
CUPE.RTINO hOTE.L 5��.�.,- No. A6
�
PLANNING PACKAGC o7/3o/oa
S t�1A51 l CO RPO RAT1 O N CUPERTINO ca RL'VISL'D ot/o6/o9
,.� , nRC��z�crs
►�,�: �,,.
2SOUTH
M1
Al2
NOR'(li7
�
, ss _ ,r
CANOPY BELOW
� FIRST FLOOR
� ELEVATOR
PENTHOUSE
EYEBROW
SCREEN FOR ROOF
TOP UNITS
�
� n»
EYEBROW
CANOPY BELOW
� FIRST FLOOR
�ts.urH
M1
ROOF PLAN
SCALE�3/'tz•-��c•
� a � , . ��
G��r���� �t'�j �i�'"e�0�0.��.... ,
E''i�'� �:�,�'�lr�.,�. , �i�� - �o�D�_d '-�� �
':; �<<' . . .. _; a:�•:--�::: � �
�
�iC�.bL+�C:'rF� 15.d.�a�� r,•�F.,.� - �
ec:'r�C.:.trl;�'�t �'�•"�
� i._7� - — - �
�`��,�� �.��n3�;��'�_ "��'�� �
�
1
1
��������G n�
� k:e i���se �
�q-S� -02008-0�, r�P_�g-og
�r�°�����, u'aoo8 �o�
��C::� ►��x.�s
��.'�E�dH9ddo �'d319��@6:.���C�€� l �� 3 � �
E»7e
� �'t�eKP���'�` ` � e�� � �"!
es7a
' � �
�i�'l18�df3� �
C:ise B ��Hi��cr �
��
CUPE.RTINO hOTEL . ShF�T NO• A7
PLANNING PACKAGC o7/3o/oe
51 CORPORATION CUP�.RT1N0. CA RL'VISL'D o�/06/09
d17! 0/J/A Ai\1..c111L\�1�:
lIOLIOQ O�IM �
CUPE.RTINO I
S1 COKPORATION
i
• b LJ u
I i � ` '�`:ir:% - I
� � � b -� ::::_:::;' �
��-�=�;;r;.;
� I � - M��r� �
� � o � O '�'''_:�::: �
I , �o �u?'�
� � o a O::, �.
� :�.=;�` i S.Q' 9-7 5-? S-Q' g.Q� �
I _ _ � �
::�,.„...
i W TYP.
,.:::..
:�::�>�;
...... � �
......... ,
y,w�::: b
.......... _
.;:,:::;: , a
� �..
n,::�:::: ,
i t_� ---------------� � �
I L � •' � , �� �
` ���:Y+'� �
I ti:)'_ �
n
� ��" , ` �7 � , �' � ;� i
x L
b •+f y «::
, • • � t... /
� ` : : b : ..
� � :, .- ,
� �: :
i:: �
: K : * ny rs
.,,. ... , m .
I .,^ ..... �.... � �- �
M /
.YNH ....,� ........... ........�. :• �
� �_ / / /
------------------------------------------ --- �
Y
b�
��
w __._ _ ...__._w�.._.�
�lRST LE.VEL GARAG�.
SCAL��3�2�- ��-0�
a � , . ��
CUPE.RTINO, CA
�T�.2010-0 � ����070l0'OS �
Ai i`��s+�r�:��• ���e4 �D�v �
/� ��.�:�r.,._..._,_�. �
// ��
��'�i'1t�8�i'd�� �. ..d.y_ -, ..�
t:._._
. �-'
C'a��� ��rh�:��� 3-�0
6u��
.�
�Ebi����3a�
�'JlfB i4� S�t„°::i'
FIRST L�VEL PARKING
36 STANDARD STALLS
6 ACCESSIBLE STALLS
42 PARKING STALLS
13 BICYCLE PARKING
�Ss4 -�8 -0 7, Ti� -�a� S -�
a
� ��'��F,���, �� —p
'.S�.i[A'�.:::'�: '��' f
6��;a�6�iedi:� �'�3ls��Fd'�b S�o'��7 � ! � 3 ��g
__ As.
YuB�Q
� �€,�9 �'��a��:.�3: / � e20 — 0 �'j
l ��''
,
�S��d����C ; , � �.��. �
�mg� �nus�.�r �
51�1�.T NO•
A8
PLANNING PACKAGC a�/3o/oe
RL' VISL' D o �/
o�ie armd ARQ�TECTS
noirn m�a �
I =:_:: ,
i 5
i ���:":
m '�:���:
�:�:::
I 10 � � 0 x� �
i u � � � �� ;:..,,,:
�-�
I W
�
5 �
i � �
( �
0
�tt:UNU LtVtL f'AKKINt�
24 (12X2) TANDEM STALLS w/ CAR LIFT
122 (61X2) STANDARD STALLS w/ CAR L1FT
2 TANDEM STALLS
11 STANDARD STALLS
159 PARKING STALLS
i
�
i
i
�
i
i
STOR , a � - - �, r,e-� -o�►
I
1
I 18 / ���i 00� i� ��u. � ���' ��
I MECH. b L1FT // 1��.'Y,..'ace;:�� Y:,�p
I m /
I / � .� a' � 'te� a;s� .�
i 6"�dFry�e86�'� �e3���3t�►��o:���9 �� � � Da
� — — — — — — — — — — — — — — — — — — — — — — — — — / � �§s0a
-- - -- - - -- ---- - - -- - -- � - � -~� � =0�
5 ��a,;j �QJ�?3�r�'c
� 4� v� �IU-= , ". '"' 3_ •
� ,�„�,�..:y . •.::: _-,:. . _ , 6L+ctt
S�.COND L�.VEL GARAG�. �
SCALE:3lsz•- "
O 1 4 0 1{
CUP�RTINO 110TE.L
S1 CORPORATION
CUPE.RTINO. CA
�Kr'�°'° �" "° � � .
� r�`'' �'�� ,,.� ��.�.?�D�� � � � �
� � �
a 5 � YO _ -� � �ar;����.d� �. � .
F ;:.;.,':.. : �
" $'�se il .ane�;c:s� ' �
� ;
��..�'+ % / ; 1
s �} e �
��d�$1Z:J�� � � a + � e �-.�.rr�..�n �a �� - lJ
G• �JOa��'.N.:.Y6r :'H
�=�.'�.
�1��� ��G,7������� ~� � � _...
r /1 i:.:e
,�Sfb���L4�°a��
T NO• A9
. .
,i� PLANN NG PACKAGC o�/30/08
�'iSLC �� 19�;2� RL' VISL' o i/o6/o9
o�� aanv ARC��TEGTS
►roar4 m�o
E�'o�OlO E�T��ot 0 "OS °
��������., � r . o► o O�O �
�...o� � � . _.�._._
f:j�y:.:a i... e ..� .� ,_.'
• r. ��� � . -. i �t,+u """�,
Pt���a��f��� �'��<���ba� .,.�::�.�.�.�
�� .
�:�i�
����r ���,;��,��� � �3-��
E���
�.
���i���L�� �__._ � _
�:�ga 1�i a 'a�
MECH. �
WELL
GUESTROOM CORR. GUESTROOM
GUESTROOM CORR. GUESTROOM
GUESTROOM CORR. GUESTROOM
GUESTROOM CORR. GUESTROOM
' I !�
���
FIRST LEVEL I I
GARAGE i
�=�g�=4� — — —�,
� I
,����
SECOND LEVEL ; I I I
GARAGE —
�2 _ �. — — �=
CONFERENCE
PARKING GARAGE o
m
PARKING GARAGE �
I t- I - i -1_I-,
_ �I�-._ iII-1II___��I
��—���—���--���—
_ �
COURTYARD
SECTION
SCAL�=3�z•_,
� MECH.
WELL
GUESTROOM CORR GUESTROOM
GUESTROOM CORR. GUESTROOM
GUESTROOM CORR GUESTROOM
GUESTROOM CORR. GUESTROOM
VERANDA
�MP
�
RESTURANT
ADMIN.
AREA
�}$�cl-�po8�07, 7'Q-�oo,$-og
.� �� y �� R u � o �s -o�
. ��3':��J��3 cL�. r � O -- -----
a�' �i��:iZb:..'�x J +
y�.. * aPS � r.� ^ sc:wy 2 � (�
a �`rCC.`�Mi��'jy VY+ allaph�.►� 46�Iy � � J 0
�}u3�
����p ��sa.y�y� r—ao -o�
,
9°ats E
.
i
�a�,�33�at��" �
�b
�:�se R�u�as ' `�
PARAPET
45 - 0"
— — — — — ROOF �DECK �
— — — — 44 _ p�7
FIFTH FLOOR
35' - 4"
FOURTH F�LOO�R �
— — — — 2B _— g�1
THIRD F�LOOR��
— — — — �g,_0�1
SECAND FLO�
� — — — — 9 ,_ 4 „
OUTDOOR FINISHED GRADE 0' - 0"
DINNING — —
� �� FIRST FLOOR-Z' - 4"
--� � �—I �
POOL b III=III FIRST
� i I I-1 I � E
I I -13� � 4�
�, � � I I S LEVQ D
PARKING GARAGE
! �= GARAG� .
d I I-I I I- I I-I I-I 1 I-I I i- i-I I I-I � � ��
—1 I i. I I 1-1 I I_. _I I 1-1 I L I I I_. I I 1-1 I 1- '-
0 3 + , i�
..-3. _
CUPERTINO hOT�L 5���.T No. A10
�
PLANNING PACI:AGC p��3p�o8
S t1A5 h 1 CO RPO RATI O N CUP�.RTINO ca RL'VISL'D oi/o6/o9
� ,�,. ��crs
PIf3L NS: OM70
Is
ML' TAL L' QUIPML' NT SGRL' L' N,
CO�OR Ct1AM�AGNL' -KYNAR
LIGh1T f'IXTCIRL'
I'pR WALL WASh
ML'TAL f'IN
� 4;, •
�,::� �
BLUL' GLA55 CURTAIN ,s, ; ,..,,;,
WALL ...;j g�„_<.,:
:.�:�
bLUL' SPANDRL'L GLA55 -, �;F- w �
• f'LOORS TYP. �.�,;�„_�
' E= K;: �:-
: � '� ;: : . • x .
,�� w�,
FHOTO VOLTAIC L'YL'BROW. �,� 4 � ; ~" "
GLA55 WITti PV f'ILM OVL' R �; � a�.; .:
ML'TAL I'RAML' - : i�'.:e:r`»>
� - � �� ��. k
L'NTRANGL' CANOPY. r�a;:aF - -
GLA55 WITFi �V t'ILM ;.��;
OVL'R ML'TAL ('RAML' ���,�:
� � .. ..
��= .Q �
.x'"; '�'u �:k r � ..���: a �;�.
,� �� �� �Ff.�� � , �W.�, -] .� .
. . . . . f� . 1 _"f . . . . � �� ,� f , . ' .
TRASFi L'NCLOSURL'
W1Tt1 LIML'STONL` f'INI51'1
ML'TAL GATL'. �AINT
' TO MATCFi LIML'STONL'
�HOTO VOLTAIG L'YL'bROW,
GLA55 WITIi PV 1'ILM OVL'K
ML' TAL ('RAML'
INSULATL'D GLA55-6LUL' -
Ct1AMPAGNL' COLORL'D --
WINDOW f'RAML'
S�ANDRL'LGLA55 —�
L1ML'STONL' TIL'LPLASTL'R
CLL'AR LOW-L' GLA55
TRASFi L'NCLOSURL' —�
WITti L1ML'STONL' 1'INI51
��� ' i ��� I
� j ��� I
I � g : � rrrrr �
rar�� '
(�' ' i ��� �
I�S �_ r s��
�
� ■a■
� �r�
�::� �
�hiOTO VOLTAIC L'YL'BROW�
GLA55 WITFi fV f'ILM OVL'R
ML'TAL PRAML'
ML'TAL �IN
INSULATL'D GLA55-bL(JL
CFIAM�AGNL' COLORL' D
WINDOW I'RAML'
SPANDRL'L GLA55
CHAMPAGNL' GOLORL'D
WINDOW �RAML'
LI ML' STONL' TILf_/f LASTL' R
CLL"AR LOW-L' GLA55
STL'LL ('RAML'D CANO�Y, GLA55 --� `LIGHT I'IXTURL'
WINDOWS WITti �V �ILM OVL'R
ML' TAL f'RAML' -
GRANITL' - GRANITL' •
VL'NL'ZIANO NANA DOORS, VL'NL'ZIANO
STL' L' L f'RAML`
�AST �.LE.VATI O N
SCALE:3�3a�- i�-0• r�
ML'TAL L'QVI�ML'NT SCRL'L'N.
�.ULUR l.(IAMf Al.�ry1L-K7fVAK
L1GFiT f'IXTURL'
1'OR WALL WA51'i
ML'TAL f'IN —�
�
,:_._..:�:...._.::::.....;�:,._...�:: _...::�......:� ..........:.:._ ::� :: ::.
STL' L' L 1'RAML' D CANOPY, GLA55 LIGIIT
WINDOWS WITti PV f'ILM OVL'R t'IXTURL'
ML'TAL �RAML'
GRANITL' -
STORL' i'RONT VL' NL'ZIANO
SOUTf-i EL�VATlO N
SCAL�.:3�z•- ��-0• o ��
- t10NL' D GRANITL'
TRIM
- GRANITL' GOLUMN
6ASL'
■'�11� ����1
�� ■■
j i�i � �����
■ � i ! 11�f�
►�111R#AI!li�Al
, ��� ��'�� I
����1
i�
• � �
.
1�-5/9'aAoB - 07, TR -�oo� -og
r�s0 '�J �'f/��$'� 1
�6 .�^s;�._�a :a„aFe
d�ud'd98d8aBd� �'���a.gr���.��:.da —�3-D
08s�a
C��,�► eL'�4�r��.�1 � 'o?d 'D �'7
E1ai�t
. � �i
Sa��a��r� ; .��
�:urc �8 u �Lzr j
��
�-ao�o�Oc� j ��T �
AP�'�t��dA1.. _ _ �X7 0 �,Db
� ���..�Y�..:':s:Ki :
�....�.�
�G�:?3Y�►c�$� ��ff89Cp��'�'yS�°�
GF1��
��=5�jt 4i��;��73�'.�� �+�'� O -
t�:tft
. ,.
�
��:���
' ° sa�i3
ML'TAL f'IN
6LLIL' GLA55 GURTAIN
WALL
SPANDRL' L GLA55 •
f'LOORS TYP.
ftiOTO VOLTAIC L'YL'bROW,
GLA55 WITH PV ('ILM OVL'R
ML'TAL f'RAML'
L' NTRANCL' CANOPY,
GLA55 WITti PV f'ILM
OVL' R ML'TAL f'RAML'
L1GHT
f'IXTURL'
. . . . . � . : 3...
� -
CUP�RTINO t10TEL � Sh�.�.T NO. A� 7
�
PLANNING PACKAGC p�/
S t1A5 h I CO R PO RATI O N CUPE.RTINO ca RL'VISL'D o �/ o 6/ ay
a ,� �,,,,. n
►�� �„o -
ML`TAL L'Q111fMLNT SCRL'L'N.
COLOR CI'fAM�AGNL'-KYNAR
LIGh1T f'IXTl1RL'
f'OR WALL WASti�
�LASTL' R, COLOR TO —
MATGti LIML'STONL'
ChiAMPAGNL' COLORL'D
WINDOW f'RAML'
SfANDRL'L GLA55 —�
^ '`, \
r " ' 1 .' �G'�;
."'.�..� � i..�
�-�.,: :'�.:`'�
:
�." �}
� j
. ._ ��
�LASTL'R ML'TAL f'IN
PHOTO VOLTAIC L'YL'6ROW�
� GLA55 WITti PV f'ILM OVL'R
ML'TAL�KAML'
INSCILATL'D GLA55-bLL1L'
i
t CHAMPAGNL' COLORL'D��
' ' ' WINDOW I'RAML'
-�� .. _ ... ...__.
� � SFANDRL' L GLA55 y� �
Gt1AM�AGNL' GO %bRL'D
WINDOW f'RAML' �
i�� 1 iu . ... � �.,.Y..�.....:.�...+6•..�..-.. ..
1 i � { �.•4
i : ':..:__�_......:._..«............. � - ...� _ .,...... m.. ' � ( 1
•! r i
: i �...� . . ......... . ......... ........_. i :.. ._�. ....._. _ _.'___
,.. ,. . . .. :.......... . �........ :�.... � . .. .. . . .. . .. � .
.
� ��...... �:. i�,. :� �.. .•.
......;; � ............. .. ..��,.
� �.•., , .�. . . . , . . .. _ . . ... .. .. ' "
. . . . . i . r .. .. . . .... � . . .... , . . � � . . . ...,.: . , .�... : � ..�.
..�
�
�
� !
..... . ...._.. , ,.. .... . ....._... . .....�• .. �... •
.. . . :. � ..... , .... _. ; . .. ..._:... . ... .: : .� ... '.,..�^ - ,( ..i i..,...
..,i : �....,. .. � .
, � . i�. : ....-,.,: ; ._. ',..
... .....
::: .'• :. :� �. : i : : �.: l: i. .. .: . . . . . .. . . t. . _
. i.,.... '
�,_. :.__ . . ; : _ ,..,,
— . . ..� , , ,._. . ..._.. . . , , , �. ; . . _.__, . , �, . . _.. : _.. . -
. . . . . . . :+., : .____ . ._... . � . .
. .. _ ...
.... ..,.. ::.,.._i: �W•: ..._..� ;, ... ,.: . i . , ; .. . ,:: t -i. --
i .�., ....� .,, ::: .. ... .;.�..:.,.:..., ..�_ . _.._ :..,_.i>. ... . �--� - -
.. . . .� , . �., ... . .. �ie'-�... . , ...,. .. .. •— . ... . . .. r3i,....�'j. �..� ,......��.'— .
�LASTL'R ML'TAL DOOR. �AINT CIIAM�AGNL' COLORL'D �LIML'STONL' TILL'/�LASTL'R
COLOR TO MATCti TO MATCti LIML'STONL' WINDOW f'RAML'
UML'STONL'
fLASTL'R
rMeN1'srNt' rni nx�•n �
WINDOW �RAML' �
ML'TAL �IN
�t10T0 VOLTAIC L'YL'bROW�
GLA55 WITfi PV f'ILM OVL' R
ML'TAL �RAML'
INSULATLD GLA55-6�iUL —
CFIAMPAGNL' CO�CCOR�.;D �
WINDOW PRAML' � �
SPANDRL' L GL^��5�_ ���-
c.aNOrY, ��s —
wiTh rv ri �6. OVL' R
ML'TAL f'R7µIL'
CLL'AR LOW-L' GLA55
1I1��.ST �.L�.VAT10 N �LASTL'R
GOLOR TO MATCH
IIML'STONL'
SCAL� ���
Pt10T0 VOLTAIC L'YL`�ROW�
GLA55 WITFi �V f'ILM OVL' R
ML'TAL f'RAML'
� ML'TAL L'QUI�ML'NT SCRL'L'N.
COLOR CHAMPAGNL' -KYNAR r-- IN.SUT ATf�n Gi A.55_RI �lr
— /' PLASTL' R� /� W NDOW 1'RAMLOLORL' D
�
.,
. . .. � 4 � „� . , .,. .
-TRASh L'NCLOSURL'
WITFi UML'STONL' I'i
- CANO�Y, GLA55 WIT
fV PILM OVL'R ML'TA,
1'RAML'
�hiOTO VOLTAIG L'YL'�ON
GLA55 WITIi F'V �ILM L'R
ML'TAL I'RAML'
r-CHAMPAGNL' COLORL'D
WINDOW f'RAML'
�.�f'LASTL'R _
�
. ; �. _� :
.. _.__ : . . _ . , : .
�...
� , . ..- - - ..
. .. . . ._. � :
... j . . '• ' ' • . '.�-'• " ' . .. .
.�.. i . . . � , : : : . , '��m . . ,.»..:.; . ;. . • � . .
�.-� . . ... •' I .. F ... . . . �... :.. �- . ... ., : � . �. 1� � 1 . . . I
�. �.... : _... , .. � � 1 1 � � . .. � . .., •. � ' " '
� . � � . -.. : :.._ . ' '
! +
. : ....:.... :... .� . . ;__. . . :_.. • • ...: � . . . . . _
. . . . . .. . .. ... .. ... .r . , � .... ... .�..,� ,. • . . . . �. . . .. . .
LIML'STONL' 71LL'/fLASTL'R FLASTL'R ML'TAL DOOR, PAINT NANA WALL ML'TAL DOOR, PAINT PLASTL'R �ROI'ILL'
� TO MATCH f LASTL' R TO MATCH PLASTL' R
NORTt �.L�.VATION PLASTL'R
SCAL��3�z•- ��� �"'T�`—`��
Exr-�o� o- o�, _. Eaa o-as
AB�9 ���'r��. _.�.�T-aoro,-ob
° ��:..�..:»:�i::.:.�.
Q ,e g • e � T . n� �/"'��
■ L�bCiierid� �:✓PPl.�bra.���.�i'vJ�s � i
:Ya�s.
�d���� ��g�d���� � � ���
2`�:a:a
. �
�9b�Ae!:s3'2
�31YC' R� ja�E:!'
�$19 - Z DOS ' 0 �. � ��OdB �
��a ��?��� �. �. -aa� - oa
�1;�g:i�s! �� F;nx,.
6 �6;�"�a� :3��O1k�f�S� � r / �'� g
_ , ..-e. _ 53s�a
,
, �
^ �
�
o[d
9
: r �"`. �
�`.�,� ..�'rdr+����
��� ��•, �.
�.s�a���:
.\
����
��
�
CUPE.RTINO t10TEL Sh�T NO� A�Z
PLANNING PACKAGC o
5 hA51�1 I CO RPO }ZATI O N CUPERTINO CA RL'VISL'D oi/o6/o9
a ,� „� aRCt�czs
.�� �,,.
�._�._____.�
��'.�O10—p+�; G�'�CT—a o—p�5
���� �3�� �. EK�T�o�ob
r ,
P�tZ�Or�l�i� �a���gr�����rr`9;;,; •�.r.�.
Srads
C�,� �'�sat���� ' -� � 0
?'eaac
\
� F��i��;.°� �
�:nsc i1Y '�f'
1qS�1—a.on8 � 0 7, 772—�cog—o�l
r►���:�'���� I,C'Zo08^ D�
.bys, t�z�� i:csuce
��'�c�a�a�Pa�► � ���asca�s���a :a 1 -Og
' BDs7a
�. ��`�� ��Ei�D��:� ` ��� � �
- n�t
�
u�l��:fa�,�i1:r� ie,�
t`ns�* � ;��e�g;�:r
���
CUP�RTiNO hOTE.L S��T No. A13
PLANNING PACKAGC o�/3o/oe
1�1A5 h 1 C O R PO RATI O N CUPE.RTINO CA RL'VISL'D o�/06/09
� �
�� ��
RYS
�.,
� �
,� �
��
WALL
4".
LINEAR LIGt1T PIXTURE
FOR WALL WASf1.
�
LIGhT FIXTURE
CUPERTINO hOTEL
LIGt1T
FIXTURE
LIMESTON�
.�� - _<.r � �A� , , ,, , „� ,..,._- .'"
Mx � 4 c
� �
� � r.
� �( �, � ' •
i,:�;L� t � _..Ar
: �����;� .� ��
�- �.
� ._.�.:
; , � � �..�.y. �=�
s � ���� � � . _ .�:..
� ������.�� y � i
�: ,,
��� ����
N �� �
�_ �
si ��
STEEL WIND0IN
FRAME
Lrr --��
�-�� _ �-_ �=�,
� � -
- "=_ �-'-• �m'��.�
�;��i � I
��
_. �■ li� II� ��
0
__ .. - I '� ---.
�i�i��.��.�. – _ -- �
._--° ` ,
�_ � =���_� ; � ; e� � i� � v���� ', ���
'11.. . , II ; I��
� ;,
, _ ,_. .r•�_. ■�•� I,�
I �' ��' _��y � �� � I ;
� I — - � I ; � — -- I '�
��� ; �� ;;, � �� ,�' � �� � I
, �, �I:��1
II� � I ■�,� i � �
�I � � � -
�i
_ -,
�-- i — - - _ �
��
� �
� ✓ 5
1 �� ��e
/ -
/ --- -- � '-
�
0
....�_.'-_.- ..-„�., _��.:�.. -_�-.�.� - -
:-.. --- ._ _. . ..:..-::-e�_.:..- -_ _ ..._ _.�. _...r.,-_. .
� ��C7� .Zf?�O"'"a�� ��T'- �_-_,_ _._ ,
�� � o� `
�
��� ���.'�A:. . �,E�T-�oto-t�(o
,
..�,_..._, . _..
• tT eT`t��� � y a+GLL�ttL�:.. s R , . �ti.a= �,_.
��, �� _ ., h, $ _3 _�o �
_� ��: .� ,� . a _..
_-..���.—.-..=.��..a:�i.._�►.�..� .:�� .
� ..=.i-�
� ` 1 �ti ,
u���._ .,... �
- _ :_ __.- i
�'
e:�Ey� r ��� - ,
- - L.
�'� II
■�■
!
■_ � �t,
-��.�.�-_: -e;
■ _ �. 5�
�' i
I '
, k:
■_�! ,�
WINDOW TRIM
PROFIL.E
�- _�-
�._-��_ /� �/I � �W ✓ - O �' �� �� r D � F
r�-
! � � �. - < <�' Dog��-�
� � ;;_�:�,__ ...._-`�`�
$
� . � ... �
; . _ .- - �� �.� —
� ^ _ � _
_ _, .= �� . � a9
� �, �.
�:�.��-�- / ` �
�.� . _
�. . e� , � t:«�� �
� � �
1h'INDOW TRIM
P�� _
a.� FiKf�., "i 'Kpri� � �Yi7��^^^�'',°��'° .. .-_
�.
- ___.�. �...��,.,, �: -��� r _
` `� •.�,�'� ;,���'�''�'��"°~,,.r.-.- �, .�
+�'r [��r;c � � � �
«_
� . . � � • r;"...•t ... .. .��
� .. . � . .. - .
�' p"y.�k -mx - � � � �
�-r '°'`� +a
',� „�,.'�,� �. ' , . � . > . : ,�
a ..,�r i
`..h' x 'r 1" a� r�-r`.�. 4 'r .,�r:,�Q �rti�..f .
t'
��7' x'.'
���� -
�e''�'h# � ...e�.� . . �. ,�, - : i ,. I
s. i
S���T No. A15
n,�
r - -
��_.:._: �_:�.�-....�.-._.. _ __ _,�. _ _ -,___ _=1._-�- _._..��- � PLANNING PACKAGE 0 7/3 o/OB
_�.-- s�__._��
ShAShI CORPORATION CUPERTINO� CA - ReviseD � oi/o6/o9 �;
�„� „�„� .�cxirE.c
raoi wo.: ano
c
PF10T0 VOLTAIC
EYE6ROW GLA55
WITh PV FILM OVER
METAL FRAME
METAL FIN KYNAR -
CYIAMPAGNE METAL
WINDOW FIN
CORNICE DETAIL
CUPERTINO hOTEL
ShAShI CORPORATION
,�- - - - _ �r � -�.� .-�.r�._
:,
. -,
? . ._ ��
, ' t �� ~� ,. '. �(� .. ,+,���
� . . _ , �� �._
. a� ` 'q . . r r
\�
. . ` �` ` . . � �
� ��`' , � `�� �� .� �.. ` .
T �, ,�� -. .� .
'� . .. �� . . �-..
d:. - ..' . � �'� .
_ _. ... ' .� __." _ s
Pt10T0 VOLTAIC EYE�ROW GLA55
WITF1 PV FILM OVER METAL FRAME
-; __
__ -- --.-�_
� Y � - , '""'`�
1 '.�
� r-�_ •
� �` "
�
�, - �
�i -
-- I
_ _- --{
I
t
��
i -
- --i _ � . � _ �.
- i
�. �
� ! �,
.;
.;
— i;
, ;; ,
CONCEPTUAL PORTE COCt1ERE
WITt1 PV FILM OVER GLA55
� ��� °�o�o—�'i; ��--�oj o—Q5
� . , E�T� a a lG
; ��� :=�� ._ .. . __.�_ �� -- a
�l�Y � � ; f .^ _ . . r . . �
l .. _�_�.-�.. ..�. ,. .._..
�.�. �sr —,�jD
t � .^2' F.:,..f . Y • , _ , _.m ._. ._..�—. _. - . .o.
i.t. .. ,
` `` `�`.�(� —a
_
•.�L��i�, ..�.,
� �--- ���� _ - _
�� - - _�_ _
1 ------., � - _� - -- � �� _ ~{ ` ,��- ,��� -
� � - - ' -�I� _ - r - --- � � =__ �--»___
_ _ -�_ =�"��� ---____;I_ �-- - __ �-��: _ -�� _
`��" � -- ' --- - __ _ _ -__ __ _ _ ' - -' _ ' �' " € --- _ _ 4
-- - - _- -_-_.-"�_�___ �.-� __-- __�
4 !��
I i � � , � _ __- ----�'"�`�"�
� _: �=-r =—r � _ � I f I � I � I I � `f'T �°,- -�. -�� l
CUPERTINO� CA
, � �� � k
; �, �
I �1'• . �
�� / ��—.-_ .
� KYNAR - Ct1AMPAGNE
' METAL WINDOW FINS
i
�
��._g � rab � g r 0 � ' ��� , D 9
� �
F ,. � _ - - - j . U 'aoc�d-o�
.. ..�,_,. _.
� . , . � —t3—o�
k � �,-- __ r
� _ �- ,�
� - . = � - - `� � a ° �
� `` �,
COLUMN DETAIL
SHEET NO.
PLANNING PACKAGE.
R�VISED
GRANITE
PROFILE
t10NED
GRANITE
TRIM
LIGt1T
�IXTURE
GRANITE
COLUMN
�AS�.
A16
07/3o/oa
0�/06/09
a ,� ,�„� �xc�
vra.NO: ania
P110T0 VOLTAIC FILM TO 6E.
USED OVER PORTE COCt1ERE/
AINNING/E.YE.� ROWS
� � _.
"' ,� >. � � . '� <,- r z � � � : � � � ����:� . �*� . f: �
� ,� ��� ...y � � ` � � "!� �.�
,f ' � �C ' . .s�� > ,�,- -, nn - y-� _ 3 � r' � �. � � ���� � '- d y ,
�`� % Y �� :��5��, �-. � . � Y � *� "� a�
_ - __-n.:... .. , � � � n : $ � � '
, ^ . 0 . . . . X :� Y4 .� t �.
C i .. � y�, ,� ���� .� �'��...� - .�:i
, v� �r.� ��=d .gY�w�' ,✓ �
� ,M , � � � ,� .`� a .'T_ ..�.
�. � � �
� d S t .. Y. � � � - �+�• .�,�`7 . �� 4 � �,,,,�� �ew d� t' A}� ��;:�
s � , � .� _: -`"'"""e' y , � � � �,�, � .
_ �•''�..,� . -�-�°� � t �.ti^.,,-�.,�.-.� -�,., �. �+.,� � ,�..��
d
-�a�.. _ ::"'.°,^�,,.--.�,. �.. _ _ _.. .. .... __.. 'a��.o....- �': ,.,:.,� ''t±;� � :� � �� ,s _
. . :YS � � � � s - x � -�h.�r� .. . . �� ,w•�.:�
� .' � " - � � " . . _._ ...._.�...�..�..�.,, � 1 . � � � � � �A'x..:•�+..✓�r.f'", � � � 91I�
,- '�s� .§ � � � _ . �"� "'..f . : �� �:��,,. � �. '� ���_ , ,y,..'� �� ^t
..*� Rn-.�..-,�.,,�y..'.,�n. � `' -� � � a � • � t - �
�,,:.t .".c;�.�x�,.:.�,,,�„�' � � - --.moss !Q� r „'.,,�,�"� , - � � � "�' �'^� � f�
4. -°"G... . f
� r ?' . �" � �p�,� .,. .., . f ,"'"°_ .'^�a'2"°"� �' ' '
, � . . ' .. �. .k'i � •
� ,.? � .� �}LSk^�� 'q�s�e. ��b . , ,�y' � �.} . , r � ,
= v, a ;? .,.�. ,��� �'�f".,��F �,''�>-� �'' a;� � . � i w � Pt - ,�«z� ��' � _a -
� "v'�3c:��'-r��.'`'b.t�'������'°e'u� ..�r . x � . + �.
r . - , ' x �,�, 7hai�.'F.?<:w�.oW � �' � . :. . . �y��� �y �� .. `3C^
-t1� a.9i ". � � ,�'i , �° � ' � � 4 � ! � t�!� . } : ' �i ! � 1 � � � a8: �:
a_.� " '. . .. s �L � iq �
+` � .! � .( ., r� .' .di t�:,y�,pra.� r. ��.y F ' - i � � �.�� . . . � 31 �� sr:,
ir �. �P
� 'Aa�� . � _ �_. 15 '�,. . � .? r .� �sY. � � y �` _� _ . .�.'n -
.,� .� ] .. � "�t9's,i�E2 '�;, ..w ' J 9 t
�� . »' t ^w,� � �h. ,�} � � ,-i�i �>. �i
# k �� �°� ,�,=�:. :- �• j��a 9 ; '�` � ,s -,s
�.. � a,� ?�� .�,; _. . ,� _ � `� �
� ,- .c,�-.a�a !s .-- n-Y _�� � :� � ,�
.., r . . �� ?;`-:38 y �.•K '.�,�_� �;,�-� �w , , � �
„ ° � _ .�'_r- `'�.� a3-, � ' � � '- '�}�^�wl� _. aw.
? d • ,�'e�'�- � � <� - - " , j r ., ' •ve��«� ' ;�..:�' � �
. �y � .E}s a� d ^" �`�, "a - �
. . � ��i , � .r1m� � 5. '.:3 � R � %C .
��. E _ A v ; . � � M1 ��,�„R -0
_ � � " - � � � ~ �. . � �� �
Y . P . rtw a� �e+ q � , �
�� s "��i� � , . _- .� � -L���2..{.. µK "y� �
' �� �'l y a c .n� �� � . . .. . ..Y',-`�,���,� . r `� . _ ' � � ' • g � «
.»..':,,.� Y. � t � _ > tr �'� � . _ _ <_ }� �;
S Y � ' �' � ✓ o.:Ad. ���€�� ;� " � . �e.� 'F R �
e �� , � � yb--�4;1!' b , . .� � .. � „�-'��"-� _'_".°
�� _ ' � _[ �` '
r } c ' .. . ` ' , ' .. -qn .' a '� , w[�'� N �
. . . F _ .d t ��
., �
.. .,g+ ""' � �. �.�. - - ; � s
�;' � �:� . _� ,: - �-
� f �c , . ° a, .:� -.Q- � 3 : �- - ",�,,,�;�• ` _- �
t . . .� _. ��K p . .:. " . � . Y 3
F l� �
�' � . 7 � . :� 'g � .r °� , {' a3�i:�� �,.
� , q '- 3�.' ' y � . �!� .;7 ��, _
v �
, �' s„�,,. � �, ` .t ? � � � � ' . ' P a, r..-.�ei zs :y �. � � ,.
�u , :>. �: ?j'� T .�,.�-`,t u " :' _ x " r � -
�. � . ° y :, � �.
.� f s �- ' " � � � "s �,�^ ' .�, °'� �a
� M � � , � , . `.� -��' � _ . ' - . . '4 •F .+.V�i�,,'�:x_�Yp . F� ���
i _ � �� - .... -- 3 ` _ . ' . � � _ 'Y ,r-
,a "
r
.
.. �. .
w
._ .
�. ' T"b _ N'�' S�ti � )R �
, . �. _ '
-.:. � � >..,� � � ^ . . . . . . . ......... a +,�� � �. s„�.�.. .. _ . .:g"'
M ' C s '. . _ , � ^��� ��
.�i:..4u�L.....� � EO `» 1 � +a� � . �.°� � � ' � � �,�. ' 4 ...Y .T � �� ��` ` _ ..
'IR^V �c , . . ..: �A%A`J��.K" .�tl�13�Fp ��.,T: r^..� � �Cw`#.j'�.y�'l�, �� ; 8 " � . SP�YFY y
_ , ��, � , . . 4 . .-^ ,�'
. ...,,, � . ,+
c�_
. , b -
, i' � -.......-.^..r•�,i,r�,,..��:_�,'^',tTi '"'??'p_:'"�...�=°:. �rx�.- wAa� .�� s�.-�.�a�-rs�.. .13 , 4 -.� , `"� t `,�,
. �` � _ �'6- "��" � . m
' - : r . '�- -- ,�t % ` � � $ ��-�?�.. - �
Y _ � . � i - - x _ ;' ':.
..ry � h :. S5- '-.: L - � . _... . .. . = F , " � i .
:w.uav�,h -..ao,:.u;r�+6:d.�.y,�;=,° ,,,a,. wos � � '—� a.-- , ... . -.,...�...-.....-4. -_ � �+c � � . ,y, ,,.F,; °y�-�ai.sr,yr�.�, � .:.�' E:: � .�..wt r ' ,... . 1 _. +. ;� '� '"� . ,�'�'� , • r �
I 0. �, �'y . � ~ � � � �i'�,�F'' -� `. J � �� . . _ � ;; { s,:...w.>r'ti' � _ u � • .:.
s� �- _ 1.� ,. �
� , ; ,,
� . ._ . ,. �, .. . . , . . ... .
a K �' °" �;•'"�T �;`� ` . �'„�,;,°�.. � �" � `. -a � t �
.� a _ � �.:.Y�.-,,,� .:- �a. =w�.v .- � '?s ..
� � � � �`�� ", ;Y ,�• 5-�"�"�z"�� "!. � ,� �, ' � -- „� ; . _ � �',�, s �+..°"'1A - s 'R
, �. ��� -. t r . � � : — _ .. ._ a: . - �� r`-?Xy
� � � S i �.�, � �It� i 3 _ .=_ •`.� � ' 'y . . � >.
F - �
'.= �. � b�� wt'L � � � « "� ; 'e . - ..� ' ",
�.e�- 4 � �, � , ��� F
�'� '� .' :�� � g� " € - �� 1 �^� " ��
� $°' � � � '� - � a„; '-�' L _.. ." '°' -�- . . ��` < £ � � `°'�°. ,`°., � .
�- y � �' "�,. �- . . e • -
� �� ] 3 '� �- � . �;� s . . . � � � _ �� �
` 1s °" `f j _�U � ..�' _r 4v P „ '
-r..y, c^f�� t + `6 � t �� � +�� �sW� � � = ` � ' .� .� . ... ., y ��
, . �, � � :,z W � �°� � i i � ;�1 h �` � - # . � � � �
r , � S f A ' � �� � .� . ,� - � � � ,� f `xte� ,� � ��
` ,; � " �
?�.; � * � ' � * • � ,� ' � �± _ # .�''� "< Y � � � . � .Y
"_" � A, $'� f � ��NF� � G w, ' � �"; �� ' . . '. � � ;� t � ,���' i �. �>..- ;�
- ' � 7 �,'?.'- Jp•� ' � �n..� '� � _ � � �v � � � * ��~ x. '�tc `..'-�e.Y�
� 'f ♦ � � . - ..4
. r d s
` ' m� ;- � , .- . . � �. . .� � .. �. �.' .... F�, , .. �� � � ,� t � _ .:'ww.:.
,. . ..'.'Y � � . . . ,�y`
i-, ,.ar'ror,� � �-.�� , . _:.:�.."s!'R . ?. � -� ,.�
� - ��� ..;iy�L . �.. `7 ,. � ' .., . . s . _. ; �° . Q ' � { , � ,,.:. . . � � � , .: �
°t.. ..a ai , � .Y" F+.: a+� J.� �
t'P ,�. ,A�n� `.u»s.+�ri"eivT'���� . ' . � _ . . _ �. S.� � : `� .. � ��`,
p �
,� V= '� ._ w . � '�. �'� r �t m � a �� t � : � . -- � '�'' . , . � �' { ffi . '4` "�„
. .e
i
� rC.'.���~.�" � � � , -.�. . "� e�k.3+ ���'',,7 '...� � ` ` � ; � ? � sey!qrta�.r.�-_ F . �Z � G �.
'd",.• 5 . . . �. Y ' `� . ' �� � . .. .k.,� � _ _'�`h. .. �.� ,�. y° � �. • � '> { �riMi'.�
�� � �� � � � 1� p�f �' � � . .. 4 w ,�y ' '� � � r �
a I
.. i3!_� . . ~� 6 r � . � x� � g.� ip► - . - .. . �w9 3 a � - ,� .
�� � �� -� ��� °�' � ` � �' _.
.
a ntr `
� «: � ., r + ' -� . . s : . .� K
� �: �� .,.. . -� � . . � _
�:�.� .. . _
.. �...��--,..R-,.�.. ��_ _ . .� � .-� — e
�
RYS
32 FT
(APPROX)
0
45 FT 45 FT
(APPROX) (APPROX)
25 FT
(APPROX)
� . . . .. �: .�.,.
:; . r:
�� - �_ :;: � , .
, �. . . . • 5 , . ` •
� �.. � ,� � - � . -- _ , �
:j .
. ;_.
� �;: -
: •� � � � .•' . •'�
.,,,,� t . . . •
��� • • -. . ,� �
25 FT 27 FT
(APPROX) (APPRO�
.� .� ..
� �.�Y
45 FT
(APPROX)
�� �
� P
�
��
O�
� �
.,.�'' E%�-T -- oZot o� 0 4; E�� aQ � o� o�
APP��V��, � o�Ort� �ob
.3�.:3:om °seta��a
����313dF�� C�£31���Pt�.�s ��
CO NT�XTUAL 3 D I�.W �D�
ct��► c�{������ � �3�1 D
_______
CUPERTINO t10TE
ShAShI COR�ORATION
CUPE.RTINO, CA
.
�
Ca�sc ilfu�
PROPOSED
LUXURY HOTEL
45 FT
l4.�t- �008 - D�1, TiiP-
� ��� �`�� �. _ u ��ooS -Da
b�;r:kt-+�t:vs� E3�i;r-:st
�,��1dP9�B9&e �'a �'!�'e?PII ,'j�0_�
B'r'a�e
�8��' ��►r���c�� 1 -og
r��Q
�i�r�a��srv - ;:
,
C.as un:� �
511F�T NO.
•'
CP2
.
PLANNING PAC{:AGC o7/3o/oe
RL' VISL' D o i/o6/o9
,�,� , ARCFIITECI'S
woi no: v,m —