Loading...
.01 TM-2010-01 Donna VingoOFFICE OF COMMUNITY DEVELOPMENT CUPERTINO CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014 -3255 (408) 777 -3308 • FAX (408) 777 -3333 • planningCdcupertin.o.or� PLANNING COMMISSION STAFF REPORT Agenda Item No. A— Agenda Date: March 9, 2010 Application: TM- 2010 -01 Applicant: Donna Vingo (Applicant), Russell Marshall Trustee (Owner) Application Summary: Tentative Map to subdivide an approximately 41,800 square foot parcel into five parcels ranging from 6,400 square feet to 8,800 square feet located at 790 South Blaney Avenue. RECOMMENDATION Staff recommends that the Planning Commission approve the Tentative Parcel Map in accordance with the model resolution. PROJECT DATA General Plan Designation: Low Density (1 -5 Dwelling Units /Gross Acre) Zoning Designation: R1 -6 (Single Family Residential - 6,000 square feet 1 -1 minimum) Total Gross Lot Area: 47,025 square feet (1.08 acre) Total Net Lot Area: 35,588 square feet (0.82 acre) Proposed Lot Areas: Lot 1: 6,722 square feet (0.15 gross acres) Lot 2: 6,525 square feet (0.15 gross acres) Lot 3: 6,461 square feet (0.15 gross acres) Lot 4: 8,890 square feet (0.20 gross acres) Lot 5: 6,990 square feet (0.16 gross acres) Existing Land Use: Single - family residential Proposed Land Use: Single - family residential Existing Density: 0.93 du/ gross acre Proposed Density: 4.63 du /gross acre Project Consistency with General Plan: Yes Zoning: Yes Environmental Review: Categorically Exempt per Section 15333, Class 33 (In- Fill Development Projects) of the California Environmental Quality Act (CEQA) 1 -1 TM- 2010 -01 Donna Vigno (Russell Marshall Trustee) February 23, 2010 Page 2 BACKGROUND Site Description The subject property is located at the northeast corner of South Blaney Avenue and Clifford Drive surrounded by single- family homes. Currently the site consists of a single- family home, a detached garage and a shed located at the eastern corner of the property. The home is currently accessed by a circular driveway along South Blaney Avenue that leads to the residence and to the detached garage. The existing home that is currently on the site was reviewed by the Historic Research Committee in 1997, and the report concluded that due to the amount of modifications and additions to the original structure, and the limited historical impact by the various families who have lived on the site, the home was not historically significant. The house is also not included on the City's General Plan Historic Resources List. All of the existing structures are proposed to be demolished prior to the recordation of the final map. Zoning and General Plan Conformance The subject site is located in a R1 -6 zoning district with minimum lot size of 6,000 square feet. The applicant is proposing to subdivide the existing 41,800 square foot parcel into five single- family residential lots, ranging from 6,461 to 8,890 in size. The proposed project is consistent with the General Plan and the RI Ordinance. DISCUSSION Subdivision Design The proposed five parcels are configured in a mariner to allow two of the lots (Lots 1 and 2) to face and access South Blaney Avenue, and Lots 3, 4 and 5 to be accessed from Clifford Drive (see Tentative Parcel Map, Attachment 1). 1 -2 TM- 2010 -01 Donna Vigno (Russell Marshall Trustee) February 23, 2010 PaLye 4 `' �+{► -- VWWI* "mow t ?'iC3 VUW* W L u; V - f KTZ Staff supports the proposed project provided that final house design on lot 5 shall be consistent with the conceptual plan included with this review. Site Improvements Frontage improvements will involve the construction of street frontage along South Blaney Avenue and Clifford Drive consisting of a 10' street dedication for curb, gutter, sidewalk and landscape strip. The applicant will work with staff on the number, location, and species of the new street trees within the landscape strip. Trees The project is anticipated to remove approximately 26 trees. The trees are being proposed for removal because they are either located in the public improvement area, located within the buildable area of the future residences, or are insignificant in size and species. None of the trees are protected per the Zoning Ordinance (14.18.035). Staff recommends that the formal tree removal request and any mitigation /replacement plan be reviewed and approved in conjunction with the full submittal of the design review for the five homes. Cupertino Sanitary District The Cupertino Sanitary District has reviewed the project and states that sanitary sewer service can be provided to the proposed parcels via South Blaney Avenue (see Attachment 2). 1 -4 TM- 2010 -01 Donna Vigno (Russell Marshall Trustee) February 23, 2010 PaLre 3 Conceptual House Plan (Lott) Typically, for a subdivision of this size, especially when the property is irregular in shape and located in a dense residential neighborhood, the City prefers to review and approve the design of the homes in conjunction with the subdivision map request. The concept is that when a subdivision is approved, the future property owners assume the right to build in accordance with R1 Ordinance. Therefore, potential building design and interface should be considered at the subdivision review phase to ensure that proper and reasonable house designs may be approved without compromising the integrity of the neighborhood. Due to financial considerations, the applicant is not able to submit full architectural and site plans for all five lots. Instead, a conceptual plan of Lot 1 has been provided to demonstrate that it can facilitate a reasonable and compatible house design. The applicant has also agreed to a condition that requires full design review approval for all five homes prior to recordation of the final map. The architectural details illustrated in "Plan 1(Lot 1) Front Elevation- Spanish Style" are intended to represent the level of design quality anticipated for the future residences (see Color Rendering in Attachment 1). The details are attractive and will enhance the neighborhood. 1 -3 TM- 2010 -01 Donna Vigno (Russell Marshall Trustee) February 23, 2010 PaLye 5 Categorical Exemption The proposed project is deemed categorically exempt per Section 15333, Class 33 (In -Fill Development Projects) of the California Environmental Quality Act (CEQA) since the project is characterized as follows: (a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. (b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. (c) The project site has no value as habitat for endangered, rare or threatened species. (d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. (e) The site can be adequately served by all required utilities and public services. Prepared by: Leslie Gross, Assistant Planner Reviewed by: ao City Planner Approved by: Aarti Shrivastava Community Development Director ATTACHMENTS Model ResoJution(s) Attachment 1 Plan Set Attachment 2 Cupertino Sanitary District comments G. lPlanntngTDREPORTpc TA4 reportsi2010lnnreportsiT.A4- ?010- Ol.doc 1 -5 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 MODEL RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPROVING A TENTATIVE PARCEL MAP TO SUBDIVIDE AN APPROXIMATELY 47,025 SQUARE FOOT PARCEL INTO FIVE PARCELS RANGING FROM 6,461 to 8,890 SQUARE FEET AT 790 SOUTH BLANEY AVENUE SECTION I: FINDINGS WHEREAS, the Planning Commission of the City of Cupertino received an application for a Tentative Parcel Map, as described in Section II of this Resolution; and WHEREAS, the necessary public notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held one or more public hearings on this matter; and WHEREAS, the applicant has met the burden of proof required to support said application; and has satisfied the following requirements: 1) That the proposed subdivision map is consistent with the City of Cupertino General Plan. 2) That the design and improvements of the proposed subdivision are consistent with the General Plan. 3) That the site is physically suitable for the type and intensity of development contemplated under the approved subdivision. 4) That the design of the subdivision or the proposed improvements are not likely to cause substantial environmental damage nor substantially and unavoidable injure fish and wildlife or their habitat. 5) That the design of the subdivision or the type of improvements associated there with is not likely to cause serious public health problems. 6) That the design of the subdivision and its associated improvements will not conflict with easements acquired by the public at large for access through or use of property within the proposed subdivision. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, the application for Tentative Parcel Map, file no. TM- 2010 -01, is hereby approved, subject to the conditions which are enumerated in this Resolution beginning on Page 2 thereof; and That the sub conclusions upon which the findings and conditions specified in this resolution are based and contained in the public hearing record concerning Application No. TM- 2010 -01 as set forth in the Minutes of the Planning Commission Meeting of March 9, 2010, and are incorporated by reference as though fully set forth herein. 1 -6 Model Resolution TM- 2010 -01 March 9, 2010 Page 2 SECTION II: PROTECT DESCRIPTION Application No.: TM- 2010 -01 Applicant: Donna Vingo (Russell Marshall Trustee) Location: 790 South Blaney Avenue SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on plan sets titled "Tentative Map, 790 S. Blaney Avenue, Cupertino, California ", dated January 2010, consisting of four sheets labeled 1 through 3, a Proximity Map, a Right -of -Way Dedication exhibit, and a color rendering showing potential new home design, except as amended by the Conditions contained in this Resolution. 2. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. 3. RESIDENTIAL DESIGN REVIEW The applicant and /or owner shall obtain design review approvals from the City for all of the proposed residential homes prior to recordation of the final map. Any proposed two - story residence shall require site and architectural approval of a two -story residential permit per Section 19.28 of the Single - Family Residential (R1) Zoning Ordinance. The home on Lot 1 shall closely resemble the conceptual rendering in architectural design and quality provided in the approved exhibits. In addition, the rest of the homes (Lots 2 - 5) shall be consistent and compatible with the Lot 1. 4. DEMOLITION OF STRUCTURES Prior to recordation of the final map, the applicant shall demolish and remove all structures on the property. All demolished buildings and site materials shall be recycled to the maximum extent feasible. The applicant shall provide evidence that materials will be recycled prior to issuance of demolition permit. 5. TREE PROTECTION This approval does not constitute any tree removals. A detailed tree removal/ preservation plan shall be submitted for review and approval prior to the approval of the home design. 6. CONSTRUCTION MANAGEMENT PLAN Final map improvement plans shall include a construction management plan detailing how construction activities will be conducted. The plan shall address, but not be limited to the following activities: 1 -7 Model Resolution TM- 2010 -01 March 9, 2010 Page 3 a. Construction staging area b. Construction schedule and hours c. Construction phasing plan, if any d. Contractor parking area e. Tree preservation/ protection plan f. Site dust, noise and storm run -off management plan g. Emergency and construction site manager contacts SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 7. STREET WIDENING Street widening and dedications shall be provided in accordance with City Standards and specifications and as required by the City Engineer. 8. CURB AND GUTTER IMPROVEMENTS Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades and standards as specified by the City Engineer. 9. STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjoining properties, and shall be no higher than the maximum height permitted by the zone in which the site is located. 10. FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed. 11. GRADING Grading shall be as approved and required by the City Engineer in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and /or Regional Water Quality Control Board as appropriate. 12. DRAINAGE Drainage shall be provided to the satisfaction of the City Engineer. Pre- and post - development calculations must be provided to indicate whether additional storm water control measures are to be installed. 13. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 14. UNDERGROUND UTILITIES The developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. The developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the City Engineer. Model Resolution TM- 2010 -01 March 9, 2010 Page 4 15. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement shall be executed prior to issuance of construction permits. Fees: a. Checking & Inspection Fees: b. Grading Permit: c. Development Maintenance Deposit: d. Storm Drainage Fee: e. Power Cost: f. Map Checking Fees: g. Park Fees: h. Street Trees $ 5% of Off -Site Improvement Cost or $2,468.00 minimum 6% of Site Improvement Cost or $2,217.00 minimum $ 2,000.00 Per Acreage ** $7,817.00 Per ordinance By Developer ** Based on the latest effective PG &E rate schedule approved by the PUC Bonds: a. Faithful Performance Bond: 100% of Off -site and On -site Improvements b. Labor & Material Bond: 100% of Off -site and On -site Improvement c. On -site Grading Bond: 100% of site improvements. The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 16. TRANSFORMERS Electrical transformers, telephone vaults and similar above ground equipment enclosures shall be screened with fencing and landscaping or located underground such that said equipment is not visible from public street areas. The transformer shall not be located in the front or side building setback area. 17. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 18. NPDES CONSTRUCTION GENERAL PERMIT The applicant must obtain a Notice of Intent (NOI) from the State Water Resources Control Board, which encompasses preparation of a Storm Water Pollution Prevention Plan (SWPPP), use of construction Best Management Practices (BMPs) to control storm water runoff quality, and BMP inspection and maintenance. 1 -9 Model Resolution TM- 2010 -01 March 9, 2010 Page 5 19. C.3 REQUIREMENTS The developer shall reserve a minimum of 4% of developable surface area for the placement of storm water treatment facilities on the tentative map, unless an alternative storm water treatment plan to satisfy c.3 requirements is approved by the City Engineer. The developer must include the use and maintenance of site design, source control and storm water treatment Best Management Practices (BMPs), which must be designed per approved numeric sizing criteria. A Storm Water Management Plan, Storm Water Facilities Easement Agreement, Storm Water Facilities Operation and Maintenance Agreement, and certification of ongoing operation and maintenance of treatment BMPs are required. The Storm Water Management Plan will be required to obtain approval from an approved third party reviewer, at the expense of the developer. 20. DEDICATION OF WATERLINES The applicant shall dedicate to the City all waterlines and appurtenances installed to City Standards and shall reach an agreement with San Jose Water for water service to the subject development. 21. EROSION CONTROL PLAN The developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. 22. TRAFFIC CONTROL PLAN The developer must submit a traffic control plan by a Registered Traffic Engineer to be approved by the City. The plan shall include a temporary traffic control plan for work in the right of way as well as a routing plan for all vehicles used during construction. All traffic control signs must be reviewed and approved by the City prior to commencement of work. The City has adopted Manual on Uniform Traffic Control Devices (MUTCD) standards for all signage and striping work throughout the City. 23. TRAFFIC SIGNS Traffic control signs shall be placed at locations specified by the City. 24. PEDESTRIAN CROSSWALKS The developer shall provide pedestrian crosswalk improvements at Clifford Drive and Blaney Avenue. Final crosswalk improvement plan shall be reviewed and approved by the City Engineer. 25. TRASH ENCLOSURES The trash enclosure plan must be designed to the satisfaction of the Environmental Programs Manager. 26. REFUSE TRUCK ACCESS The developer must obtain clearance from the Environmental Programs Manager in regards to refuse truck access for the proposed development. 27. STREET TREES Street trees shall be planted within the Public Right of Way and shall be of a type approved by the City in accordance with Ordinance No. 125 1 -10 Model Resolution TM- 2010 -01 March 9, 2010 Page 6 28. SANITARY DISTRICT A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior to issuance of building permits. 29. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. 30. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG &E, PacBell, and California Water Company, and /or equivalent agencies) will be required prior to issuance of building permits. 31. WORK SCHEDULE A work schedule shall be provided to the City to show the timetable necessary for completion of on and off site improvements. CITY ENGINEER'S CERTIFICATE OF ACCEPTANCE OF ENGINEERING/ SURVEYING CONDITIONS (Section 66474.18 of the California Government Code) I hereby certify that the engineering and surveying conditions specified in Section IV. Of this resolution conform to generally accepted engineering practices Ralph Qualls, Director of Public Works City Engineer CA License 22046 PASSED AND ADOPTED this 9th day of March 2010, at a Regular Meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSTAIN: COMMISSIONERS: ABSENT: COMMISSIONERS: ATTEST: Aarti Shrivastava, Director Community Development Department APPROVED: Paul Brophy, Chair Planning Commission G: � P1anning \ PDReport \ Res \ 2010 \ TM- 2010- 01.doc 1 -11 TENTATIVE MAP APN: 369 -11 -048 30' Y!L as cat sae rpm FLoaR 2c WL s;— d 10U. PAD E3�1 ,= TYPICAL BUILDING SECTION In m So" +zo 1+40 1+60 1+e0 2+00 2+20 2+40 SECTION A —A WAS Mm=ffx. 18-1c m,1m. 1 WATER: SAN JOSE WATER COMPANY TELEPHONE: ATT SEWER: CUPERTINO SANITARY DISTRICT LM VSZ: RESIDENTIAL souitcr Or c011710 R. TOPOGRAPHIC FIELD SURVEY BY NORDIC ENGINEERING vrau 0+qu 3+50 s+w 6+w 0+20 SECTION B —B Scat.: HORONTAU e• -10 1 -12 PROJECT INFORMATION APPMICAffr. Blaney Venturs, L LC MIks McOldon 1448 Entrnda Verde Plaos Alamo CA 94507 923 785 4646 FAX 923 944 9108 mmoddanOsbcoobal.net OFNML. Ths Solsy Trust 15 L.F. W H.O X PPE RETWON aclY Ir The Successor Trustee Is Russell Marshall Nm UM T cAsr sea MATE CAMPBELL CA 95009 "CHIAM• MARIUS E NEI SEN. R.C.E. 20597. DIP. 9/11 — T NORDIC ENGINEERING 31r oww noac 21801 STEIIENS CRFF.If BOULEVARD. STE 8 CUPERTINO, CALIFORNIA. 95014 TEL (408) 257 -6452 s• FAX (408) 257 -6821 I P PROPrRTY ADAWSS AND 1PAI: or I CUPERTINO. CALIFORNIA APN: 369 -11 -048 PROPOMM Iv7MZA Of LOTS: 5 WXM AARk 4 7,025 5589 S0 . PERCOLATION PIT DETAIL ' NOT m ScAu ELECTRIC AND GAS P G. a& E. 6+40 6+00 100 se Y � : All � S �� A e.l i• w IK Ie�oN= er (n O N Q 4 a� n . L O W LL— U < � W U Q z w O M Z Q co W Z O n W � � w:C. awaw 2mo _.. GC ,-6 3 DOST.) B Y �I�R�M� AIL &VNT I LTiLTTY POLE 9$ 14 I Foz. LOT I I I ' NET AREA: I I LOT 5 I 8,890 SQ. FT. I I NET. AREA: 6,990 SQ. FT. I I 1 I I Ti00 1 i i TUULDQ. SEMI 1 � I ,► wx am 1 I I SE09X I I s 1 I 1 III I � 1, I I LEMON I I I g � l I I s • 1 I c 7wm X I / saTaA�c I�ORAR MAIL AND EL. -10LOr ((ASKIMED( )f SCALE. 1• - 10' kp lltx \ 0, \ \\\\\ \ 1 I 4 LEMON I J vv 100, .0000' .000 \ 1 I 1 Q) / ti I ORAIN ' AOEAW Lo W �� 1 0I Culls AND GUTTER LEGEND: PROPERTY LINE * CENTER LINE - - Rl0 T- OF-WAY UK CONTOUR LINE EDGE: OF ASPHALT O o 1WEELINAR RAMP SANUTARY SETGR YANIOLE APPRON"'m LOOA7TON OF NEB POMDt POLE FAL IMJW"0 FAL Im"! \ �— d x - - -- - - -- — - 1-- - - - - -� _ 1 1 NEW HOUSE I BIO. STALE MsT. aolNT F007MNT LOT 1 am TO BE Tom► PAD -10Z NET AREA: 3-m e \ 6 SQ. FT. J i T RVfNOq! K N 0 E am / / 1 I 1 INSTALL PERPOLAATOON PIT TS'L.F U 7 S OF 70 10= a- 4`tREE 1 1 � WrAAL 9lET / / / NET AREA: c7ilwcAL PER Ell. LOT) 6,461 SQ. FT. 1 / 100, 1-01 24OP93MM If Xr.\ � V B g ' 1 ' 0 ILL \ SE78AM / HM COI O LL_ Q W ODae _ :369 -11 -048 1 GROSS AREA: 0 47,025 SO. FT. 1 DRAINAGE MaEr \ 1.08 AC. 1 QU7E- 100.40 i A Ta ` I r NET AREA: , pElDnW SEE WTAL MR \ C 35,589 FT. y ES► L CTIIIIIII put EA. LOT) [' a < 0.82 AC. . ` / saTaA�c I�ORAR MAIL AND EL. -10LOr ((ASKIMED( )f SCALE. 1• - 10' kp lltx \ 0, \ \\\\\ \ 1 I 4 LEMON I J vv 100, .0000' .000 \ 1 I 1 Q) / ti I ORAIN ' AOEAW Lo W �� 1 0I Culls AND GUTTER LEGEND: PROPERTY LINE * CENTER LINE - - Rl0 T- OF-WAY UK CONTOUR LINE EDGE: OF ASPHALT O o 1WEELINAR RAMP SANUTARY SETGR YANIOLE APPRON"'m LOOA7TON OF NEB POMDt POLE FAL IMJW"0 FAL Im"! \ �— d x - - -- - - -- — - 1-- - - - - -� _ 1 1 NEW HOUSE I BIO. STALE MsT. aolNT F007MNT LOT 1 am TO BE Tom► PAD -10Z NET AREA: 3-m e \ 6 SQ. FT. J i T RVfNOq! K N 0 E am / / 1 I 1 INSTALL PERPOLAATOON PIT TS'L.F U 7 S OF 70 10= a- 4`tREE 1 1 � WrAAL 9lET / / / NET AREA: c7ilwcAL PER Ell. LOT) 6,461 SQ. FT. 1 / 100, 1-01 24OP93MM If Xr.\ � V B g ' 1 ' 0 ILL � < HM COI O LL_ Q W ODae _ 0 z NEW IN WDE DRNEYAY TVPIC& FOR EACH LOT. V , Li �— O E cr) 1 ar R0. 2094E „^ [' a < ✓eir iWUr1R1' 7010 HM THIS 6 A 701 �` YAP. NOT A BM*dM Y SURVEY. CWfd� 5s 1 • -10 PROPERTY LINES SHOUN ARE OERrWW F CIM REOORO DATA. u CAD AND MAY VARY SOYEIMIAT FROM ABSOLUTE BOUNDARY LOCATIONS 5-a I APPR0MATE 1� P NE71 7RAN9TION CONC. \ \ E10SiM10 girm 70 AWK DINE —� \ \ t ,., ONER�EAD P01ER LN U7LrFYPOLE t \TO E m \ EOaE OT \ \ \ FOUL LIP. a Boot s \ + l(k NAIL AND 9NlQ! e.J-nOLW ( A SS •s• SCAM. 1• - 10 CDC cum AND GUTTER s' WOOD FENCE .000 � wum Cott t ulluTY POLE APN: 369 -11 -048 GROSS AREA: 47.025 SQ. FT. 1.08 AC. NET AREA: 35.589 SO. FT. 0.82 AC. tr.�'�nwoOOs t \ ,1f► , l ir LEMON !' MOOD FENCE I A- '� �4- 6'FIIUT I I I I r I Wac irlT � �I el s. �I r� � I GARAGE r CAR I \ DRIVEMMY� \ � ♦ s'xrtD9io � \ oONOESTW �di \ 4• LEMON 70 BE REMlIrM r � I -30 c TREES TVP. � SrnaN EDaE . \ ' ASPF 70 OC ' / ClNM ls ON + [#lT1E1t df i LEGEND: PROPERTY LINE , p.� FOUND \ ♦ / r �� = • v \ /� cE L!E Box \\ ♦ `caNCE — � � � 1 , , 1i7Q1 \ y DR111EDAY `k ? .' `. I :t; • \ /p �; � QfT -OF -SAY LINE Y f f f e r �\ C S C O� Q Jfb IO 20.581 OMMUR LIE EDOF OF ASPHALT \ �A". AR RAMP NOT 6 A 7OPOOtAR LI SUR VE Y. y \ / PROPERTY LIES SFIOwi ARE f �/ / �` �•`� OERFM FROM REOORD DATA. i ' 7- =r-r t t . • 'REDrIO00 i AND IiAY VARY SOE1fiAT FROM SANITARY WVER MANN01.4: �' �. i +\ �\ / ABSOLUTE BOUNDARY LOCA71ONS 4 x RENIBm MY N E 0 E W � Q Z z Cn W W Q 0 W Q z U LjJ m G �- (J) Li W cy) Jcs dA1lM 4010 :r w.-: CAD J= 1-a 9 >&w. 3 7 re `, s u"u. K-Tisma BY 10401 GLENVIEW AW- E)CST. 104=44 1 ASMLLANEY A FIESKOXI 10455 GLENVIEW AVF- 10471 GLENVIEW AVE- MMIC MST. RESMENCE DIST. RESCENCE DIST. F43MCE � \ el� ? - I . wrloo I I \ % N 1 40 2C 0 20 40 SC&L. 11-2v low & AVE S DETACHED EXW. SOULE SIORY FESMEMM I F.R-1013V 00 % W\7 % %\ 00 Rm . % LEGEND: FRa=-=r 1-46- -- - - - -- C84TER UNE'r R)c44T--CF-w*1Y U4E ctwi7(AA u4E. tow r" V, FRE HYDRAJ-fT _M A, ukc% 4:T t 1-15 pt U r L C-i E f c 8 .3 ow LL � oc O z r- E5 6 Lu c z 0 CENTERLINE SOUTH BLANEI 20' DEDICATIO APN: 369 -11 -048 790 SOUTH BLANEY AVE., CUPERTINO, CA L�1 PLAN 1- LOT 1 4 BED 13 BATH N.T.S. W Z� K, O j ARCHITECTURAL W { DETAILS 0- 1 i V (< T - d " Y W r ay ~ ti ��r SMOOTH FINISH PLASTER 4 DECORATIVE LIGHT F"ES DECO RAILING - ~ RECESSED - ' ARCHITECTURAL PROMINENT --J � ZUILT OUT �t-- RECESSED SURROUNDED PAnO WINDOWS DeTATLS ENTRY 1/1►JTH 54SE GARAGR DOORS DECORATIVE TILES PLAN 1 (LOT 1) FRONT ELEVATION - SPANISH REVIVAL N.T.S- u� Z� F. J � � �i W, a of of C� -BS 2 BLANEY HOMES CUPERTINO, C j ,,f j i FOFi€NiA JANUARY 27. 2010 A RCH t l ri: a f: - PLANKI AG - CK BAN OrSIG lm.W.Vtbl.COTR El -!toC 4A `- ' Lrym D ` ° \- i P&TIQ 1 tic a 1 0 13ARAGE 1 ,1 U BATH t t. 1 f --------------------- >------ - - - - -- PRopem - - - -- ------ - - - - -- ------- - - - - -J PLAN 1- LOT 1 4 BED 13 BATH N.T.S. W Z� K, O j ARCHITECTURAL W { DETAILS 0- 1 i V (< T - d " Y W r ay ~ ti ��r SMOOTH FINISH PLASTER 4 DECORATIVE LIGHT F"ES DECO RAILING - ~ RECESSED - ' ARCHITECTURAL PROMINENT --J � ZUILT OUT �t-- RECESSED SURROUNDED PAnO WINDOWS DeTATLS ENTRY 1/1►JTH 54SE GARAGR DOORS DECORATIVE TILES PLAN 1 (LOT 1) FRONT ELEVATION - SPANISH REVIVAL N.T.S- u� Z� F. J � � �i W, a of of C� -BS 2 BLANEY HOMES CUPERTINO, C j ,,f j i FOFi€NiA JANUARY 27. 2010 A RCH t l ri: a f: - PLANKI AG - CK BAN OrSIG lm.W.Vtbl.COTR Attachment 2 DISTRICT MANAGER - ENGINEER MARK THOMAS & COMPANY, INC RICHARD K. TANAKA N I TA,Q l �o 6 Is HE'D BOARD OF DIRECTORS WILLIAM A. BOSWORTH JOHN M. GATTO CURTIS B. HARRISON WENDELL H. KERR, JR. CHRISTOPHER C. LEE DISTRICT COUNSEL ATKINSON • FARASYN, LLP. HAROLD S. TOPPEL February 11, 2010 20833 STEVENS CREEK BOULEVARD, SUITE 104 CUPERTINO, CALIFORNIA 95014-2154 (408) 253 -7071 PHONE • (408) 253 -5173 FAX www. cup ertinosanitarydistrict. com File: CSD — MOPO Planning Department - Cupertino Leslie Gross Community Development Department - Planning City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 -3255 Subject: Tentative Map to subdivide an approximately 41,800 square feet lot into five parcels ranging from 6,400 to 8,800 square feet. Name: Russell Marshall Trustee (Donna Vingo) Address: 790 S. Blaney Avenue APN: 369 -11 -048 Planning Application No: TM- 2010 -01 Dear Ms. Gross: The Cupertino Sanitary District has reviewed the tentative map and has the following comments: • Sanitary sewer service can be provided to the proposed parcels via S. Blaney Avenue and Clifford Drive. There is one existing lateral connection for the entire parcel on Clifford Drive. • It is anticipated additional Cupertino Sanitary District Fees and Permits shall be required for the proposed development. • Improvement plans for the subject project shall be reviewed by the District. SUPPLYING SANITARY SEWERAGE SERVICES FOR: CITY OF CUPERTINO, PORTIONS OF THE CITIES OF SARATOGA, SUNNYVALE Los ALTOS AND SURROUNDING UNINCORPORATED AREAS 1 -18 Page 2 Subject: Tentative Map to subdivide an approximately 41,800 square feet lot into five parcels ranging from 6,400 to 8,800 square feet. Name: Russell Marshall Trustee (Donna Vingo) Address: 790 S. Blaney Avenue APN: 369 -11 -048 Planning Application No: TM- 2010 -01 Please feel free to contact Nichol Bowersox at (408) 253 -7071 if you have any questions or concerns. Yours very truly, MARK THOMAS & COMPANY, INC. District Manager- Engineer r G' for Richard K. Tanaka SUPPLYING SANITARY SEWERAGE SERVICES FOR: CITY OF CUPERTINO, PORTIONS OF THE CITIES OF SARATOGA, SUNNYVALE, LOS ALTOS AND SURROUNDING UNINCORPORATED AREAS 1 -19