BLD-2024-2031_SignedPermit.pdf(1) UPERTINO
REROOF / TEAR -OFF POLICY
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3228 • FAX (408) 777-3333 • buildinq@cupertino.org
PROJECT ADDRESS: 23500 Cristo Rey Dr. BIdg4
APN #
OWNER NAME: The Forum at Rancho San Antonio
PHONE: 650 944 0100
MalE-MAIL: i theforumrsa.com
STREET ADDRESS:
23500 Cristo Rey Dr.
CITY, STATE, ZIP:
Cupertino CA 95014
FAX
CONTRACTOR NAME:
IQV Construction & Roofing
LICENSE NUMBER:
963219
LICENSE TYPE:
B C-39
BUS. LIC. #
BL 405683
COMPANY NAME:
QV Construction & Roofing
E-MAIL:
mike@iqvinc.com
FAX:
STREET ADDRESS:
877 Chestnut St.
CITY, STATE, ZIP:
San Jose CA 95110
PHONE:
408 638 5500
I UNDERSTAND AND AGREE TO THE FOLLOWING:
1. The re -roof project shall comply with all applicable provisions of the 2019 California Codes and Cupertino Municipal Codes.
*NOTE: PV/Solar removed from the existing roof to install new roofing will require a separate permit for re -installation of PV/Solar
panels/system.
2. An inspection request may be scheduled up to one business day before the requested inspection date. Please schedule inspections
online or call (408) 777-3228 from 7:30am-3:30pm (Mon-Thurs) or 7:30am-2:30pm (Friday) to schedule inspections. "Roof Tear -Off' and
"Roof Plywood Nail" inspections are "ON CALL" inspections. You must call in on the day of the inspection ONLY after that phase of
the work is completed. The building inspector should be available within one hour. The hours for this service are: 7:30-10:30am and
1:00-3:30pm (Mon-Thurs) and 7:30-10:30am and 12:30-2:30 (Friday). "Final Building" inspection will be given a two hour window.
3. For all reroof inspections, safe ladder access to roof is to be provided per CAL OSHA requirements
(https://www.dir.ca.gov/dosh/etools/08-001/regs.htm). Ladder side rails must extend to at least 3 ft. above the landing (roof surface)
unless handholds are provided. The ladder shall be so placed as to prevent slipping, or it shall be tied, blocked, held, or otherwise
secured to prevent slipping.
4. "Roof Tear -Off' inspection is required. All dry -rotted wood shall be replaced prior to this inspection. All nails/fasteners shall be
completely removed or knocked -down prior to this inspection.
5. "Roof Plywood Nail" inspection is required if new solid sheathing is installed. If solid sheathing is present on existing roof at time of
"Roof Tear -Off' inspection, "Roof Plywood Nail" inspection may be omitted.
6. "Roof Batten" inspection is required if installation of tile or metal shingle is required by manufacturer. This is an "ON CALL"
inspection, see #2 above for scheduling instructions.
7. NOTE: NO underlayment or roofing shall be applied without first obtaining all required inspection/s and documented approvals from
the building inspector. Failure to obtain inspection approvals will result in removal of all materials to sheathing to perform required
inspections and a re -inspection fee will be charged. The re -inspection fee shall be paid prior to scheduling another inspection.
8. A "Final Building" inspection and approval shall be obtained from the building inspector when the reroofing is completed. To receive
final sign -off, the following items will be required and verified:
a. Flat roofs shall have a minimum of 1/4" per foot of slope and shall demonstrate no ponding.
b. Listings from approved testing agencies for all pre -manufactured products used shall be available on -site to review at time of the
inspection. Note: Verification of class "A" fire rating may be requested by building inspector.
c. Spark arrestor installation, double wall flues have not been cut and 1" min. clearance to roof sheathing, plastic vents are painted
with water based synthetic latex paint, gutters/downspouts installed, and verification of NO PV/Solar previously installed and/or
the required PV/Solar permit for re -installation. All construction debris is to be removed.
NOTE: City of Cupertino does NOT allow copper roofing or copper architectural materials.
I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf. I understand
and agree to comply with the reroof policy stated above. I understand that smoke detectors and carbon monoxide detectors are required
to be installed in accordance with Sections R314 and R315 of the 2019 California Residential Code for "Final Building" sign off.
Signature of Applicant/Agent: Christina Johnson
Date: 6/6/2024
ReroofPolicy 2019.doc revised 10/18/22