Application Summary:
Review of the 5-Year Capital Improvement Program, Fiscal Years 2006-07 to 20010-11, for
General Plan Consistency
RECOMMENDATION:
Staff recommends that the Commission:
1) recommend a negative declaration, file no. EA-2006-03, on the CIP, and
2) find the proposed 5-Year Capital Improvement Program (eIP), file no. CP-2006-03,
consistent with the General Plan.
Background:
Each year the City Council adopts a five-year spending plan for capital improvements
throughout the City. The CIP is critical because it prioritizes significant city expenditures
on capital projects of importance to the City. Funding is not fixed or committed during the
five year term. Typically, funding may shift in the second through fifth years as priorities
change and project schedules accelerate or decelerate during the lifetime of the project.
State law and the Cupertino Municipal Code (Section 2.32.070.C) recognize the role the
Planning Commission plays in the CIP review.
Discussion:
Exhibit A is the draft CIP that will be presented to the City Council. lbis CIP focuses on
funding repairs, renovations and relatively minor improvements or additions to existing
City infrastructure: streets and public facilities.
Environmental Review
The Environmental Review Committee (ERC) reviewed the CIP at its meeting of June 7,
2006. Staff explained four important aspects of this environmental analysis:
1) Since the environmental analysis is conducted annually, only the first year-
funded projects are analyzed.
2) Larger, more significant projects are not included in this environmental analysis
and are expected to conduct their own separate environmental analysis as part of
their ongoing project development. This is the case for the Stevens Creek Park
Master Plan, and the Mary Avenue pedestrian and bicycle bridge that requires
3-/
2
both state (CEQA) and federal (NEP A) envirorunental review because of the
funding sources.
3) Envirorunental review is not performed for any projects where another agency is
the lead agency for project development. nus is the case for the Bollinger bicycle
lanes over Calabazas Creek bridge where the Santa Clara Valley Water District is
the lead agency.
The Initial Study attaclunent lists each first-year funded project and staff's
envirorunental review notes. The ERC recommended a negative declaration on
the CIP.
General Plan Consistency
Exhibit B lists the proposed capital projects and staff notes describing how the project
relates to the General Plan. The General Plan consistency findings are summarized below:
1. Projects that improve the safety and functioning of the City's primary circulation
system. See general plan policies 4-1,4-6 and 4-12
Projects in this category include: Pavement Management, Traffic Signal Upgrades,
Yellow & Ped Head LED Traffic Signal Upgrade, Rancho Rinconada Street Study,
Vehicle Count Stations, and VITS Extensions.
2. Transportation Projects that manage neighborhood tTaffic, decrease reliance on
usage of private cars and promote pedestrian activity. See general plan policies 4-
2,4-3,4-7,4-13.
Projects in this category include: Stevens Creek Corridor Park, Bollinger Bicycle Lanes
over Calabazas Creek Bridge, Sidewalk Repairs, Neighborhood Traffic Calming
Measures, Countdown Ped Heads, Safe Routes to School project for Garden Gate,
SCB/SR85 crosswalk improvements, Collins Elem. School Zone Beacons & Lights and
Mary Avenue Bicycle Footbridge.
3. Projects that provide distinctive community gateways at major entry points. See
general plan policy 2-8.
There is one project in this category-the City Monument Signs Replacement.
4. Projects that maintain the usability of the City's parks and recreation inventory.
'While much of the Parks section of the General Plan focuses on acquiring and
developing new parkland, the plan also recognizes that a well-managed park
system enhances the quality of life for its citizens. See general plan policy text
pages 2-46, 2-51.
.3~x
3
.
Projects in this category include: Stevens Creek Corridor Park, Sports Center Tennis
Court Lighting, Memorial Park Softball Field, Library Play Field, McOellan Ranch
Facility Improvements, HV AC Replacement at Monta VIsta Park and StockImeir
Property Improveme:nt.
,
5. Projects that increase the inventory of parklands, particularly in neighborhoods
that are deficient in parks. See general plan policies 2-74, 2-82 and 2-83
There is one project in this category -- Rancho Rinconada Park.
,.r
6. Projects that improve library service. See general plan policy 2-61.
There is one project in this category-- Library Improvements and Upgrades.
7. Projects that reduce flood risks. See Flood Hazards General Plan text, starting page
6-25.
.
The projects in this category include: Gutter & Curb Repairs, Minor Storm Drainage
Improvements, Monta Vista Storm Drainage System and Master Storm Drain Plan
Update.
8. Other projects that are not addressed in the General Plan, but do not conflict with
the text, policy or goals of the General Plan.
There are no specific policies or general plan language that discusses the importance of
maintaining existing public facilities and structures for public access and execution of
general plan policies. Projects in the above category include: City Hall Emergency
Generator/PG& E upgrade, Conununity Hall Improvements & Upgrades, Service
Center Security Gate, and Community Hall Improvement.
Enclosures:
ERe Recommendation, Initial Study and attachment
Model Resolution
Exhibit A: Five Year Capital Improvement Program, FY 2006-07 to 20010-11
Exhibit B: Matrix of CIP projects and General Plan notes
Prepared by: Colin Jung, Senior Planner
Approved by: Steve Piasecki, Director of Community Developmen
G:planning/pdreportJ pcCPreporlsJ CP-2006-03
3-3
CITY OF CUPERTINO
RECOMMENDATION OF ENVIRONMENTAL REVIEW COMMITTEE
June 7, 2006
As provided by the Environmental Assessment Procedure, adopted by the City Council
of the City of Cupertino on May 27, 1983, as amended, the following described project
was reviewed by the Environmental Review Committee of the City of Cupertino on
June 7,2006.
PROTECT DESCRIPTION AND LOCATION
Application No.:
Applicant:
Location:
CP-2006-03 (EA-2006-14)
Oty of Cupertino
citywide
DISCRETIONARY ACTION REQUEST
General Plan conformance of the Five Year Capital Improvements Program, FY 2006-07
to 2010-11
FINDINGS OF THE ENVIRONMENT At REVIEW COMMI'ITEE
The Environmental Review Committee recommends the granting of a Negative
Declaration finding that the project is consistent with the General Plan and has no
significant . nv' ntal impacts.
.
Steve . asecki
Director of Community Development
g/erc/REC EA-2006-14
.3 -Jf-
'::\ .
/;:,- ."
""."'1'
j;;j\,' .
... j" ,I .~\ .
0j:)~,;:.3r .
j'l'6,1
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
(408) 777-3251
FAX (408) 777-3333
Community Development Department
CUPEt{fINO
PROJECT DESCRIPTION:
EA File No. EA -2006-14
Case File No. CP-2006-03
ttachments Exhibit A .
Project Title: City of Cupertino 5-vear Capital Improvement ProQram. FY 2006-07 to
2010-11
Project Location: Citywide
Project Description: Various City capital Q(Qjects to repair. renovate. reRlace or
.!:!Q9rade existinQ City facilities and structures
Environmental Setting:
Various urban settinQs that include_public parks. city streets and city buildinQs: city hall.
library. community hall and service center.
PROJECT DESCRIPTION:
Site Area (ae.) - N/A Building Coverage - N/A % Exist. Building -_s.1. Proposed
Bldg. - s.f, Zone - BA. PR G.P. Designation - Public Facilities. Transoortation. Parks
& Ooen Soace
Assessor's Parcel No. - various
If Residential, Units/Gross Acre -
Total# Rental/OWn Bdrms
Total s. f.
Price
Unit Type #1
Unit Type #2
Unit Type #3
Unit Type #4
Unit Type #5
Applicable Special Area Plans: (Check)
o Manta Vista Design Guidelines
o
S. De Anza Conceptual
o
o
N. De Anza Conceptual
o
S. Sara-Sunny Conceptual
Stevens Crk Blvd. Conceptual
o
Stevens Creek Blvd. SW & Landscape
If Non-Residential, Building Area - s.f. FAR - Max.
Employees/Shift - Parking Required Parking Provided
Project Site is Within Cupertino Urban Service Area - YES X NO 0
.3~5
A. CUPERTINO GENERAL PLAN SOURCES D. OUTSIDE AGENCIES (Continued)
1. Land Use Element 26. Midpeninsula Regional Open Space District
2. Public Safety Element 27. County Parks and Recreation Department
3. Housing Element ~B. Cupertino Sanitary District
4. Transportation Element 29. Fremont Union High School District
5. Environmental Resources 30. Cupertino Union School District
6. Appendix A- Hillside Development 31. Pacific Gas and Electric
7. Land Use Map 32. Santa Clara County Fire Department
B. Noise Element Amendment 33. County Sheriff
9. City Ridgeline Policy 34. CAL TRANS
10. Constraint Maps 35. County Transportation Agency
36. Santa Clara Valley Water District
B. CUPERTINO SOURCE DOCUMENTS
11. Tree Preservation ordinance 778 E. OUTSIDE AGENCY DOCUMENTS
12. City Aerial Photography Maps 37. BAAQMD Survey of Contaminant
13. <<Cupertino Chronicle- (California History Excesses
Center, 1976) 38. FEMA Flood Maps/SCVWD Flood Maps
14. Geological Report (site specific) 39. USDA, "Soils of Santa Clara County"
15. Parking Ordinance 1277 40. County Hazardous Waste Management
16. Zoning Map Plan
17. Zoning Code/Specific Plan Documents 41. County Heritage Resources Inventory
1 B. City Noise Ordinance 42. Santa Clara Valley Water District Fuel
Leak Site
C. CITY AGENCIES Site 43. CalEPA Hazardous Waste and
19. Community Development Dept. List Substances Site
20. Public Works Dept.
21. Parks & Recreation Department F. OTHER SOURCES
22. Cupertino Water Utility 44. Project Plan Set/Application Materials
45. Field Reconnaissance
D. OUTSIDE AGENCIES 46. experience w/project of similar
23. County Planning Department scope/characteristics
24. Adjacent Cities' Planning Departments 47. ABAG Projection Series
25. County Departmental of Environmental
Health
A. Complete all information requested on the Initial Study Cover page. LEAVE BLANK SPACES
ONLY WHEN A SPECIFIC ITEM IS NOT APPLICABLE.
B. Consult the Initial Study Source List; use the materials listed therein to complete, the checklist
information in Categories A through. O.
C. You are encouraged to cite other relevant sources; if such sources are used, job in their title(s)
in the "Source" column next to the question to which they relate.
D. If you check any of the "YES" response to any questions, you must attach a sheet explaining the
potential impact and suggest mitigation if needed.
E. When explaining any yes response, label your answer clearly (Example "N - 3 Historican Please
try to respond concisely, and place as many explanatory responses as possible on each oaoe.
F. Upon completing the checklist, sign and date the Preparer's Affidavit.
G. Please attach the following materials before submitting the Initial Study to the City.
v'"Project Plan Set of Legislative Document
v'"Location map with site clearly marked (when applicable)
3--h
EVALUATION OF ENVIRONMENTAL IMPACTS:
>>- 0 C-
- C Cc C; C
-ftJl> ftJftJ 0<<1 ftJ"..... l>
.! u .cu.c-'" .cuu
ISSUES: -l;:;! 1-=.....'50 I-r;:" o ftJ
C._ lI) .- i tb e- ll) - Q. zQ.
[and Supporting Information Sources] G> C E lI) C .- lI)cE E
o~- G>tb ~o G> tb_
..J .- :e u .- -
a.. en en C -'en
-
I. AESTHETICS - Would the project:
a) Have a substantial adverse effect on a 0 0 0 [RJ
scenic vista? [5,9,24,41,44]
b) Substantially damage scenic resources, 0 0 0 [RJ
including, but not limited to, trees, rock
outcroppings, and historic buildings within a
state scenic highway? [5,9,11,24,34,41,44]
c) Substantially degrade the existing visual 0 0 0 [BJ
character or quality of the site and its
surroundings? [1,17,19,44]
d) Create a new source of substantial light or 0 0 0 [BJ
glare, which would adversely affect day or
nighttime views In the area? [1,16,44]
II. AGRICULTURE RESOURCES: In
determining whether impacts to agricultural
resources are significant environmental
effects, lead agencies may refer to the
California Agricultural Land Evaluation and
Site Assessment Model (1997) prepared by
the California Dept. of Conservation as an
optional model to use in assessing impacts
on agriculture and farmland. Would the
project:
a) Convert Prime Farmland, Unique 0 0 0 [BJ
Farmland, or Farmland of Statewide
Importance (Farmland), as shown on the
maps prepared pursuant to the Farmland
Mapping and Monitoring Program of the
California Resources Agency, to non-
agricultural use? [5.7,39]
b) Conflict with existing zoning for 0 0 0 [BJ
agricultural use, or a Williamson Act
contract? [5,7,23]
c) Involve other changes in the existing 0 0 0 [RJ
environment which. due to their location or
nature, could result in conversion of
Farmland, to non-agricultural use? [5,7,39]
3~7
~- 0 Cc
-C Cc C;
-~- ~ ~ 0 C'lI ~lU- ts
.!! u u .c u .c'- ... .cUU
ISSUES: -q::! 1-q::_1Go l-q::lU o C'lI
C._ 0'-'j tnCl. 0'- Q. zQ.
[and Supporting Information Sources] CP C E o C .-... o C E E
- tn" Cl)tn :!::::!:O
0_ - ...I .- :E U CP .2>>- -
a.t/) t/) c ...It/)
-
III. AIR QUALITY - Where available. the
significance criteria established by the
applicable air quality management or air
pollution control district may be relied upon
to make the following determinations. Would
the project:
--
a) Conflict with or obstruct implementation of 0 0 0 [RI
the applicable air quality plan? [5,37,42,44J
b) Violate any air quality standard or 0 0 0 l&l
contribute substantially to an existing or
projected air quality violation? [5,37,42,44]
c) Result in a cumulatively considerable net 0 0 0 l&l
increase of any criteria pollutant for which
the project region is non-attainment under an
applicable federal or state ambient air quality
standard (including releasing emissions
which exceed quantitative thresholds for
ozone precursors)? [4.37,44]
d) Expose sensitive receptors to substantial 0 0 0 lEI
pollutant concentrations? [4,37,44]
e) Create objectionable odors affecting a 0 0 0 l&l
substantial number of people? [4,37,44]
IV. BIOLOGICAL RESOURCES -- Would
the project:
a) Have a substantial adverse effect, either 0 0 0 1::&:1
directly or through habitat modifications, on
any species identified as a candidate,
sensitive, or special status species in local or
regional plans, policies, or regulations, or by
the California Department of Fish and Game
or U.S. Fish and Wildlife Service?
[5,10,27,44]
b) Have a substantial adverse effect on any 0 0 0 l&l
riparian habitat or other sensitive natural
community identified in local or regional
plans, policies, regulations or by the
California Department of Fish and Game or
US Fish and Wildlife Service? [5,10,27,44]
c) Have a substantial adverse effect on 0 0 0 l:&:l
federally protected wetlands as defined by
Section 404 of the Clean Water Act
(including, but not limited to, marsh, vernal
3'-6
.
>0,- 0 C'C
-C C'C C;:
-CUt) CUcu OCU CUCU_ t)
.!! u ~u~.-... ~uu
ISSUES: --3 ~=_1iio ~_cu o CU
C._ 11)'-'- me. fI)'- Q. zQ.
[and Supporting Information Sources] SCE fI) C ~._... II)cE E
o~- Cl)m ~o CI)~- -
..I .- :E CJ
!:Let) et) C ..let)
-
pool, coastal, etc.) through direct removal,
filling, hydrological interruption, or other
means? [20,36,44]
d) Interfere substantially with the movement 0 0 0 IX!
of any native resident or migratory fish or
wildlife species or with established native
resident or migratory wildlife corridors, or
impede the use of native wildlife nursery
sites? [5,10,12,21.26]
e) Conflict with any local policies or 0 0 0 IX!
ordinances protecting biological resources,
such as a tree preservation policy or
ordinance? [11,12,41]
f) Conflict with the provisions of an adopted
Habitat Conservation Plan, Natural 0 0 0 [8]
Community Conservation Plan, or other
approved local, regional, or state habitat
conservation plan? [5,10,26,27]
V. CULTURAL RESOURCES - Would the
project:
a) Cause a substantial adverse change in 0 0 0 [8]
the significance of a historical resource as
defined in 915064.5? [5,13,41]
b) Cause a substantial adverse change in 0 0 0 IX!
the significance of an archaeological
resource pursuant to 915064.5? [5,13,41]
c) Directly or indirectly destroy a unique 0 0 0 [8]
paleontological resource or site or unique
geologic feature? [5,13,41]
d) Disturb any human remains, including 0 0 0 [8]
those interred outside of formal cemeteries?
[1.5] I.
VI. GEOLOGY AND SOILS - Would the
project:
a) Expose people or structures to potential
substantial adverse effects, including the risk
of loss, injury, or death involving:
i) Rupture of a known earthquake fault, as 0 0 0 IX!
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued bv the
3-9
>,... 0 1:1:
I: 1: c .-
-I: nsns o1ii
-ns't) nsns't) 't)
.!! CJ .&: CJ .-... ~~ns
ISSUES: -~a 1-r;:51iio o ns
1:._ II)'-'i C)Q. 0'- D. zD.
[and Supporting Information Sources] .!IcE II) C .-... II)cE E
o .g>>- G)C) ~o G) C)_ -
..J .- :E U .-
Q.(/) (/) c ..J(/)
-
State Geologist for the area or based on
other substantial evidence of a known fault?
Refer to Division of Mines and Geology
Special Publication 42. [2,14,44J
ii) Strong seismic ground shaking? 0 0 0 IRJ
[2.5,10,44]
iii) Seismic-related ground failure, including 0 0 0 IRJ
liquefaction? [2,5,10,39,44]
iv) Landslides? [2.5,10,39,44] 0 0 0 IRJ
b) Result in substantial soil erosion or the 0 0 0 IRJ
loss of topsoil? [2,5,10,44]
c) Be located on a geologic unit or soil that is 0 0 0 IRJ
unstable, or that would become unstable as
a result of the project, and potentially result
in on- or off-site landslide, lateral spreading,
subsidence, liquefaction or collapse?
[2,5,10,39]
d) Be located on expansive soil, as defined 0 0 0 IRJ
in Table 18-1-B of the Uniform Building Code
(1997), creating substantial risks to life or
property? [2,5,1 OJ
e) Have soils incapable of adequately 0 0 0 IRJ
supporting the use of septic tanks or
alternative waste water disposal systems
where sewers are not available for the
disposal of waste water? [6,9,36,39]
VII. HAZARDS AND HAZARDOUS
MATERIALS - Would the project:
a) Create a significant hazard to the public or 0 0 0 IRJ
the environment through the routine
transport, use, or disposal of hazardous
materials? [32,40,42,43,44]
b) Create a significant hazard to the public or 0 0 0 IRJ
the environment through reasonably
foreseeable upset and accident conditions
involving the release of hazardous materials
into the environment? [32,40,42,43,44J
c) Emit hazardous emissions or handle 0 0 0 IRJ
hazardous or acutely hazardous materials.
substances, or waste within one-Quarter mile
3-lt
>,- C _ 0 C-
C C ;::;
-C CIS CIS 0 CIS C
-ClS- ClSns- 1:)
.!! u u -'= fJ -'= .- lo. -'=ufJ
ISSUES: -(i:~ ~r=_-;o ~(i:CIS ons
c_ II) - .- en Q. 11)'- Q. zQ.
[and Supporting Information Sources] SCE II) C := .- lo. II)cE E
en :: 0
o .2>>- ~.- ::!iE u G)~- -
11.(1) (I) C ...J(I)
-
of an existing or proposed school?
[2,29,30,40,44]
d) Be located on a site which is included on a 0 0 0 [g]
list of hazardous materials sites compiled
pursuant to Government Code Section
65962.5 and, as a result, would it create a
significant hazard to the public or the
environment? [2,42,40,43]
e) For a project located within an airport land 0 0 0 [g]
use plan or, where such a plan has not been
adopted, within two miles of a public airport
or public use airport, would the project result
in a safety hazard for people residing or
working in the project area? [ ]
f) For a project within the vicinity of a private 0 0 0 [g]
airstrip, would the project result in a safety
hazard for people residing or working in the
project area? [ ]
g) Impair implementation of or physically 0 0 0 [g]
interfere with an adopted emergency
response plan or emergency evacuation
plan? [2,32.33.44]
h) Expose people or structures to a 0 0 0 [g]
significant risk of loss. injury or death
involving wildland fires, including where
wildlands are adjacent to urbanized areas or
where residences are intermixed with
wildlands?[1,2,44]
VIII. HYDROLOGY AND WATER QUALITY
- Would the project:
a) Violate any water quality standards or 0 0 0 [g]
waste discharge requirements? [20,36,37]
b) Substantially deplete groundwater 0 0 0 [g]
supplies or interfere substantially with
groundwater recharge such that there would
be a net deficit in aquifer volume or a
lowering of the local groundwater table level
(e.g., the production rate of pre-existing
nearby wells would drop to a level
which would not support existing land uses
or planned uses for which permits have been
granted)? [20,36,42]
3-1/
>0,- 0 c-
-c C1: c:c; c
-CIS- CIS <<I 0<<1 <<IftS'tS 'tS
.! u u ,cU,c;:;1.. ,cu
ISSUES: .. r;:: 8 1-l;::_caO I-r;::CIS o CIS
c ._ tn'-'j O)Q. tn'- C. zc.
[and Supporting Information Sources] SCE rn C .- I.. rncE E
o.~- GJO) :=0 CD .2'- -
..J- :lEu
Q.II) II) C ..JII)
-
c) Substantially alter the existing drainage 0 0 0 ~
pattern of the site or area, including through
the alteration of the course of a stream or
river, in a manner which would result in
substantial erosion of siltation on- or off-site?
[14, 20,36}
d) Substantially alter the existing drainage 0 0 0 ~
pattern of the site or area, including through
the alteration of the course of a stream or
river, or substantially increase the rate or
amount of surface runoff in a manner which
would result in flooding on- or off-site
[20,36,38]
e) Create or contribute runoff water which 0 0 0 [8]
would exceed the capacity of existing or
planned stormwater drainage systems or
provide substantial additional sources of
polluted runoff? [20,36,42]
f) OthelWise substantially degrade water 0 0 0 [8]
quality? [20.36,37]
g) Place housing within a 1 DO-year flood 0 0 0 [RJ
hazard area as mapped on a federal Flood
Hazard Boundary or Flood Insurance Rate
Map or other flood hazard delineation map?
[2,38]
h) Place within a 100-year flood hazard area 0 0 0 ~
structures which would impede or redirect
flood flows? [2,38]
i) Expose people or structures to a significant 0 0 0 [RJ
risk of loss, injury or death involving flooding,
including flooding as a result of the failure of
a levee or dam? [2,36,38]
j) Inundation by seiche, tsunami, or 0 0 0 [RJ
mudflow? [2,36.38]
IX. LAND USE AND PLANNING - Would
the project:
a) Physically divide an established 0 0 0 [RJ
community? [7,12,22,41]
b) Conflict with any applicable land use plan, 0 0 0 [RJ
policy, or regulation of an agency with
..
~ -I..!;(
>>- 0 c1:
-c c1: c;:;
iijCU1$ CU CU 0 CI:S Cl:SCI:S1$ 1$
-u ,C U ,C .- "- 'cu
ISSUES: -li:~ 1-l;:_1Uo I-q::Cl:I o cu
C._ en'-'- O)Q. en'- Q. zQ.
[and Supporting Information Sources] SCE en c ~.- "- en C E E
o.~- Q) CD :!:: 0 Q) .2>>- -
..J- :lEu
Q..en en c ..Jen
-
jurisdiction over the project (including, but
not limited to the general plan, specific plan,
local coastal program, or zoning ordinance)
adopted for the purpose of avoiding or
mitigating an environmental effect?
[1,7,8,16,17,18,44]
- ~ ---- --
c) Conflict with any applicable habitat 0 0 0 [8]
conservation plan or natural community
conservation plan? [1,5,6.9,26]
X. MINERAL RESOURCES - Would the
project:
a) Result in the loss of availability of a known 0 0 0 [8]
mineral resource that would be of value to
the region and the residents of the state?
[5,10]
b) Result in the loss of availability of a 0 0 0 !XI
locally-important mineral resource recovery
site delineated on a local general plan,
specific plan or other land use plan? [5.10]
XI. NOISE - Would the project result in:
a) Exposure of persons to, or generation of, 0 0 0 [8]
noise levels in excess of standards
established in the local general plan or noise
ordinance, or applicable standards of other
agencies? [8. 18.44J
b) Exposure of persons to or generation of 0 0 0 [8]
excessive groundborne vibration or
ground borne noise levels? [8,18,44]
c) A substantial permanent increase in 0 0 0 [8]
ambient noise levels in the project vicinity
above levels existing without the project?
[8,18]
d) A substantial temporary or periodic 0 0 0 IRI
increase in ambient noise levels in the
project vicinity above levels existing without
the project? [8,18,44]
e) For a project located within an airport land 0 0 0 IX!
use plan or, where such a plan has not been
adopted, within two miles of a public airport
or public use airport, would the project
expose people reSiding or working in the
];-(j
>>- 0 C!:
-C C!: C;:;
-nl"S nInI Onl nlnI"S "S
.!! u .c u .c .- ... .cu
ISSUES: -r= a ....r=~1i0 ....r=nI Onl
c_ fI) .-' l:n e- fI)'- Q. zc.
[and Supporting Information Sources] G) C E fl)c:=;:;o fl)cE E
a l:n_ G) l:n .- G)~- -
.- ...I .- :E Co)
~tn (I) C ...1(1)
-
project area to excessive noise levels?
[8,18,44]
f) For a project within the vicinity of a private 0 0 0 IRI
airstrip, would the project expose people
residing or working in the project area to
excessive noise levels? [B,1B]
XII. POPULATION AND HOUSING - Would
the project:
a) Induce substantial population growth in an 0 0 0 IRI
area, either directly (for example, by
proposing new homes and businesses) or
indirectly (for example, through extension of
roads or other infrastructure)? [3,16,47,44]
b) Displace substantial numbers of existing , 0 0 0 IRI
housing, necessitating the construction of
replacement housing elsewhere? [3,16,44]
c) Displace substantial numbers of people, 0 0 0 IRI
necessitating the construction of
replacement housing elsewhere? [3,16,44]
XIII. PUBLIC SERVICES
a) Would the project result in substantial
adverse physical impacts associated with the
provision of new or physically altered
governmental facilities, need for new or
physically altered governmental facilities, the
construction of which could cause significant
environmental impacts, in order to mail')tain
acceptable service ratios, response times or
other performance objectives for any of the
public services:
Fire protection? [19,32,44] 0 0 0 IRI
Police protection? [33,44] 0 0 0 IRI
Schools? [29,30,44] 0 0 0 IRI
Parks? [5,17,19,21,26,27,44J 0 0 0 IRI
Other public facilities? [19,20,44J 0 0 0 1:&1
XIV. RECREATION --
a) Would the project increase the use of 0 0 0 IRI
existing neighborhood and regional parks or
3~/tf
~- C- 0 C-
-C C C;:; C
-C\S- C\S C\S 0 C\S CIS CIS- ~
.!!! u u .c u .c .- ... .cuu
ISSUES: -lj:~ 1-lj:_1iio I-lj:CIS o CIS
C ._ II) - .- C) c. (1)'- c. zc.
[and Supporting Information Sources] SCE II) C ~._... ",cE E
o~- Q) C) :!:: 0 Q)~- -
...I .- :E u
c.en en c ...Jen
-
other recreational facilities such that
substantial physical deterioration of the
facility would occur or be accelerated?
[5,17.19,21,26,27.44]
b) Does the project include recreational 0 0 0 lRl
facilities or require the construction or
expansion of recreational facilities which
might have an adverse physical effect on the
environment? [5,44]
XV. TRANSPORTATIONITRAFFIC-
Would the project:
a) Cause an increase in traffic which is 0 0 0 lRl
substantial in relation to the existing traffic
load and capacity of the street system (i.e.,
result in a substantial increase in either the
number of vehicle trips, the volume to
capacity ratio on roads, or congestion at
intersections)? [4,20,35,44]
b) Exceed, either individually or cumulatively, 0 0 0 lRl
a level of service standard established by the
county congestion management agency for
designated roads or highways? [4,20,44]
c) Result in a change in air traffic patterns, 0 0 0 lRl
including either an increase in traffic levels or
a change in location that results in
substantial safety risks? [4,?]
d) Substantially increase hazards due to a 0 0 0 lRl
design feature (e.g., sharp curves or
dangerous intersections) or incompatible
uses (e.g., farm equipment)? [20,35,44]
e) Result in inadequate emergency access? 0 0 0 IRI
[2,19,32,33,44]
f) Result in inadequate parking capacity? 0 0 0 lRl
[17,44]
g) Conflict with adopted policies, plans, or 0 0 0 IRI
programs supporting alternative
transportation (e.g., bus turnouts, bicycle
racks)? [4,34]
XVI. UTILITIES AND SERVICE SYSTEMS -
Would the project:
3-1.5
>0- 0 Cc
-C Cc C:;::
I!B'tS CUcu om cucu'tS 'tS
,cu,c'-- ,cu
ISSUES: - r;:: ~ f-r;::_1ao f-r;::cu o cu
c_ 11)'-'- cnc. 11)'- c. zc.
[and Supporting Information Sources] SCE II) C !:.-- II)cE E
o tD_ Cl)tD ~o CI)~- -
.- ...1- ::!!:u
11.U) U) C ..JU)
-
a) Exceed wastewater treatment 0 0 0 IX!
requirements of the applicable Regional
Water Quality Control Board? [5.22.28,36,44]
b) Require or result in the construction of 0 0 0 I:RI
new water or wastewater treatment facilities
or expansion of existing facilities, the
construction of which could cause significant
environmental effects? [36,22,28.36]
c) Require or result in the construction of 0 0 IX! 0
new storm water drainage facilities or
expanSion of existing facilities, the
construction of which could cause significant
environmental effects? [5,22,28,36.44]
Installing new storm drainage facilities in an area that has none will disrupt traffic circulation
and access to individual properties, including access by emergency vehicles. All work will
take place in the public right of way, so there should be minimal impact to existing trees.
Design and construction work will need to be carefully planned and phased to allow for
emergency vehicle access.
e) Result in a detennination by the 0 0 0 l&J
wastewater treatment provider which serves
or may serve the project that it has adequate
capacity to serve the project's projected
demand in addition to the provider's existing
commitments? [5,22,28,36,44]
f) Be served by a landfill with sufficient 0 0 0 l&J
permitted capacity to accommodate the
project's solid waste disposal needs? [1]
g) Comply with federal. state, and local 0 0 0 l&J
statutes and regulations related to solid
waste? [1]
3-lfe
a) Does the project have the potential to 0 0 0 [g]
degrade the quality of the environment,
substantially reduce the habitat of a fish or
wildlife species, cause a fish or wildlife
population to drop below self-sustaining
levels, threaten to eliminate a plant or animal
community, reduce the number or restrict the
range of a rare or endangered plant or
animal or eliminate important examples of
the major periods of California history or
prehistory? []
b) Does the project have impacts that are 0 0 0 [g]
individually limited, but cumulatively
considerable? ("Cumulatively
considerable" means that the incremental
effects of a project are considerable when
viewed in connection with the effects of past
projects, the effects of other current projects,
and the effects of probable future projects)?
0
c) Does the project have environmental 0 0 0 [g]
effects which will cause substantial adverse
effects on human beings, either directly or
indirectly? 0
I hereby certify that the information provided in this Initial Study is true and correct to the
best of my knowledge and belief; I certify that J have used proper diligence in responding
accurately to all questions herein, and have consulted appropriate source references
when necessary to ensure full and complete disclosure of relevant environmental data. I
hereby acknowledge than any substantial errors dated within this Initial Study may cause
delay or discontinuance of related project review procedures, and hereby agree to hold
harmless the City of Cupertino, its staff and authorized agents, from the consequences of
such delay or discontinuance.
Preparer's Signature
Print Preparer's Name
3-/'1
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED:
The environmental factors checked below would be potentially affected by this project,
involving at least one impact that is a "Potentially Significant Impact" as indicated by the
checklist on the following pages.
0 Aesthetics 0 Agriculture Resources 0 Air Quality
0 Biological Resources 0 Cultural Resources 0 Geology ISoils
0 Hazards & Hazardous 0 Hydrology I Water 0 Land Use I Planning
Materials Quality
0 Mineral Resources 0 Noise 0 Population I Housing
0 Public Services 0 Recreation 0 Transportation/Traffic
00 Utilities / Service 0 Mandatory Findings of
Systems Significance
DETERMINATION:
On the basis of this initial evaluation the Environmental Review Committee (ERC) finds that:
[g] The proposed project COULD NOT have a significant effect on the environment, and
a NEGATIVE DECLARATION will be prepared.
o Although the proposed project could have a significant effect on the environment,
there will not be a significant effect in this case because revisions in the project have
been made by or agreed to by the project proponent. A MITIGATED NEGATIVE
DECLARATION will be prepared.
o The proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
o The proposed project MAY have a "potentially significant impacf' or "potentially
significant unless mitigated" impact on the environment, but at least one effect 1) has
been adequately analyzed in an earlier document pursuant to applicable legal
standards, and 2) has been addressed by mitigation measures based on the earlier
analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT
is required, but it must analyze only the effects that remain to be addressed.
o Although the proposed project could have a significant effect on the environment,
because all potentially significant effects (a) have been analyzed adequately in an
earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b)
have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE
DECLARATION, induding revisions or mitigation measures that are imposed upon the
propose project, nothing further is required.
Staff Evaluator
7{
, "
617/06
Date
ERC
6f7/06
Date
3-/8
Exhibit A
Environmental Assessment of File No. CP-2006-03
City of Cupertino First Year Programmed Projects
5- Year Capital Improvement Program
Fiscal Years 2006-07 to 2010-11
Stevens Creek
Corridor Park
Mary Avenue
Bicycle
Footbrid e
Bollinger Bike
Lanes over
Calabazas Creek
Brid e
Memorial Park
Softball Field
Rancho Rinconada
Park
Library Play Field
McClellan Ranch
Facility
Improvements
City Hall Emergency
GeneratorlPG&E
Upgrade
Sport Center Tennis
Court Lighting
Library
Improvements &
U ades
Restoration of Stevens Creek btw.
Stevens Creek Blvd. & McClellan Rd.
Reduce picnicking from 4,000 to 800,
instaU multiuse trail, reconstruct
facilities
Construction of a bicycle
footbridge on Mary Ave.
all nment over Hi hwa 280.
City's contribution to widen
bridge for bicycle lanes over
Calabazas Creek.
Renovation of existing softball
field
Acquisition of 8JW property for
neighbor park purposes
Renovation of existing play field,
with irrigation & turf restoration
Replace irrigation system for
Comm. Gardens; Repaint and
fumigate barn, bathrooms & water
tower; rebuild or replace garden
shed.
Remove existing emergency
generator and undersized
transformer. Upgrade main
electrical ane!.
Design of tennis court lighting for
night time use.
Lighting upgrade to various
interior areas in the library
Separate environmental analysis
is underway. ERC
recommended a mitigated
negative declaration for the
TO' ect.
55 will be budgeted to conduct a
separate environmental analysis
when ro' ect is desi ed.
SCVWD will be the lead agency
for the project and
environmental review.
Categorically Exempt. CEQA
section 15301, Class Id:
restoration of deteriorated
facilities.
Categorically Exempt. CEQA section
15316, Class 16: acquisition ofland
for ark ses
Categorically Exempt. CEQA
section 15301, Class Id:
restoration of deteriorated
facilities.
Categorically Exempt. CEQA
section 15301. Class Id:
restoration of deteriorated
facilities.
Categorically Exempt. CEQA
section 15301, Class Id:
restoration of deteriorated
facilities.
Categorically Exempt. CEQA
section 15301, Class la: minor
alteration of existin facilities
Categorically Exempt. CEQA
section 15301, Class la: minor
alteration of existin facilities
1
.3 -/1
Exhibit A
Community Hall
Improvements &
U ades
Monta Vista Park
Building HV AC
R lacement
Service Center
Security Gate
Pavement
Management
Curb, Gutter &
Sidewalk Repairs
City Monument Signs
Replacement
Rancho Rinconada
Street Study
Dais shelving and storage
installation, patio wall protective
coatin
Replace existing HV AC system on
building.
Install a more secure automatic
gate at the Service Center
Ongoing maintenance of street
pavement, which may include
pothole filling, slurry sealing and
overla ent.
Funds for the repair of curb, gutter
and sidewalks when they meet
repair criteria
One on Foothill Blvd. to be moved
to SCB at SR85. Replace one at
SCB at Tantau Avenue
Neighborhood street circulation
study.
Neighborhood Traffic Funds for roadway modifications
Calming Measures to slow and redirect auto traffic
Safe Routes to School
Garden Gate & Signal
Upgrade at Stelling
Rd./Greenleaf
Yellow & Ped Head
LED Traffic Signal
U ade
Countdown Ped
Heads
SCB/SR85 on Ramp
Crosswalk Imps.
Install sidewalks where gaps exist on
Stelling Road, Greenleaf Dr & on Ann
Arbor Ave. to provide safe route to
Garden Gate School. Traffic signal
upgrade of County installed traffic
signal.
Re-Iamp all yellow & ped head
indicators with LED in all traffic
si also
Re-Iamp existing ped traffic
signals with LED countdown units
throughout the City. Funds will
com lete 20 intersections.
Improve crosswalks at Stevens
Creek Blvd. and SR85
Categorically Exempt. CEQA
section 15301, Class la: minor
alteration of existin facilities
Categorically Exempt. CEQA
section 15301, Class Id: minor
alteration of existing facilities
Categorically Exempt. CEQA
section 15301, Class Id: minor
alteration of existin facilities
Categorically Exempt. CEQA
section 15301, Class lc: minor
alteration of existing facilities
which includes streets.
Categorically Exempt. CEQA
section 15301, Class lc: minor
alteration of existing facilities
which includes streets.
Categorically Exempt. CEQA
section 15301, Class Ic: minor
alteration of existing facilities
Categorically Exempt: CEQA
section 15306, Class 6: data
collection
Categorically Exempt. CEQA
section 15301, Class Ic: minor
alteration of existing facilities
which includes streets.
Categorically Exempt. CEQA
section 15301, Class lc: minor
alteration of existing facilities,
which includes streets.
Categorically Exempt. CEQA
section 15301, Class lc: minor
alteration of existin facilities
Categorically Exempt. CEQA
section 15301, Class Ic: minor
alteration of existing facilities
Categorically Exempt. CEQA
section 15301, Class Ic: minor
alteration of existing facilities
2
3-.2 ()
Exhibit A
Collins Elem School
Zone Beacons &
Lights
Vehicle Count
Stations
SVITS Extensions
Remove Traffic Sig.
Flashing Red L T
arrows
Minor Storm Drain
hnprovements
Monta Vista Storm
Drainage System
Master Storm Drain
Plan Update
Stocklmeir Property
Improvement
Comm. Hall
Improvement
Install advance flashing beacons
and flashing red lights m srop
signs in the Collins School Zone.
Install traffic count stations at De
Anza & Lazaneo, and De Anza &
Pros ect Rd.
Install cable and boxes to connect
City traffic facilities to Regional
Intelli ent Trans ortation S stem
Removal of flashing red left turn
arrows at 4 traffic signals.
Funding for emergency repairs as
needed in various locations.
Categorically Exempt. CEQA
section 15301, Class Ie: minor
alteration of existing facilities
Categorically Exempt. CEQA
section 15301, Class Ie: minor
alteration of existing facilities
Categorically Exempt. CEQA
section 15301, Class lc: minor
alteration of existin facilities
Categorically Exempt. CEQA
section 15301, Class lc: minor
alteration of existin facilities
Categorically Exempt. CEQA
section 15301, Class lc: minor
alteration of existin facilities
Categorically Exempt. CEQA
section 15303. Class 3d: utility
extensions ro service existing
develo ment.
Categorically Exempt: CEQA
section 15306, Class 6: data
collection
Installation of new storm drainage
system in Monta Vista area Lines
to be installed on Orange Ave and
B e Avenue
Update 1993 plan by evaluating
existing system and make
recommendations, including fee
u date.
2006-07 Pro' ects Listed as Unfunded
Repair roof of former Stocklmeir Categorically Exempt. CEQA
Residence section 15301, Class Ie: minor
alteration of existin facilities
Categorically Exempt. CEQA
section 15301, Class I c: minor
alteration of existing facilities
Reception Room Automatic Door
Upgrade
3
3 - :;l{
CP-2006-03
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO.
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO
FINDING THE PROPOSED FIVE YEAR CAPITAL IMPROVEMENT PR<:X;RAM, FISCAL YEARS 2006-
07 TO 20010-11 CONSISTENT WITH THE CITY OF CUPERTINO GENERAL PLAN
SECTION I: PROTECT DESCRIPTION
Application No.:
Applicant
Location:
CP-2006-03 (EA-2006-14)
City of Cupertino
Citywide
SECTION ll: FINDINGS
WHEREAS, the Planning Commission of the City of Cupertino received the proposed five-year capital
improvement program, fiscal years 2006-07 to 20010-11, as described in Section I of this Resolution; and
WHEREAS, the Planning Commission has held at least one public hearing in regard to the application;
NOW, 'IHEREFORE, BE IT RESOLVED:.
That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this
matter, the Planning Commission finds in accordance with CMC Section 2.32.070C, that application CP-
2006-03 is consistent with the City of Cupertino's General Plan.
That the subcondusions upon which the findings and conditions specified in this Resolution are based
and contained in the Public Hearing record concerning Application CP-2006-03 as set forth in the Minutes
of Planning Commission Meeting of June 13. 2006, and are incorporated by reference as though fully set
forth herein.
PASSED AND ADOPfED this 13th day of June 2006, at a Regular Meeting of the Planning Commission
of the City of Cupertino by the following roll call vote:
AYFS:
NOES:
ABSTAIN:
ABSENT:
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
ATTEST:
APPROVED:
Steve Piasecki
Director of Community Development
Marty Miller, Chair
Cupertino Planning Commission
g:/planninglpdrepart/res,ICP-2006-03 res
3-:?~
Proposed FiveYear Capital Improvement Program
Current
Fund DescriDtion 2005-06 2006-07 2007 -08 2008-09 2009-10 2010-11
9100 Parks
427-9112 Stevens Creek Corridor Park 680,000 3,617,200 500,000
New Projects
Memorial Park Softball Field Renovation 250,000
Rancho Rinconada Park Property 1,000,000
Library Field Renovation 100,000
McClellan Ranch Facility Improvements 45,000
Total 680,000 5,012,200 500,000 0 0 0
9200 Buildings
423-9222 Civic Center 45,000
420-9229 City Hall Emergency Power/Electrical System 40,000 370,000
570-9230 Sports Center Tennis Court Resurfacing (EFt 112,000
New Projects
Sports Center Tennis Court Lighting 250,000
Library Improvements & Upgrades 120,000
Community Hall Improvements & Upgrades 45,000
Monta Vista Park Building Replace HVAC System 150,000
00 Service Center Security Gate 50,000
tv
Total 197,000 735,000 0 250,000 0 0
* EF = Enterprise Fund
9400 Streets
270-9450 Pavement Management 1,512,900 1,250,000 750,000 750,000 750,000 750,000
270-9450 Pavement Management - STP Portion 5"29,000 369,000
270~9451 Curb, Gutter and Sidewalk Repairs 500,000 500,000 500,000 500,000 500,000 500,000
New Projects
City Monument Signs Replacement (2) 50,000
Rancho Rinconada Street Study 100,000
Total 2,541,900 1,900,000 1,619,000 1,250,000 1,250,000 1,250,000
9700 Pedestrian/Bicycle Facilities
270-9443 Bollinger Bike Lanes/Calabazas Cr. Bridge(SCVWD) 10,000 156,000
428-9449 Mary Avenue Bicycle Footbridge 1,472,000 7,241,000
428-9449 Mary Ave. Bicycle Footbridge-Mary/Meteor Entry Impr. 250,000
270-9447 Mary Avenue Crosswalk/Parking 107,000
Total 1,589,000 7,647,000 0 0 0 0
~
~
"""
Proposed Five Year Capital Improvement Program
Current
Fund Description 2005-06 2006-07 2007 -08 2008-09 2009-10. 2010-11
9500 Traffic Facilities
270-9435 Neighborhood Traffic Calming Measures 5.000 50,000
420-9544 Safe Routes to School-Cupertino High 239,000
420~9549 Safe Routes to School-Garden Gate & Signal Upgrade at 475,000
Stelling/Greenleaf
420-9547 Yellow and Ped Head LED and Traffic Signal Battery 20,000 40,000
Backup System
420-9547 Countdown Ped Heads 50,000
420-9548 Street Safety Education Program 2,500
420-9551 Lawrence Expwy.fMitty Xing (Cupertino Share) 75,000
New Projects
Stevens Cr. Blvd.lSR85 on Ramp x Walk Improv. (HES) 75,000
Collins Elem. Sch. Zone Beacons & Lights (OTS) 44,100
Count Sta.(DeAnzalLazaneo & DeAnzalProspect) 50,000
SVITS Extensions (FO Cable & Boxes) 35,000
Remove Traffic Sig. Flashing Red L T Arrows(4 Locations) 60,000
Total 266,500 879,100 0 0 0 75,000
00
\,;.J
9600 Storm Drainage
210.9612 Minor Storm Drain Improvements 47,000 75,000 75,000 75,000 75,000 75,000
215-9620 Manta Vista Storm Drainage Syst. 10,000 874.000
Master Storm Drain Plan Update 30,000
Total 57,000 979,000 75.000 75,000 75.000 75,000
Total Capital Improvement Program 5.331.400 17,152,300 2,194,000 1,575,000 1,325,000 1,400,000
Total Outside Revenue Share 3,128,000 13,071,300 902,000 75,000 75.000 75,000
Net City General Fund Funding 2,203,400 4.081.000 1,292.000 1.500,000 1,250,000 1.325,000
~
~
l.h
REVENUE
Proposed Five Year Capital Improvement Program
Current
Fund Description Funding Source 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11
9100 Parks
427-9112 Stevens Creek Corridor Park Urban Park Act, Land&Water Conservation, 3,117,200
Roberti-Z'Berg-Harris, SCVWD FACHE Settlement,
Dept. of Water Resources, SCVWD Collaborative
427-9112 Stevens Creek Corridor Park (EF)* Recreation/Blackberry F ann 680,000
427-9112 Stevens Creek Corridor Park Sale of City Owned Property/General Fund 500,000 500,000
New Project
420-91 xx Rancho Rinconada Park Property Sale of City Owned Property 1,000,000
Total 680,000 4,617,200 500,000 0 0 0
9200 Buildings
570-9230 Sports Center Tennis Court Resurfacing (EF)* Sports Center Revenue Account 112,000
Total 112,000 0 0 0 0 0
9400 Streets
270-9450 Pavement Management Safe, Accountable, Flexible, Efficient Transp 468,000 327,000
Equity Act, A Legacy for Users (SAFETEA-LU)
270-94xx City Monument Signs Replacement (2) Developer and Insurance Settlement 50,000
270-94xx Rancho Rinconada Street Study (VTA Local Streets & County Roads) 100,000
Total 468,000 150,000 327,000 0 0 0
9500 Traffic Facilities
420-9544 Safe Routes to School-Cupertino High SR2S 239,000
420-9549 Safe Routes to School-Garden Gate & Signal SR2S 472,500
Upgrade at Stelllng/Greenleaf
New Projects
420-95xx SCB/SR85 on Ramp x walk Improvements (Hazard Elimination Safety pgm - Hes Caltrans) 67,500
420-95xx Collins ES Zone Beacons & Light (State Office ofT raffic Safety -OrS) 44,100
Total 239,000 584,100 0 0 0 0
9700 Pedestrian/Bicycle FacilitieS
428-9449 Mary Avenue Bicycle Footbridge VTA Measure BfTFCNTDA 872,000 5,928,000
428.9449 Mary Avenue Bicycle Footbridge State General Fund (Sher)
428-9449 Mary Avenue Bicycle Footbridge . City of SUnnyvale (General Fund & IDA) 110,000
428-9449 Mary Avenue Bicycle Footbridge Caltrans 304/BT A - 2003/2004 600,000
428-9449 Mary Avenue Bicycle Footbridge TDA (Non BEP)2004-05:$65k;2005-06:$38k 103,000 .
428-9449 Mary Avenue Bicycle Footbridge Caltrans 304/BT A - 2005/2006 300,000
428-9449 Mary Avenue Bicycle Footbridge Caltrans 304/BT A 2006/2007 300,000
270-9447 Mary Avenue Crosswalk/Parking Clean Air Grant 100,000
~ Total 1,572,000 6,741,000 0 0 0 0
~ 9600 Storm Drainage Storm Drain Fund & SCVWD 57,000 979,000 75,000 75,000 75,000 75,000
~
00
-+>- TOTAL OUTSIDE REVENUE SHARE 3,128,000 13,071,300 902,000 75,000 75,000 75,000
New and Carryover Budget Version Proposed Five Year Capital Improvement Program
Current Carryover New
Fund Description 2005-06 2006-07 2006~07 2007-08 2008-09 2009~10 201 0~11
9100 Parks
427-9112 Stevens Creek Corridor Park 680,000 3,117,200 500,000 500,000
New Projects
420.91 xx Memorial Park Softball Field Renovation 250,000
420~91 xx Rancho Rinconada Park Property 1,000,000
420-91 xx Library Field Renovation 100,000
420-91 xx McClellan Ranch Facility Improvements 45,000
Total 680,000 3,117 ,200 1,895,000 500,000 0 0 0
9200 BUildings
423-9222 Civic Center 45,000
420-9229 City Hall Emergency Power/Electrical System 40,000 270,000 100,000
570-9230 Sports Center Tennis Court Resurfacing (EF)* 112,000
New Projects
420-92xx Sports Center Tennis Court Lighting 250,000
420-92xx Library Improvements & Upgrades 120,000
420-92xx Community Hall Improvements & Upgrades 45,000
420-92xx Monta Vista Park Building Replace HVAC System 150,000
::.0 420-92xx Service Center Security Gate 50,000
VI
Total 197,000 270,000 465,000 0 250,000 0 0
* EF = Enterprise Fund
9400 Streets .
270~9450 Pavement Management 1,512,900 500,000 750,000 750,000 750,000 750,000 750,000
270-9450 Pavement Management - STP Portion 529,000 . 369,000
270-9451 Curb, Gutter and Sidewalk Repairs 500,000 500,000 500,000 500,000 500,000 500,000
New Projects
270-94xx City Monument Signs Replacement (2) 50,000
270-94xx Rancho Rinconada Street Study 100,000
Total 2,541,900 500,000 1,400,000 1,619,000 1,250,000 1,250,000 1,250,000
9700 Pedestrian/Bicycle Facilities
270-9443 Bollinger Bike Lanes/Calabazas Cr. Bridge(SCVWD) 10,000 156,000
428-9449 Mary Avenue Bicycle.Footbridge 1,472,000 7,103,000 138,000
428-9449 Mary Ave. Bicycle Footbridge-Mary/Meteor Entry Impr. 250,000
270-9447 Mary Avenue Crosswalk/Parking 107,000
Total. 1,589,000 7,259,000 388,000 0 0 0 0
<..,\J
\
~
~
New and Carryover Budget Version Proposed Five Year Capital Improvement Program
Current Carryover New
Fund Description 2005~06 2006-07 2006-07 2007-08 2008-09 2009-10 2010-11
9500 Traffic Facilities
270-9435 Neighborhood Traffic Calming Measures 5,000 50,000
420-9544 Safe Routes to School-Cupertino High 239,000
420-9549 Safe Routes to School-Garden Gate & Signal Upgrade 475,000
at Stelling/Greenleaf
420-9547 Yellow and Ped Head LED and Traffic Signal Battery 20,000 40,000
Backup System
420-9547 Countdown Ped Heads 50,000
420-9548 Street Safety Education Program 2,500
420-9551 Lawrence Expwy.lMitty Xing (Cupertino Share) 75,000 (75,000) 75,000
New Projects
420-95xx Stevens Cr. Blvd.lSR85 on Ramp x Walk Improv. (HES) 75,000
420-95xx Collins Elem. Sch. Zone Beacons & Lights (OTS) 44,100
420-95xx Count Sta.(DeAnza/Lazaneo & DeAnza/Prospect) 50,000
420-95xx SVITS Extensions (FO Cable & Boxes) 35,000
420-95xx Remove Traffic 5ig. Flashing Red L T Arrows(4 Locations) 60,000
Total 266,500 550,000 329,100 0 0 0 75,000
00 9600 Storm Drainage
0'1 210-9612 Minor Storm Drain Improvements 47,000 75,000 75,000 75,000 75,000 75,000
)
215~9620 Monta Vista Storm Drainage Syst. 10,000 671,000 203,000
210-96xx Master Storm Drain Plan Update 30,000
Total 57,000 671,000 308,000 75,000 75,000 75,000 75,000
Total Capital Improvement Program 5,331,400 12,367,200 4,785,100 2,194,000 1,575,000 1,325,000 1,400,000
Total Outside Revenue Share 3,128,000 10,863,700 2,207,600 902,000 75,000 75,000 75,000
Net City General Fund Funding 2,203,400 1,503,500 2,577,500 1,292,000 1,500,000 1,250,000 1.325,000
~
t)
~
REVENUE
New and Carryover Budget Version Proposed Five Year Capital Improvement Program
Current Carryover New
Fund Description Funding Source 2005-06 2006-07 2006-07 2007-08 2008-09 2009-10 2010-11
9100 Parks
427-9112 Stevens Creek Corridor Park Urban Park Act, Land&Water Conservation, 3,117,200
Roberti-Z'Berg-Harris, SCVWD FACHE Seltlement,
Dept. of Water Resources, SCVWD Collaborative
427-9112 Stevens Creek Corridor Park (EFt Recreation/Blackberry Farm 680,000
427-9112 Stevens Creek Corridor Park Sale of City Owned Property/General Fund. 500,000 500,000
New Project
420-91xx Rancho Rinconada Park Property Sale of City Owned Property 1,000,000
Total 680,000 3,117,200 1,500,000 500,000 0 0 0
9200 Buildings
570-9230 Sports Center Tennis Court Resurtacing {EFt Sports Center Revenue Account 112,000
Total 112,000 0 0 0 0 0 0
9400 Streets
270-9450 Pavement Management Safe, Accountable, Flexible, Efficient Transp 468,000 327,000
Equity Act, A Legacy for Users (SAFETEA-LU)
270-94xx City Monument Signs Replacement (2) Developer and Insurance Settlement 50,000
270-94xx Rancho Rinconada Street Study (VT A Local Streets & County Roads) 100,000
Total 468,000 0 150,000 327,000 0 0 0
9500 Traffic Facilities
420-9544 Safe Routes to School-Cupertino High SR2S 239,000
420-9549 Safe Routes to School-Garden Gate & Signal SR2S 472,500
Upgrade at Stelling/Greenleaf
New Projects
420-95xx SCB/SR85 on Ramp x walk Improvements (Hazard Elimination Safety pgm - Hes Callrans) 67,500
420-95xx Collins ES Zone Beacons & Light (State Office of Traffic Safety -OTS) 44,100
Total 239,000 472,500 111,600 0 0 0 0
9700 Pedestrian/Bicycle Facilities
428-9449 Mary Avenue Bicycle Footbridge VTA Measure BITFCAlTDA 872,000 5,928,000
428-9449 Mary Avenue Bicycle Footbridge State General Fund (Sher)
428-9449 Mary Avenue Bicycle Footbridge City of Sunnyvale (General Fund & TDA) 110,000
428-9449 Mary Avenue Bicycle Footbridge Callrans 304/BT A - 200312004 600,000
428-9449 Mary Avenue Bicycle Footbridge TDA (Non BEP)2004-05:$65k;2005-06:$38k 65,000 38,000
428-9449 Mary Avenue Bicycle Footbridge Caltrans 304/BT A - 2005/2006 200,000 100,000
428-9449 Mary Avenue Bicycle Footbridge Caltrans 304/BT A 2006/2007 300,000
270-9447 Mary Avenue Crosswalk/Parking Clean Air Grant 100,000
Total 1,572,000 6,603,000 138,000 0 0 0 0
9600 Storm Drainage Storm Drain Fund & SCVWD 57,000 671,000 308,000 75,000 75,000 75,000 75,000
W TOTAL OUTSIDE REVENUE SHARE 3,128,000 10,863,700 2,207,600 902,000 75,000 75,000 75,000
~
~
Unfunded Five Year Capital Improvement Program
Current
Fund Description 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11
9100 Parks
Rancho Rinconada Park Construction 1,000,000
Stocklmeir Property Improv. (roof repairs) 50,000
0 50,000 0 0 1,000,000 0
9200 Buildings
Quinlan Fountain 150,000
City Hall Remodel with Seismic/ADA! 3,000,000
Fire Code Upgrades (Essential Building)
Comm. Hall Reception Auto. Door Upgrade 45,000
0 45,000 150,000 3,000,000 0 0
9300 Trails
:)0
:)0 0 0 0 0 0 0
9500 Traffic Facilities
0 0 0 0 0 0
9700 Storm Drainage
Bubb/McClellan Storm Sewer Upgrade 750,000 2,000,000
0 0 0 0 750,000 2,000,000
Total Unfunded Projects 0 95,000 150,000 3,000,000 1,750,000 2,000,000
t.>>
~
.. . .. . . . . . . . ....... .ollCOr........ . .. . .. .. . .01;.08. .... .. .. . .. .. . .. .0800. . ... .. .. .... . . . .0~tO: , ,... . .. .. . ... ., :to:tt . . .. . , ...tOTAt... .......
.......T. > ,. "."..... ... _,.......,. _.., _..... ...... ..".. or..<."'...,................,.".....,..... ............... .,., - ..,....
i:!'U' . 'D'V'OF' ~U"'OING' SOURC'e:S . . . .
~.:..MMA:n:':<.'. ..<r: : x",'. :. .:: . . ..:.:.' .:~.::::::::
GF=GENERAl FUND 2,778,500 500,000 250,000 0 75,000 3,603,500
RC=BLACKBERRY FARM 0 0 0 0 0 0
GT=GAS TAX 1,847,500 1,292,000 1,250,000 1,250,000 1,250,000 6,889 ~..,
EI=ENVIRONMENTAl IMPACT 0 0 0 0 0
PS=PROPERTY SALE 1,000,000 0 0 0 0 1,000,. .J
SD=STORM DRAIN 979,000 75,000 75,000 75,000 75,000 1,279,000
RA=RESERVEACCOUNT 0 0 0 0 0 0
TG=TRANSPORTATION GRANT FUND 3,756,300 327,000 0 0 0 4,083,300
PG=PARK GRANT 6,741,000 0 0 0 0 6,741,000
OV=DEVELOPER CONTRIBUTION 50,000 0 0 0 0 50,000
SC=SPORTS CENTER 0 0 0 0 0 0
---------..... - - - ------------- - - --~-----
TOTALS 17,152,300 2,194,000 1,575,000 1.325,000 1,400,000 23,646,300
'S' "U'" M" 'M'" A'" 'R' 'y'" "0" 'F' "p" 'R' 0" "G" RA" '.' 'M'" S" .........,.......................
. " . . ,. .' .. c. ... .+." ,....
. .. L .... ...... ..........
... ... ... ... .." .......
", ,...'...... .+..,_....c. ............. .... ,....... . ...T.C...'.....T..........<.c.'.<.
PARKS 5,012,200 500,000 0 0 0 5,512,200
TRAILS 0 0 0 0 0 0
BUILDINGS 735,000 0 250,000 0 0 985,
STREETS 1,900,000 1,619,000 1,250,000 1,250,000 1,250,000 7,26~
TRAFFIC FACIUTIES 879,100 0 0 0 75,000 954,100
STORM DRAIN 979,000 75,000 75,000 75,000 75,000 1,279,000
PEDESTRIAN/BICYCLES FACILITIES 7,647,000 0 0 0 0 7,647,000
------------------ _.-..~---- -----..- ----------....- -
TOTALS 17,152,300 2,194,000 1,575,000 1,325,000 1,400,000 23,646,300
S"U.., 'M' 'M'<A' 'R' 'y" >0' . 'F' >0' . p' 'E' :RA'" .T" (. N'" G' : '-:M'" A' ".I'N'T' E': :N' 'A"N' . C" 'E' .......:.:.:-:-:.:-:.:.:-:'.-:.:-:.:.:...:.:.:.:.:.>..:...:-:.:-:.:-:.;.:....-:...:-..:->;.:-:.:-:.:-:-:-:.:.:.:.....:.:-:.:-:-:';.:.:-:-:-:.:-:'.':-:'>:':':':':':':-:';':'>:-:-:-:':-:-:-:-:-:':-:':':-:':-:': :.:.:.:...:.:.:-:,:.:.:-:.:.:.:-:.:,..:.::.'
. .. > .. .. . . ... ,. _. . ........._ ...... .... ... ....r..<. .+,.. ............ ,- ..,......... ..... ,." .',........ ,. ......... ...... ..... . .... ...... ...... .....
... ".. .. c _. .. . .. ...., ..+.." >., ,,".,... ........ ...._.. ........ c..,..,, ,.. ,. ".,. .......... ... ..,. ...,..,.. ...... c." ..+...+.
. . .. . _ + .. ... . . .. .. ., "+"... ....... ......... ......... co..... ...+.., ........ ....... ............... 'T" C, _ -.. ..... ........ ......
.......,.., c....., '" ............. '" _, .......,......, _..., <...,. _.. ............."......... ... c. <., _"............. .........,..,.. ,.. >.. c..... >.... ,..... ........ .....,. ...
OM=OPERATING MAINTENANCE
o
o
o
o
o
~
~~
-.
pARKS"SUMMARY' .............. .....'..... .',. ........,...,.. :::.:.:.:...:.:.:::.:.:....:;:.:::::::::::::::;:::.:::::;::.:::::::::::.:.:::::::::.:.:.FIVE::VEAR:PROGRANf:::;:::;:':..::;:;:;:::::.:::.:::::::::::::::::::: :.:':-:.:...:.:'..;.:-:.:-:.:-:.;.:-::.:.
L' ., .. . +"..... ........... ,..... ..,
. . . <, ... ............. ......... ".". ~N~~q~~~:~~<::
. . .. . .. ...... ....... .."........ c
_, .. _ _. . ._...,. 'T" .., ..,. ,..... ... ....,... ..... CO.... co,.,., ".< ..... ... ....... _. ",.. _ .. .... . . .....". .+.. ... "T"" ...
'. +:'. -:......'.".....". -:.;. < ,". ',':-.', '.', <. > ,',.. <. -:'.':-.':-: -:.:->>:-:.: <.: -:.: -:.:-:-:.: -:.;.:-:':.:-:':.: : +:.>>>:-:-:->:-:-: -:.:.:-...: -: -:.:. >: -:.:-: -:.:-:-:.:-:->: -:.;.: -:-:-: -:':.: +: .:. ..:-:.:. .">.'. -: -:'. -:...... -:',' .... ,". -:':'. > L'. +....:-...". -:.....:.......:-:.: -:.:-:-:':. >: -:.: -: -:.:.; -: -:.;.:-:-:-:- :-;.:
.'............. ........ 'ri" ..oi......,. .'..,..'..,......... .'.' '0:" .08'........ ..... ,.............. .:i)ifilfi..'...'..'....... ..... ....,..... o~'iil'" , .... .,................ .',...... GUJi{R~N:(pOL~$:
.....................'........, 6" .........'....................... 1- ..........,..'.....'............ c......,..........,.,............ c. .,............................,.1{J..;1l
...,.,. c.. '"" _ ............. ..... ., .. .rc .+.,....... . .... .0... ... ... >, . ..,....... .0..... .
..,..,.........,............ ........... r.. c..."...... ... ......... .+. 0...'...... ...... .. .....,........... c
S\:lMMARy:qF:.FUNDJN~::SOURPIE$:::::::.:::: ..:'..::::..:.:::..::::.:::.:.:::.:.:::::::..:.:::.::.::::::':::.:.::::::.:,:.:.:.:.:.:::..:.:..:::::::,:.:.::::.:::.:.::::::.:.:.:.:,:.:::-:::::::.:::,:.:.:::.:.',:.:.:.:::::.:::...:.::::::::::::::::::::'::::.:.:.:.:
GF=GENERAL FUND 895,000 500,000
RC=BLACKBERRY FARM
GT=GAS TAX
EI=ENVIRONMENTAL IMPACT
PS=PROPERTY SALE 1 ,000,000
SD=STORM DRAIN
TG=TRANSPORT A TION GRANT FUND
PG=PARK GRANT 3,1 1 7,200
DV=DEVELOPER CONTRIBUTION
---..........--- -- - ---
PARKS TOTAL 5,012,200 500,000
SUMMARY OF PROGRAMS .... .....,......,
.. .. .. "T' '. .., ..........
. . .. ' _ +. .0.... ..... .....
.. . + ' . ...... ... .........
._'.. ..,...... ........ ...'.............. c. .. .+.'..>........T.....C.................
STEVENS CREEK CORRIDOR PARK 3,61 7,200 500,000
MEMORIAL PARK SOFTBALL FIELD RENOVATE. 250,000
RANCHO RINCONADA PARK PROPERTY 1,000,000
LIBRARY FIELD RENOVATION 100,000
MCCLELLAN RANCH FAC. IMPROVEMENTS 45,000
------ ..........------------ ------- ---------- .........---------- ..------------
TOTAL 5,01 2,200 500,000
SUMMARY' , . F'OPERATING MAtNTE . ANCE'" .. .. .. . , . . . .. .. . .. .. . ,... ,. . ,. . .. . .. .,. .. . . .. ... . .. ,. . ... . ,. ..,. .,. .. ... ... ...............,....,...
,. '0' . . ,. N' .............,........................,..,..,....,..,................................................
.' . ... . .. .. . . 0 ..,.,...........,. .r. ..,...... ,..... ..... ... .... ,.. ..... ...... ....... 'T..r"'T" --.' '0+"+' 0.. O' ......
. . .. .. . _ .. . ........ ,................. ........ ... ........ ............ .... ... .... ..... ..... ......,.. ,. .r.... .T.....' >
'. .'+ .','> 0' .T.. :'.'. >>. .'.'>>. .'.:-:.. .. .'.::-, ... T' .'c. . >'. 0 +' ....... :. '.',C.. .... .<<:'_:-'<<_'.:.:<<_>>>:-:-:,:-:<<,:-'-:-:,:->'-:<-:.:-:-:<<<-:.:-..:-:-:..c.-:.....:->>.<<<.>>:-:<<<-:..._:-:-: >>>:->:-~-:.:-:->:-_.c-:,_.'.>.-:-:,'-:-:,:-'.:-:-.-:.'.'-:-:-:
OM=OPERATING MAINTENANCE
~;:g
\
W
'10.
\.}..\
'\
1.)\)\.0
I....}.j-
, , , , , , , , , , ' , , , , , , , , , , , , , , . . . . , . ' . . . . . . . . . . . . . . . . . . . . . . . . . . , . . , .. ...,..,.,.........................,...... .....,............,.,." "n"'" , . . . . ' . ' . . . . . . . . . . . . , . . . . . . . . . . . . . ,
~~~~~:??/?>>??:::<>?/:::>?????::::>':???:q))<::~>}}~:::}))/:)(C))):<()f~x~)rt~B::r:~*8M:r~:::j)::i<)::U::)}:?:) ~~f~~~%~M~9)
..,..,.'..,.,...............,...........,..",.............,... ......... 06.n7..m.......... 07."'8..m.......... 08'ng. .FO.......... 09..10' .FD.......... ..10 ,1,1, .FD. J:oURRENT.DO.....^RS
.........................c..'..........,.....,... .T..'_..........>. .'............,.....................,...,.,..._....c...".r ...T.'..,..... .... , .~ ..... . . .... .......c.........< _.~ .>.'. . . .',.,.....,............. .~ ,...... ,".r ....r................ . .",'. , . ................_.T._.' - .~. . ...... . .' Y. .. ... ......., . ,~.' .
STEVENS CREEK CORRIDOR PARK
flestoflOUon of Stevens Creek, Stevens Creek Blvd, \0 McClellan Rd
with SCVWD, reduced picnicklng from 4,000 to 800. Install
multiuse lreN through the length 01 the parldand, construct end
environmental c1anroom et McClellan Ranch and re<:onstruct park
amenities and park malntenanca laclliUes.
Grant Share of Project Cost
City Share of Project Cost
Total Project Cost
3,117 ,200 PG
500,000 GF
3,617 ,200
500,000 GF
MEMORIAL PARK SOFTBALL FIELD
RENOVATION
Renovation of aJdstiflg soflballlleld. This wor1< has been deferred
'or 4 years,
Project Cost
250,000 GF
RANCHO RINCONADA PARK PROPERTY
Purchase the e.lstlng vacant San Jose Waler
parcels locale<! at Sterling and Barnhart tor Mure
neighborhood park.
Purchase Cost
1,000,000 PS
LIBRARY FIELD RENOVATION
Renovation 01 axlsllog pley Foeld. with irrigation and lurf I1lslorallon.
Project Cost
100,000 GF
MCCLELLAN RANCH FACILITY IMPROVEMENTS
Replace lITigation Sys, For Community Gardens
Repaint & Fumigate Milk Bam, Bathrooms & Water Tower
Rebuild or Replace Gerden Shed
25,000 GF
10,000 GF
10,000 GF
Total Project Cost
45,000 GF
S.UILDlNGS..SUMMAitt.'.....'...........'.....'...'.....'.' :::::::::::::::::::::::::::::::::::::::::;:::::;::;::;:::::;:::::::::::::::;:::::::::::::::F.iVE:YEAR::PROGAANi;;::;::::::::::::::;::;::;::::::;:;:::::::::::::::::;:
.., ,. .. .... ........ ..r........ :v.NP.~MM~1;Q::::::
. ..... -.. .+. ....+. .....+.,
.. ".. . .. , . .,-...... ... ..... ...
. .. + ... .................
- . .. _. . ...... .r.. >. ....... , ..+.+..+.......... ... ....... ... .... ......, "0". . .. . .... . .. ...- -, ............... ,.....
..., ..... ................ ................. ....0.... .00 ..... :::::::::::::::::::::::;:::::::: :~~: :~j::::::::::::::;::::::::::::::::::: :6i :ti~::::::::::::::::::::::::::::::::: tiMi~:::::::::: ::: :::::;::::::::::::::: ~~: ~'o:::::::;:::::;:::;:;:::::::::::::: :~K :~:~ ,
CURRENtOOll:ARS:::
. . < . . . . . . . . . . - - .. - .. . . . . . . . . . . . . . . . - - . . .. . . . . . . . . . . . . . . . . . . . . . . . . + , . . - ........ - . . . . . . . .. -.,
.... 0."".._ .... . ..... ...+.,. 0... o. . . 0...'.., >. < ,.... . ....... ... 0.. .... . - ,.... ...... o. .... .
~UM:~A:R:'!:QF:f.~NP~~Q.:$:Pv.R.C~$:::::::::: ::::::: :::;:::: :::::
GF=GENERAL FUND 735,000 250,000
RC=BLACKBERRY FARM
GT=GAS TAX
EI=ENVIRONMENT AL IMPACT
PD=PARK DEDICATION
SD=STORM DRAIN
RA=RESERVE ACCOUNT
TG=TRANSPORT A TION GRANT FUND
PG=PARK GRANT
DV=DEVELOPER CONTRIBUTION
SC=SPORTS CENTER
- ---- - -
BUILDINGS TOTAL 735,000 0 250,000 0 0
S.UMMARy..OF.PROGRAM5'.'.....,...,.....,......., ,', ,.,..
: ". > - :,".: . : ..' -:.:-:-:.:-:-:.:-:-:-:.:-:-:.:-:-:.:.
.................+........... ....... ,..... ..................................+..........
CITY HALL EMERGENCY POWER/ELEC. SYS. 370,000
SPORTS CENTER TENNIS COURT LIGHTING 250,000
LIBRARY IMPROVEMENTS & UPGRADES 120,000
COMMUNITY HALL IMPROVEMENTS & UPGRADES 45,000
MaNTA VISTA PARK BLDG. HVAC REPLACE 150,000
SERVICE CENTER SECURITY GATE 50,000
-----"""'---- -- --- -
TOTAL 735,000 0 250,000 0 0
SUMMAR~.{'.OF.O:p~RATlNG MAINTENANCE: . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . , , . , . . " , . , , . . . . , , . . . . . , . . . . . . . .. . . . . . .. . . . . .. . . . . . . . . . . . . . . . . .. . . . . . . . . . . .
. . .. . ., '.. . '. . .....+..., ... ...... .... ............,....... .................. ...... .................... ...... .............
.,....... .. .',: ..:.... .<:.:. '." .,. '.'......:..:.... .',:.' . ",... ".. ,"::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~:::::~::::::::::::::::~::::::::::::::::::::;:::::::;:::::;:;:::::::::::;::::::::::::::::::::::::::::::::::::::::::::::::::::::::::;:::::::::::;
OM=OPERATING MAINTENANCE
().jts
.,
,
UJ
~
\0
VJ
w
(ft
)
's' ':U':; 'I';:;D'.' :J:N....G.. "S" ::;:::::::;:::;:::;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:::;:::;:;:;:::;:;:;:;:;:;:;:;:::;: :::::;:;:;:::::;:;:;:::;:;:;:;:::;:;:;:;:;:;:;:::;:;:;:;:;:;:;:;:;:;:::;:;:;:::;F' 'I'V'" 'E":;Y"::EA' :-. ':'R' ::;p" 'R' :0": 'G" ;RA' '';';M'' >:::::::>:;:;:::;:::;:;:;:;:;:::;:::;-:-:::-:-:.::::-:.:-:-:.:-:::':';":;;::
Lo; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . , , . . . , . . , , . . . . , . . . . . , . . , . . . , , , , . , . , ' . , . . . . . . . . . . . .. . .. ..' . ,. . . . . . . . . . . . . . . . . . . . .. UNPROGRAMMED.,
.." .'". .. . ..,'. ..,." ..,...,..,.,.,...,...,.,.,.,'....,.......,.,....'.'..,..'...',...,'.'.'...'.'.......'....... <><<:::6~~{~6:>>>>%i~~i~~>:~::;::::::::>~:~~;:~~~><<<<6~~6:::~~~<>~:~;::::<~~~(~~ .~0~~~;~&~~~
CITY HALL EMERGENCY POWER/ELECTRICAL
SYSTEM
Remove She BJileting emetgency generator, at She end 01 lts uaefullile, from the
CIty HaM be.emen! end replece n with a new generalor mounted on e ped _aide.
Also relllO\'e \he eld8Ung out or date and undenlzad transformer end replllC8 II
willi an efficien! end lnc:re1lll8d size vaulled InlO.fonner In ~uocUon with an
lncreese in electrical .en/ice capaolty and an upgrade or Ihe meln e1ectrtcal panel,
Project Cost
SPORTS CENTER TENNIS COURT LIGHTING
InsteU lighting on sports ""nler ianni. courts lor nlghl u.e
and 8ddllloanM revenue.
Project Cost
LIBRARY IMPROVEMENTS & UPGRADES
Chldren'. Book Area lighting Upgrade
Children'. Story Time Area UgI1Ung UPllrade
Lobby Service Oeslk L1ghUng Upgrade
Total Project Cost
COMMUNITY HALL IMPROVEMENTS & UPGRADES
Oal. Shelving and Slorllll6lnslalalion
Slor,""a behind Oal. in.lellallon
Pallo Wall protecllva maUng
Total Project Cost
370,000 GF
250,000 GF
50,000
55,000
15,000
120,000 GF
25,000
5.000
15,000
45,000 GF
B. . u' ....r. L' "0' . 'I'N' . 'G' . 's' ..',.,'.','.',..'..................................,.,.......,...,...,............',......' ...'...'.....'.......'.........'................................,.....,..'..".F' 'I' V' . 'E' . 'y' . 'E' 'A' "'R' .'.'p. . 'R' . O' . "G' . 'RA' . ',' "M' . ......'.....',..'....
'... '. .. . ............,.....,.,...,..'.',...,'.'.'.'.....'.'.......'................................ ,...................,.....,.,.....,.....,.,...,'.'.'.'...'...'.'...'........... . .., '.. ". ..... . ........,.......,... j'iN' P"';"Q' 'G' RAM' .......M...E. Q' .....
.' .. . '. .' . -:-:_:-:-:_:--:<.~-:.:-:.;.:-:-:-:->>:-:.:<.:.:<<<<.:<<<.:<.>>>>:->>>>: -:.>:->:-:-:-:-:-:-:-:-:<<<.:-:-:-:-:-:-:-:-:-:-:->>:.;.:<<<.:-:-:-:. '.' : -: >:.; , '. :- ,': .'". ". '. . .:-:-:.:-:-:-:-:-:< ~. .Iii". . . -:-:
... ...................... ... ........ .......... ...... ....... ...... ........ .... .... ... .....'L.... ........... ............................... ......... ....... .r'.. ...............
::::::::::::::::: :oe;.01:: 'F" h::::::::::::::::;:: :0" f~o" ~: :'F' '0':':::::;:::::;::::::: :o;;~o~>:::~:;;::::::::::: :;:;:: 'Q' '9" ~1Q":: :f.': cC:::::::::::::::::: o~ ::: FP": c: URD"'N' ..too': ,: ';"R' .;,
............ T'" .'~........ +. .. Y. . ...... T.... .W..~. ';,Lf.......... _ ..............." ,.. ,,,..... .. ....~.v
'0
+>-
llJ
t \
~
MONTA VISTA PARK BUILDING REPLACE HVAC
SYSTEM
Thls projecl would repla~ exiting HVAC system wI1lch Is u""""ble,
Project Cost
SERVICE CENTER SECURITY GATE
This proIecl would Inslall a more secure automatic gale 81lhe Servtce Center.
Project Cost
150,000 GF
50,000 GF
.
STREEtS::StJt\iiMARY:::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::;:::::::::::::::::::::::::::::::F.ive::yEAR::PROG:RA,iVf::::::;:::::::::::::::::::::::::;:::;:::::::::::::::: ~NP.!W~~M~iW::::::
. ..... . ..... ................. r",' ..............., .0....................... ...... . ...... c. .+.................
. .' .. . . - _.. ........ ..... 0.. 0" ::: ~::::::::::::::::: ~:::::::: ::: b:~~~::::::::::::::::::::: ~::::::::: ~: :~i :~i ::: :::::::::::::: :~:: ::::::::::: ::b~~ci;:::::: ::::: ;::::::: :::::: ;::: :::: ~~i6::::::::::::::: :::::: ::::::: ~:::~: :~:~~~
.. .... . . ......................
........ ............................... .,.,..... .,." ......
.,........................ ............... ......+. ......... CURRiilit: DbitARS::
. .
. ...,......"....."..............." 0" .....,.....................,.....+.. "': ."....,..".......................' . ................................ . ,.r. .... ..0 ...... ..
SVMIVIA~y::QF.:f:UNPING::SQURCe$:::::::::::
GF=GENERAL FUND
RC=BLACKBERRY FARM
GT=GAS TAX 1,750,000 1,292,000 1,250,000 1,250,000 1,250,000
EI=ENV1RONMENT AL IMPACT
PD=PARK DEDICATION
SD=STORM DRAIN
RA=RESERVE ACCOUNT
TG=TRANSPORTA TION GRANT FUND 100,000 327,000
PG=PARK GRANT
DV=DEVELOPER CONTRIBUTION 50,000
- . -
STREETS TOTAL 1,900,000 1,619,000 1,250,000 1,250,000 1,250,000
SOMMARyt~F. P"FtOGMMff" ...........'...........'.....'
. . . . . .. .......... ,". ..... .
. . ... ........ ....,. ..+
. ". ... .......... ..., ....
... ..... .................... ........ ........ ... .....................................
PAVEMENT MANAGEMENT 1,250,000 750,000 750,000 750,000 750,000
PAVEMENT MANAGEMENT. STP PORTION 369,000
CURB, GUTTER AND SIDEWALK REPAIRS 500,000 500,000 500,000 500,000 500,000
CITY MONUMENT SIGNS REPLACEMENT (4) 50,000
RANCHO RINCONADA STREET STUDY 100,000
TOTAL - -
1 ,900,000 1,619,000 1,250,000 1,250,000 1,250,000
~
w~
\1
-.....:1
;$'.J. .~eE:TS:' ;:;:::::;:;:;:;:;:;:;:;:::;:;:::::;:;:;:::::;:;:;:;:;:;:;:;:;:;:;:::;:;:;:;:;:;:;:;:;:;: :;:;:;:;:;:;:::::;:;:::;:;:;:::;:;:::;:;:;:;:;:;:;:;:::;:::;:::;:;:;:;:;:;:;:;:F'I:V.e;:):I;~A' :i:i;:'p:~^'G': "~:^:-M:.. ;;;:;;/::;:;:;:;}:;;::::;:;::; ~;:ii:p';'R:<Q'::b:i:i;ii~~~ii::p':;;;:;:;
. ,'. ,.-'" . .. ...'.+...'.+.....+.........'.'..................."...................................... ......................................... ....................................:. .:.... .'. . ..:::'::~ ,', ~.:...:,~~-. ...~.......:.:.:............................... '~~~'.'.'... ~.~~':"I~l~.I;"r7 ...<.....
. '.'.,. . ',.... . .. . .,. .,. .. . .,. . ... .". .". .,. .". . .., ',.." . .,.., . ::;::;:::::;:;;::::o6~7.::~6::. ;::;:;:;::<:::oi;.da:;~6:::;:::::::::::::<O$4(fQ:::;:::;:;:::::::;::~~1~::p.P:::<:::::::::::::::1~~1{~O @*Nr.:i;i~f~~~(
... ... ... ,.. ... ..... .......... .......... .....
PAVEMENT MANAGEMENT 9450
Aonual CIly funding of $750.000. Actual PMS baddog ill $1,540,000.
Addlllooal G<anl Funding wi. b9 &OUght on an amual basis lor lhe
short 1.1110 Iha b.cl<log. $330.000 lrom TEA-21
ProJect Cost
1,250,000 GT 750,000 GT 750,000 GT 750,000 GT 750,000 GT
PAVEMENT MANAGEMENT. STP PORTION
FUlldlng for pavmenl mainle....nc:e from Sale.
Acoounlabla, Flexible. EfllcIent Transp, Equity
Act, A legacy lor users - SAFETEA-lU,
Grant Share of Project Cost 327,000 TG
City Share of Project Cost 42,000 GT
Total Project Cost 369,000
\0 CURB, GUTTER AND SIDEWALK REPAIRS
0\ 9451
Th.... lunds .,. fQr lhe ,.palr of curb, guller .nd sldeewalks
wIlan lh.y mael rep.I, c:rfl8rl..
ProJect Cost 500.000 GT 500,000 GT 500,000 GT 500,000 GT 500,000 GT
CITY MONUMENT SIGN REPLACEMENT (2)
Replaoa 2 CIly monumenla Ilgnl, one on FoothI. Blvd. 10 b9 moViId
10 S~ns Creek Blvd, .II-Iwy 85 and p.1d for by InSU'lIIlC8 claim,
Replace ooe on Stevens Creek Blvd, .. Tenlau. 10 be paid lot by
de..lopeto fees,
Project Cost
50,000 DV
RANCHO RINCONADA STREET STUDY
1fT A lacel Slreels and County Roadl money for the nelghbortJood
slreet circulation 8tudy.
Project Cost
100,000 TG
u:.
\1
~
PEDESTRIAN/B' CYCLE 'FACIL TIES SUMM" RY........... .'. .... ..:.:.........FlVS..YEAR..PROGRAM:.:.;.:.:.:.:.:-:.:.:...:.:...:...........:........... 8Nl?R6$F.u{....~i):::::
.. . I ....1 ... . 'A ................
., ,. .. . . . .... ... .... .......... ,., . . _ . . . . .. ~. . . .... . . . . . . . . . . . . . . . . . . . . . . . r .
. + ,. - .. < . . .. .. ... . ....... .......... . ....... ... ."... ...... .... ........... .......
. ., .. . . .. ... . .-... . . . . ... ...+........, ....... .. ..- .. .. . .. .... .............+........ .......................~...........
. . .. ... -.. . .. . ....... .......... ....... .. . ... , .. ....".., ..r..... .....,_,.. ....
"....................,..."."..............................'........"...........................'........... .............."........................................+.......,....... ....... 0 ......... ..... ..- - .. . . ..+, ..... ......................
SUMMARy.........,........................................................................ :.:.:.:.: -:.:-: -:.:- >:-:-:-:.:-:-:.:-:.:.:-:->>:.:-: -: -:.:-:.:-:.:.:-:-: -:.:.;.:-:-: -: -:.: -:.:':. ~.:.;.:-;.:.:.:.:-:.:-:,:.:-:.: -: -: -: -:.:.: -:. +.......... .... .......
.. ., ..,. .... ... .............. .............. ......... .... ......... .......... ..... .............:.:.:.:.:.:.:.:.: -:.:.:.:.:.:.:. :PM9:.:.:.:.:.:.:.:.:.:.:.:.:........ 09' .1.0.'.............................. '10"1 i
. . ..... ............. ............ .... ........ ................................0$.07:............................. . : URRE...TO:Qll;A.... . :
'. '.. . .-:.>>>:<<<':.>>>>:-:-:.:-:<.>~<<-:.>:<.:-:-:-:.:-:-:.:-:->:-:->:. ,........ ....... .. .... ...... ..... . Q.l'Q.~' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .' , . . . . . . . . . . . . . . .. · C......N........R$.
......... ....... ...... ...... .... . . .. ,.....,........................... +. +,.................... . .'...'....... . . . , ....,............ ~...'.....' +..... +. ..'
r . . ... ... ... .......... .... ........ ... ........... ..... ........... .. .+,. ..+........
SUPJJMAR.Y:QP:1.UNOJNG:$QURCas;::::::::::;:::
GF=GENERAL FUND 906,000
RC=BLACKBERRY FARM
GT=GAS TAX
EI::ENVIRONMENT AL IMPACT
PD=PARK DEDICATION
SD=STORM DRAIN
RA=RESERVE ACCOUNT
SC::STEVENS CREEK FUND
TG=TRANSPORTA TION GRANT FUND 6,741,000
PG=PARK GRANT
DV=DEVELOPER CONTRIBUTION
-- ----- --
MEDIANS AND OVERPASSES TOTAL 7,647,000
SUMMARy.OF'PROGRAMS.......".......... .
.. " + . ...,..... ..,...... .
.. . . . .. ....................
. . ... ....... ... ..... ....
.. ... ......... ....+... ...
. .. ...... ... ... .... ........ .... ........
MARY AVENUE BICYCLE FOOTBRIDGE 7,241,000
MARY AVENUE BICYCLE .MARY/METEOR ENTRY 250,000
BOLLINGER BIKE LANES/CABALAZAS CR. BRDG. 156,000
-- - ----- -
TOTAL 7,647.000
SUMMARy.OF...... . .RA.... ......... ..... 'e' . 'ANC'" . . . ..... . . .... ... ..... .. .............. .. .........,... .... ........................ . .. .. . ,.. ........ ........
.. OPE . :TJNG'MAINT N' . E............,................,.....................................................,......................
., . .... .... . . .... ........ ... ..... ... ..... ....................... .... .......... ................,... ....... ....... ........
T . ... . T' ... . .. ..... ..... ... .... ................................... ..,...,.. ..,.......,.. ........,... ,....., .........,..,
. .. .. .. . . . ,.. ....... ..+,. ... ...........+................. ... .... .... .... .....................,... .... ...............
............... .................. ............ ..r'. ............. .............. .........'.............................................................................................................................r........+..r......+........r.....'. ._',.+.,...+........+..<................r...
OM=OPERATING MAINTENANCE
\0
~......:l
\
.,~
~
~~
t
riE" 'D' "'E' 's' "TR"" "r'A' "'N"'I' B" 'J'C" 'Y"'C" '["'E" 'cF' >A:C" 'I'[''']'J' '1' 'E' 's' ........ .................................c........... ........................F. 'J'V'" 'E' "'vE" 'A' "'R' '''p'' 'R' '0" 'G" .RA..... 'M" '............................ ....c..... ..c..................c....................
r.:' ': : . ::' .:. ";. :-'.: -: ;: ..;M .: -::::: ';:;:;: ::::;:::;::::;:::;::;:::;:;:::;:::::::;:::::; :;:::::;:::;:;:;:;:::;:; '. :.' ::::[: .... <: .... .... . .' . ::;:::::<:;:::;:::::;:;::;: .:::;:;::::: (i'NPROGAAMME6:;::;::
'."....."......................................................."......,........................................................ ........,.................................... ..'.....'.................................................................................................'.'...........................................................................f.
'.' .. ..........0.6. ;.(I'" 7' '.1" '0' ................ "'0'7."0' .8....F. .0.'.....................0.8..0. .9....F. .O:...'...................:O.Q:;...1:.0....p. .D.......................1.0. "1"1' ":P' '0' "C'U"R'R' E' 'I'l' r' "0' '0' ["'LA' 'R' .s....
..... . . ,......... . .......... . ...... .... ... ...... ...... . . .+. .... .
..... . . ......... - .. .,........... ..., . + .......... .., , -, ..., ... _. . . .. ..
. c.., . , , '" ,..... .... . ... .+..+.. . ... .... .... ... . . . ..,........ . ..... T +... .'
MARY AVENUE BICYCLE FOOTBRIDGE 9449
Conswellon of e BIcyds Foolbf1dgB on Maty A'IlMlue alignment
0'/8< Roule 2BO. Addl\lonsllundlng needed $3.5 mHllon.
Grant Share of Construction Cost
City Share of Constructlon Cost
Total Project Cost
6,741,000 TG
500,000 GF
7,241 ,000
MARY AVENUE BICYCLE FOOTBRIDGE -
MARY/METEOR ENTRY IMPROVEMENTS
9449
Impro....meol1llo \he MerylMe\so4' enll)'" lmpfovsmenIB In
",,"/Untllon with lI1e Me/)' Ave. Ellcyde FooIbrldge projso:l.
Project Cost
250,000 GF
BOLLINGER BIKE LANES/CALABAZAZ CR.
BRIDGE 9443
Clly's ahare to widen bridge lor bk:yckllanel Oller Celabazsl Cr.
at Bollinger Rd. In par\ne""'lp wllI1 Santa Clere Valley Weier DIslrIcl.
Project 10 be menage<! by SCVWD.
Project Cost
156,000 GF
I
T. '.'RA' '.: '-:F' "F" 'I'C"'::F' "A:--:C'.' 'I'L:::t'T' . I'E' . 'S"::S":U' : 'M'" 'M" 'AR" .... 'y'" ::::::::::::::: :::::::::::::<:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::F" 'I'V: 'E" :y" :E' '::JfR<' ::'p' 'R" 'O':"G' ':RA' . '.' ':'M' . :::-:::::::::::::::::::::::::::::::::::::::::::::::::.' ..... .... '.' .. '.' .. .......
. . ........ . ..................................................... .. ... r.\' . . ..'..... . ........ .................. :UNPROGRAMMED......
:. .::...... ':'.' .::: .:::..:....:: '.:::. .:. ...... ......... :..:..... ......::: .... '.' :.:..... ..........:...:..::. .:::::::::::::::: :::::::::::::::::::::::::~::::::~~~i~:::::{:::;:::::::::::::::~::::~cij:ici~:::::::::::::;:::::::::::;:~::;::ri~~~~:::::::::::::::::::::::::::::::::~~~~6::::::::::::::::::::::~:::::;:::::~~ji t~~:~t:6b~t~::
. MMA'RY."OF':F.U~DING'SOURCES"""""""""""
.. ". , ... . ... ........
.. . .. .. . <... "'" .......
SU.. ......................... ........ .........................................
GF=GENERAL FUND
RC=BLACKBERRY FARM
GT=GAS TAX
EI=ENVIRONMENTAL IMPACT
PD=PARK DEDICATION
SD=STORM DRAIN
RA=RESERVEACCOUNT
TG=TRANSPORTATION GRANT FUND
PG=PARK GRANT
DV=DEVELOPER CONTRIBUTION
242,500
75,000
97,500
539,100
STREETS TOTAL
o
o
o
75,000
879,100
9;U1MM !ty. Of.':'PROG;Ri\IMS ..... .. ... .. .
. . .... .......... ,....., ...., ....
. c., .. .......... ... ....... ..... ...
A.... ...... ...........................................................
NEIGHBORHOOD TRAFFIC CALMING M.EASURES
SAFE ROUTES TO SCHOOL-GARDEN GATE & SIG.
UPGRADE AT STELLING/GREENLEAF
YELLOW LED TRAF. SIGNAL&BATTERY BACKUP
COUNTDOWN PED HEADS
LAWRENCE EXPPWY.lMITIY XING - CITY SHARE
STEVENS CR. BLlSR85 RAMP X WALK IMPROV.
COLLINS ELEM. SCH. ZONE BEACONS & LIGHTS
~
COUNT ST A.: DEANZAlLAZANEO&DEANZAlPROSP ECT
SVITS EXTENSIONS (FO CABLE & BOXES)
REMOVE TRAFFIC SIG. FLASHING RED LT ARROWS:4
50,000
475,000
40,000
50,000
75,000
75,000
44,100
50,000
35,000
60,000
TOTAL
879,100
o
o
75,000
o
SUMMARY' Of. OPERA::tING MAJNTeNANCE" .. .. .. .
. . . ..........
_ .. . .. .. . ......... ......... ,_.... ..r...... .....
. . .... .... . .. '. .. . .. .. ...........,....... .........................................................
~
~(g
-
OM=OPERATING MAINTENANCE
.. .. '.' .... .. . .... '.' . '.' '.' . .. ..... ....... ................... ........................ .......c....... ......... ................................................................................. '.' '.' .. ...... ... "G" .D:A:.M.... ..............................'.. ............................................
:-: ....:. "::.. '.' ':-.: -:::::::::::::::::::::::/:::::::::::::::::::::::::::::::::-::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::.... :::.:..': ::'" ....~ :::::::::::-:::::::::::::::::::::::.:.N.'....:...c.........:::::::
TRAF.FIC. FACILITIES. . . . . . . .. ............ ....... .... .................................. FIVE.YEAR. PRO. .. .. . . . . . . . . . . . . . . . .IJ. PROGRAMM6Q . . .
:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::: .:::::::::::::::::::::::: :::::::::::::::: ::::::::: ::::::::.:.:.:.:.: -:::.:.:::::::::::::::::::::::.:.:::.:.: ::::.:.::::::::::::::::: ::::'>IH):': -:.:.:::.:.:::::::: :::::::::: :::c:: -:.: :"1':0':: :ro-:::'::::: :::::::. -:::: :~::.:-: ::.~::: ::F" :0' >C:-:::-: ::R:: '6:-::: -: <00':::- :t-: 'l;.A::: -:.:.:.:::
., ......... ,..0. ,_.... .... ....... ....... ..... ...................J..........' .. ........... . ...... .... . .......... . o. ,... .... .. .....
.........................,.........,.c................................................... .........c................ ........c...... ...................O(H):r..Fp:....................OI..O~..FO:.c..................0 . I:J..FO.....................O~...... ..... ......c.c..... ~~. .... . Uj;t N:r. . . RS."
.
NEIGHBORHOOD TRAFFIC CALMING MEASURES
Re-esleblis/i fund lor nelghbolhood lr8111c calming which requires
modlflcalions oIlhe roadway. Certain crIlerie musl be mel before lund.
ere undo Funding e. needed during year.
Project Cost
50,000 GT
SAFE ROUTES TO SCHOOL - GARDEN GATE &
SIGNAL UPGRADE AT STELLING/GREENLEAF
Inslal .lde.....ks where gel'" eKls\ on Stelllnv Rd., Gre.......af Or. end
on Ann Arbor Ave. 10 provide e safe roulelo Garden SchOO.
Aleo Includes trelllc algnal uwade a\ StellnglGreenleaf.
Thla I. a Granl project yello be funded.
City Share of Project Cost
Grant Share of Project Cost
Total Project Cost
47,500 GT
427,500 TG
475,000
YELLOW & PED HEAD LED TRAFFIC SIGNAL
UPGRADE
Thia pro/eCl would re~emp all of the yellow II pad heed Indlcalonl
wllh light emltllng diode or lED In all oIlhi1 trelllc elgnels. This is the
la81 p/len 01 changing ell of !he Indlcalofs 10 lED.
Project Cost
40,000 GF
COUNTDOWN PED HEADS
This projeclle for \he re-Iamplllll QI eldsllng ped IrIffle signal
units with lED countdown unlls Ihroughoullhe City.
The Countdown leewfe ~villes pedeslrlan Uma provld~ and/or
remelnlng 10 cross the S"III.. CUmlnUy 5 Inlereecllon. have been completed.
50 InlenleCllons remain 10 be completed. Thes.. funds will complele 20
Inlereecllons.
Project Cost
50,000 GF
~.....
'\ 0
~O
~
.....
o
.....
~
~
. . . . . . . . . . . , . . . . . . . . . . ., . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. ,...........,...........................,. ve' v' .... 'R' 'PROG' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . " . . . . .. . .. . ..
Tr;s.J(F~fC.,;:F'A:;CI.::IT:J~S:::::;:::;:::::::;:::::::;:;::;::::;:::::;:::;:;::;::;::;::;:; ;:;:;:::;:;:;:;:;::;::;:;:;:;:;:;:;::;::;::;::;:::;:::;:;:;:;:::;:::::::;:::;:;.:;:1.... . ::. .:E:;:'A' . :; .... .,': :D.~:M:::::;:::;:;:::;:::>:::;:::::;:::;: ~iN'P"'RQQRA':~M':'ED.::::;
"'~""~ .'. .'. "'~' ....~ ... . '~" ............................................................... <>>:::<oo~(~6><><>~14~f~~:D;::<;~<~$~~&::>))>~~p<<>>~>1~~1:(~ ~~~~$Nr:~8dji~:
STEVENS CR. BLVD./SR 85 ON RAMP X WALK
This project wouldimptovethe cross weln at S(evans CJll9k 81. And
SR 65. This 18 part of a Hezard E1lm1nalion 5arety ProgIlIm thou
Callrans.
CIty's Share of Project Cost
Grant Share of Project Cost
Total Project Cost
7,500 GF
67,500 TG
75.000
LAWRENCE EXPPWY./MIITY XING
(CUPERTINO'S SHARE)
CIty's sllsre of pro)scl.ldenUfl8d from th8 County-wide EKPWY. 5tudy
to uPllrsde lh8 pedeslll8n Croulng at Mllty IIIld Lawrence Expwy.
to connect to Ihs City's t_Uy completed 5an T OIl\llS Aquiflo..
5arllloga CJll9k Trllil. The ll\lljolity of lI1eluodlng will be provIdad by
(he County wllh II simler share lrom lI1e elty of San Jose.
Project Cost
75,000 GF
COLLINS ELEM. SCH. ZONE BEACONS & LIGHTS
This project would inslall edV8008 fleshing beacons and Peehlng red
lights at slop elgns In lI1e Collins School Zone on Blaney A.venue.
Grant Share of Project Cost
44,100 TG
COUNT STA. (DEANZAlLAZANEO &
DEANZAlPROSPECT)
This project woukllnstaq lr81flc counl stlllions to eWmI""le lI1e rnled
lot manual counts for 8fVlUal studies.
Project Cost
50,000 GF
......
o
N
~
,
\
..t.
~
... .......... .... '.' '.' '.' .......... .................................................................. :.....:-.-:.:-:...:-........,..-:.,.......,.......,.....,...,.,...............FIVE..YE. 'A' 'R" "'p' 'R.' Q' "G' 'RA' '. '-:M'" :-:.:-:-............................ ............."..,..,
T..I!)'AJ:!FIC..F:AiC.IL.ITI.ES.'...................'........................................... ...........'...................................'.............................. . . ... .. ......... ',. ....,............................... UNpRo.GRAMMEo..-:.
...~ .-: . . .-: .-:~. .'. . : .'. : : : . : .-:':-:-:-:-:-:';':-:':-:-:':-:-:-:':-:-:-:-:-:-:':-:-:':-:';':';. ;}:;:;::::::::::o:::a':::O::1:::::F.:::O::::::::::::::::::::::{j:::1:::Q:::a::::F:::O::::::::::::::::::::::::D8+:':::n-::g:-::F:-'C":::::::::;:::::::::;::O:'9::-::1::0::';;:F.::-D::::}::}::::\'1<O::;'1<t::::'F.';:Q::: :CU':-:-:R'::RE:-:-:m':':-::'O'-:O-:'L:::LA-::::R:::S:::
...... ... ... .......... . .......... . . .......... . ... ......... .. . .
. . . . . . . . ,. .. . . . . . . . . . . . _ . ... . . . . . . . . ., . . L . . . . .. _ . . . . . . . . . I . _ .. . . .
. ,. ,".... ..... ........ .. . .......... . . .......... . ....- >.'......+...,. ..... . '.
SVITS EXTENSIONS (FO CABLE & BOXES)
This project would ln9lBlI ""b1e and boxes to conned City traffic
'aclllUas 10 Regi.....llntelllgent TtansporlBUon System (ITS)
Total Project Cost
REMOVE TRAFFIC SIG. FLASHING RED L T
ARROWS (4 LOCATIONS)
Thls project would remove Ihe flashing red left lum amMS al4 traffic
signals lhroughoul lIIe Clly and replace wtlll standard lelI. 'um IIfI'OW lamps.
Project Cost
35.000 GF
60,000 GF
. ':T:O'RM' 'ORA' 'IN 'SU MMA' . RY'" .. .'. . . . . . , . , ., , .. .'. . . . . . ,. . . . FlY' 'E"'VEA'R" "'p' RO' ORA" :'M' : .-:.,....-:-:-:.:-:-:-:-:.:-,...,'.-:.:-..:-.'....:-:-:- ,.. . . , . . . . . . . . . . . . . . .
$ .,....... .. . .. . , . .. . . . . ' .. .. . .. .. .. .. .. . , . .. .. . .. .. .. .. .. .. .. .. .. .. .. . U . H"'. . ....~.J.. . . . . . . . . .
. . ,.. .. . . . . . . . . . . . . , . . . . , . . , . . . , . . , . .. . . ... . '.. . , . . . . . . , . , . . . . . . . . . . . . . " 'N""....OwY:>.MMED.'.
'.' .,:. .::-: .....:-.....'.:;..::.:.... .':-...'.., :::....'....: . . . . . .-:'. . -:,.::-,:::::::::::::::::::::::::;:: ...... .... ........ ........... "O'b'O' '7.' ............... >>}>)o::1<8:::~::::::::::::::::::::,:::::;:.:::~~:1::::::::::;::::::::::::::::::~::::b.:}1::0.:: ::::::::::~::::::::::{:::::~:::~'Q<% :c\j:~~~Ni:68~UiJr
. :::::<::~::::::::::::::::::::~:. 9", .'<::::::::::::: ::::::::::::::::::,.:~ ::~::::::::::::::::::<::-::-:::-:~71.?~:-:<.:.>>>:...:..-:.>.'>>:'. ~:~:. .-:.:-:<<.:...:,.-:.....:-:-:.>:.. .":....' :... ,",. ,",';:..: ~....:-
SU'M."'A:'R~' O'F ~UNDING' :C!:OU~~S"''''
. . ~ IYJ~. .J:::' .:~r:'.. . ~ ' . ::0." :: .n.~~. :::::::::::::: .
GF=GENERAL FUND
RC=BLACKBERRYFARM
GT=GAS TAX
EI=ENVIRONMENTAL IMPACT
PD=PARK DEDICATION
SD=STORM DRAIN
RA=RESERVEACCOUNT
TG=TRANSPORTATION GRANT FUND
PG=PARK GRANT
DV=DEVELOPER CONTRIBUTION
979,000
75,000
75,000
75,000
75,000
STREETS TOTAL
979,000
75,000
75,000
75,000
75.000
SUMMPi-R:Y QF.P.RQGRANlS.........................
. .. . ............. ............
.... . .........................
. ., .,.....".., ,.+., ,..., ,..
.. ,. ,.. ... ....... , .. . .. . ... ... .... ... ....... .....
MINOR STORM DRAIN IMPROVEMENTS
MONTA VISTA STORM DRAINAGE SYSTEM
MASTER STROM DRAIN PLAN UPDATE
75,000
874,000
30,000
75,000
75,000
75,000
75,000
TOTAL
979,000
75,000
75,000
75,000
75,000
..
$QMMA~Y:Qp.::QP.~~1'~~G.:MAINreNAN.C15:<:::::: ' .
OM=OPERAT1NG MAINTENANCE
.......
o
l>.l
~
~
S. '~j'!\R' M:::I!S'~'x'JN::::::::::::::::::::::::::::::::;:::::;:::::::::::::::::-:::::-::::: :::::::::::::::::::::::::::;:::::::::::;:::::::::::;:::::::::::::::::::::::::::f"IV' J:::::::-Y' :~:^:R\p~O' 'G'd:l\:M:::::::::::::::::: '.' .', ..-:.'-:-:.:.:-:-:.:-:-:.:-:-::::::-
, :I<~ ..u:~ .. . .. .. .. .. .. .. .. .... .. .. .. .. .. .. .. .. . .. . . ... .. , . .. .. .. .. .. .. .. , .. . .. . .. . .. . ~,. ~M .. . ~ ~ ...'.....'.....' Vtl!PROGRAIyWf;D.......
'. .::-. -:'. ,'..:-,..... .':'. '.-: .'. .':-. .... ,-:': .:-:.: .:. :.: -:-:.: -:::::.:-:-:.:- ::;:: -:.:-:-:-:-:- :-:.:. :-:':.: ::::::::;::}::::O:-6-;::::O:-1-:::::~<'O': ::::::;:::::;:::;:::::0::1:::;0-:6::::::P::::0:::::::::::::::::::::::O::-a;.;o:::':-g:<;~'-:O-::::::::::::::::;:::::O:-'g-,;.<:j:-o:.<::p:..'tl:.::::::::::::;:::;:::: ()..:. '1. . ~D C:. '1:1' :'P.{-:'R"'!::"'N:::;;':OO:-::--:t.:':u,';:' :;;;;;;:::
.+..... >. .,.. ........... .. . .........- . .. .......... . ..-......... .-.... . _ 1." +1"\0.",
.......... . . ..... ..... . ... ........T.. . < ... "," .... .. ... .. ...... . .
. ... ... ..... ... ..... ..... or. .... . ...... ....," 0.. ........... ....... ...._r....... ... "+".< ..+. .+. .+..... >, .. ..
MINOR STROM DRAIN IMPROVEMENTS 9612
Fumllng for emergency d"'lnage repair. el nlKlded In verioul
Iocalloos
Project Cost
75,000 SO
75,000 SO
75,000 SO
75,000 SO
75,000 SO
MONTA VISTA STORM DRAINAGE SYST.
9620
Inolalle\loo of stonn drall1l1ge eystem In Monta Viela Area.
Llneeto be lIIelalled on Orange Avenue end Byrne Avenue.
Design and ConstructIon
874,000 SD
MASTER STORM DRAIN PLAN UPDATE
The Meelel' Slom1 Drain Plan waelae' updated In 1993, thie update
would evaluete \he eldsUng syelem end make recommendeliolll,
Indudlng lea updaLee.
Design and Construction
30,000 SO
.......
We
-4
~
-
'u' 'N'" 'F' 'U.., N..D.... "D" .... .... '.' c.... 'E' 'c" 'Tc 's' ........................'...... . ...'................,...................,'.'.....'........................'f.. 'I'V'" E" "y' "'E" A'" 'R" "'p' "R" '0' "'G' "RAM" '.' '.' '.' .,'..............,.........,.............................'..
. o. .. ... ....... 'TO .+.. > ..,.. ,...,. ..... o. ,.. ......., "0' ..... o. . .. o. 'T _ c..... .+. ". ..... .......+..+...
. . o. ... ..." .." o. .... .r. ... ....... ................... o. ........... .., ,..... ....... ...... ,..," ...... ......
.. .... . .. ... . ...... .0.. 0.... o. 0.. ...... .... .... ..... ... o. .... ..... + 0... .. ..' . ........ ... .... ..... .0". o. .....
'. . . . ..,.:-. . . .'. : . ..e: . ..:-PRQ~.. . : . .': .'. : .':';';':-:-:-:-::';';':':-:- :-:-:-:-:-:.;.:-:.;-:.;-:.:-:-:-:-:-:-:.;-:.:-:-:-:.:-;.:-:-:-:-:-:.:-:-:-:: .-:'. : ..: . .':-: .'. . . ... . :'. :-. :.; :-. . : ... . . .'. . .'. . . .':-:';':-:';':-:-:';':-:-:-:';-:';':-:';';.:-:.;.;.:-:-:-:-:-
PARKS
Rancho Rinconada Park Construction
Stocklmeir Property Improv. (roof repairs)
BUILDINGS
Quinlan Fountain
City Hall Remodel with Seismic/ADA
Fire Code Upgrades (Essential Building)
Comm. Hall Reception Auto. Door Upgrade
&: TRAFFIC FACILITIES
~
~
-.t.
~
STORM DRAINAGE
Bubb/McClellan Storm Sewer Upgrade
TRAILS
..................0. .a;....O.7...F. o' ..................... . . '0'8' 'F' o' ....'..'.............08.'.00. 'g' "F' o' ...............'.....o.S-'. "'0' "F' .0:.................,'..'1.0. '.1......F. '.0:...,'....,'..'..............
c......'...'........ .' . ...........'.....'..OI~ . . ,.............,..... .. '. ......',.....,..... ...... .................... '';'. .1.'. ..........................
0.. c. ...+, ,'_" .+. o. 0.. o. . . .... ...... . ..,. ... 0.. o. . . . o. 0.. .... . . . ... ... 0.. c..
1,000,000
50,000
150,000
3,000,000
45,000
750,000
2,000,000
Exhibit B
City of Cupertino Programmed Projects
5- Year Capital Improvement Program
Fiscal Years 2006-07 to 20010-11
And General Plan Consistency Notes
Stevens Creek
Corridor Park
Mary Avenue Bicycle
Footbridge
Bollinger Bike Lanes
over Calabazas Creek
Brid e
Memorial Park
Softball Field
Rancho Rinconada
Park
Library Play Field
McClellan Ranch
Facility
Improvements
City Hall Emergency
Generator/PG&E
Upgrade
Restoration of Stevens Creek btw.
Stevens Creek Blvd. & McClellan
Rd. Reduce picnicking from 4.000
to 800, install multiuse trail,
reconstruct facilities
Construction of a bicycle
footbridge on Mary Ave.
ali ent over Hi wa 280.
City's contribution to widen
bridge for bicycle lanes over
Calabazas Creek. '
Renovation of existing softball
field
Acquisition of SJW property for
neighbor park purposes
Renovation of existing play field.
with irrigation & turfrestoration
Replace irrigation system for
Comm. Gardens; Repaint and
fumigate bam, bathrooms & water
tower; rebuild or replace garden
shed.
Remove existing emergency
generator and undersized
transformer. Upgrade main
electrical ane!.
Implements trail plan and
decreases reliance on private autos.
Policies 4-2. 4-3. 4-7, 4-13.
Maintains usability of City parks
and rec. facilities. See general plan
text a es 2-46, 2-51.
Manage neighborhood traffic and
decrease reliance on private autos.
Policies 4-2. 4-3. 4-7, 4-13.
Manage neighborhood traffic and
decrease reliance on private autos.
Policies 4-2.4-3.4-7.4-13.
Maintains usability of City parks
and rec. facilities. See general plan
policy text pages 2-46. 2-51.
Projects that increase the inventory
ofparklands, particularly in
neighborhoods that are deficient in
parks. See general plan policies 2-
74.2-82 and 2-83
Maintains usability of City parks
and rec. facilities. See general plan
text pages 2-46. 2-51.
Maintains usability of City parks
and rec. facilities. See general plan
text pages 2-46.2-51.
Maintains usability of City facility.
No direct policy connection to
General Plan. No conflicts with
Plan
3~n
Sport Center Tennis
Court Lighting
Library
Improvements &
U ades
Community Hall
Improvements &
Upgrades
Monta Vista Park
Building HV AC
R lacement
Service Center
Security Gate
Pavement
Management
Curb, Gutter &
Sidewalk Repairs
City Monument Signs
Replacement
Rancho Rinconada
Street Study
Design of Tennis Court Lights for
Night Time Use
Lighting upgrade to various
interior areas in the library
Dais shelving and storage
installation, patio wall protective
coating
Replace existing HV AC system on
building.
Install a more secure automatic
gate at the Service Center
Ongoing maintenance of street
pavement, which may include
pothole filling, slurry sealing and
overlayment.
Funds for the repair of curb, gutter
and sidewalks when they meet
repair criteria
One on Foothill Blvd. to be moved
to SCB at SR85. Replace one at
SCB at Tantau Avenue
Neighborhood street circulation
study.
Neighborhood Traffic Funds for roadway modifications
Calming Measures to slow and redirect auto traffic
Safe Routes to School
Garden Gate & Signal
Upgrade at Stelling
Rd./Greenleaf
Install sidewalks where gaps exist
on Stelling Road, Greenleaf Dr &
on Ann Arbor Ave. to provide safe
route to Garden Gate School.
Traffic signal upgrade of County
installed traffic signal.
Maintains usability of City parks
and ree. facilities. See general plan
policy text pages 2-46, 2-51.
Improves library service. See
policy 2-61.
Maintains usability of City facility.
No direct policy connection to
General Plan. No conflicts with
Plan
Maintains usability of City parks
and ree. facilities. See general plan
text a es 2-46, 2-51.
Maintains usability of City facility.
No direet policy connection to
General Plan. No conflicts with
Plan
Safety and functioning of the
City's circulation system. See
general plan policies 4-1, 4-6 and
4-12
Manage neighborhood traffic and
deerease reliance on private autos.
Policies 4-2,4-3,4-7,4-13.
Reduce flooding risks. See Flood
Hazard text a e 6-25.
Provide distinctive community
gateways at major entry points.
See olic 2-8.
Safety and functioning of the
circulation system. See policies 4-
1.4-6 and 4-12
Manage neighborhood traffic and
decrease reliance on private autos.
Policies 4-2, 4-3, 4-7, 4-13.
Manage neighborhood traffic and
decrease reliance on private autos.
Policies 4-2, 4-3, 4-7, 4-13.
Safety and functioning of the
circulation system. Policies 4-1, 4-
6 and 4-12
3/tjtj
Yellow & Ped Head
LED Traffic Signal
Upgrade
Countdown Ped
Heads
SCB/SR85 on Ramp
Crosswalk Imps.
Collins Elem School
Zone Beacons &
Li 15
Vehicle Count
Stations
SVITS Extensions
Remove Traffic Sig.
Flashing Red L T
arrows
Minor Storm Drain
1m rovements
Monta Vista Storm
Drainage System
Master Storm Drain
Plan Update
Stocklmeir Property
Improvement
Comm. Hall
Improvement
Funding for emergency repairs as
needed in various locations.
Installation of new storm drainage
system in Monta Vista area. Lines
to be installed on Orange Ave and
B e Avenue
Update 1993 plan by evaluating
existing system and make
recommendations. including fee
u date.
2006-07 Pro' ects Listed as Unfunded
Repair roof of former Stocklmeir Maintains usability of City parks
Residence and rec. facilities. See general plan
text a es 2-46,2-51.
Maintains usability of City facility.
No direct policy connection to
General Plan. No conflicts with
Plan
Re-Iamp all yellow & ped head
indicators with LED in all traffic
signals.
Re-Iamp existing ped traffic
signals with LED countdown units
throughout the City. Funds will
com lete 20 intersections.
Improve crosswalks at Stevens
Creek Blvd. and SR85
Install advance flasWng beacons
and flasWng red lights at stop
si in the Collins School Zone.
Install traffic count stations at De
Anza & Lazaneo, and De Anza &
Pro ect Rd.
Install cable and boxes to connect
City traffic facilities to Regional
Intelli ent Trans ortation S tern
Removal of flasWng red left turn
arrows at 4 traffic signals.
Reception Room Automatic Door
Upgrade
Safety & functioning of circulation
system. Policies 4-1, 4-6 and 4-12
Manage neighborhood traffic and
decrease reliance on private autos.
Policies 4-2, 4-3. 4-7. 4-13.
Manage neighborhood traffic and
decrease reliance on private autos.
Policies 4-2,4-3,4-7.4-13.
Manage neighborhood traffic and
decrease reliance on private autos.
Policies 4-2,4-3,4-7.4-13.
Safety and functioning of the
circulation system. See policies 4-
1,4-6 and 4-12
Safety and functioning of the
circulation system. See policies 4-
1,4-6 and 4-12
Safety and functioning of the
circulation system. See policies 4-
1,4-6 and 4-12
Reduce flooding risks. See Flood
Hazard text a e 6-25.
Reduce flooding risks. See Flood
Hazard text page 6-25.
Reduce flooding risks. See Flood
Hazard text page 6-25.
3~5D