BLD-2019-1561InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 10700 DEEP CLIFFE DR Cupertino APN: 356 04 010 PERMIT NO: BLD-2019-1561
OWNER'S NAME: LAM JIMMY KWOK-CHING AND CHU LAM MING-WAI R OWNER'S PHONE: 408-497-1489
CONTRACTOR: ALCAZAR CONSTRUCTION, 1472 HILLSDALE AVENUE SAN JOSE,CONTRACTOR PHONE: 408-506-8357
DATE ISSUED 3/25/2024 9:54:46 AM ISSUED BY:VALUATION: $250000
JOB DESCRIPTION
1ST STORY ADDITION (370 SF); 2ND STORY ADDITION (188 SF); RE-ROOF; TEAR-OFF; INSTALL OSB; INSTALL COMP SHINGLES (30 SQ); REMODEL (2) BATHROOMS (124 SF); REMODEL
OTHER (450 SF); (N) 2 FLOOR DECK (512 SF); UPGRADE MAIN ELECTRICAL PANEL (200 AMP).REV #1 - CHANGE LAYOUT OF MASTER BATHROOM AND CLOSET; REMODEL 1ST FLOOR
BATH; REMOVED WALLS AROUND STAIRWAY; REPLACE STAIRWAY RAILINGS; CHANGE MASTER BEDROOM WINDOW TO SLIDING DOOR; (N) BEAM AT GARAGE OPENING; REMOVE
DOOR 3068 FROM MASTER BEDROOM; STRUCTURAL CHANGES TO SUPPORT THE REVISIONS.APPROVED 3/11/2021 REV2 - NEW HVAC - HEAT PUMP; NEW ELECTRIC HOT WATER
HEATER; STAIR RAILING REVISED -APPROVED 1/10/2024
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2020-06-05 Passed James Lee
ELECTRIC METER RELEASE 2020-07-24 Passed Antonio Torrez
FOUNDATION 2020-08-11 Passed Antonio Torrez
EXTERIOR SHEAR 2020-11-23 Conditional Antonio Torrez
ROOF NAIL 2020-11-23 Passed Antonio Torrez
FOUNDATION 2021-03-19 Conditional Bob Sabich
FOUNDATION 2021-03-23 Passed JOSE MARTINEZ
EXTERIOR LATH 2021-04-08 Passed Bob Sabich
ROUGH FRAME 2021-04-14 Passed Bob Sabich
ROUGH MECHANICAL 2021-04-14 Conditional Bob Sabich
ROUGH ELECTRICAL 2021-04-14 Conditional Bob Sabich
ROUGH PLUMBING 2021-04-14 Conditional Bob Sabich
INSULATION 2021-04-22 Passed Antonio Torrez
ROUGH ELECTRICAL 2021-04-22 Passed Antonio Torrez
ROUGH MECHANICAL 2021-04-22 Passed Antonio Torrez
ROUGH PLUMBING 2021-04-22 Passed Antonio Torrez
SHEETROCK 2021-05-03 Passed Antonio Torrez
SCRATCH COAT 2021-05-18 Passed Antonio Torrez
SHOWER PAN 2021-07-01 Passed Antonio Torrez
UNDERFLOOR PLUMBING 2021-09-01 Cancelled Antonio Torrez
UNDERGROUND SEWER 2021-09-01 Passed Antonio Torrez
PIERS 2021-11-05 Rescheduled
PIERS 2021-11-08 Failed Antonio Torrez
PIERS 2021-11-23 Passed Antonio Torrez
ROUGH FRAME 2022-12-06 Passed Antonio Torrez
FINAL BUILDING 2023-08-25 Failed Rodney Weathers
FINAL MECHANICAL 2023-08-25 Failed Rodney Weathers
FINAL PLUMBING 2023-08-25 Failed Rodney Weathers
FINAL ELECTRICAL 2023-08-25 Failed Rodney Weathers
FINAL BUILDING 2024-03-25 Passed Antonio Torrez
FINAL ELECTRICAL 2024-03-25 Passed Antonio Torrez
FINAL MECHANICAL 2024-03-25 Passed Antonio Torrez
FINAL PLUMBING 2024-03-25 Passed Antonio Torrez
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.