Loading...
05-15-2024 BPC FINAL Minutes1 Bicycle Pedestrian Commission Regular Meeting May 15, 2024 FINAL MINUTES MINUTES OF THE REGULAR MEETING OF THE BICYCLE PEDESTRIAN COMMISSION May 15, 2024 Final Minutes The meeting was called to order at 7:01 p.m. ROLL CALL: Present: Ilango Ganga, Grace John, Hervé Marcy (C), Joel Wolf (VC) Absent: John Zhao Staff: David Stillman, Staff Liaison Others Present: Chad Mosley, Director of Public Works APPROVAL OF MINUTES 1. April 17, 2024 Bicycle Pedestrian Commission minutes MOTION: Vice Chair Wolf moved, seconded by Commissioner Ganga to approve the minutes as presented. MOTION PASSED: 3-0, John, Zhao Absent POSTPONEMENTS No Postponements ORAL COMMUNICATIONS None WRITTEN COMMUNICATIONS None OLD BUSINESS NEW BUSINESS 2. Transportation Development Act (TDA) Article 3 Fund Allocation (Stillman) 2 Bicycle Pedestrian Commission Regular Meeting May 15, 2024 Commissioner John joined the meeting at 7:14 p.m. MOTION: Commissioner Ganga moved, seconded by Vice Chair Wolf to recommend the allocation of Cupertino’s TDA Article 3 Allocation for Cupertino’s Active Transportation Plan. MOTION PASSED: 4-0, Zhao Absent STAFF AND COMMISSION REPORTS 3. Staff Update and Commissioner Activity Report (All) NO ACTION TAKEN FUTURE AGENDA SETTING Work Plan • Bicycle Facilities – In Progress • Vision Zero – In Progress – June meeting o Invite the City of Fremont to present on their Vision Zero Program (June dependent on if a representative can join) • New Bicycle Pedestrian Plan (FY 24-25) Grants • Know/Understand Fed Grant Funding with Caltrans on updated bike-ped planning • Understand/Educate on what funding standards are (Fed/State) Studies / Plans • Kennewick Drive/Homestead Road Study o Stop Gap Measures/Temporary Solutions • Study on McClellan Ave bike lanes in front of Monte Vista High School • Staff update - Rodrigues Ave Speed Study and Street Crossing Behavior- suggested for July meeting • Staff update - Stevens Creek Corridor Vision Study • Examine Pedestrian Walkways for Safety • Install Bollards at existing buffered bike lanes (Public Request) • Path between Lincoln Elem and Monta Vista HS • Regnart Creek Trail Crossing at Blaney Avenue • Speed Limit Reduction Study on Blaney, Rodrigues, McClellan (Public Request) • Speed Limits Studies • Bollinger Road Corridor Projects • Staff update - Stevens Creek Boulevard, Phases 3 • Staff update - Safe Routes to School (SR2S) 3 Bicycle Pedestrian Commission Regular Meeting May 15, 2024 • Staff update – De Anza Blvd Buffered Bike Lanes • Carmen Road Bridge • I-280 Wolfe Interchange Education • Adult Bicycle Education • Impact of Semi-Rural Designation on Bike and Ped Projects/Priorities • Lead Pedestrian Walk Interval (LPI) – Start pedestrian green before vehicles Miscellaneous • Bicycle Licensing (Theft Prevention) • Review Progress toward BPC Objectives & Grant Applications (6 mo.) • Status – VTA BPAC Adult Bicycle Education (Lindskog) • Inventory of Traffic Lights (triggering traffic light from a detector) – Staff update o Is there a sensitivity setting? NO ACTION TAKEN ADJOURNMENT Meeting adjourned at 7:37 p.m. SUBMITTED BY: ____________________________ David Stillman, Staff Liaison Note: Any attachments can be found on the Cupertino Website https://www.cupertino.org/our-city/agendas-minutes