Loading...
10-17-2024 Agenda Item #2 Desk Item PV Design Installation Plus Attachments CITY OF PUBLIC WORKS DEPARTMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 TELEPHONE: (408) 777-3354 • FAX: (408) 777-3333 CUPERTINO CUPERTINO.ORG SUSTAINABILITY COMMISSION STAFF REPORT DESK ITEM Meeting: October 17, 2024 Agenda Item#2 Subject Capital Improvement Program Photovoltaic Systems Design and Installation project. Recommended Action Recommend that City Council approve the Capital Improvement Program Photovoltaic Systems Design and Installation project's conceptual design for five City facilities: Cupertino Library, Community Hall, Cupertino Sports Center,Blackberry Farm, and Quinlan Community Center. Background: Staff added financial information to the staff report. Attachments include the redlined and clean versions of the staff report, as well as an additional table in Attachment D. Attachments Provided with Original Staff Report: A. —FY 24-25 CIP Project Narratives Excerpt Additional Attachments Provided with Desk Item: B. Redlined Staff Report with Changes C. Clean Staff Report with Changes D. PV Project Cost Savings Attachment B CITY OF PUBLIC WORKS DEPARTMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 TELEPHONE: (408) 777-3354 • FAX: (408) 777-3333 CUPERTINO CUPERTINO.ORG SUSTAINABILITY COMMISSION STAFF REPORT Meeting: October 17, 2024 Subject Capital Improvement Program Photovoltaic Systems Design and Installation project Recommended Action Recommend that City Council approve the Capital Improvement Program Photovoltaic Systems Design and Installation project's conceptual design for five City facilities: Cupertino Library, Community Hall, Cupertino Sports Center, Blackberry Farm, and Quinlan Community Center. Executive Summary This report provides scope and fiscal information on each proposed site of the Photovoltaic Systems Design and Installation(PV) Capital Improvement Program (CIP) project. Background Information The PV project was approved by the City Council as part of the Fiscal Year (FY)24-25 annual budget. The PV project description included in the budget adoption and meeting details is attached (Attachment A). The Net Energy Metering (NEM)program is administered by the California Public Utilities Commission and provides credits to a building's utility bill for producing excess on-site clean energy over a 20-year period. In 2023 PG&E announced a rate decrease for electricity generated by photovoltaic (PV) systems (NEM 3)but provided a window to allow grandfathering the more economically attractive NEM 2.0 rates if interconnection applications were successfully submitted and corresponding systems operational by 2026. Reasons for Recommendation NEM 2.0 Interconnection Applications were successfully submitted to PG&E for five Cupertino facilities:Blackberry Farm Recreation and Pool facility, Community Hall, Cupertino Library, Quinlan Community Center, and Cupertino Sports Center. This Project aims to design and build PV systems at all five locations. NEM 2.0 projects must be completed by April 15,2026 to receive the incentive. Otherwise, the NEM 3.0 program, that offers reduced incentives/savings,would need to be pursued. NEM 2.0 provides 75-80% greater compensation than NEM 3 rates for electricity that is fed back into the electrical system. The savings in utility costs are projected to be$500,000 annually, and$4-7-.8 26.5 million over a 30yr lifespan. For more detail, please see attachment B. The City CIP staff is compiling a Conceptual Design Report that includes technical and cost analysis data for each site. The following narratives from that report depict the proposed layouts and projected cost savings at each site. Cupertino Library A number of options were considered for this site. The Library roof locations have an advantageous size,but only one of the large roofs is well-oriented to the west or south. Standing seam rooftops (supporting the two largest rooftop arrays) are ideal for supporting solar, as racking can be clamped to the standing seams as opposed to penetrating the roof surface. Long trenching/boring routes will be required to consolidate generation at point of interconnection. While the proposed carport locations took the trees into consideration, some smaller trees will need to be removed or significantly trimmed to support the installation. The electrical bill at the Library would be reduced from-$325K annually to-$120K annually, with projected lifecycle savings of$11.7 million. The City's costs for design and construction of$2.6 million could be recouped in approximately 11 years. The complication for the Library site is that the tenant, the Santa Clara County Library District(SCCLD), pays the electrical bill. The fiscal benefit of the cost savings from the photovoltaic installation would go to the SCCLD for the next twenty years. The payback period for the project would be extended accordingly. 1 fto - ;*4 *�Y r' MWWI s L „ i Uesig Library!Civic Center ip . 5 Uc Nameplate 422.8 kW f AC Nameplate 403.0 kW(1.05 DC1AC} j�J �i '! - Library Meter#1932850108 Last 12 months kWh usage 1,048,978 Construction Cost- PV only $3,801,000 Last 12 months cost of electrical $322,517 Construction Cost- EV only $300,000 Cost per kWh (ave.) $0.31 Construction Cost-Total (PV+EV) $4,101,000 PV systems kWH generation Direct Payback(IRA)funding (40%, 621477 PV only) $1,520,400 PV systems annual savings* $202,501 City Funding $2,580,600 PV systems annual electrical bill** Payback period (years, discounted $120,016 cash flow) 10.65 PV systems lifecycle savings*** $11,701,727 ROI 453% Blackberry Farm Recreation and Pool facility A number of options were considered for this site. The building roof locations are too small for a simple installation, and the solar orientation is not ideal. The proposed layout is a single continuous system that requires fewer trenching/boring paths to the electrical point of interconnection. The installation is far enough from trees that tree trimming will not be needed to ensure solar access, and existing netting system will protect array from golf balls. With system shading parking stalls, proportional shade coverage will need to be provided on ADA parking stalls. The State and Cupertino green energy code for EV parking requirements are under review and may be substantial. The electrical bill at Blackberry Farm would be reduced from costing-$33K annually to generating a revenue of almost$6K annually(because the PV system would generate slightly more than the demand, and thus selling power back to PG&E). The lifecycle savings are projected to be$1.6 million. The City's costs for design and construction of $675K could be recouped in approximately 14 years. rr yy k Y, f' Design Blackberry Farm Carport r DC Nameplate 73.1 kW AC Nameplate 60.0 kW(1.22 DQAQ Meter#114315284 Last 12 months kWh usage 110,428 Construction Cost- PV only $955,500 Last 12 months cost of electrical $32,539 Construction Cost- EV only $100,000 Cost per kWh (ave.) $0.29 Construction Cost-Total (PV+EV) $1,055,500 PV systems kWH generation Direct Payback(IRA)funding(40%, 110948 PV only) $382,200 PV systems annual savings* $38,253 City Funding $673,300 PV systems annual electrical bill** Payback period (years, discounted -$5,714 cash flow) 13.99 PV systems lifecycle savings*** $1,587,032 ROI 236% Quinlan Community Center A number of options were considered for this site. Preserving significant trees and working within the aesthetics of the park were high priorities. This layout provides maximal shaded parking and significantly shaded picnic area. Utilizes existing roof areas, mitigating overall costs of the system. Northern carport will require some tree trimming(overall tree health will not be compromised,however) to maintain solar access and may require shade be provided for some existing ADA stalls. The picnic area structure will be designed to respond architecturally to the layout of the picnic area (rather than one large single shed roof as shown in the illustration). The electrical bill at Quinlan would be reduced from costing-$122K annually to generating a revenue of almost$33K annually(because the PV system would generate slightly more than the demand, and thus selling power back to PG&E). The lifecycle savings are projected to be$7.4 million. The City's costs for design and construction of $1.6 million could be recouped in approximately 9 years. t o aeslp Quinlan Community Center 6CNameplate all kW �9 h AC Nameplate 773.E k'N f 1 i D71A(_) y Quinlan Center Meter#0116367009- 116367840 Last 12 months kWh usage 383,109 Construction Cost- PV only $2,341,500 Last 12 months cost of electrical $121,336 Construction Cost- EV only $150,000 Cost per kWh (ave.) $0.32 Construction Cost-Total (PV+EV) $2,491,500 PV systems kWH generation Direct Payback(IRA)funding(40%, 453795 PV only) $936,600 PV systems annual savings* $154,217 City Funding $1,554,900 PV systems annual electrical bill** Payback period (years, discounted -$32,881 cash flow) 8.85 PV systems lifecycle savings*** $7,398,086 RO1 476% Cupertino Sports Center This system is well-aligned to the west and south-facing solar access.The northern array is split around north-south site access path to allow for any traffic which could interfere with the carport array. The tree in the corner between the two arrays would ideally be slightly trimmed to ensure maximum solar access, and trees under the northern arrays would need to be removed. The electrical bill at the Sports Center would be reduced from—$108K annually to~$15K annually,with projected lifecycle savings of$4.5 million. The City's costs for design and construction of$1.3 million could be recouped in approximately 11 years. . .� lei .a Design spons center carpons Pi Nameplate 214 0 kW AC Nameplate 172.0kW(1,24DVAQ Sports Center A Meter#0116367009- 116971849 Last 12 months kWh usage 329,369 Construction Cost- PV only $1,812,300 Last 12 months cost of electrical $108,143 Construction Cost- EV only $150,000 Cost per kWh (ave.) $0.33 Construction Cost-Total (PV+EV) $1,962,300 PV systems kWH generation Direct Payback(IRA)funding(40%, 322104 PV only) $724,920 PV systems annual savings* $93,047 City Funding $1,237,380 PV systems annual electrical bill** Payback period (years, discounted $15,096 cash flow) 11.06 PV systems lifecycle savings*** $4,511,620 ROI 365% Community Hall This is an ideally oriented system with rooftop racking. Roof penetrations will not be required, as the system will be able to clamp to the existing standing seam roof profile. The electrical bill at Community Hall would be reduced from-$40K annually to-$10K annually, with projected lifecycle savings of$1.3 million. The City's costs for design and construction of$1.3 million could be recouped in approximately 7 years. 4 e i D � C r i Design Community Hall Rooftop DC Nameplate 49.3 kW " AC Nameplate 5M kW(0.99 DC/AQ nity Hall 116367009 - Last 12 months kWh usage 114,600 Construction Cost- PV only $376,950 Last 12 months cost of electrical $39,810 Construction Cost- EV only $0 Cost per kWh (ave.) $0.35 Construction Cost-Total (PV+EV) $376,950 PV systems kWH generation Direct Payback(IRA)funding(40%, 66784 PV only) $150,780 PV systems annual savings* $29,441 City Funding $226,170 PV systems annual electrical bill** Payback period (years, discounted $10,369 cash flow) 7.13 PV systems lifecycle savings*** $1,336,267 ROI 591% The next steps for the project,pending Council's approval of the design-build project delivery method, are: 1. Review of the photovoltaic systems for the five City facilities with Parks and Recreation Commission(11/07/24), and the Community (10/29/24). 2. City Council meeting in December 2024 for approval of the design intent for each facility. Sustainability Impact Adding solar generation reduces demand on the electrical grid and provides a foundation to support future electrification of these facilities, which would be achieved by transitioning to electric appliances. Electrification of existing buildings is a goal under Measure BE-3 in the City's Climate Action Plan 2.0. Fiscal Impact The Photovoltaic Systems Design and Installation(budget unit 420-99-274)was approved as part of the FY 2024-25 Budget at$6,300,000. There are no recommended changes to the budget. California Environmental Quality Act The Project is Categorically Exempt as Class 1, Existing Facilities Under the California Environmental Quality Act(CEQA) Guidelines Section 15301 and on a Separate and Independent Basis is Exempt as Class 3, Construction of Small Structures,Under CEQA Guidelines Section 15301. Prepared by: Susan Michael, Capital Improvement Program Manager Reviewed by: Chad Mosley, Director of Public Works Attachments: A—FY 24-25 CIP Project Narratives Excerpt B -Redlined Staff Report with Changes C-Clean Staff Report with Changes D—PV Project Cost Savings Attachment C CITY OF PUBLIC WORKS DEPARTMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 TELEPHONE: (408) 777-3354 • FAX: (408) 777-3333 CUPERTINO CUPERTINO.ORG SUSTAINABILITY COMMISSION STAFF REPORT Meeting: October 17, 2024 Subject Capital Improvement Program Photovoltaic Systems Design and Installation project Recommended Action Recommend that City Council approve the Capital Improvement Program Photovoltaic Systems Design and Installation project's conceptual design for five City facilities: Cupertino Library, Community Hall, Cupertino Sports Center, Blackberry Farm, and Quinlan Community Center. Executive Summary This report provides scope and fiscal information on each proposed site of the Photovoltaic Systems Design and Installation(PV) Capital Improvement Program (CIP) project. Background Information The PV project was approved by the City Council as part of the Fiscal Year (FY)24-25 annual budget. The PV project description included in the budget adoption and meeting details is attached (Attachment A). The Net Energy Metering (NEM)program is administered by the California Public Utilities Commission and provides credits to a building's utility bill for producing excess on-site clean energy over a 20-year period. In 2023 PG&E announced a rate decrease for electricity generated by photovoltaic (PV) systems (NEM 3)but provided a window to allow grandfathering the more economically attractive NEM 2.0 rates if interconnection applications were successfully submitted and corresponding systems operational by 2026. Reasons for Recommendation NEM 2.0 Interconnection Applications were successfully submitted to PG&E for five Cupertino facilities:Blackberry Farm Recreation and Pool facility, Community Hall, Cupertino Library, Quinlan Community Center, and Cupertino Sports Center. This Project aims to design and build PV systems at all five locations. NEM 2.0 projects must be completed by April 15,2026 to receive the incentive. Otherwise, the NEM 3.0 program, that offers reduced incentives/savings,would need to be pursued. NEM 2.0 provides 75-80% greater compensation than NEM 3 rates for electricity that is fed back into the electrical system. The savings in utility costs are projected to be$500,000 annually, and$26.5 million over a 30yr lifespan. For more detail, please see attachment B. The City CIP staff is compiling a Conceptual Design Report that includes technical and cost analysis data for each site. The following narratives from that report depict the proposed layouts and projected cost savings at each site. Cupertino Library A number of options were considered for this site. The Library roof locations have an advantageous size,but only one of the large roofs is well-oriented to the west or south. Standing seam rooftops (supporting the two largest rooftop arrays) are ideal for supporting solar, as racking can be clamped to the standing seams as opposed to penetrating the roof surface.Long trenching/boring routes will be required to consolidate generation at point of interconnection. While the proposed carport locations took the trees into consideration, some smaller trees will need to be removed or significantly trimmed to support the installation. The electrical bill at the Library would be reduced from-$325K annually to-$120K annually, with projected lifecycle savings of$11.7 million. The City's costs for design and construction of$2.6 million could be recouped in just approximately 11 years. The complication for the Library site is that the tenant, the Santa Clara County Library District(SCCLD), pays the electrical bill. The fiscal benefit of the cost savings from the photovoltaic installation would go to the SCCLD for the next twenty years. The payback period for the project would be extended accordingly. Aye * O AWL — ,Y _ ` k. G+— r rt 2 ik fi ,, ,f■ • � d Design Library!Civic Center rr Dc Nameplate 422.8 kW AC Nameplate 403.0 kW(1.05 DC1AC} Library Meter#1932850108 Last 12 months kWh usage 1,048,978 Construction Cost- PV only $3,801,000 Last 12 months cost of electrical $322,517 Construction Cost- EV only $300,000 Cost per kWh (ave.) $0.31 Construction Cost-Total (PV+EV) $4,101,000 PV systems kWH generation Direct Payback(IRA)funding (40%, 621477 PV only) $1,520,400 PV systems annual savings* $202,501 City Funding $2,580,600 PV systems annual electrical bill** Payback period (years, discounted $120,016 cash flow) 10.65 PV systems lifecycle savings*** $11,701,727 ROI 453% Blackberry Farm Recreation and Pool facility A number of options were considered for this site. The building roof locations are too small for a simple installation, and the solar orientation is not ideal. The proposed layout is a single continuous system that requires fewer trenching/boring paths to the electrical point of interconnection. The installation is far enough from trees that tree trimming will not be needed to ensure solar access, and existing netting system will protect array from golf balls. With system shading parking stalls, proportional shade coverage will need to be provided on ADA parking stalls. The State and Cupertino green energy code for EV parking requirements are under review and may be substantial. The electrical bill at Blackberry Farm would be reduced from costing-$33K annually to generating a revenue of almost$6K annually(because the PV system would generate slightly more than the demand, and thus selling power back to PG&E). The lifecycle savings are projected to be$1.6 million. The City's costs for design and construction of $675K could be recouped in approximately 14 years. rr yy k Y, f' Design Blackberry Farm carport r DC Nameplate 73.1 kW AC Nameplate 60.0 kW(1.22 DQAQ Meter#11431 Last 12 months kWh usage 110,428 Construction Cost- PV only $955,500 Last 12 months cost of electrical $32,539 Construction Cost- EV only $100,000 Cost per kWh (ave.) $0.29 Construction Cost-Total (PV+EV) $1,055,500 PV systems kWH generation Direct Payback(IRA)funding(40%, 110948 PV only) $382,200 PV systems annual savings* $38,253 City Funding $673,300 PV systems annual electrical bill** Payback period (years, discounted -$5,714 cash flow) 13.99 PV systems lifecycle savings*** $1,587,032 ROI 236% Quinlan Community Center A number of options were considered for this site. Preserving significant trees and working within the aesthetics of the park were high priorities. This layout provides maximal shaded parking and significantly shaded picnic area. Utilizes existing roof areas, mitigating overall costs of the system. Northern carport will require some tree trimming(overall tree health will not be compromised,however) to maintain solar access and may require shade be provided for some existing ADA stalls. The picnic area structure will be designed to respond architecturally to the layout of the picnic area (rather than one large single shed roof as shown in the illustration). The electrical bill at Quinlan would be reduced from costing-$122K annually to generating a revenue of almost$33K annually(because the PV system would generate slightly more than the demand, and thus selling power back to PG&E). The lifecycle savings are projected to be$7.4 million. The City's costs for design and construction of $1.6 million could be recouped in approximately 9 years. Aft— r F F ' 14 t r Design Quinlan Community Center DC Nameplate 311.5 kW .�s C-' • 1 .Nameplate 273.n kW(1.14 DC/AC) Quinlan Center Meter#0116367009- 116367840 Last 12 months kWh usage 383,109 Construction Cost- PV only $2,341,500 Last 12 months cost of electrical $121,336 Construction Cost- EV only $150,000 Cost per kWh (ave.) $0.32 Construction Cost-Total (PV+EV) $2,491,500 PV systems kWH generation Direct Payback (IRA) funding (40%, 453795 PV only) $936,600 PV systems annual savings* $154,217 City Funding $1,554,900 PV systems annual electrical bill** Payback period (years, discounted -$32,881 cash flow) 8.85 PV systems lifecycle savings*** $7,398,086 R01 476% Cupertino Sports Center This system is well-aligned to the west and south-facing solar access. The northern array is split around north-south site access path to allow for any traffic which could interfere with the carport array. The tree in the corner between the two arrays would ideally be slightly trimmed to ensure maximum solar access, and trees under the northern arrays would need to be removed. The electrical bill at the Sports Center would be reduced from -$108K annually to -$15K annually, with projected lifecycle savings of$4.5 million. The City's costs for design and construction of$1.3 million could be recouped in approximately 11 years. �, :�- ;. - •�` -tom --tom ILI �. 51 a. C; "`1 +I Design Spons Center Carports PC Nameplate 214 0 kW AC Nameplate 172.0kW(1,24DVAC1 Sports Center Meter#0116367009- 116971849 Last 12 months kWh usage 329,369 Construction Cost- PV only $1,812,300 Last 12 months cost of electrical $108,143 Construction Cost- EV only $150,000 Cost per kWh (ave.) $0.33 Construction Cost-Total (PV+EV) $1,962,300 PV systems kWH generation Direct Payback (IRA)funding (40%, 322104 PV only) $724,920 PV systems annual savings* $93,047 City Funding $1,237,380 PV systems annual electrical bill** Payback period (years, discounted $15,096 cash flow) 11.06 PV systems lifecycle savings*** $4,511,620 ROI 365% Community Hall This is an ideally oriented system with rooftop racking. Roof penetrations will not be required, as the system will be able to clamp to the existing standing seam roof profile. The electrical bill at Community Hall would be reduced from-$40K annually to-$10K annually, with projected lifecycle savings of$1.3 million. The City's costs for design and construction of$1.3 million could be recouped in approximately 7 years. 1� Design Community Hall Rooftop 71 DC Nameplate 49.3 kW AC Nameplate 5M kW(0.99 DC/AQ m Community Hall Aeter#0116367009 - 116367449 Last 12 months kWh usage 114,600 Construction Cost- PV only $376,950 Last 12 months cost of electrical $39,810 Construction Cost- EV only $0 Cost per kWh (ave.) $0.35 Construction Cost-Total (PV+EV) $376,950 PV systems kWH generation Direct Payback (IRA)funding (40%, 66784 PV only) $150,780 PV systems annual savings* $29,441 City Funding $226,170 PV systems annual electrical bill** Payback period (years, discounted $10,369 cash flow) 7.13 PV systems lifecycle savings*** $1,336,267 ROI 591% The next steps for the project, pending Council's approval of the design-build project delivery method, are: 1. Review of the photovoltaic systems for the five City facilities with Parks and Recreation Commission (11/07/24), and the Community (10/29/24). 2. City Council meeting in December 2024 for approval of the design intent for each facility. Sustainability Impact Adding solar generation reduces demand on the electrical grid and provides a foundation to support future electrification of these facilities, which would be achieved by transitioning to electric appliances. Electrification of existing buildings is a goal under Measure BE-3 in the City's Climate Action Plan 2.0. Fiscal Impact The Photovoltaic Systems Design and Installation(budget unit 420-99-274)was approved as part of the FY 2024-25 Budget at$6,300,000. There are no recommended changes to the budget. California Environmental Quality Act The Project is Categorically Exempt as Class 1, Existing Facilities Under the California Environmental Quality Act(CEQA) Guidelines Section 15301 and on a Separate and Independent Basis is Exempt as Class 3, Construction of Small Structures,Under CEQA Guidelines Section 15301. Prepared by: Susan Michael, Capital Improvement Program Manager Reviewed by: Chad Mosley, Director of Public Works Attachments: A—FY 24-25 CIP Project Narratives Excerpt B -Redlined Staff Report with Changes C-Clean Staff Report with Changes D—PV Project Cost Savings ATTACHMENT D PHOTOVOLTAIC PROJECT COST/SAVINGS 17-Oct-24 *Annual savings includes 5%utility escalation,Year 1 ***Lifecycle Savings(30yrs)includes:5%utility escalation,0.4%module degradation,30 years,NEM3 Included **The costs(8)are offset by the kWh savings(E),resulting in lowered electrical bill(F) *-Discounted cashflow methodology includes:5%utility escalation,0.4%module degradation,30 years,NEK A R c n F F G H I I i< L M Facility kWh kWh Cost cost per PV systems PV systems PV systems PV systems Constrn Constrn Constrn.Cast IRAfunding City Funding Payback kWh kWH annual annual Lifecycle Cost:PV Cost:EVCS (PV+EV) (40%ofPV Period (ave.) generation savings* electrical savings*** only only only) (years) bill** **** formula A/B 8-E H+l H*40% J-K Library(1932850108) 1,048,978 $322,517 $0.31 621,477 $202,501 $120,016 $11,701,727 $3,801,000 $300,000 $4,101,000 $1,520,400 $2,580,600 10.65 BBF(1143 110 15284) ,428 $32,539 $0.29 110,948 $38,253 $5,714 $1,587,032 $955,500 $100,000 $1,055,500 $382,2001 $673,300 13.99 Quinlan Community Center (0116367009-116367840) 383,109 $121,336 $0.32 453,795 $154,217 -$32,881 $7,398,086 $2,341,500 $150,000 $2,491,500 $936,600 $1,554,900 8.85 Sports Center(0116367009 116971849) 329,369 $108,143 $0.33 322,104 $93,047 $15,096 $4,511,620 $1,812,300 $150,000 $1,962,300 $724,920 $1,237,380 11.06 Community H (0116367009 114,600 $39,810 $0.35 66,784 $29,441 $10,369 $1,336,267 $376,950 $0 $376,950 $150,780 $226,170 7.13 $624,345 $517,459 $106,886 $26,534,7321 $9,287,250 $700,000 $9,987,250 $3,714,900 $6,272,350 10.28 decreased by: 517,459 with 20%contingency $11,984,700 Four sites,WITHOUT BBF Library(1932850108) 1,048,978 $322,517 $0.31 621,477 $202,501 $120,016 $11,701,727 $3,801,000 $300,000 $4,101,000 $1,520,400 $2,580,600 10.65 Quinlan Community Center (0116367009-116367840) 383,109 $121,336 $0.32 453,795 $154,217 -$32,881 $7,398,086 $2,341,500 $150,000 $2,491,500 $936,600 $1,554,900 8.85 Sports Center(0116367009 116971849) 329,369 $108,143 $0.33 322,104 $93,047 $15,096 $4,511,620 $1,812,300 $150,000 $1,962,300 $724,920 $1,237,380 11.06 Community Hall (0116367009-1163 114.600 $39,810 $0.35 66,784 $29,441 $10,369 $1,336,267 $376,950 $0 $376,950 $150,780 $226,170 7.13 $591,805 $479,206 $112,599 $24,947,700 $8,331,750 $600,000 $8,931,750 $3,332,700 $5,599,050 9.98 decreased by: 479,206 with 20%contingency $10,718,100 Three sites,WITHOUT BBF and Library Quinlan Community Center (0116367009-116367840) 383,109 $121,336 $0.32 453,795 $154,217 -$32,881 $7,398,086 $2,341,500 $150,000 $2,491,500 $936,600 $1,554,900 8.85 Sports Center(0116367009 116971849) 329,369 $108,143 $0.33 322,104 $93,047 $15,096 $4,511,620 $1,812,300 $150,000 $1,962,300 $724,920 $1,237,380 11.06 Community Hal (0116367009-116367449) 114,600 $39,810 $0.35 66,7841 $29,441 $10,369 $1,336,267 $376,950F $0 $376,9501 $150,780 $226,170 7.13 $269,289 $276,705 -$7,416 $13,245,973 $4,530,750 $300,000 $4,830,7501 $1,812,300 $3,018,450 9.46 decreased by: 276,705 with 20%contingency $5,796,900 Four sites,WITHOUT LIBRARY BBF(114315284) 110,428 $32,539 $0.29 110,948 $38,253 -$5,714 $1,587,032 $955,500 $100,000 $1,055,500 $382,200 $673,300 13.99 Quinlan Community Center (0116367009-116367840) 383,109 $121,336 $0.32 453,795 $154,217 -$32,881 $7,398,086 $2,341,500 $150,000 $2,491,500 $936,600 $1,554,900 8.85 Sports Center(0116367009- 116971849) 329,369 $108,143 $0.33 322,104 $93,047 $15,096 $4,511,620 $1,812,300 $150,000 $1,962,300 $724,920 $1,237,380 11.06 Community Hall (0116367009-116367449) 1 114,600 $39,810 $0.35 66,784 $29,441 $10,369 $1,336,267 $376,950 $0 $376,950 $150,780 $226,170 7.13 $301,828 $314,958 -$13,130 $14,833,005 $5,486,250 $400,000 $5,886,250 $2,194,500 $3,691,750 10.28 decreased by: 314,958 with 20%contingency $7,063,500